HomeMy WebLinkAbout20011715 Ver 3_Monitoring Reports_20050425C~j (7~
Channel Mitigation Monitoring Sheets I, II, III, AND IV ~~ ~~ 1~..~~' ~ ~~~~
Monitoring Data Record
Project Title: R-2214A COE Action ID: 200330312
Stream Name: Mud Creek Tributary (Site 3) DWQ Number: 011715
City, County and other Location Information: Intersection of US 25 and Industrial Park Rd. in
Hendersonville, NC
Date Construction Completed: March 2005 Monitoring Year: (1) of 5
Ecoregion: 8 digit HUC unit: 06010105
USGS Quad Name and Coordinates:
Rosgen Classification:
Length of Project: 464' Urban or Rural: Rural Watershed Size:
Monitoring DATA collected by: J. Wait Date: 4/25/05
Applicant Information:
Name: NCDOT Roadside Environmental Unit
Address: 1425 Rock Quarry Rd. Raleigh, NC 27610
Telephone Number: (919) 861-3772 Email address: ml rg een(a~dot.state.nc.us
Consultant Information:
Name:
Address:
Telephone Number:
Email address:
Project Status: Complete
Monitoring Level required by COE and DWQ (404 permit/ 401 Cert.): Level 1 ~
Monitoring Level 1 requires completion of Section 1, section 2 and Section 3
Permit States: NCDOT shall perform the following components of Level I monitoring twice
each year for the 5 year monitoring period (summer and winter): Reference photos, plant
survival, and visual inspection of channel stability. If less than two bankfull events occur
during the first 5 years, NCDOT shall continue monitoring until the second bankfull event is
documented. The bankfull events must occur during separate monitoring years. In the event
that the required bankfull events do not occur during the 5 year monitoring period, the
USACE, in consultation with resource agencies, may determine that further monitoring is not
required.
Section 1. PHOTO REFERENCE SITES
(Monitoring at all levels must complete this section)
Attach site map showing the location and angle of all reference photos with a site
designation (name, number, letter, etc.) assigned to each reference photo location. Photos should
be provided for all structures and cross section locations, should show both banks and include an
upstream and downstream view. Photos taken to document physical stability should be taken in
winter. Photos taken to document vegetation should be taken in summer (at representative
locations). Attach photos and a description of each reference photo or location. We recommend
the use of a photo identification board in each photo to identify location.
Total number of reference photo locations at this site: 3 reference points, 2 photos at each
Dates reference photos have been taken at this site: 4/25/05
Individual from whom additional photos can be obtained (name, address, phone):
Other Information relative to site photo reference:
If required to complete Level 3 monitoring only stop here; otherwise, complete section 2.
Section 2. PLANT SURVIVAL
Attach plan sheet indicating reference photos.
Identify specific problem areas (missing, stressed, damaged or dead plantings):
There were very few bareroot seedlings noted on the streambank (type I)
Estimated causes, and proposed/required remedial action: Division Roadside Engineer has been
notified and the streambank planting will take place as soon as possible
ADDITIONAL COMMENTS: The bareroot seedlings planted in the floodplain (type II) are doing well
at this time and consisted of black willow silky doewood sycamore river birch black walnut and black chem.
If required to complete Level 1 and Level 2 monitoring only stop here; otherwise, complete section 3.
Section 3. CHANNEL STABILITY
Visual Inspection: The entire stream project as well as each in-stream structure and bank
stabilization/revetment structure must be evaluated and problems addressed.
Report on the visual inspection of channel stability. Ph~ical measurements of channel
stability/morphology will not be required. Include a discussion of any deviations from as-built
and an evaluation of the significance of these deviations and whether they are indicative of a
stabilizing or destabilizing situation.
The stream is stabilized for Year 1 Summer evaluation.
Date Station Station Station Station Station
Ins ected Number Number Number Number Number
Structure
T e
Is water
piping
through or
around
structure?
Head cut or
down cut
resent?
Bank or scour
erosion
resent?
Other
problems
noted?
NOTE: Attach separate narrative sheets to each monitoring report describing/discussing
the overall monitoring results. Include the identification of specific problem
areas/channel failures, estimated cause and proposed/required remedial action. This
should include a brief discussion of any parameter that has changed significantly from as-
built.
r ,
Photo 1
d... ~...
dj~"
:des--"
Tim
f
~.. y
Photo3
Mud Creek Tributary
.....^ .
~..l.
i ~'~ 1
s-f.
4~
*~w
~~ ~
i,
c~ 1
. ~ . ~~~~.
:W.~~
Photo 2
~„
t
~u ~~ '~
.:~ ~ ,I _
r
w ~ 4 ^' y
_ ~.
~` , u
1 y ~,~~5 _
•~ ~
,~ 'fir-1
r _~
Photo 4
'~a.~~
„~:
s,
i~~~
`:)
r-
~~
Photo 6
5
f~;~
Photo 5
Year 1 -April 2005
,.
~G ~'
giam~~, p~~~„1~~Y
W~I~' ~},~v'i
~,~„_
~~~ ~.
same d/~<.
~~ ~~
D _ ,~
~- ~ ,
.. ~'~"-Q'~ ~,~1 die
s~~"':,.~ ':~.~ r it hYat :nm< °~
c~ ~~ }~l \~;~~
c
~~+c~ +„S~~ s re
~u~~
~Il 1_~.~
~~ ~~
~~
~~
~~ ~ ~~~
(~~ ~ ,
/'
S , ~ ~ i-' ~l ~-. 1
~~ ~
~,~y,~
J~~
P ~~
(~I~ 3~~
~) ~~ ~eA',bl~~~ ~l~acJy
~~~~
~~~ ~~
~~! ~~
~`_ ~
as
~-~ o
~ w~ 11
~,
~~
„AJ
~-~dSS
~~
~~~~' 41 ~~7 yes
~ ~5 ;5
`'-~~"
rn,~~--
`Ucnt) ~S U
- ~~-- ~ ~
`~I
~~ ~-~ ~~
E~~~~.
;.
0
~~
~mf~+~~' sc~... l~les
rv1~
~«
~~ IJ ~
~,~~ ~u
SCD~ In~~e-
~~
~ s)
l~~s~
~~ ~JL
~;~~i
~;
,~~'' -
u
(S c~-
i s ~.
~~'°"7
~,+~
~~`~
~~ ~~ l~v)
~~l~a
g~,QttQv ~'ta~nm,7-
bus ;s
s~
~O~t a~ ~~as,~,~
~ „~ ~~-
~~c~~ ~~a~~ ~In /U~il~a~2
Y s
..