HomeMy WebLinkAboutNCC216772_ESC Approval Submitted_20211208Jordan Young
From: Kent Wall <kentw@cityofws.org>
Sent: Friday, December 3, 2021 2:12 PM
To: Jordan Young; Matthew Osborne
Cc: Vince Townsend
Subject: RE: [EXTERNAL] FW: Tentative Approval- Clouds Harbor
Jordan,
I have stamped and approved the erosion control plans in application submittal 005 in IDT. Please use the approval
letter below to apply for NCG01 Certificate of Coverage (COC). Once you obtain the COC, please upload it in the project
documents in IDT and then we can move forward with issuing the grading permit.
Thanks,
Kent Wall
Erosion Control Inspector
336-462-7481
Number of Recipients:1
Sent:12/03/2021 2:02:19 PM
Sent by:Kent Wall
To:Jordan@greenmountainengineers.com
Cc:
Bcc:
Subject:Review Completed - Clouds Harbour- Phase 1
Attachments:
Application Type: 04.02) Grading/Erosion Control Permit
Workflow: 04.02) Grading & Erosion Control
Project: Clouds Harbour - Phase 1
A/P #: EN2100133
Acreage to be Disturbed: 22.60
https://winston-salem.idtplans.com/secure/project/?Promectid=570390
Hello Clayton Properties Group, Inc,
Thank you for submitting your project to City of Winston-Salem. Review of the plans for this project have been
completed. The design is adequate to meet the ordinance standards and the plans have been approved.
If you have not already done so, please provide an original signed and notarized Financial
Responsibility/Ownership form. This document is required prior to the issuance of the Grading/Erosion Control
Permit. If this has already been provided, then please disregard this statement.
If this project will disturb more than 1 acre or is part of a larger common plan of development, the Grading/Erosion
Control Permit cannot be issued until documentation is provided that coverage under the NCG01 Construction
Stormwater Permit (NPDES) has been obtained. Please obtain coverage under the permit at the following website
(https://edocs.deci.nc.gov/Forms/NCG01-NOI). Once coverage is obtained please upload a copy to the project
documents in the electronic plan review system. The Grading/Erosion Control Permit will not be issued until proof
of coverage under NCG01 is provided.
As outlined in the Unified Development Ordinances (UDO) of Winston-Salem/Forsyth County, Village of Clemmons,
Town of Lewisville, and Town of Walkertown, Erosion Control Division staff may periodically inspect sites of land
disturbing activity to determine compliance with the Erosion Control ordinances and the approved Erosion Control
Plan. No person shall willfully resist, delay, or obstruct an authorized representative, employee, or agent of the
Erosion Control Division while that person is inspecting or attempting to inspect a land disturbing activity under the
ordinance.
Should you have any questions as you move forward please feel free to contact our offices. We will be happy to
assist you.
Winston-Salem North Carolina and Forsyth County
City Link 311
311 or (336)727-8000
ci link ,cityofws.org
100 E. First Street
Winston-Salem, NC 27101
City Directory
From: Jordan Young <jordan@greenmountainengineers.com>
Sent: Friday, December 3, 2021 10:59 AM
To: Kent Wall <kentw@cityofws.org>; Matthew Osborne <matthewo@cityofws.org>
Cc: Vince Townsend <vince@greenmountainengineers.com>
Subject: RE: [EXTERNAL] FW: Tentative Approval- Clouds Harbor
Good Morning guys,
All of the comments have been addressed on the grading application for Clouds Harbor phase 1.
Is there any way we can get an approval email today so I can send in the NCG01 application?
Let me know if you need anything else and I can send it right away. Shugart is really pushing to get started and this is the
last thing we need.
Thanks,
Jordan Young, PE
Green Mountain Engineering, PLLC
336-252-2781
From: Jordan Young
Sent: Thursday, December 2, 20214:40 PM
To: Kent Wall <kentw@citvofws.org>
Cc: Matthew Osborne <matthewo@citvo -is.org>
Subject: RE: [EXTERNAL] FW: Tentative Approval- Clouds Harbor
Kent, Just wanted to let you know I added that note that you asked for on clouds harbor, are we all set now?
Thanks,
Jordan Young, PE
Green Mountain Engineering, PLLC
336-252-2781
From: Kent Wall <kentw@citvofws.org>
Sent: Wednesday, December 1, 2021 1:36 PM
To: Jordan Young <iordan@greenmou ntainengineers.com>; Matthew Osborne <matthewo@citvofws.org>
Subject: RE: [EXTERNAL] FW: Tentative Approval- Clouds Harbor
Jordan,
Unfortunately, we cannot conduct our pre -construction meeting yet. We will need to have the erosion control plans
approved, NCG01 COC issued and the grading permit issued prior to conducting the pre -construction meeting for
erosion control.
Thanks,
Kent Wall
Erosion Control Inspector
336-462-7481
From: Jordan Young <iordan@greenmountainengineers.com>
Sent: Wednesday, December 1, 2021 12:10 PM
To: Matthew Osborne <matthewo@cityofws.org>; Kent Wall <kentw@cityofws.org>
Subject: [EXTERNAL] FW: Tentative Approval- Clouds Harbor
Good Afternoon guys,
Wesley Kimbrell from the Village of Clemmons is asking to have the pre construction meeting today before 3:30. 1 know
this is really short notice and the ESC plans are not actually approved yet so if it is not possible, I can just ask to
reschedule.
But if we are able to make this work somehow please let me know, that would be great!
Thanks,
Jordan Young, PE
Green Mountain Engineering, PLLC
336-252-2781
From: Wesley Kimbrell <wkimbrell@clemmons.org>
Sent: Tuesday, November 30, 2021 11:22 AM
To:'Kent Wall' <kentw@citvofws.org>; Matthew Osborne <matthewo@citvofws.org>
Cc: Jordan Young<iordan@greenmountainengineers.com>; Vince Townsend<vince@greenmountainengineers.com>;
Ken Capron <ken@shugarthomes.net>; Mike Gunnell <mgunnell@clemmons.org>
Subject: Tentative Approval- Clouds Harbor
Gentlemen,
This email is to inform you that the developer and the designer has met all requirements to obtain a Village of
Clemmons SWM permit. The permit is being held until a pre -con meeting is setup between their team and our staff
regarding the site expectations for this development. The permit will be issued based off of a set of plans that were
submitted with a seal date of 11-23-2021. Please confirm that you have the most recent set of plans, and if all items are
addressed on your end, accept this email on our behalf for agreement to release the grading permit. We will send out
the official SWM permit once the pre -con meeting is completed.
Let me know if you have any questions or concerns.
Thank you,
Wesley Kimbrell, PE
Village Engineer
Village of Clemmons
Direct Line: (336) 439-5193
Public Works: (336) 766-9170
www.clemmons.ora