HomeMy WebLinkAboutWQCS0052_Annual Performance Report 2013-2014_20140730ALLISON WALTERS
Administrati erAss stantz
COUNTY OF HOKE
Hoke Box 240 • 663 E. Palmer Street
Raeford, North Carolina 28376
Office: (910)`:875-4127 Ext. 1003
Fax: (910) 875 8.136 /
awalters@h''okecouriti..org
COUNTY OF HOKE lIENR FRO
Public Works
JUL 3 9; 2014
owQ
HOKE COUNTY PUBLIC WORKS
POST OFFICE BOX 240
423 E. CENTRAL AVE.
RAEFORD, NORTH CAROLINA 28376
(910) 875-6704
2013-2014 WASTEWATER COLLECTIONS SYSTEM
ANNUAL PERFORMANCE REPORT
General Information
Facility/System Name: Hoke County Public Works
Responsible Entity: County of Hoke
Person in Charge/Contact: Mike Dean 910-848-0385
Applicable Permits: WQCS00352
Description of Collections System
Hoke County Public Works' sanitary sewer collection system serves portions of Hoke County,
east of Raeford along the 401 corridor. The system consists of approximately 11.4 miles of force
main ranging in size from 4 to 14 inch, 20 miles of gravity ranging in size from 6 to 18 inch and
8 pumping stations.
Wastewater is collected from 1606 current customers who are 100% residential/commercial. The
flow is sent to PWC of Fayetteville and the City of Raeford. We continue to contract with PWC
for O&M of the collection system that delivers flow to their plant, but have cancelled our
contract with the City of Raeford and perform the O&M of that system ourselves.
Last year we received our final approval required in order to move forward with bidding the 1.5
MGD Waste Water Treatment Plant. We met with the LGC and were approved for construction
to begin with a Notice to Proceed date of March 31, 2014 and scheduled date of completion to be
October 31, 2015. Wharton Smith is constructing the plant and McArthur construction is laying
the sewer outfall lines.
The Phase lA project was completed in May of 2013. This project provided a pump station,
force main and gravity outfall to serve Cape Fear and First Health hospitals.
HOKE COUNTY PUBLIC WORKS WQCS00352- SUMMARY OF COLLECTIONS
SYSTEM PERFORMANCE FOR FISCAL YEAR (JULY 2012-JUNE 2013)
During the Fiscal Year July 2013 — June 2014, approximately 79 million gallons of wastewater
was conveyed to PWC and the City of Raeford. There were no reportable SSO's.
2012-2013 WASTEWATER COLLECTIONS SYSTEM
ANNUAL PERFORMANCE REPORT
Prevention
This fiscal year Hoke County Public Works made the following efforts to reduce overflows.
1. Bi-annual mailing of FOG educational material.
2. Cleaned and filmed lines with a potential risk for SSO'S.
3. Inspections were performed on approximately 10% of the system.
4. Performed required mandatory inspections.
Notification
The report is available on the County website and at the Utilities Billing Office 910-875-6704. A
statement of availability will be included on the customer's bills during the month of August.
Certification
I certify under penalty of law that this report is complete and accurate to the best of my
knowledge. I certify that this report has been made available to the customers of the system, and
that those customers have been notified of its availability.
Miekta
Michael E. Dean
Hoke County Operations Manager