HomeMy WebLinkAboutWQ0004892_Regional Office Historical File Pre 2018OF NATURAL
.iO'MM`['4'.$ a'': ' s ..= ":bCFP
State of North Carolina DWI
Department of Environment, Health and Natural Res
Division of Environmental Management
512 North Salisbury Street • Raleigh, North Carolina 27626-05
Jarnes G. Martin, Governor
William W. Cotrcgy, Jr., Secretary
May 23, 1991
Mr. David Berry, Church Administrator
First Baptist Church
Post Office Box 549
Indian Trail, North Carolina 28079
1991
George T'. Everett, Ph.D.
Director
Subject: Permit No. WQ0004892
First Baptist Church
Pump Station and Force Main
Sewer Extension
Union County
Dear Mr. Berry:
In accordance with your application received April 2, 1991, we are forwarding herewith
Permit No. WQ0004892, dated May 23, 1991, to First Baptist Church for the construction and
operation of the subject wastewater collection extension.
This permit shall be effective from the date of issuance until rescinded, and shall be subject
to the conditions and limitations as specified therein.
Please be advised that the pump on/off elevations shall be loea ed so that 2-8 pumping cycles
may be achieved per hour in the pump station.
If any parts, requirements, or limitations contained in this permit are unacceptable to you,
your have the right to request an adjudicatory hearing upon written request within 30 days
following receipt of this permit. This request must be in the fonn of a written petition, conforming
to Chapter 150.8 of North Carolina General Statutes, and filed with the. Office of Administrative
Hearings, PRO. Drawer 27447, Raleigh, NC 27611.-7447. Unless such demands are made this
permit shall be final and binding.
One set of approved plans
additional information concerni
919/733-5083.
cc: Union County Health Department
Mooresville Regional Office
Ralph. W. Broeils, P. E.
ations is being forwarded to you. if you need
matter, please contact Ms. Angela Y. ffin at
Sincei
0 Cu
George
E.verett
Poilutiwn Prevention Pap'
P.O. Box 29535, Raleigh,. North Caxolina 27626-0535 Telephone 919-733 7Ci15
An Equal Opportunity Affirmative Action Employer
NORTH CAROLINA
ENVIRONMENTAL MANAGEMENT COMMISSION
DEPARTMENT OF ENVIRONMENT, HEALTH AND NATURAL REg EUr.(rS NAtNTURAL
E5o.fl
co z1:UNIIT I':rv;:I.L1I'T
RALEIGH
WASTEWATER COLLECTION PERMIT
MAY 2 8 1991
bIVISION OF EilV;rTMET J. P,'AitIGE PENT
JIOORESVII.LE REGIONAL OFFICE
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North
Carolina as amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
First Baptist Church
Union County
FOR THE
construction and operation of approximately 290 linear feet of 8-inch gravity sewer, a 25 GPM
pump station with duplex pumps and high water alarms, and approximately 1,970 linear feet of
2-inch force main to serve the First Baptist Church and the discharge of 3,300 GPD of collected
domestic wastewater into the Union County Public Works Department's existing sewerage system,
pursuant to the application received April 2, 1991, and in conformity with the project plan,
specifications, and other supporting data subsequently filed and approved by the Department of
Environment, Health and Natural Resources and considered a part of this permit.
This permit shall be effective from the date of issuance until rescinded and shall be subject
to the following specified conditions and limitations:
1. This permit shall become voidable unless the facilities are constructed in accordance with
the conditions of this permit, the approved plans and specifications and other supporting
data.
2. This permit is effective only with respect to the nature and volume of wastes described in
the application and other supporting data.
3. The facilities must be properly maintained and operated at all times.
4. The sewage and wastewater collected by this system shall be treated in the Crooked Creek
Wastewater Treatment Facility prior to being discharged into the receiving stream.
5. This permit is not transferable. In the event there is a desire for the facilities to change
ownership, or there is a name change of the Permittee, a formal permit request must be
submitted to the Division of Environmental Management accompanied by an application
fee, documentation from the parties involved, and other supporting materials as may be
appropriate. The approval of this request will be considered on its merits and may or may
not be approved.
6. Construction of the sewers, pump station(s) and force main shall be scheduled so as not to
interrupt service by the existing utilities nor result in an overflow or bypass discharge of
wastewater to the surface waters of the State.
7. Upon completion of construction and prior to operation of this permitted facility, a
certification must be received from a professional engineer certifying that the permitted
facility has been installed in accordance with this permit, the approved plans and
specifications. Mail the Certification to the Permits and Engineering Unit, P.O. Box
29535, Raleigh, NC 27626-0535.
1
A copy of the approved plans and specifications shall be maintained on file by the Permie
for a minimum of five years from the date of the completion of construction.
9. Failure to abide by the conditions and limitations contained in this permit may subject the
Permittee to an enforcement action by the Division of Environmental Management in
accordance with North Carolina General Statute 143-215.6.
10. The issuance of this permit does not preclude the Permittee from complying with any and
all statutes, rules, regulations, or ordinances which may be imposed by other government
agencies (local, state, and federal) which have jurisdiction.
11. The Permittee shall provide for the pump station and force main the following items:
a. Pump on/off elevations located so that 2-8 pumping cycles may be achieved per hour
in the pump station.
b. An air relief valve located at all high points along the force main.
c. A screened vent for the wet well.
d. Fillets located in the wet well at the intersection of the flooring and sidewalls.
e. Three feet of cover (minimum) over the force main or the use of ferrous material where
three feet cannot be maintained.
f. Sufficient devices which will protect the pump station from vandals.
g. Flood protection if the pump station is located below the 100-year flood elevation.
12. In the event that the facilities fail to perform satisfactorily, including the creation of
nuisance conditions, the Permittee shall take immediate corrective action, including those as
may be required by this Division, such as the construction of additional or replacement
wastewater collection facilities.
13. Noncompliance Notification:
The Permittee shall report by telephone to the Mooresville Regional Office, telephone no.
(704) 663-1699 as soon as possible, but in no case more than 24 hours or on the next
working day following the occurrence or first knowledge of the occurrence of either of the
following:
a. Any process unit failure, due to known or unknown reasons, that render the facility
incapable of adequate wastewater transport such as mechanical or electrical failures of
pumps, line blockage or breakage, etc.
b. Any failure of a pumping station or sewer line resulting in a by-pass directly to
receiving waters without treatment of all or any portion of the influent to such station
or facility.
Persons reporting such occurrences by telephone shall also file a written report in letter
form within 15 days following first knowledge of the occurrence. This report must outline
the actions taken or proposed to be taken to ensure that the problem does not recur.
14. This permit shall become voidable unless the agreement between First Baptist Church and
Union County Public Works Department for the collection and final treatment of
wastewater is in full force and effect.
Permit issued this the 23th day of May, 1991
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
N.kg- ,c\f\(‘c-
,LiCQ__} 14,4
George T. verett, Direc or
Division o Environmental Management
By Authority of the Environmental Management Commission
Permit No. WQ0004892
2
Permit No. W 0004892
May 23, 1991 "
Engineer's Certification
I, , as a duly registered Professional Engineer in the State of North
Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the
project, for the
Project Name Location
Permittee hereby state that, to the best of my abilities, due care and diligence was used in the
observation of the construction such that the construction was observed to be built within substantial
compliance and intent of .the approved plans and specifications.
Signature Registration No.
Date
1
3