Loading...
HomeMy WebLinkAboutNCC193175_NOT Closeout Documents_20211206North Carolina Department of Environmental Quality Land Resources: 610 East Center Avenue, Suite 301, Mooresville, NC 28115 (704) 663-1699 County: Iredell Project: Fairfield Inn River basin: Yadkin-PeeDee Person financially responsible: City of Statesville - J. Mark Taylor, Assistant City project #: IREDE-2020-010 Manager Address: 301 South Center Street, Statesville, NC 28687 1. Project Location: 110 Tonewood, Statesville Pictures: No 2. Weather and soil conditions: Cloudy, workable soil Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): No one on site Title: Inspection report: Sent Report Date given/sent: July 26, 2021 9. Corrective action needed: 10. Comments: Overall the site has sufficient permanent ground cover to restrain erosion, however there are some bare areas and rills that need to be repaired and stabilized. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. All project that have been approved prior to April 01, 2019, under the old permit system, are not required to take any additional actions. The stormwater permit is terminated at the same time as the termination of this erosion control permit. Reported by: Jesse McDonnell Others present: Date of inspection: July 20, 2021 Time arriving on site: 10:10 AM Time leaving site: 10:20 AM cc: