Loading...
HomeMy WebLinkAboutSW8970936_HISTORICAL FILE_19980113STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 q lOg3lu DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS �] HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 11ia od O I 1,5 YYYYMMDD State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office James B. Hunt, Jr., Governor Wayne McDevitt, Secretary Division of Water Quality January 13, 1998 Mr. John Sabitini, President Clear Water Place, Inc. PO Box 6059 South Brunswick, NC 28470 STUN;Wor • NCl.®ENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Subject: Permit No. SW8 970936 Clear Water Place @Winding River Plantation High Density Commercial Stormwater Project Brunswick County Dear Mr. Sabitini: The Wilmington Regional Office received the Stormwater Management Permit Application for Clear Water Place @Winding River Plantation on September 26, 1997, with final information on November 13, 1997. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 970936 dated January 13, 1998, for the construction of Clear Water Place @Winding River Plantation. This permit shall be effective from the date of issuance until January 13, 2008, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Linda Lewis, or me at (910) 395-3900. Sincerely, k—)—l'C� S(� I\,fti Rick Shiver, P.G. Acting Regional Water Quality Supervisor RSS/arl: S:\WQS\STORMWAT\PERMIT\970936.JAN cc: Jay Houston, P.E. Delaney Aycock, Brunswick County Inspections Linda Lewis Wilms mington-Regional-Office Central Files 127 North Cardinal Dr., Wilmington, North Carolina 28405 Telephone 910-395-3900 FAX 910-350-2004 An Equal Opportunity Affirmative Action Employer 50% recycled/10 % post -consumer paper } State Stormwater Management Systems Permit No. SW8 970936 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Clear Water Place, Inc. Clear Water Place @Winding River Plantation Brunswick County FOR THE .construction, operation and maintenance of a detention pond in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules") and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until January 13, 2008 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described on page 3 of this permit, the Project Data Sheet. The stormwater control has been designed to handle the runoff from 222,330 square feet of impervious area. 3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 4. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. Clearwater Place is designated as Tract R on the Master Plan, under permit #SW8 961109. K, 2 • State Stormwater Management Systems Permit No. SW8 270936 DIVISION OF WATER QUALITY PROJECT DATA SHEET Project Name: Clear Water Place @Winding River Plantation Permit Number: 970936 Location: Brunswick County Applicant: Mr. John Sabitini, President Mailing Address: Clear Water Place, Inc. PO Box 6059 South Brunswick, NC 28470 Application Date: September 26, 1997 Water Body Receiving Stormwater Runoff: Lockwoods Folly River Classification of Water Body: "SC" If Class SA, chloride sampling results: N/A Pond Depth, feet: 6 Permanent Pool Elevation, FMSL: 20 Total Impervious Surfaces, ft2: 222,330 Buildings 14@6174 ftz: 86,436 Pool and Tennis Courts, ftz: 22,825 (Portion of Amenity Area) Amenity Building, ftz: 3,167 (Portion of Amenity Area) Parking, ftz: 98,576 Sidewalk, ft2: 11,326 Offsite Area entering Pond, ft2: none, per Engineer Required Surface Area, ftz: 12,479 Provided Surface Area, ftz: 19,150 Required Storage Volume, ft3: 18,281 Provided Storage Volume, ft3: 20,335 Temporary Storage Elevation, FMSL: 21 Controlling Orifice: 2" pipe State Stormwater Management Systems Permit No. SW8 970936 The permittee is responsible for verifying that the proposed built -upon area does not exceed the allowable built - upon area. The following items will require a modification to the permit: a. Any revision to the approved plans, regardless of size. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area. C. Further subdivision of the project area. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. In addition, the Director may determine that other revisions to the project should require a modification to the permit. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. II. SCHEDULE OF COMPLIANCE 1. The permittee will comply with the following schedule for construction and maintenance of the stormwater management system: a. The stormwater management system shall be constructed in it's entirety, vegetated and operational for it's intended use prior to the construction of any built -upon surface except roads. b. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 2. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device and catch basins and piping. g. Access to the outlet structure must be available at all times. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 4. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. State Stormwater Management Systems Permit No. SW8 970936 Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. Prior to the sale of any portion of the property, an access/maintenance easement to the stormwater facilities shall be granted in favor of the permittee if access to the stormwater facilities will be restricted by the sale of any portion of the property. III. GENERAL CONDITIONS 1. This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a formal permit request must be submitted to the Division of Water Quality accompanied by an application fee, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143- 215.6C. 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permittee grants DENR Staff permission to enter the property for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. Permit issued this the 13th day of January, 1998. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION C L � `�) l- t "/ u ( — 1 (D l:)— A. Preston Howard, Jr., P.E., Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW8 970936 State Stormwater Management Systems Permit No. SW8 970936 Clear Water Place @Winding River Plantation Stormwater Permit No. SW8 970936 Brunswick County Engineer's Certification I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Noted deviations from approved plans and specification: SEAL Signature Registration Number Date i _ . DIVISION OF WATER QUALITY NORTH CAROLINA STORYIWATER YLANAGE`fENI' PERMIT .APPLICATION I. GENERAL INFORMATION (Please pnm dearly or rypu 1. Project Name CLEAR WATER PT ACF R WINDING RIVER PLANTATION 2. Location, directions to project (include County, Address, State Road) Attach map. BRUNSWICK COUNTY .).Owner's Name John Sabitini Clear Water Place, Inc 4. Owner's Mailing Address P.O. Box 6059 .910-579-1375 City Smith Brunswick State N.C. Zip 28470 5. Nearest Receiving Stream Sandy Branch Class 6.Projectdescription Multi —Family Development U. PERVUT INFORMATION I. Permit No.rrobeslled;nlyowQ) i)8i7QC�'��j C SW 2.Application Date _ Aualgt 29 1997 FeeenclosedS 385.00 3. Permit Type: x New Renewal Modification (existing Permit No.) 4. Project Type: _Low Density x Detention_Intiltration_Redevelop_General_ Alter_Offsite 5. Other State/Federal Permits/Approvals Required (Cwck appropriate blanks) CAMA Major Sedimentation/Erosion Control x 404 Permit III. BUILT UPON .AREA (Please see NCAC 2H. 1005 thru .1007 for applicable density limiv) Classification Existing Built -upon Area Proposed Built -upon Area Total Project Area Built -upon Area Drainage Drainage Basin Basin C SW —0- 5.104 AC 8.85 Acres 57.7% IV. STORAIWATER TREATMENT (Desenbe how the runoff will be rreared) Breakdown of Impervious Area (Please intricate below the design impervious area) Buildings 2.057 AC Sidewalk Stfeets 0.26 AC Parking/SW 2.263 AC Pool/Tennis Mler 0.524 AC 5.104 AC V. DEED RESTRICTIONS .-VND PROTECTIVE COVENANTS Deed restrictions and protective covenants are required to be recorded For all low density projects and all subdivisions prior to the sale of any lot. Please see Attachment A for the specific items that must be recorded for the type of project applied for. By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the items required by the permit, that the covenants will be binding on all parries and persons claiming under them, that they will run with the land, that the covenant cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. VI. OWNER'S CERTIFICATION h John sabitini=President certify that the information included on this permit (Please prinr cieariy or type) application form is correct, that the project will be constructed in conformance with the approved plans, that the deed restrictions will be recorded with all required permit conditions, and that to the best of my knowledge, the proposed project complies with the requirements of 15A NCAC 2H.1000. I authorize the below nar�ed,,person or,irm to submit stormwater plans on my behalf. gent Signature and Tide VII. AGENT AUTHORIZATION (Ptease fill in the name of the engineer/surveyor authonzed to suhmir plans on the owner's behalf.) Person or firm name Hnnston and Associates P A Mailing Address P.O. Box 2927 Ciry Shallotte State N.C. Zip 28459 Phone 910-754-6324 Please submit application, fee, plans and calculations to the appropriate Regional Office. cc: Applicant/WiRO//Central Files ST HOUSTON and ASSOCIATES, P.A. Consulting Engineers SHALLOTTE, NORTH CAROLINA 28459 Telephc�e (910) 754-6324 117 Pine Street Facsimile (910) 754-2121 Post Office Box 2927 MUMMERThursday, November 6, 1997 Ms. Linda Lewis, Environmental Engineer RECEIVED Division of Environmental Management NOV 1 3 1997 North Carolina Department of Environment. Health, and Natural Resources BY: q3 127 Cardinal Drive Extension Wilmington, North Carolina 28405 Subject: Clear Water Place Brunswick County, North Carolina Resubmittal of Stormwater Plan Dear Ms. Lewis: In response to your letter dated November 4, 1997, we offer the following. 1. A typical unit footprint with dimensions and the wood stairs has been enclosed. 2. Dimensions of the typical parking space, sidewalk, and parking lot aisle have been added to the plans. 3. Calculations are based on a removal efficiency of 85%. A flow spreader and vegetative filter with a minimum length of 50 feet has been added. 4. Wetlands are delineated on the plans. 5. The tennis courts are located in the amenity area and have been labeled on the plans. 6. Only the delineated portion of the amenity area will be directed to the stormwater pond. The amenity area has a total area of 5.49 acres and the Master SW Plan allows a total impervious area of 3.50 acres. The proposed amenity area will fall within the allowable impervious area; however, we propose to collect funoff from the parking lot area and a portion of the future tennis courts to avoid direct discharge into the wetlands and to preserve and ensure water quality standards with an engineered system. 7. In reference to the overall Master SW Plan for Winding River Plantation, the. Clear Water project is delineated as Tract R with an allowable impervious area of 5.10 acres. A revised overall stormwater plan was submitted on October 15, 1997 including Clear Water Place. Mrs. Lewis Page Two Clear Water Place November 6, 1997 Stormwater Resubmittal Enclosed are two copies each of the revised plans, calculations, and typical building footprint. We appreciate your attention in this matter. Should you have any comments or require any additional information, please do not hesitate to contact our office at your convenience. Sincerely, J toHouston, P.E. snand Associates, P.A. JRH/swq Enclosures pc: Mr. John Sabatini, Clear Water Place Inc. File; 97-0137 (Clear Water Place, SW/EC) Hydrologic and Hydraulic Calculations for Q o J ° w(I)T Tang �o BRUNSWICK COUNTY, NORTH CAROLEVA \\ � 7 ryryrya 4' ST®RMWATER Prepared By CONSULTING ENGINEERS Shallotte, North Carolina September 1997 Revised October 1997 E C E! V E NOV 1 31997 D p IP70( PROJ 0 Clearwater Place Drainage Basin Data 10/8/97 Prepared By: SWQ . Checked By: BASIN IMPERVIOUS AREA TOTAL TOTAL WEIGHTED I.D. PARKING BUILDINGS SIDEWALK POOL/TENNIS AREA IMPERVIOUS "C" AC AC AC AC AC AC A 0.102 0.078 0.013 0.000 0.305 0.193 0.68 B 0.130 0.142 0.009 0.000 0.485 0.281 0.64 C 0.317 0.272 0.059 0.000 1.093 0.648 0.64 D 0.176 0.181 0.020 0.141 0.703 0.518 0.75 E 0.291 0.439 0.042 0.000 1.030 0.771 0.76 F 0.124 0.078 0.014 0.028 0.332 0.244 0.75 G 0.213 0.297 0.037 0.000 0.683 0.547 0.80 H 0.186 0.212 0.032 0.000 0.612 0.429 0.73 1 0.000 0.350 0.000 0.000 1.556 0.350 0.37 J 0.000 0.000 0.000 0.000 0.314 0.000 0.20 K 0.145 0.000 0.000 0.000 0.216 0.145 0.70 L 0.111 0.000 0.000 0.000 0.148 0.111 0.76 M 0.322 0.010 0.018 0.217 0.946 0.568 0.65 N 0.146 0.000 0.016 0.138 0.4253 0.300 0.73 Total: 2.263 2.057 0.260 0.524 8.847 5.103 Clearwater Place Storm Drainage Flowrate Calculations 10/8/97 Prepared By: SWQ . Checked By: Storm Drain I.D. Contributing Area Drainage Area Impervious Area Weighted "C" Length Slope 'Tc i10 Q10 ac. ac. ft ft/ft min. in/hr cfs SD11E;FG,H`, 2.66 1.99 0.76 623 0.005 4.25 7.0 14.17 SD2 E,F,G'l� '_ 2.05 1.56 0.77 503 0.005 3.61 7.0 11.06 SD3 EFF -'-a 1.36 1.02 0.76 388 0.005 2.95 7.0 7.24 SD4 _",E 1.03 0.77 0.76 262 0.005 2.18 7.0 5.49 SD5 E 1.03 0.77 0.76 150 0.005 1.42 7.0 5.49 SD6 A,B,C,D,J,K,L,M,N 4.63 2.76 0.65 490 0.005 3.54 7.0 20.99 SD6A A B CI D 9K}L MN 4.63 2.76 0.65 490 0.005 3.54 7.0 20.99 SD7 D M Nu Hv 2.07 1 0.70 360 0.005 2.79 7.0 10.17 .38 SD8 A,B 0.79 0.47 0.65 175 0.005 1.60 7.0 3.60 SD9 A 0.30 0.19 0.68 120 0.005 1.20 7.0 1.44 SD10 M,N 1.37 0.87 0.67 240 0.005 2.04 7.0 6.47 SD10A M,N 1.37 0.87 0.67 200 0.005 1.77 7.0 6.47 SD11 N 0.43 0.30 0.73 140 0.005 1.35 7.0 2.17 SD12 J,K,L 0.68 0.26 0.48 265 0.005 2.20 7.0 2.29 SD13 K,L 0.36 0.26 0.73 185 0.005 1.67 7.0 1.85 SD14 L 0.15 0.11 0.76 120 0.005 1.20 7.0 0.79 `Tc multiplied by 0.5 for flow over asphalt. Clearwater Place Storm Drainage Inverts 1 0/8/97 Prepared By: SWQ . Checked By: Storm Drain Length Inv. In Inv. Out Grate Elev. Culvert Diam. I.D. Feet) (msI) (msI) at Inv. In Inches SD1 100 16.50 16.00 22.50 24 SD2 120 17.10 16.50 23.50 24 SD3 115 19.81 1 19.24 25.10 18 SD4 126 20.44 19.81 JB 18 SD5 112 21.00 20.44 24.40 15 SD6 81 18.70 18.00 24.90 r,, 24 SD6A 71 18.00 16.50 JB 30 SD7 130 20.85 19.30 23.30 24 SD8 110 20.80 19.00 24.65 15 SD9 55 21.08 20.80 24.50 15 SD10 125 21.50 20.85 JB 18 SD10A 40 21.70 21.50 24.60 18 SD11 60 22.00 21.70 25.10 15 SD12 125 19.63 19.00 23.60 15 SD13 80 22.58 19.63 26.30 15 SD14 65 22.90 22.58 26.30 15 JB = Junction Box Clearwater Place Culvert Hydraulics 10/8/97 SD1 HEADWATER ELEVATION CALCULATIONS FLOWRATE = CFS MANNINGS nDIA. FOR CULVERT PIPE _ NINCHES INCHES DIA. FOR RISER = LENGTH OF CULVERT PIPE = 1 00: FEET INV. IN ELEV. OF CULVERT = 16.501 FEET INV. OUT ELEV. OF CULVERT = .1:6'.00! FEET INLET COEF. FOR CULV. PIPE FLOW - !,1 45 INLET COEF. FOR CULVERT INLET CONTROL ' 8 p RISER WEIR ELEVATION= a 000 FEET WEIR FLOW COEF. = LL s %0 TAILWATER ELEVATION = Pria2150FEET VELOCITY= 4.51 FPS SD2 ELEVATION CALCULATIONS FLOWRATE= CFS MANNINGS n = DIA. FOR CULVERT PIPE _ MINCHES INCHES DIA. FOR RISER = LENGTH OF CULVERT PIPE = 1 20! FEET INV. IN ELEV. OF CULVERT= 1.T.101 FEET INV. OUT ELEV. OF CULVERT = . 16.50P FEET INLET COEF. FOR CULV. PIPE FLOW = INLET COEF. FOR CULVERT INLET CONTROLRISER WEIR ELEVATION=FEET L7- WEIR FLOW COEF. = TAILWATER ELEVATION = 22.31 FEET VELOCITY= 3.52 FPS Prepared By: SWO . Checked By: HEADWATER ELEVATION ASSUMING INLET CONTROL] HEAD = 0.88 HEADWATER ELEVATION = 18.38 HEADWATER ELEVATION ASSUMING PIPE FLOW HEAD = 0.81 HEADWATER ELEVATION = 22.31 HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/01 HEADWATER ELEVATION = #DIV/0! HEADWATER ELEVATION ASSUMING INLET CONTROLI HEAD = 0.53 HEADWATER ELEVATION = 18.63 HEADWATER ELEVATION ASSUMING PIPE FLOW HEAD = 0.53 HEADWATER ELEVATION = 22.84 HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/0! HEADWATER ELEVATION = #DIV/0! Clearwater Place Culvert Hydraulics 10/8/97 ELEVATION CALCULATIONS �FLOWRATE= Y CFS MANNINGS n 1 DIA.FOR CULVERT PIPE = 15x18INCHES DIA. FOR RISER = #'; ` «0 INCHES LENGTH OF CULVERT PIPE = 1 1'5! FEET INV. IN ELEV. OF CULVERT = 19.81 1 FEET INV. OUT ELEV. OFCULVERT = -...;::,1.9'.24!FEET INLET COEF. FOR CULV. PIPE FLOW = INLET COEF. FOR CULVERT T ;7 5 INLET CONTROL RISER WEIR ELEVATION=4 0'00 FEET WEIR FLOW COEF. n TAILWATER ELEVATION = 22.84 FEET VELOCITY= 4.10 FPS SD4 HEADWATER ELEVATION CALCULATIONS FLOWRATE= � 5 49 CFS MANNINGS n DIA. FOR CULVERT PIPE _ '�,a, }+1 r8 INCHES DIA. FOR RISER = ` 0 INCHES LENGTH OF CULVERT PIPE = 1;26! FEET INV. IN ELEV. OF CULVERT = 20.44� FEET INV. OUT ELEV. OF CULVERT = 19.81. INLET COEF. FOR CULV. PIPE FLOW = tg 05 INLET COEF. FOR CULVERT INLET CONTROL RISER WEIR ELEVATION FEET WEIR FLOW COEF. = ratA TAILWATER ELEVATION = 23.70 FEET VELOCITY= 3.11 FPS Prepared By: SWO Checked By: HEADWATER ELEVATION ASSUMING INLET HEAD = 0.72 HEADWATER ELEVATION = 21.28 HEADWATER ELEVATION ASSUMING PIPE FLOW HEAD = 0.86 HEADWATER ELEVATION = 23.70 HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/01 HEADWATER ELEVATION = #DIV/0! HEADWATER ELEVATION ASSUMING INLET HEAD = 0.42 HEADWATER ELEVATION = 21.61 HEADWATER ELEVATION ASSUMING PIPE FLOW HEAD = 0.52 HEADWATER ELEVATION = 24.22 HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/0! #DIV/0! Clearwater Place Culvert Hydraulics 10/8/97 SD5 HEADWATER ELEVATION CALCULATIONS FLOWRATE=i 5 49 CFS MANNINGS n = 0 012 r4 DIA. FOR CULVERT PIPE = `j 15 INCHES DIA. FOR RISER INCHES LENGTH OF CULVERT PIPE= 112 FEEr INV. IN ELEV. OF CULVERT= 21.00 FEET INV. OUT ELEV. OFCULVERT = 20.44 FEET INLET COEF. FOR CULV. PIPE FLOW = yfi� 0x5 INLET COEF. FOR CULVERT INLET CONTROL k 40,6 RISER WEIR ELEVATION = 0 00 FEET WEIR FLOW COEF. _ ` L TAILWATER ELEVATION = 24.22 FEET VELOCITY= 4.47 FPS ELEVATION CALCULATIONS =LOWRATE CFS ✓1ANNINGS n = -• �O.O�t2 CIA. FOR CULVERT PIPE _ ; 2,4 INCHES CIA. FOR RISER = --,'r,..µ0. INCHES _ENGTHOFCULVERT PIPE= 81 FEET NV. IN ELEV. OF CULVERT = 18.70 FEET NV. OUT ELEV. OFCULVERT = 18.00 FEET NLET COEF. FOR CULV. PIPE FLOW NLETCOEF. FOR CULVERT INLET CONTROL RISER WEIR ELEVATION FEET NEIR FLOW COEF. = TAILWATER ELEVATION = 22.08 FEET /ELOCITY= 6.68 FPS Prepared By: SWO . Checked By: HEADWATER ELEVATION ASSUMING INLET HEAD = 0.86 HEADWATER ELEVATION = 22.49 HEADWATER ELEVATION ASSUMING PIPE FLOW HEAD= 1.16 HEADWATER ELEVATION = 25.37 HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/0! HEADWATER ELEVATION = #DIV/0! HEADWATER ELEVATION ASSUMING INLET HEAD = 1.93 HEADWATER ELEVATION = 21.63 HEADWATER ELEVATION ASSUMING PIPE FLOW HEAD = 1.63 HEADWATER ELEVATION = 23.72 HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/0! HEADWATER ELEVATION = #DIV/0! Clearwater Place Culvert Hydraulics 10/8/97 ELEVATION CALCULATIONS FLOWRATE= 7 720"99 CPS MANNINGS n DIA. FOR CULVERT PIPE I,�� 3,0 INCHES DIA FOR RISER = c �. :�;;0. INCHES LENGTH OF CULVERT PIPE = 71 i FEET INV. IN ELEV. OF CULVERT = 18.001 FEET INV. OUT ELEV. OF CULVERT = 16! 501 FEET INLET COEF. FOR CULV. PIPE FLOW0'15 INLET COEF. FOR CULVERT INLET CONTROL RISER WEIR ELEVATION = =<' `'Oa00 FEET WEIR FLOW COEF. TAILWATER ELEVATION lii5"Ib FEET VELOCITY= 4.28 FPS SD7 HEADWATER ELEVATION CALCULATIONS FLOWRATE= ',;`'1.0:.1`9 CFS MANNINGS n DIA. FOR CULVERT PIPE = 5 ;..'+;.:� 24 INCHES DIA. FOR RISER=[;w 0 INCHES LENGTH OF CULVERT PIPE = 1'3 01 FEET INV. IN ELEV. OF CULVERT = 20:85 FEET INV. OUT ELEV. OF CULVERT = 19.30, FEET INLET COEF. FOR CULV. PIPE FLOW = „0.5 INLET COEF. FOR CULVERT INLET CONTROL' 0.'6 RISER WEIR ELEVATION=0 00 FEET WEIR FLOW COEF. _' *0' TAILWATER ELEVATION = 23.72 FEET VELOCITY= 3.24 FPS Prepared By: SWO Checked By: HEADWATER ELEVATION ASSUMING INLET HEAD = 0.79 HEADWATER ELEVATION = 20.04 HEADWATER ELEVATION ASSUMING PIPE FLOW HEAD = 0.58 HEADWATER ELEVATION = 22.08 HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/0! HEADWATER ELEVATION = #DIV/0! HEADWATER ELEVATION ASSUMING INLET HEAD = 0.45 HEADWATER ELEVATION = 22.30 HEADWATER ELEVATION ASSUMING PIPE FLOW HEAD = 0.47 HEADWATER ELEVATION = 24.19 HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/0! HEADWATER ELEVATION = #DIV/0! ISD8 ELEVATION CALCULATIONS Clearwater Place Culvert Hydraulics 10/8/97 FLOWRATE _MINCHES CFS MANNINGS n = DIA. FOR CULVERT PIPE _ INCHES DIA. FOR RISER = LENGTH OF CULVERT PIPE = 1101 FEET .INV. IN ELEV. OF CULVERT = 20580' FEET INV. OUT ELEV. OF CULVERT= 1900 FEET INLET COEF. FOR CULV. PIPE FLOW =O:r5 INLET COEF. FOR CULVERT INLET CONTROL yV RISER WEIR ELEVATION = 106 00 FEET „„0 WEIR FLOW COEF. _ TAILWATER ELEVATION = 23.72 FEET VELOCITY= 2.93 FPS SD9 HEADWATER ELEVATION CALCULATIONS FLOWRATE=' Y+1"44 CPS MANNINGS n = % " Oc0:1.2 DIA. FOR CULVERT PIPE _ DIA. FOR RISER= h z, l ww`'3 ;115 1�;j r,,�""O:INCHES INCHES LENGTH OF CULVERT PIPE = 5'5: FEET INV. IN ELEV. OF CULVERT = 21.08 FEET INV. OUT ELEV. OF CULVERT = 20.80 FEET INLET COEF. FOR CULV. PIPE FLOW = INLET COEF. FOR CULVERT INLET CONTROLRISERWEIRELEVATION= D-11 FEET WEIR FLOW COEF. _ ELEVATION = 24.21 FEET (TAILWATER VELOCITY= 1.17 FPS Prepared By: SWO . Checked By: HEADWATER ELEVATION ASSUMING INLET HEAD = 0.37 HEADWATER ELEVATION = 21.80 HEADWATER ELEVATION ASSUMING PIPE FLOW HEAD = 0.49 HEADWATER ELEVATION = 24.21 HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD= #DIV/0! HEADWATER ELEVATION = #DIV/0! HEADWATER ELEVATION ASSUMING INLET HEAD = 0.06 HEADWATER ELEVATION = 21.76 HEADWATER ELEVATION ASSUMING PIPE FLOW HEAD = 0.06 HEADWATER ELEVATION = 24.27 HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/01 HEADWATER ELEVATION = #DIV/01 SD10 TER ELEVATION CALCULATIONS Clearwater Place Culvert Hydraulics 10/8/97 FLOWRATE = f6..;47 CPS MANNINGS n = I ` fr 0;12 DIA. FOR CULVERT PIPE _1 8 INCHES DIA. FOR RISER =�� INCHES LENGTH OF CULVERT PIPE = 12 5 FEET INV. IN ELEV. OF CULVERT = 21.50FEET INV. OUT ELEV. OF CULVERT = 20.85 FEET INLET COEF. FOR CULV. PIPE FLOW = Ot5 i INLET COEF. FOR CULVERT INLET CONTROL RISER WEIR ELEVATION = 000 FEET WEIR FLOW COEF. = k ,0 TAILWATER ELEVATION = 24.19 FEET VELOCITY= 3.66 FPS 10A ELEVATION CALCULATIONS °LOWRATE= '9(-2'•1S7 CPS AANNINGS n = 0 �01:2 DIA. FOR CULVERT PIPE= J ^ li"„rS. t��``' INCHES DIA. FOR RISER= I` � x. •!`� 0 INCHES _ENGTH OF CULVERT PIPE= 40 FEET NV. IN ELEV. OF CULVERT = 21 .70, FEET NV. OUT ELEV. OF CULVERT = 21.50 FEET NLET COEF. FOR CULV. PIPE FLOW 0.5 NLET COEF. FOR CULVERT INLET CONTROL 0.'6 RISER WEIR ELEVATION =' ° t0"00 FEET NEIR FLOW COEF.= 0 TAILWATER ELEVATION = 24.90 FEET /ELOCITY= 1.77 FPS Prepared By: SWO . Checked By: HEADWATER ELEVATION ASSUMING INLET HEAD = 0.58 HEADWATER ELEVATION = 22.83 HEADWATER ELEVATION ASSUMING PIPE FLOW HEAD = 0.72 HEADWATER ELEVATION = 24.90 HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/0! HEADWATER ELEVATION = #DIV/0! HEADWATER ELEVATION ASSUMING INLET HEAD = 0.13 HEADWATER ELEVATION = 22.46 HEADWATER ELEVATION ASSUMING PIPE FLOW HEAD = 0.11 HEADWATER ELEVATION = 25.02 HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/0! HEADWATER ELEVATION = #DIV/0! Clearwater Place Culvert Hydraulics 10/8/97 SD11 HEADWATER ELEVATION CALCULATIONS FLOWRATE= 2 1r7 CFS MANNINGS n = DIA. FOR CULVERT PIPE= 1 5 INCHES LJ�o DIA. FOR RISER = +''9'u0 INCHES LENGTH OF CULVERT PIPE = 6 0' FEET INV. IN ELEV. OF CULVERT = 22.00FEET INV. OUT ELEV. OF CULVERT = 21.70, FEET INLET COEF. FOR CULV. PIPE FLOW = Or5 INLET COEF. FOR CULVERT INLET CONTROL= 0`.6 RISER WEIR ELEVATION =0 4, �a. 00 FEET WEIR FLOW COEF. _0 TAILWATER ELEVATION = 25.02 FEET VELOCITY= 1.77 FPS iE ELEVATION CALCULATIONS Prepared By: SWO . Checked By: HEADWATER ELEVATION ASSUMING INLET CONTROL] HEAD = 0.13 HEADWATER ELEVATION = 22.76 HEADWATER ELEVATION ASSUMING PIPE FLOW HEAD = 0.13 HEADWATER ELEVATION = 25.15 HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/01 HEADWATER ELEVATION = #DIV/01 NRATE _ �' 2 29 CFS WINGS n = a �f 0a012 HEADWATER ELEVATION ASSUMING INLET CON' FOR CULVERT PIPE = 4 �, �' ,�1 5 INCHES FOR RISER INCHES HEAD= 0.15 3TH OF CULVERT PIPE = 125 FEET HEADWATER ELEVATION = 20.40 IN ELEV. OF CULVERT = 19 63i FEET OUT ELEV. OF CULVERT = 19.00 FEET T COEF. FOR CULV. PIPE FLOW = 0:5 HEADWATER ELEVATION ASSUMING PIPE FLOW T COEF. FOR CULVERT INLET CONTROL =+ ° 06 iR WEIR ELEVATION = 1, 000 FEET HEAD = 0.22 9 FLOW COEF. = b;`'-0 HEADWATER ELEVATION = 23.93 WATER ELEVATION = 23.72 FEET JCITY= 1.87 FPS HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/01 HEADWATER ELEVATION = #DIV/O! Clearwater Place Culvert Hydraulics 10/8/97 SD13 HEADWATER ELEVATION CALCULATIONS FLOWRATE= i� 1 85 CFS MANNINGS n = 0 012 DIA. FOR CULVERT PIPE = Y 1,5 INCHES DIA. FOR RISER = INCHES LENGTH OF CULVERT PIPE = 8 0; FEET INV. IN ELEV. OF CULVERT = 22.56' FEET INV. OUT ELEV. OF CULVERT = 19"631 FEET INLET COEF. FOR CULV. PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL a Ou6 RISER WEIR ELEVATION = '�'`' 000 FEET WEIR FLOW COEF. TAILWATERELEVATION= 23.93 FEET VELOCITY= 1.51 FPS SD14 ELEVATION CALCULATIONS FLOWRATE=0i7.9 CFS MANNINGS n DIA. FOR CULVERT PIPE = r y1,5 INCHES DIA. FOR RISER = ' "' "' "' 0 INCHES LENGTH OF CULVERT PIPE = 6 51 FEET INV. IN ELEV. OF CULVERT 22.90 FEET INV. OUT ELEV. OF CULVERT = 22.58� FEET INLET COEF. FOR CULV. PIPE FLOW INLET COEF. FOR CULVERT INLET CONTROL y4 RISER WEIR ELEVATION = I 0 00 FEET WEIR FLOW COEF. _ TAILWATER ELEVATION = 24.04 FEET VELOCITY= 0.64 FPS Prepared By: SWO Checked By: HEADWATER ELEVATION ASSUMING INLET HEAD = 0.10 HEADWATER ELEVATION = 23.30 HEADWATER ELEVATION ASSUMING PIPE FLOW HEAD = 0.11 HEADWATER ELEVATION = 24.04 HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/0! HEADWATER ELEVATION = #DIV/0! HEADWATER ELEVATION ASSUMING INLET HEAD = 0.02 HEADWATER ELEVATION = 23.54 HEADWATER ELEVATION ASSUMING PIPE FLOW HEAD = 0.02 HEADWATER ELEVATION = 24.06 HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = #DIV/0! HEADWATER ELEVATION = #DIV/0! BASIN I.D. Flowrate A 1.44 B 2.15 C 4.93 D 3.70 E 5.49 F 1.75 G 3.83 H 3.11 4.01 0.44 K 1.06 L 0.79 M 4.30 N 2.17 Clearwater Place Grate Inlets 9/2/97 Inlet Grate Hydrology & Hydraulics Check most critical catch basin. Inlet grate sized for most critical basin will be suitable for all basins. Most Critical Basin = Area P 10-Yr Flowrate: 5.49 cfs Minimum Perimeter grate with head limited to 0.6 feet: P = Q / (C'H)M.5 where C=2.5 Perimiter: 3.0 Feet Minimum Open area of grate with head limited to 0.6 feet: A = Q / C'(2'g'H)^0.5 where C=0.6 Open Area: 1 .5 g Clearwater Place Stormwatar Pond Design 8/27/97 Stormwater Pond Design Total Drainage Area: Impervious Area: Buildings: Parking: Sidewalk: Pool/Tennis Area: Total: % Imperivous: § 847 F Acres Acres 2"05'7 � 2:283 ° Acres ° .. 426, Acres 0.524� Acres 5.104 Acres 57.7 % Permanent Pool Depth 8 % TSS Removal SA/DA 2 Required SA: 9,634 SF Runoff: Inches "Simple Method" R, 0.57 Volume: 18,280 CF Actual Normal Pool SA:,"P '1'9;i50` SF (® 20.V MSL) Depth of Storage: 1.0 Feet USE: =�Feet SA @ Storage Pool: Provided Storage: Pond Elevations: Bottom Elev.: Permanent Pool: Storage Pool: Flood Pool: "Freeboard" Elev: 211,5�SF (@ 21.0' MSL) 20,335 CF 1?4� 0 � MSL 20.0 MSL 21.0 MSL 2.1`.5 MSL 22.0 MSL Prepared By: SWC Checked By: �•� _ S _ .. O C 2 4 2 1 7 3 . 0 2— 7 5.=. > 90% TSS =gCti — OR VET W=THOL= /- _J. 7 2.0 7.0 6.Li 5.7 7.2 of gym.. I fir = 5 Clearwater Place Stormwater Pond Design 9/2/97 Prepared By: SWQ . Checked By: aws:x- Cleanlvater°Place`` x Runoff Hydrograph into SW Pond The following Hydrograph Calculations are based on "Soil and Water Conservation Engineering," Schwab,Frevert, Edminster, Barnes; Pages 93-115. (See Flowrate Calc. and Drainage Basin Data for Breakdown of Areas) Curve Number Draina a Area Land Use Soil Grou NA %Fbi7fpervious B 499.8 ' 8a1 3.7 c .:W. Grassed '� 4_, B, -1, 228.14 Total: 8.84 Total: 727.94 Weighted Curve Number: 82.35 Runoff Volume: (Soil Conservation Service Method) Storm Duration: 10 Yr 1'Mr Storm Rainfall: 2.8 Inches S: 2.14 Direct Surface Runoff: 1.25 Inches Total Runoff: 39,961 CF 0.92 Ac-Ft Peak Flowrate: 10 Yr Intensity: 1�Inches/Hour Weighted "C": 0.63 10 Yr Peak Flowrate: 39.15 CFS Basic Hydrograph: Conversion Factors: u: 0.000278 Ac-Ft/Unit w: 0.39151 CFS/Unit k: 0.516 Min/Unit Clearwater Place Stormwater Pond Design 8/27/97 Prepared By: SWQ . Checked By: Time Min Flow CFS 0.0 0.0 1.5 2.0 3.6 5.9 5.2 13.7 6.7 21.9 8.2 30.1 9.3 35.2 10.3 38.0 11.9 39.2 13.9 37.6 15.5 33.3 17.5 28.2 20.6 19.6 24.2 12.9 27.3 9.4 30.9 6.3 34.5 4.3 43.3 1.6 51.6 0.0 Inflow Hydrograph 40.0 - 35.0 30.0 LL 25.0 U 20.0 i 2 15.0 LL 10.0 I 5.0 0.0 0.0 10.0 20.0 30.0 40.0 50.0 60.0 i Time (MIN) i i Clearwater Place Stormwater Pond Design 8/27/97 Prepared By: SWQ Checked By: Clearwater Place Pond Stage -Discharge -Storage Pond Storage Area = 19,150.00 Square Feet AT = �01'2�0 sec. ELEVATION DISCHARGE STORAGE 2S/DT + O 20.00 0.00 0.00 21.00 0.00 19150 319 21.12 1.00 21448 358 21.34 5.00 25661 433 21.43 7.00 27385 463 21.54 10.00 29491 502 21.86 15.00 35619 609 22.74 17.00 52471 892 24.38 20.00 83877 1418 " Discharge / Stage Relationship Based on 18" Barrel and 24" Riser 1600 - Outflow vs MAT + O i 1400 i I 1200 1000 O I I I 800 (n I N I I II I I I I I I i 600 i I I I I I I I I � 400 I I � I I I I I I I 200 lie y0 I I I I 1 I I O I 0 5 10 Outflow (CFS) 15 20 1 Clearwater Place Stormwater Pond Design 8/27/97 Prepared By: SWQ . Checked By: Clearwater. Place Routing Table.- SW Treatment Pond AT USED IN STAGE-DISCHARGESTORAGE 2 (min) Time n In In + In+1 2S/DT - On 2S/DT + On+1 On+1 (min) (CFS) (CFS) (CFS) (CFS) (CFS) 0, 1 0'- 2 2 2 2, 8 2 2 0. •; 4 3 6 27 10 10 0 6 4 ;2,1. 51 37 37 8 5 30 68 88 88 0 10 6 38' 77 156 156,,« �0 ` 12 7 3977 233 233' �0 14 8 38: 72 310 310 � 0 16 9 34' 62 378 382 2 18 10 28, 47 430 440 � 5 20 11 19 34 461 477 "BP 22 12 15 27 475 495 1=0 24 13 12. 23 482 502 26 14 11 20 485 505 10 28 15 9 16 485 505a10 30 16 7 12 481' 501 10 32 17 5 9 473 493 0 34 18 4 7 466 482 Sa xe 36 19 3 6 459 473 7 xw� 38 20 35 451 465 40 21 2 4 444 456 6 42 22 2' 3 436 4486� 44 23 1 2 429 4395 46 24 1. 2 421 431� 5 48 25 1` 1 413 423_r5y °¢ 50 26 0 0 406 414 P4 Clearwater Place Stormwater Pond Design 8/27/97 Stormwater Pond Outlet Structure HEADWATER ELEVATION CALCULATIONS FLOW RATE = bj CFS F1 MANNINGS n = 0.012 DIA. FOR CULVERT PIPE = 18 INCHES DIA. FOR RISER = 24 INCHES LENGTH OF CULVERT PIPE = 1 1 0 FEET INV. IN ELEV. OF CULVERT = 18.00 FEET INV. OUT ELEV. OF CULVERT = 17.00 FEET INLET COEF. FOR CULV. PIPE FLOW = 0.5 INLET COEF. FOR CULVERT INLET CONTROL = .0.6 RISER WEIR ELEVATION = 21.00 FEET WEIR FLOW COEF. = 1 4 TAILWATER ELEVATION = 18.00 FEET 010 Routed Flowrate equals 10 cfs Prepared By: SWO ulluumuu HEADWATER ELEVATION ASSUMING INLET CONTROL HEAD = 1.38 HEADWATER ELEVATION = 20.13 HEADWATER ELEVATION ASSUMING PIPE FLOW HEAD = 1.60 HEADWATER ELEVATION = 19.60 HEADWATER ELEVATION ASSUMING WEIR FLOW HEAD = 0.54 HEADWATER ELEVATION = 21.54 Clearwater Place Drawdown Calculations 8/27/97 Clearwater Place Stormwater Pond Drawdown ORIFICE DIA. INCHES AREAS (FTA2) NUMBER OF ORIFICES 1 2 3 4 INWig 211 0.034 0.068 0.102 0.1361 DATAINPUT NORMALPOOLAREA= INCHES OF RAINFALL = BASIN AREA = IMPERVIOUS AREA = NORMAL POOL ELEVATION = ORIFICE AREA = STORAGE POOL AREA= TIME INCREMENT OF ROUTING = ORIFICE COEF. = INPUT RESULTS RUNOFF COEF. (Rv) = ELEVATION OF POOL AT STORAGE _ NORMALPOOLAREA= VOLUME OF RUNOFF FROM RAINFALL = VOLUME OF STORAGE = 0.440'ACRES W'°WR INCHES 8.85iACRES 5.10'ACRES 20'.ob FEET �v 5 0 034 FEE 2 0:4940'ACRES �' 2; I HOURS �. 0 '6 0.5692 2.1.00 FEET 19,150.00 FEETZ 18,280.50 FEET3 20,335.00 FEET3 Prepared By: SWC . Checked By: T Clearwater Place Drawdown Calculations 8/27/97 Prepared By: SWO . Checked By: Drawdown Calculations For Pond Orfice TIME ELEVATION HEAD FLOWRATE VOLUME END ELEV. FEET FEET CFS CIF FEET 0 21.00 1.0000 0.16371 1,178.71 20.94 2.0 20.94 0.9384 0.15859 1,141.85 20.88 4.0 20.88 0.8788 0.15347 1,104.98 20.82 6.0 20.82 0.8211 0.14835 1,068.09 20.77 8.0 20.77 0.7653 0.14322 1,031.18 20.71 10.0 20.71 0.7115 0.13809 994.24 20.66 12.0 20.66 0.6596 0.13296 957.28 20.61 14.0 20.61 0.6096 0.12782 920.29 20.56 16.0 20.56 0.5615 0.12268 883.27 20.52 18.0 20.52 0.5154 0.11753 846.22 20.47 20.0 20.47 0.4712 0.11238 809.13 20.43 22.0 20.43 0.4290 0.10722 772.00 20.39 24.0 20.39 0.3887 0.10206 734.83 20.35 26.0 20.35 0.3503 0.09689 697.61 20.31 28.0 20.31 0.3139 0.09171 660.34 20.28 30.0 20.28 0.2794 0.08653 623.01 20.25 32.0 20.25 0.2468 0.08134 585.61 20.22 34.0 20.22 0.2163 0.07613 548.14 20.19 36.0 20.19 0.1876 0.07091 510.58 20.16 38.0 20.16 0.1610 0.06568 472.91 20.14 40.0 20.14 0.1363 0.06043 435.13 20.11 42.0 20.11 0.1136 0.05517 397.20 20.09 44.0 20.09 0.0928 0.04987 359.10 20.07 46.0 20.07 0.0741 0.04455 320.78 20.06 48.0 20.06 0.0573 0.03919 282.18 20.04 50.0 20.04 0.0426 0.03378 243.21 20.03 52.0 20.03 0.0299 0.02830 203.73 20.02 54.0 20.02 0.0192 0.02271 163.48 20.01 56.0 20.01 0.0107 0.01693 121.92 20.00 58.0 20.00 0.0043 0.01078 77.59 20.00 60.0 20.00 0.0003 0.00275 #REF! #REF! Tim�n�e ODrawdown c1 eze 12 I 6 = b7 �ts/INiRiv /✓fl/SaU a�N >n/NN d7�/ -'7n7)lrCrD fVOIJ--W Na w/Q_)5 aN� NO/jyu:R "b 90'$ t; Sal'?/,./ gi = -L nQ ;dam /./OlLaatovd 1a'7tnp cw 5?1 'D'�1H/7% 41./710155 aL o' State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office James B. Hunt, Jr., Governor Wayne McDevitt, Secretary Division of Water Quality November 4. 1997 Mr. Jay Houston, P.E. Houston and Associates PO Box 2927 Shallotte, NC 28459 -ANT4 NC®ENR NORTH C.AROLINA DEPARTMENT OF ENVIRONMENT ANo NATURAL RESOURCES Subject: ACKNOWLEDGEMENT OF RECEIPT AND REQUEST FOR ADDITIONAL INFORMATION Stormwater Project No. SW8 970936 Clearwater Place @Winding River �� Brunswick County 1 'Ic- Dear Mr. Houston: The Wilmington Regional Office received a Stormwater Management Permit Application for Clearwater Place @Winding River on September 26, 1997. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Provide typical unit footprints with dimensions, and wood/concrete areas noted. 2. Provide parking lot aisle, space, and sidewalk dimensions. 3. The calculations report a removal efficiency of 80%. I believe this should be 90%. Please remember that if you use the 85 % SA/DA number, you MUST provide a vegetated filter at the outlet. 4. Delineate all wetlands on site, or note on the plans that none exist. 5. Label the location of the tennis courts referred to on the plans. 6. Will the future amenity area be routed to this pond? Portions of the area are already delineated within the drainage area of this pond. 7. In reference to the overall map, what is the tract number and allowable impervious area for this project, as approved in the Master Plan? 127 North Cardinal Dr., Wilmington, North Carolina 28405 Telephone 910-395-3900 FAX 910-350-2004 An Equal Opportunity Affirmative Action Employer 50 % recycled/10% post -consumer paper Mr. Houston November 4, 1997 Stormwater Project No. SW8 970936 Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to December 4, 1997, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you have any questions concerning this matter please feel free to call me at (910) 395-3900. Sincerely, Ms. Linda Lewis Environmental Engineer RSS/arl: S:\WQS\STORMWAT\ADDINFO\970936.NOV cc: Linda Lewis Central Files 127 North Cardinal Dr., Wilmington, North Carolina 28405 Telephone 910-395-3900 FAX 910-350-2004 An Equal Opportunity Affirmative Action Employer 2 50% recycled/10% post -consumer paper HOUSTON and ASSOCIATES, P.A. Consulting Engineers SHALLOTTE, NORTH CAROLINA 28459 Telephone (910) 754-6324 Facsimile (910) 754-2121 Ms. Linda Lewis, Environmental Engineer Division of Environmental Management North Carolina Department of Environment, Health, and Natural Resources 127 Cardinal Drive Extension Wilmington, North Carolina 28405 117 Pine Street Post Office Box 2927 Wednesday, September 24, 1997 Subject: Clear Water Place Brunswick County, North Carolina Submittal of Stormwater Plan for Approval Dear Ms. Lewis: n F-'' c a-+'e ''✓ 1✓D SEp 2 i; 1'.?97 B"'' �8 On behalf of Clear Water Place, Inc., we are pleased to submit for your review and approval two copies each of the Stormwater Plans, the hydrologic and hydraulic calculations and the executed Permit Application forms. The proposed subject project falls within the high density guidelines. Enclosed is a check in the amount of $385.00 to cover the required high density application fee. We appreciate your attention in this matter. Should you have any comments or require any additional information, please do not hesitate to contact our office at vour convenience. Sincerely, J WoAs n, P.E. s on andsociat P.A. JRH/swq Enclosures pc: Mr. John Sabatini, Clear Water Place Inc. \ , File: 97-0137 (Clear Water Place, SW/EC) J�