HomeMy WebLinkAboutNCC192812_NOT Closeout Documents_20211206Permit Number: 2019-00002435
TOWN of
WAKE FOREST
ENGINEERING
Certificate of Completion
Erosion and Sediment Control
Town of Wake Forest Engineering Department
301 South Brooks Street
Wake Forest, NC 27587
Phone: (919) 435-9443
Inspector: Contractor: Owner:
Lamar Minter Homes by Dickerson
Subdivision/Site Name: Plan Approval Date: Date of Final Inspection/walk dun:
Traditions SE (Bridgewater)
9/30/2013
11/5/2021
Location:
Financial Responsible Party:
Contactor Phone Number:
1104 Grande Water Way
Homes by Dickerson
(919) 847-4447
Plan Specifications
Local Ordinance Met:
Temporary Controls Removed:
Permanent Controls Installed and
Met:
Operational:
Yes
Yes
Yes
Yes
Additional Comments:
Lots #1, 20, 40-47, 50, 51, 56-59, 64
The undersigned (inspector) hereby accepts the installation of permanent and removal of temporary erosion and
sediment control devices (per plan and specification) on behalf of the Town of Wake Forest. The owner is responsible
for maintaining these devices, and in no way holds the Town responsible for cleanout or repair.