June 3, 2005
United States Army Corps of Engineers
Regulatory Field Office
Post Office Box 1000 p 510 3 5
Washington, NC 27899-1000
ATTN: Mr. Bill Biddlecome
NCDOT Coordinator-Division One
SUBJECT: Nationwide 6 Permit Application:
Bridge No. 212 over Bachelor Creek on SR 1005; Craven County; TIP
Project B-4085; Federal Aid Project No. BRSTP-1005(7); State Project
No.33444.1. l .
Dear Mr. Biddlecome,
The North Carolina Department of Transportation (NCDOT) is in the process of planning
a foundation investigation for the above referenced project. A consultant will be
conducting the investigation with a minimum of 8 borings. Four of the borings will be
performed within Bachelor Creek and will be drilled through the bridge deck of the
existing bridge. Four others will be drilled through the existing roadway embankment.
All eight borings are shown on the attached permit drawings.
Due to the fact Bachelor Creek supports anadromous fish, notification to the appropriate
agencies through a Nationwide 6 Permit is required.
In order to build the new bridge over Bachelor Creek, geotechnical test borings will need
to be done so that structure and foundation recommendations can be made. All borings
will be drilled utilizing a drill mounted on an ATV (All Terrain Vehicle) or a Drill Truck.
The size of the borings are approximately 0.5 feet in diameter. The area that may be
disturbed per boring is estimated to be 4 square feet, for a total disturbance area of 16
square feet with 32 square feet in the creek. The consultant will use casing to advance the
borings and rotary-wash techniques while recirculating the drilling fluids between the
mud tub and the inside of the casing. This will isolate the drilling mud and cuttings and
contain them in the boring and the mud tub. The borings will be backfilled with the
MAILING ADDRESS: TELEPHONE: 919-733-3141 LOCATION:
NC DEPARTMENT OF TRANSPORTATION FAX: 919-733-9794 TRANSPORTATION BUILDING
PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS ~ SOUTH WILMINGTON STREET
'I 54H MAIL SERVICE CENTER a RALEIGH NC
RALEIGH NC 27699-1548 WEBSITE: WWW.nCdOt.Or~
cuttings and then sealed with a bentonite hold plug. The excess drilling mud will be
disposed of in the upland areas.
Because this area is located in sensitive waters, an in-water moratorium exists between
February 15 through June 30. All in-stream work will take place outside the moratorium
dates.
The NCDOT anticipates that these activities will be authorized by Nationwide Permit No.
6. NCDOT will follow the conditions set by a Nationwide Permit No. 6 and by NCDWQ
Water Quality Certification # 3494. In accordance with 15A NCAC 2H.0501 (a), we are
providing two copies of this application to the NCDWQ for their records.
If you have any questions or would like additional information, please call Mr. Chris
Underwood at (919) 715-1451. Thank you in advance for your help in this matter.
Sincerely,
w Gregory .Thorpe, Ph.D.
Environmental Management Director
Project Development and Environmental Analysis Branch
CC: W/attachment
Mr. John Hennessy, NCDWQ (7 copies)
Mr. Travis Wilson, NCWRC
Mr. Gary Jordan, USFWS
Mr. Ron Sechler, NMFS
Mr. Michael Street, NCDMF
Mr. Cathy Brittingham, NCDCM
Mr. Bill Arrington, NCDCM
Mr. David Chang, P.E., Hydraulics
Mr. Greg Perfetti, P.E., Structure Design
Mr. Mark Staley, Roadside Environmental
Mr. Njoroge W. Wainaina, State Engineering Geologist, P.E., Geotechnical Unit
Mr. C. E. Lassiter, P.E., Division Engineer
Mr. Jay Johnson, DEO
W/o attachment
Mr. David Franklin, USACE, Wilmington (Cover Letter Only)
Mr. Jay Bennett, P.E., Roadway Design
Mr. Omar Sultan, Programming and TIP
Mr. Art McMillan, P.E., Highway Design
Mr. John Williams, P.E., PDEA
Office Use Only: ^ C ~ 0 ~ C Form Version May 2002
USACE Action ID No. DWQ No. •7 J
(lt any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".)
I. Processing
Check all of the approval(s) requested for this project:
® Section 404 Permit ^ Riparian or Watershed Buffer Rules
^ Section 10 Permit ^ Isolated Wetland Permit from DWQ
401 Water Quality Certification
2. Nationwide, Regional or General Permit Number(s) Requested: NW 6
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here:
4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for
mitigation of impacts (verify availability with NCWRP prior to submittal of PCN), complete
section VIII and check here: ^
5. If your project is located in any of North Carolina's twenty coastal counties (listed on page
4), and the project is within a North Carolina Division of Coastal Management Area of
Environmental Concern (see the top of page 2 for further details), check here:
II. Applicant Information
Owner/Applicant Information
Name: NCDOT / PDEA Branch /Greg Thorpe
Mailing Address: 1548 Mail Service Center
Raleigh, NC 27699-1548
Telephone Number: (919) 733-3141 Fax Number: (919) 733-9794
E-mail Address:
2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter
must be attached if the Agent has signatory authority for the owner/applicant.)
Name:
Company Affiliation:
Mailing Address:
Telephone Number:
E-mail Address:
Fax Number:
Page 5 of 12
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: Borings for Bride No. 212 Over Bachelor Creek on SR 1005
2. T.I.P. Project Number or State Project Number (NCDOT Only): B-4085
3. Property Identification Number (Tax PIN):
4. Location
County: Craven Nearest Town: New Bern
Subdivision name (include phase/lot number):
Directions to site (include road numbers, landmarks, etc.): Bride No. 212 over Bachelork
Creek On SR 1005
5. Site coordinates, if available (UTM or Lat/Long): N514386 E2545976
(Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the
coordinates for each crossing of a distinct waterbody.)
6. Property size (acres):
7. Nearest body of water (stream/river/sound/ocean/lake): Bachelor Creek
River Basin: Neuse
(Note -this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.)
9. Describe the existing conditions on the site and general land use in the vicinity of the project
at the time of this application: Wetlands and riparian forest with little development.
Page 6 of 12
10. Describe the overall project in detail, including the type of equipment to be used:
Geotechnical test borings will be made in the roadway and creek bottom. Drilling_ri swill
be used to perform this work.
11. Explain the purpose of the proposed work: To provide structure and foundation
recommendations for the proposed bride.
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules.
V. Future Project Plans
Are any future permit requests anticipated for this project? If so, describe the anticipated work,
and provide justification for the exclusion of this work from the current application.
Yes. NW 23 permit will be applied for. Typical bridge construction on existing location and
improving approaches.
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. The applicant must also
provide justification for these impacts in Section VII below. All proposed impacts, permanent
and temporary, must be listed herein, and must be clearly identifiable on an accompanying site
plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a
delineation map, whether or not impacts are proposed to these systems. Wetland and stream
evaluation and delineation forms should be included as appropriate. Photographs may be
included at the applicant's discretion. If this proposed impact is strictly for wetland or stream
mitigation, list and describe the impact in Section VIII below. If additional space is needed for
listing or description, please attach a separate sheet.
1. Provide a written description of the proposed impacts: Soil borings in the wetland
high ground, and river bottom.
Page 7 of 12
2. Individually list wetland impacts below:
Wetland Impact
Site Number
(indicate on map)
Type of Impact* Area of
Impact
(acres) Located within
100-year Floodplain**
(yes/no) Distance to
Nearest Stream
(linear feet)
Type of Wetland***
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill,
excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding.
** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps
(FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or
online at httn://www.fema.eov.
*** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond,
Carolina Bay, bog, etc.) Indicate if wetland is isolated (determination of isolation to be made by USACE only).
List the total acreage (estimated) of all existing wetlands on the property:
Total area of wetland impact proposed:
3. Individually list all intermittent and perennial stream impacts below:
Stream Impact
Site Number
(indicate on map)
Type of Impact* Length of
Impact
(linear feet)
Stream Name** Average Width
of Stream
Before Impact Perennial or
Intermittent?
leases ecify)
'~ Ltst each impact separately and identity temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap,
dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain),
stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is
proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included.
** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest
downstream named stream into which it flows. USGS maps are available through the USES at 1-800-358-9616, or online at
www.usgs.gov. Several Internet sites also allow direct download and printing of USGS maps (e.g., www.tonozone.com,
~~~r,~w.mapguest.com, etc.).
Cumulative impacts (linear distance in feet) to all streams on site:
4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic
Ocean and any other water of the U.S.) below:
Page 8 of 12
Open Water Impact
Site Number
(indicate on map)
Type of Impact* Area of
Impact
(acres)
Name of Waterbod
(if applicable) y Type of Waterbody
ry, sound,
(lake, pond, estua
bay, ocean, etc.)
• L.~si eacn impact separately ana iaemiry temporary impacts. tmpacts include, but are not limited to: t511, excavation, dredging,
flooding, drainage, bulkheads, etc.
5. Pond Creation
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ^ uplands ^ stream ^ wetlands
Describe the method of construction (e.g., dam embankment, excavation, installation of
draw-down valve or spillway, etc.):
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.):
Size of watershed draining to pond: Expected pond surface area:
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It maybe useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USAGE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on March 9, 2000, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
Page 9 of 12
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that maybe appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as
incomplete. An applicant may also choose to review the current guidelines for stream restoration
in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at
http://h2o. enr.state. nc.us/ncwetlands/strmgide. html.
Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
N/A
2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration
Program (NCWRP). Please note it is the applicant's responsibility to contact the NCWRP at
(919) 733-5208 to determine availability and to request written approval of mitigation prior
to submittal of a PCN. For additional information regarding the application process for the
NCWRP, check the NCWRP website at http://h2o.enr.state.nc.us/wrp/index.htm. If use of
the NCWRP is proposed, please check the appropriate box on page three and provide the
following information:
Amount of stream mitigation requested (linear feet): N/A
Amount of buffer mitigation requested (square feet): N/A
Amount of Riparian wetland mitigation requested (acres): N/A
Amount ofNon-riparian wetland mitigation requested (acres): N/A
Amount of Coastal wetland mitigation requested (acres): N/A
IX. Environmental Documentation (required by DWQ)
Does the project involve an expenditure of public (federal/state) funds or the use of public
(federal/state) land?
Yes ® No ^
Page 10 of 12
If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ® No ^
If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a
copy of the NEPA or SEPA final approval letter.
Yes ® No ^
X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and
Water Supply Buffer Requirements), or other (please identify )?
Yes ^ No ®If you answered "yes", provide the following information:
Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer
mitigation is required calculate the required amount of mitigation by applying the buffer
multipliers.
Zone* Impact
(square feet) Multiplier Required
Mitigation
1 3
2 1.5
Total
gone i ex[enas out su teet perpenchcular from near bank of channel; Zone 2 extends an
additiona120 feet from the edge of Zone 1.
If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation
of Property, Conservation Easement, Riparian Buffer Restoration /Enhancement, Preservation or
Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as
identified within 15A NCAC 2B .0242 or .0260.
Page 11 of 12
XI. Stormwater (required by DWQ)
Describe impervious acreage (both existing and proposed) versus total acreage on the site.
Discuss stormwater controls proposed in order to protect surface waters and wetlands
downstream from the property.
N/A
XII. Sewage Disposal (required by DWQ)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
N/A
XIII. Violations (required by DWQ)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules?
Yes ^ No
Is this anafter-the-fact permit application?
Yes ^ No
XIV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
1~-----"--' 6 3 0 ~
Ap licant/Agent's Signature a e
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
Page 12 of 12
Z
I°
d
z
i
~Z
s a~
8
~8
$ ~~
~z
s a8
_. ..~ cns
a
a
~~``$
~ 6~
~~6
F
::
! t
0
a Z M
~~
i z aH
.S- -.6
M Q
~ O
w
am
I-
w
O
z
t I.c-lu y ~--
t ~ -
oa
m~
=J~
~
I
s4~ I
mNrnw
`°~
v, i
~~
FO 1
I
I
-
-
~4 ~~ I
~
~~ ~~
~~~ $
Q
b .
a
9na
o
i
~_~ I
I
I~
l;? I
I
IY
I~
I,
I ~
~ ~ I
11 I
II
O ~. ` ;.._
O ~
~p~~
+QNr
O~11+ 1
~~
u
3~I~~n
a°maS
~~S ~~
~~
~J W
m Jr W
M1~
~~
~~
BATCHELgER CREEK'
1 =~ ~~
_\, i a ~
\\ 3 0 ~
~g ~'~
m \ o s~
a,
-aQ 8# _<
am~F sq g~
aM u,p 3~
~mW ~~ ~F
N ~ ~~:~ h
~J WW W
Vm J~
i~
wi
iu
a
~
I
I _.
Y
0
O
V
r I
I
~ ~ `{
T
2 ~~Q i
I ~ ~kk
g~~o
~ ~ I e
Q~
4~4
~ 7~
~8 I
I
S
C
~
i
~~ .7i ~
~!»!w I I m
J
I ti
o
:S
:„ .
g ~
1
N
~ v'
Z
I
I~ ~~~
I M
I r` I ~ m
I N
_ I
+ 1 d. - -I
t
I
~~ _ ab ~
h
gy ~~~~~
W ~~
J ~~ m o t y
O ti v
= u
~ _
~ s ~
~ ~ '~ °~-
3
5 0
c« iI
~^ i
h~ u
rr 4 ~ a
0
w F ~R
~ ~` ~_ mi~
\ ~
z+~39``~
tigyI_d~~Wl
~Q~2~~2
~~~~~z~
~~
d
~~
Q
2
~~
~$~
nA
++
~.
g~
I
I
F ?E
I c i11 gOYTtl
I~ .__~ .00'002
IW
I I
& ~ I
t g i I
~ g I I
~ I I
I ~ I
~ I I
i ~ i I
~ I
~ ,
~ ~ I
i
~ ~ I
~ I
~ I
~ m
~ I
~ I I
>~"
I '.
~.
<:F.
N.. ~.~:
~'J:
~. I.
~~~~
IY....r..y..~
SWAY
~~~~
'_~ w
.~p ~WY
~ ~ c
~ r
~ I
1 I I p„~
66/L /B I ' u6 iwaad-1;1804p~~,~ fiPa-580b9\f oad~fionpooa~fionpooa\580b-8\s~°°f °-'d H\s}oaf°ad~
~ I ¢6
I ~~
1
I I I W
I I =
1 ~ I
I I ~
I
t I I
1
11 I I
1 ~ I
• 1\ I I
~ 1
r_
~~_
0
S
~O
t[)
.-~
M
r
N
r
a
4
o)
a
v