Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW8121205_APPROVED PLANS_20130321
STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 1 Z a 2 a 5 DOC TYPE ❑ CURRENT PERMIT APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2013 p 3 2 1 YYYYMMDD LOUTS ROAD PARKING LOT -CAMP LEJEUNE, NC PROJECT NO. P1266 / >Id sbaro us >o Kinston Dover ew Bern GS� e Tuscarora ��'�`�"\`^`=J� ems. �% Trenton OAK GROVE / / c Seven — \ CHERRY POINT I Springs Pollacksville tl I o Olive Havelock O(wa� I Pink Comfort Maysville I Hill L r I ( L Richlands eaufortt orehead City I 1 I 'saw Deulaville � / r Jacksonville \ y� Swansboro c Veron Rosehill ti G Dixon CAMP LEJEUNE � 3 Wallace Folkstone os PROJECT Ridge LOCATION Durgow /H/olly r Wards Corner � w pstead JH/am Scall Hill " Acme P Delco Wilmington � k 76 Leland c° Bolton Q' I O ps kJ) R U 1 v as NI vn YI — WAS .nu.. L M]IdOIW .� u Lu2wT w �virxa B OBron F E gog O F- o z Y a x `L jf Q o a C z Q N W 0 W W Q J � N � z 7 W 0 W5 J J (0 � LL ps B] 15 Wi, Q REC ED AS Wann FEB 14 2013�i-��-� VICINITY MAP [� LOCATION MAP BY:-_� 12639650 T ,i � srxc No w,tE G-001 z A I L 6°I H I1M1NF]OM1{..(S-0.V' N M F, z I LEGEND: XE ISTING NENV CIVIL ABBREVIATIONS: TOP OF CURB OR CONCRETE (TC) ELLVATCN 13 &T,Iy'� BLDG BUILDING ELEVATION OF WilEfl, PAVEMFNf OR GROUND C.C. CENTER TO CENTER COMM. COMMUNICATION g9�M1 20.55\ CONST. CONSTRUCTION SPOT ELEVATION CP CONTROL POINT �,Bfl ELEV ELEVATION TOP OF WALL (TW) HrvATKIN EXP. EXPANSION FT FEET BTUMINWS PAVEMENT GAIN. GALVINIZED / INV INVERT JTS JOINTS CENITRI ARCH/SWAIE MAX./MAX MAXIMUM MH MI CONCRETE (CONC.) CONK IMUM MIN./MIN MINE _ NTS NOT TO SCALE O.C. ON CENTER A PCC PORTAND CEMENT CONCRETE POUNDS PER SQUARE INCH CURB AND GUTTERP.S.I./PSI R RADIUS REINFORCED CONCRETE PIPE EDGE OF WOODS �' RDP ROAD REOb REQUIRED FENCE S.S. TBM TEMPORARY BENCH MARK SIGN T T TYP TYPICAL TOP OF BANK (T.O.BJ TOR — MANHOLE or. MH DEMOLITION NOTES UTUTY POLL 0 1. REMOVE AND DISPOSE OF EXISTING MANMADE SURFACE FUTURES WITHIN THE LIMIT OF WORK INCLUDING BUILDINGS, STRUCTURES, PAVEMENTS, WORK tEtE/COMM. MN (1) CURBING, FENCES, UTILITY POLES, SIGNS, ETC. UNLESS INDICATED OTHERWISE ON THE DRAWINGS. STORM PIPE 2. EXISTING UTIUTES SHALL BE TERMINATED, UNLESS OTHERWISE NOTED, IN CONFORMANCE WITH STATE, CATCH BASIN LOCAL, BASE AND INDIVIDUAL UTRNY COMPANY STANDARDS, AND DETAILS. THE CONTRACTOR SHALL TBM COORDINATE UTILITY SERVICE DISCONNECTS WITH THE UTILITY REPRESENTATIVES. FARED END SECTION 3. DISPOSE OF DEMOLMON DEBRIS IN ACCORDANCE WITH APPLICABLE FEDERAL, STATE AND OUTLET STRUCTURE O LOCAL REGULATIONS, ORDINANCES AND STATUTES. aT PENCE LAYOUT NOTES TREE PROTECTION 1. ANY PROPERTY LINE MONUMENTATION DISTURBED DURING CONSTRUCTION STALL BE SET OR RESET BY A PERMANENT POW. PROFESSIONAL LICENSED SURVEYOR. DRAWING REFERENCE NUMBER NAVFAC DRAWING NUMBER GENERAL I C-001 12639650 TITLE SHEET, VICINITY AND LOCATION MAPS CIVIL 2 C-001 12639651 INDEX OF DRAWINGS B GENERAL NOTES 3 C-101 12639652 EXISTING SITE & DEMOLITION 4 C-201 12639653 SITE LAYOUT PLAN 5 C-301 12639654 GRADING h DRAINAGE PALN 6 C-401 12639655 EROSION & SEDIMENT CONTROL PLAN 7 C-501 12639656 SITE DETAILS 8 C-502 12639657 SITE DETAILS 9 C-503 12639659 EROSION CONTROL NOTES 10 C-601 12639660 PRE -DEVELOPMENT DRAINAGE AREAS 11 C-602 12639661 POST -DEVELOPMENT DRAINAGE AREAS 12 L-100 12639fi62 LANDSCAPE PAIN SHEETINDEX NOT TO SCALE 4 v 0 GENERAL NOTES: 1. UNLESS OTHERWISE INDICATED, ALL EXISTING STRUCTURES AND FACILITIES SHALL REMAIN. 2, ALL DIMENSIONS ARE TO FACE OF BUILDING, FACE OF CURB AND/OR EDGE OF PAVEMENT UNLESS OTHERWISE INDICATED. 3. SOD (CENTIPEDE) ALL DISTURBED PERVIOUS AREAS WITHIN THE LIMITS OF CONSTRUCTION UNLESS OTHERWISE SPECIFIED. T NO EARTHWORK SHALL BE PERFORMED UNTIL ALL SOIL EROSION AND SEDIMENT CONTROL DEVICES ARE IN PLACE. 5., ALL GRADE TRANSITIONS BETWEEN NEW AND EXISTING SHALL BE SMOOTH AND GRADUAL WITH NO SHARP OR ABRUPT CHANGES. 6. COORDINATE THE WORK OF ALL TRADES - VERIFY ALL FIELD CONDITIONS, QUANTITIES AND DIMENSIONS PRIOR TO COMMENCEMENT OF WORK. ANY DISCREPANCIES SHALL BE PROMPTLY BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER. 7. EXECUTE ALL WORK WITH CARE TO PROTECT FROM DAMAGE ALL ADJACENT EXISTING FEATURES THAT ARE TO REMAIN. ANY SUCH DAMAGE SHALL BE REPAIRED OR REPLACED TO MATCH THE ORIGINAL CONDITION AS APPROVED BY THE CONTRACTING OFFICER AT NO ADDITIONAL COST TO THE GOVERNMENT. E. FINISHED GRADE OF TOP SOIL (AFTER COMPACTION) SHALL BE 0.5 INCH TO I INCH (MAXIMUM) BELOW TOP OF ABUTTING PAVEMENTS, SIDEWALKS AND CURBING, 9, ALL HOLES, DEPRESSIONS, EXCAVATIONS, ETC. CREATED AS A RESULT OF DEMOLITION SHALL BE BACK -FILLED, GRADED AND SEEDED. 10, CONTAMINATED SOIL SHOULD NOT BE ENCOUNTERED, HOWEVER, IF CONTAMINANTS ARE SUSPECTED THROUGH ODORS OR VISUAL INSPECTIONS DURING EXCAVATION OPERATIONS, STOP WORK AND IMMEDIATELY CONTACT THE CONTRACTING OFFICER FOR FURTHER INSTRUCTIONS. 11, THERE ARE NO KNOWN GROUNDWATER MONITORING WELLS WITHIN THE PROJECT SITE, HOWEVER, IF AN UNMARKED WELL IS DISCOVERED AND INADVERTENTLY DAMAGED, STOP WORK AND IMMEDIATELY CONTACT THE CONTRACTING OFFICER FOR FURTHER INSTRUCTIONS. SURVEY NOTES: UTILITY NOTES 1. EXISTING UTNDES SHOWN ARE APPROXIMATE ONLY AND BASED ON FIELD SURVEYS, AVAILABLE RECORDS, VERBAL INFORMATION AND/OR PHYSICAL FEATURES. THE CONTRACTOR SHALL OBTAIN DIGGING PERMITS PRIOR TO START OF EXCAVATION. AT LEAST 15 DAYS PRIOR TO STARTING EXCAVATION WORK, ME CONTRACTOR SHNL CONTACT THE CONTRACTING OFFICER TO ALLOW WNW OF EXISTING BURIED UTILITIES. All EXISTING UNDERGROUND UTILITIES IN ME WORK AREA MUST BE POSITIVELY IDENTIFIED BY A THIRD PARTY, INDEPENDENT, PRIVATE UTILITY LOCATING COMPANY AND COORDINATED WITH THE CONTRACTING OFFICER. ANY MARKINGS MADE DURING THE UTILITY INVESTICATION MOIST BE MAINTAINED THROUGHOUT THE CONTRACT. WHENEVER CONTRACT WORK INVOLVES CHIPPING, SAW CUTTING, OR CORE DRILLING THROUGH CONCRETE. BITUMINOUS ASPHALT OR OTHER IMPERVIOUS SURFACES, ME THIRD PARTY, INDEPENDENT. PRIVATE LOCATING COMPANY SHU1 LOCATE URUTY DEPTH BY USE OF GROUND PENETRATING RADAR (CPR), X-RAY, BORE SCOPE, OR ULTRASOUND PRIOR TO THE START OF DEMOLITION AND CONSTRUCTION. OUTAGES TO ISOLATE UNLTIY SYSTEMS MUST BE USED IN CIRCUMSTANCES WHERE UTILITIES PRE UNABLE TO BE POSITIVELY IDENTIFlED. ME USE OF HISTORICAL DRAWINGS DOES NOT ALLEVIATE THE CONTRACTOR FROM MEETING THIS REQUIREMENT. PRIOR TO CONSTRUCTION, THE SITE SHALL BE SCANNED WITH ELECTROMAGNETIC AND SONIC EQUIPMENT AND THE GROUND SURFACE MARKED WHERE EXISTING UNDERGROUND UTILITIES ARE DISCOVERED. THE CONTRACTOR WILL TAKE THE NECESSARY PRECAUTONS TO PROTECT THE EXISTING UDULES AND ANY DAMAGE TO THE UTHUTIES SHALE BE IMMEIATELY REPAIRED AT THE CONTRACTOR'S EXPENSE. THE CONTRACTOR SHALL BE REQUIRED AND AGREES TO COMPLY WITH ALL ME PROVISIONS OF THE GOVERNMENT, STATE AND UTILITY FOR UNDERGROUND DAMAGE �v PREVENTION AND HEREBY AGREES TO HOLD THE GOVERNMENT HARMLESS AGAINST ANY LOSS, DAMAGES AND CLAIMS OF ANY NATURE WINTSOEVER ARISING OUT OF FAILURE TO COMPLY WITH SAID PROVISIONS. 2. THE LOCATIONS, SIZES, ANDTYPESOF EXISTING UTILITIES ARE SHOWN AS AN APPROXIMATE REPRESENTATION ONLY. PRIOR TO ORDERING MATERIALS AND BEGINNING OF CONSTRUCTION THE CONTRACTOR SHALL VERIFY AND DETERMINE THE EXACT LOCATIONS, SIZES, AND ELEVATIONS OF POINTS OF CONNECTIONS TO EXISTING UTILITIES AND. SHALL CONFIRM THAT THERE ARE NO INTERFERENCES WITH THE EXISTING UTILITIES AND THE PROPOSED UTILITY ROUTES, INCLUDING ROUTES WITHIN THE PUBLIC RIGHTS -OF -WAY. 3. WHERE AN EXISTING UTILITY IS FOUND TO CONVICT WITH THE PROPOSED WORK, OR EXISTING CONDITIONS DIFFER FROM THOSE SHOWN SUCH THAT THE WORK CANNOT BE COMPLETED AS INTENDED, THE CONTRACTOR WILL NOTIFY THE CONTRACTING OFFICER IN ACCORDANCE WITH FAR 52.236-2. 4. SET DITCHES IN ACCORDANCE WITH ELEVATIONS ON THE GRADING PLANS. 5. RIM ELEVATIONS FOR DRAIN AND SEWER MANHOLES, WATER VALVE COVERS, GAS GATES, ELECTRIC AND TELEPHONE PULL BOXES, AND MANHOLES, AND OTHER SUCH ITEMS, ARE APPROXIMATE AND SHALL BE SET/RESET AS FOLLOWS: A PAVEMENTS AND CONCRETE SURFACES: FLUSH B. ALL SURFACES ALONG ACCESSIBLE ROUTES: FLUSH C. LANDSCAPE, LOAM AND SEED, AND OTHER EARTH SURFACE AREAS: ONE INCH BELOW SURROUNDING AREA AND TAPER EARTH TO THE RIM ELEVATION. 6. MAKE ARRANGEMENTS FOR AND BE RESPONSIBLE FOR PAYING FEES FOR POLE RELOCATION AND FOR ALTERATION AND ADJUSTMENTS OF GAS. ELECTRIC, TELEPHONE, FIRE ALARM, AND MY OTHER PRIVATE UTILITIES, WHETHER WORK IS PERFORMED BY THE CONTRACTOR OR BY THE UTILITY COMPANY. 7. FURNISH EXCAVATION, INSTALLATION, PAID BACKFILL OF ELECTRICAL FURNISHED SITEWORK RELATED ITEMS SUCH AS - PULL BOXES, CONDUITS, DUCT BANKS, LIGHT POLE BASES, AND CONCRETE PADS. CONTRACTOR SHALL FURNISH CONCRETE ENCASEMENT OF DUCT BANKS IF REQUIRED BY UTILITY COMPANY AND AS INDICATED ON THE DRAWINGS. 1, THE TOPOGRAPHIC SURVEY WAS COLLECTED BY NAVFAC MIDLANT NC-IPT STAFF. 2. CONFIRM THE LOCATION OF ALL ITEMS PRIOR TO THE START OF CONSTRUCTION. 3. NO WETLANDS WERE EVIDENCED WITHIN THE LIMIT OF WORK. 4. THE EXISTENCE, SIZE AND OR LOCATION OF UTILITIES ARE NOT GUARANTEED BY THE SURVEY, UTILITIES SHOWN ARE BASED ON ABOVE GROUND STRUCTURES AND AVAILABLE UTILITY PLANS, THE CONTRACTOR SHALL FIELD VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO CONSTRUCTION. 5. BENCHMARKS: HORIZONTAL DATUM: NORTH CAROLINA STATE PLANE NAD83 VERTICAL DATUM: NAVD88 PW-114 N 34031R.6021 E 2503523.8808 14 F o O SG, Z z 0 i� Q �0 Cl. m z �Q z O w Q N w w � � z z w O o wE J w U iJ j to t W rC N EZ$ IN n 5 L C E CLEARING LIMIT POINTS PANT A NORTHING FASTING 01 339258.0169 1 2503338.5045 C2 3393J0.6526 25034]0.3239 F �W=77--Trml 000 TOe�µ19e z99 VM) Vv0 19$ T90 T91 19.9 !_ _ JO ---� 000000 29' .zee .zea \ - /gU1WNED UH _. �_ n O 06_ B.O 50 0 Z48 O o P91� a J¢J IXISi1NG GE O< I .-I2J \ -... -_ .- FPA VENf TIN = \ EXIS P .)2o F Tgs / \ \ rT9e r29J Iy 05 L0 i aJlJ \ I . JLJ •J09 1 9 i \ EXISTING TOP I OF flauK I / 0R DISTURBED E AGE DRAINPFEA z69 F o 8Z ti � Z JO J 11,J tl 1 � 28 _ Q o Y A17D> j� Q o Jae C % GRUB EA IN / _ 29 / / / �T�' // `°01 / L / / / o PREa o D 18 EXISTING DITCH / C) PROPOSED PARKIN LO �Q .J« ,J46 / -28 zq;� // '� 1LJ 29 Q v1 J,e AND EGRADING i / N / // / / z O F «J10 \� \ 22 \`\ Z ir M 25.62 0 cm cm J \ EXISTING DITCH �I FEB 14 7W3 z AS NOTED J9EW3 / ll� illlll-ll-i-llll 0 10' 20' 40' "`"` 2639652 20 s I2 M C-101 A 5 rv[ wy[: >:\wrl�mew\Cm�r wig^•41imx\m:o-r�Wznmv_vlxes-uary [•vm.a•. czrva. ew\P�. e - o.q"\�\[1viz� [zn wmvlzes-naves-c-rvla.e uron wr[: c-roi sn[ uian our a[anm: tn�,eaq. reenary �.. xoi� - z,r.om us[n:.�llom...onn r c I is ob1=F0 I �\ u• o. III I I m 1 III I I � � I �Y I `a LN s .sue%� 24.00' I I Im n I I I x i u• B� I (I I I I II (TYP) YJ 1 yg m D24.00' d o II (TYP.) -^ iiji 31I4'03 /♦— It i I I Irr 'iol T (•L � y 9 � I I ' 2 00', N. 50 (T)I \ I. I' �I Sj S� I ! ti 02 �' 02 (n"P .) h.. AL FACILITIES ENGINEERING COMMAND - MID -ATLANTIC s rum vmrv. a rwu[ nemx - xommx vxalx AP LEJEUNE JACKSONJILLE, NORTH CAROUNA P-1264 LOUIS ROAD PARKING LOT SITE LAYOUT PLAN ----7— ■C No IN III fj FU NME P:\NaRM1_Cere1,,C\temp L,.... \WAON\Ip10_'.NI......_PI3Cfi-UIdM1 Erppnm IwRlwne Bq'\Re+e 0 - Ongn\CM\<\PIgAS_Len NwfP1E65-MA165-C-]01'J�q UIOJr xuR'. C-]01 40.1L4W UA [RVNILL MN KOaF9. w,ercfNa. MartA M. n:1 - 1., VSEB..�Aiem+ enry i IMIM O O O Ii f� p f u.0 S 291 2 0 n um 250 • <� 1 •f �r i � v •'a O O O 11 m / 250 � 1N 7 2 O n 0 c Z li � 6 O I 0 q 1 I J a 0 0 0 Elm I ^V,y �r I iI 91 �1 a gg R awaa OP 1XE 1U'T 1 M fKV1— PIRIRAT C T NAVAL FACILITIES ENGINEERING COMMAND —MID-ATLANTIC NAVAL mws wx cw+ rt «a� Haan -war \naa � f 5 �` a � MCS CAMP LEJEUNE JACKSW LE, NORM CAROLLNA i o 1 N� > o P-1264 LOUIS ROAD PARKING LOT 9 GRADING AND DRAINAGE PLAN 5 n nl[ xA4L P\HOM W,orno\Gmo 111—\u IWN\M I0_W41%1) ' Mz -uNll Lemon:Ion 1-11 we -APh— e - I.,{ \u1\1\11 1e5_L-, FwaFUSs-11111C-e0I dwg uK WE: C-e01 ENSiox a D SmwLxl Wxlea %Ax Pe07ED'. w IeWry rmewry u, zou - ulom US[x, 01m,sAnney r x o 0 0 J1 _ 0 eo 0 00 0 0 a� m q a 4 4 i b OI e I a o o00 0 o S m w. /ai; III 1Po 0 000 0 oc I o� 4 I 4� 1 I — O 001 O I 0 O. 00 o0c O 1 _ I 1 \ I— lll�jl 00 \ 4 0 o �ao 800 I a I I + �'0 000 ti o��\ g om o \ \ I 800 II �a� I \ 000 C Oa i �~ / m I m � W e o — o� o 0 000 0 $ � Do',wruwr or me W.vr xevu renurl¢ wewEexlxc cauwxo � $ x � 5 3 NAVAL FACILITIES ENGINEERING COMMAND —MTD-ATLANTIC A 3 gp t / "' N $ �i d WLYf RKS WKIx fwPolvu M W.wL SlAttw - MWIXN NFOWN � Y � y � � a @ mx MOB CAMP LEJENNE JACKSONMILLE, NORTH CAROLINA p m 1 P-1264 LOUTS ROAD PARKING LOT 0 bFx4 EROSION AND SEDIMENT CONTROL PLAN a p n A u IZ APHALT • CONCRETE PAVEMENT _ L. L L 6" AGGREGATE BASE COURSE COMPACTED SUBGRADE 6- THICK. EDGE USE AT CONNECTION TO ASPHALT TYPICAL CONCRETE ASPHALT CONNECTION D1 NOT TO SCALE C-201 MINIMUM 2.0 INCHES OF ASPHALT CONCRETE, NCDOT TYPE SF9.5A PRIME COAT MINIMUM 8.0 INCHES OF AGGREGATE BASE MATERIAL. SIZE NCDOT TYPE ABC. COMPACTED TO AT LEAST 95% OF THE MODIFIED PROCTOR (ASTM D 1557). 8" COMPACTED SUBGRADE COMPACTED i�\��\j�\jam\jam\jam iTO AT LEAST 95% OF THE MODIFIED PROCTOR (ASTM 0 1557). TYPICAL ASPHALT PAVEMENT NOT TO SCALE C-201 C1 JOINT SEALANT, REFER DETAIL THIS SHEET JOINT SPACING TO MATCH WIDTH t/4 DEEP SAWED JOINT TYPICAL CONTROL JOINT NOT TO SCALE ' C-201 61 1/4" R SEE PLAN FOR WIDTH `1 SLOPE TO DRAIN (1 /4' 4-INCH CONCRETE SIDEWALK �\ 4,000 PSI, TYPE II CEMENT COMPACTED SUBGRADE TYPICAL CONCRETE SIDEWALK NOT TO SCALE C-201 v 'CONTRACTION JOINTS TO MATCH WIDTH CONSTRUCTION JOINTS 50' C.C. - - NO PROJECTION OF C•VE GROUND LINE TOP Of FILL TOP Of FILL /,TOP X ni-l- v •'v •. `'}jvfi,r +,.•a,-••.�y\�'•'rv'i 4 i,. \EARN '(>�r�gfi�•r.• -••'•ENE WND UNE —D .y?-.•,yY}/♦♦/'(�o"i LOOK UP R '•••:�♦@.�,v'`�.�. LINE y $S'�/'iv/'A EARN MIN, 1/10' I25n/%/////////�.X. 4' BEDDING BEDDING BEDDING 'PENSION TO BE MAINTAINED I RRM SUPPING WIC PIPE PROJECTING ABOVE GROUND LINE ZCTOP OF FILL y yyI',J��.p,yeyy,•• 4' 1 , � - I:S ?i:..•.., •Y 1^e[ KIND 0 NE a— LLe •./' ••.g`,vsM•. . • Sa,.•- v,.gfL:+.Lv.3 r..Ap3•,'>♦7> ♦�`r �>) • �i/. �. ( :.MATE AL •• • •• • BEIDDING ROCK FOUNDATION• FIRM •• • OTHERWISE UNSUITABLEMATLRIAL EAR BEARING WE •FT, YIELDING OR CULKATS LESS THAN P-191m n. UP TO Mla (PIPE PRO.ECTON ABOVE GROUND UNE) ® BEDDING MATERIAL IN ACCORDANCE MM SECTION W21 03 OF TIE ROAD AND BRIDGE SPEPFlCAPCNS. N.D..61m CULWATS MERE E-.91m AND OAR fLYIBt< RPE ® BACNfRL MATERIAL IN ACCORDANCE MM SECTION 30103 OF 1NE ROAD .0 BRIDLE SPECI11CAlI0N5. .-D..91m AS SING. ON TABLES MEMCO 'A' PPE SECOND SHALL BE USED AS f0.LOn UNLESS OMERMSE NOTED H.HEIGHT 6 COWR MEASURED MOM TOP Of DRAINAGE ® EMBANKMENT ' ON PLANS: STRUCNRE TO FINISHED MADE. BEDDING REQUIREMENTS DETAILED UNDER MEMOS A, PROJECTING CONDITION. ARE APPLICABLE TO METHOD BI AND B2. RIGID PIP Ilu$ UP TO 9AI (NO PROJECTIM OF PIPE ABDA GRouHO urvc) INSTALLATION OF PIPE CULVERTS AND STORM SEWERS �G�Y NOT TO SCALE C-201 \/ BAR OR STEEL FABRIC REINFORCING LL�'� 4 6" 4'-0" SECTION A -A SPIGOT END ON INLET END SECTIONS HUB END ON OUTLET END SECTIONS DP A A 2'-6" 2 -6 FRONT ELEVATION PLAN ` e _ FULL WIDTH OF TRAVEL LANE -I z 1 1/2" 0 GALV. STOP BAR STEEL POST B4 w/cAP — Nor To SCALE c-201 FLARED END SECTION 1 " CONCRETE PIPE NOT TO SCALE C-301 A3 i FINISHED 4,000 P.S.I. CONCRETE - 1[ 11 5F o E Rg 9 zQ o MUTCO RI -I WIDTH: 30" HEIGHT: 30" z J �L YQ Z F`oN Y 12 a C) U z a N a G, 1 Fr w US O cc w � i 7 N CEIV w wli;cm O J _ cm a FEB 14 2013 � i < a .,. I Z M ,.. NOTE: ALL SIGNS SHALL BE BOLTED TO POST STOP I N NOT r0 SCALE C-201 0 A 5 C-501 r 1 I � L. SET POSTS AND EXCAVATE A 4" x 82. ATTACH WIRE FENCING TO TRENCH UPSLOPE ALONG THE LINE OF POSTS. THE POSTS. 6• 12-1/2 GAUGE MIN. (STfF< SMESH SPACING 6" MAX. / STEEL POST g•• IMBED 24" 3- ATTACH THE FILTER BARRIER FABRIC TO THE 4. BACKFILL AND COMPACT THE WIRE FENCE AND EXTEND IT INTO THE TRENCH. EXCAVATED SOIL. �j FILTER BARRIER — FABRIC HEIGHT 18"-24" ABOVE GRADE NOT TO SCALE [IIYC. YAiIALYfL YAiiA O AHOE, UV RE95TAVT ww TEASAF SPRNCIN PClrtlXvlExE LWWAR 9 AMCADE rABRII MIN. 4u,wuB.C. —i uu 1.33 Ie./lr STOOL POST ...I�E. 1. INSPECT STRUCTURES WEUY AND A7TR AT LEAST A 1/2- OR GREATER RuxEAll DITTO. _ 2. REMIM SEDIMENT r BEHIND SILT FENCE PRIOR TO IT REACHING A WIMUM DEPTH OF 6 INCHES. D. SET POST 4' O.C. HERMON. AREAS EXTENSION OF FABRIC AND WIRE INTO THE TRENCH. WIRE FILTER BARRIER GROUND LINE g FABRIC 1 24" (STEEL) NOT TO 1' BIN V BAFFLI t 1/4- ALUMINUM STEEL PLATE 1/2.0 S.S. BOLTS —� 4 EACH SIDE (TIP) BAFFLE 2' BAFFLE KEYSTONE CAP UNIT — STANDARD UNIT BLOCK —UNIT DRAINAGE FILL (3/4" CRUSHED ROCK OR STONE) lD 1/8" - 1/4" 1D 1 8" Note: When site conditions require, wrap drainage Tile in 3/4" aggregate and filter fabric with Foundation Soil drainage Composite or aggregate back drain system, as directed by geolechnical engineer. TOP OF BAFFLE=22.05 1/2'0 SS, BOLTS p 4 EACH SIDE (TYP) 6' PVC SCREW BOITOMNOF TYPE PLUG WEIR=26.55 ORIFICE ELEV FIFV. = ]6E S. BAFRE�25.40 U 6' PVC TEE FOR -- ORIRCE PIPES DRILLED CAP ELEV. 25.00 6- PVC CAP DRILLED FOR 1.25' OPENING — SECTION BOTTOM EL— 24.00 NOTES: PLAN VIEW 1. MODIFIED CONCRETE STRUCTURE PER NCDOT STD 840AA 2, 4,000 PSI TYPE II CEMENT GRADE ICED CONCRETE OR STONE LEVELING PAD I15- RCP INV-25.55 SEDIMENT LAYER = 21.00 BOTTOM OF POND 2n fNl i�itliR� PROVIDE 2OF CLASS 1 RIP RAP TO INVERT OF OUTLET PIPE 6- (TYP) MAR 2 0 2013 11 ■[ H Z O Z N `L Y Q tp O C C H U N 7 6 O i � li / TREE PROTECTION OUTNOT LET ESTRUCTURE c_3D, A4 1263Q965712 NOT TO SCALE C-100 C-502 4 5 a L I J I CZ TEMPORARY SEEDING SCHEDULE NOTE TEMPORARY SEED MIX SHALL BE USED FOR ALL AREAS EXPOSED GREATER THAN 15 WORKING DAYS AND SUBJECT TO FURTHER DISTURBANCE. AN ADEQUATE COVER SHALL HAVE 50 SPRIGS OF BERMUDA OR SERICEA LESPEDEZA PER ONE SQUARE FOOT. TEMPORARY SEEDING AND MULCHING: THE KINDS OF SEED AND FERTILIZER, AND THE RATES OF APPLICATION OF SEED, FERTILIZER, AND LIMESTONE, SHALL BE AS STATED BELOW. DURING PERIODS OF OVERLAPPING DATES, THE KINDS OF SEED TO BE USED SHALL BE DETERMINED BY THE ENGINEER. ALL ARE IN POUNDS PER ACRE (KILOGRAMS PER HECTARE). TEMPORARY SUMMER SEED MIX SPECIES RATE (LB./ACRE) MARCH 1 - SEPT. 1 CRIMPED STRAW 4,000 TEMPORARY WINTER SEED MIX SPECIES RATE (LE/ACRE) SEPT. 1 - MARCH 1 WINTER RYE (GRAIN) 200 KOBE LESPEDEZA 120 APPROVED TALL FESCUE CULTIVARS' ADVENTURE ADVENTURE II AMIGO ANTHEM APACHE APACHE II ARID AUSTIN BROOKSTONE BONANZA BONANZA II CHAPEL HILL CHESAPEAKE CHIEFTAIN CORONADO CROSSFIRE II DEBUTANTE DUSTER FALCON FALCON II FINELAWN PETITE FINELAWN FINELAWN I GENESIS GRANDE GUARDIAN HOUNDOG JAGUAR JAGUAR III KENTUCKY 31 KITTY HAWK MONARCH MONTAUK MUSTANG OLYMPIC PACER PHOENIX PIXIE PYRAMID REBEL REBEL JR. REBEL II RENEGADE SAFARI SHENANDOAH TEMPO TITAN TOMAHAWK TRAILBLAZER TRIBUTE VEGAS WOLFPACK WRANGLER FERTILIZER SHALL BE 10-20-20 ANALYSIS. UPON WRITTEN APPROVAL OF THE ENGINEER, A DIFFERENT ANALYSIS OF FERTILIZER MAY BE USED PROVIDED THE 1-2-2 RATIO IS MAINTAINED AND THE RATE OF APPLICATION ADJUSTED TO PROVIDE THE SAME AMOUNT OF PUNT FOOD AS 10-20-20 ANALYSIS. TEMPORARY SEEDING: FERTILIZER SHALL BE THE SAME ANALYSIS AS SPECIFIED FOR "SEEDING AND MULCHING" AND APPLIED AT THE RATE OF 400 POUNDS (450 KILOGRAMS) AND SEEDED AT THE RATE OF 50 POUNDS (55 k9) PER HECTARE. SWEET SUDAN GRASS, GERMAN MILLET OR BROWNTOP MILLET SHALL BE USED IN SUMMER MONTHS AND RYE GRAIN DURING THE REMAINDER OF THE YEAR. THE ENGINEER WILL DETERMINE THE EXACT DATES FOR USING EACH KIND OF SEED. FERTILIZER TOPDRESSING: FERTILIZER USED FOR TOPDRESSING ON ALL ROADWAY AREAS EXCEPT SLOPES 2:1 AND STEEPER SHALL BE 10-20-20 WRITIEN APPROVAL OF THE ENGINEER, A DIFFERENT ANALYSIS OF FERTILIZER MAY BE USED PROVIDED GRADE AND SHALL BE APPLIED AT THE RATE OF APPLICATION ADJUSTED TO PROVIDE THE SAME AMOUNT OF PLANT FOOD AS 10-20-20 ANALYSIS. FERTILIZER USED FOR TOPDRESSING ON SLOPES 2.1 AND STEEPER AND WASTE AND BORROW AREAS SHALL BE 16-8-8 GRADE AND SHALL BE APPLIED AT THE RATE OF 500 POUNDS PER ACRE (560 KG PER HECTARE). UPON WRITTEN APPROVAL OF THE ENGINEER, A DIFFERENT ANALYSIS OF FERTILIZER MAY BE USED PROVIDED THE 2-1-1 RATIO IS MAINTAINED AND THE RATE OF APPLICATION ADJUSTED TO PROVIDE THE SAME AMOUNT OF PLANT FOOD AS I6-8-8 ANALYSIS. THE KINDS OF SEED AND PROPORTIONS SHALL BE THE SAME AS SPECIFIED FOR TEMPORARY SEEDING AND MULCHING", WITH THE EXCEPTION THAT NO CENTIPEDE SEED WILL BE USED IN THE SEED MIX FOR SUPPLEMENTAL SEEDING. THE RATE OF APPLICATION FOR SUPPLEMENTAL SEEDING MAY VARY FROM 25,# TO 75# PER ACRE (28KG TO 85KG PER HECTARE). THE ACTUAL RATE PER ACRE (HECTARE) WILL BE DETERMINED BY THE ENGINEER PRIOR TO THE TIME OF TOPDRESSING AND THE CONTRACTOR WILL BE NOTIFIED IN WRITING OF THE RATE PER ACRE (HECTARE), TOTAL QUANTITY NEEDED, AND AREAS ON WHICH TO APPLY THE SUPPLEMENTAL SEED. MINIMUM TILLAGE EQUIPMENT, CONSISTING OF SOD SEEDER SHALL BE USED FOR INCORPORATING SEED INTO THE SOIL AS TO PREVENT DISTURBANCE OF EXISTING VEGETATION. A CLODBUSTER (BALL AND CHAIN) MAY BE USED WHERE DEGREE OF SLOPE PREVENTS THE USE OF A SOD SEEDER. MOW NGG THE MINIMUM MOWING HEIGHT ON THIS PROJECT SHALL BE 4 INCHES (100 MM). CRIMPING STRAW MULCH' CRIMPING SHALL BE REQUIRED ON THIS PROJECT FOR ALL SEEDING OPERATIONS PER NCOENR. STRAW MULCH TO BE OF SUFFICIENT LENGTH AND QUALITY TO WITHSTAND THE CRIMPING OPERATION AND PROVIDE ADEQUATE GROUND COVER. CRIMPING EQUIPMENT INCLUDING POWER SOURCE SHALL BE SUBJECT TO THE APPROVAL OF THE ENGINEER PROVIDING THAT MAXIMUM SPACING OF CRIMPER BLADES SHALL NOT EXCEED 8 INCHES (200 MM). SOIL AMENDMENTS TO BE INCORPORATED INTO THE TOP 3 INCHES OF SOIL IN AREAS WITH SLOPES 2:1 OR FLATTER - - - - • APPLY FERTILIZER (10-10-10) AT A RATE OF 1000 LB/ACRE • APPLY LIME (GROUND AGRICULTURAL LIMESTONE) AT A RATE OF 4000 LB/ACRE • APPLY SUPERPHOSPHATE (0-49-0) AT A RATE OF 200 LB/ACRE MULCH APPLY 4,000 LB/ACRE GRAIN STRAW OR EQUIVALENT COVER. ANCHOR MULCH WITH ROVING, NETTING OR BY TACKING WITH ASPHALT EMULSION AT A RATE OF 400 GAL/ACRE WATER MINIMUM OF 1° OF RAINFALL A WEEK (IF NOT SUPPLIED NATURALLY, CONTRACTOR SHALL SUPPLY THE REMAINING AMOUNT UNTIL GROUND COVER HAS BEEN ESTABUSHED). MAINTENANCE REFERTILIZE IN THE SECOND YEAR UNLESS THE GROWTH IS FULLY ADEQUATE. MOW WHEN THE AVERAGE PLANT HEIGHT EXCEEDS 6 INCHES. RESEED, FERTILIZE AND MULCH DAMAGED AREAS IMMEDIATELY. TEMPORARY SEED BED PREPARATION 1. RIP THE ENTIRE AREA TO 6" DEPTH. 2. REMOVE ALL LOOSE ROCK, ROOTS, AND OTHER OBSTRUCTIONS LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM. 3. APPLY AGRICULTURAL LIME, FERTILIZER, AND SUPERPHOSPHATE IN ACCORDANCE WITH "SEEDING SCHEDULE" AND MIX WITH SOIL, 4. CONTINUE TILLAGE UNTIL A WELL -PULVERIZED, FIRM, REASONABLY UNIFORM SEEDBED IS PREPARED 4 TO 6 INCHES DEEP. 5, SEED ON A FRESHLY PREPARED SEEDBED AND COVER SEED UGHTLY WITH SEEDING EQUIPMENT OR CULTIPACK AFTER SEEDING. SEED ACCORDING TO "SEEDING SCHEDULE' 6. MULCH IN ACCORDANCE WITH "SEEDING SCHEDULE' IMMEDIATELY AFTER SEEDING. 7. INSPECT ALL SEEDING FOR COMPLIANCE WITH THE REQUIREMENTS OF THE "SEEDING SCHEDULE". MAKE NECESSARYREPAIRS AND RESEED WITHIN THE PLANTING SEASON, IF POSSIBLE, OR THE DAMAGED AREA SHALL BE REESTABLISHED FOLLOWING THE ORIGINAL UME, FERTILIZER, AND SEEDING REQUIREMENTS. GROUND COVER NOTE: PURSUANT TO G.S. 133-A57(2), THE ANGLE FOR GRADED SLOPES AND FILLS SHALL BE NO GREATER THAN THE ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER OR OTHER XOEROSION CONTROL DEVICES OR STRUCTURES. IN ANY EVENT, SLOPES LEFT EXPOSED WILL, WITHIN 7 TO 14 CALETUDER DAYS COMPLETION OF ANY PHASE OF GRADING, PLANTED R OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES, OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. PURSUANT TO G.S. 113A-57(3), PROVISIONS FOR PERMANENT GROUNDCOVER SUFFICIENT TO RESTRAIN EROSION MUST BE ACCOMPUSHED FOR ALL DISTURBED AREAS WITHIN 14 WORKING DAYS FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. GROUND STABILIZATION: THE NPDES PERMIT (SECTION II. 8.2) HAS RECENTLY REUSED THE REQUIREMENTS FOR GROUND STABILIZATION. STABILIZATION SHALL BE ACCOMPUSHED AS FOLLOWS: PERIMETER DIKES, SWALES, DITCHES AND SLOPES WITHIN 7 DAYS HIGH QUALITY WATER (HOW) ZONES WITHIN 7 DAYS SLOPES STEEPER THAN 3:1 WITHIN 7 DAYS SLOPES 3:1 OR FLATTER WITHIN 14 DAYS ALL OTHER AREAS W/ SLOPES FLATTER THAN 4:1 WITHIN 14 DAYS PERMANENT GROUND COVER ALL DISTURBED AREAS TO BE COVERED WITH CENTIPEDE SOD UNLESS NOTED OTHERWISE. EROSION CONTROL SEQUENCE OF CONSTRUCTION 1. INSTALL RCP DRIVEWAY CULVERTS AND TEMPORARY CONSTRUCTION ENTRANCES. 2, INSTALL CULVERT INLET PROTECTION AND EROSION CONTROL PRODUCT AROUND CULVERTS AND CHECK DAMS IN ALL EXISTING DITCHES AND SWALES AS INDICATED. 3. INSTALL TEMPORARY SILT FENCE AND TREE PROTECTION AROUND THE PERIMETER OF THE SITE AS INDICATED ON THE EROSION & SEDIMENT CONTROL PLAN PHASE I, 4. CLEAR AND GRUB THE SITE WITHIN LIMIT OF DISTURBANCE. ROUGH GRADE SITE, CONSTRUCT CHANNELS, INSTALL PROPOSED STORM DRAW SYSTEM AND INLET PROTECTION. INSTALL OUTLET PROTECTION AT PROPOSED CULVERTS. NO STORMWATER SHALL BE CONVEYED TO BASINS UNTIL BASINS ARE 75% STABILIZED. 5. INSTALL TEMPORARY SEDIMENT 6. SEDIMENT BASINS THAT ARE ONLY REQUIRED DURING PHASE I ARE NOT TO BE REMOVED UNTIL COMPLETION OF STORM DRAIN SYSTEM AND UNTIL ALL RUN OFF IS REDIRECTED TO PHASE II SEDIMENT BASINS. NOTIFY CONSTRUCTION MANAGER AND NCDENR PRIOR TO REMOVAL. 7. INSTALL BUILDING PAD, UTILITIES, AND SITE WORK. 8, FINISH SLOPES AROUND BUILDINGS UPON COMPLETION OF ROUGH GRADING. LEAVE SLIGHTLY ROUGH AND VEGETATE AND MULCH IMMEDIATELY. 9. COMPLETE FINAL GRADING FOR PARKING AREAS AND DRIVES AND STABILIZE WITH GRAVEL. 10. COMPLETE FINAL GRADING FOR THE BUILDING. 11. COMPLETE FINAL GRADING OF THE GROUNDS, TOPSOIL CRITICAL AREAS AND PERMANENTLY VEGETATE, LANDSCAPE AND MULCH. 12. INSPECT ALL EROSION AND SEDIMENT CONTROL PRACTICES WEEKLY AND WITHIN 24 HOURS OF A 0.5 INCH- MEASURED RAINFALL EVENT. A RAIN GAUGE SHALL BE INSTALLED TO MEASURE RAINFALL EVENTS. REPAIR ANY DAMAGE IMMEDIATELY TO EROSION AND SEDIMENT CONTROL MEASURES. 13. INSPECT AND INSTALL ALL EROSION AND SEDIMENT CONTROL MEASURES IN ACCORDANCE WITH DOCENTS NEW SELF INSPECTION PROGRAM FOR EROSION AND SEDIMENTATION CONTROL. COPIES OF THE SELF INSPECTION REPORTS SHALL BE PROVIDED TO THE ROICC'S OFFICE. 14. AFTER SITE IS STABILIZED, DEGRADE SKIMMER BASINS AND INFILTRATION BASIN TO FINAL GRADES, REMOVE ALL TEMPORARY MEASURES AND INSTALL SOD ON DISTURBED AREAS. EROSION AND SEDIMENT CONTROL NARRATIVE THE EXISTING LOT IS GENERALLY HEAVILY WOODED, WITH A DOG CEMETERY ON THE NORTHERN EDGE. THE LAND GENERALLY SLOPES DOWN TO EXISTING SERVICE ROAD. THE SITE DRAINS TO THE EXISTING DITCH ON THE EAST SIDE OF WHITE ROAD. IN ORDER TO PREVENT EROSION AND CAPTURE SEDIMENTS WITHIN THE PROJECT, THE FOLLOWING PRACTICES SHALL BE USED AND LOCATED APPROXIMATELY AS SHOWN ON ESC PLAN. 1. CLEARING LIMITS SHALL BE MARKED BY FENCING OR OTHER MEANS ON THE GROUND. 2. DRIVEWAY CULVERTS AND ROCKED CONSTRUCTION ENTRANCE (CE) WILL BE PLACED AT ENTRANCES TO SITE INDICATED ON THE PLAN. 3. SEDIMENT TRAPS SHALL BE CONSTRUCTED. 4, SILT FENCE (SF) SHALL BE PLACED ALONG SLOPE CONTOURS AT THE LIMITS OF CLEARING. IN SOME CASES TWO (2) ROWS OF SILT FENCE MAY BE REQUIRED AT THE CONSTRUCTION INSPECTOR'S DISCRETION. 5. MULCH SHALL BE SPREAD OVER ALL CLEARED AREAS OF THE SITE WHEN THEY ARE NOT BEING WORKED. MULCH SHALL CONSIST OF AIR-DRIED STRAW AND CHIPPED SITE VEGETATION. 6. WATER WILL NOT BE ALLOWED TO POINT DISCHARGE ONTO SLOPES. A ROCK -LINED DITCH MAY BE NECESSARY TO INTERCEPT AND DIRECT WATER TO THE TEMPORARY SEDIMENT TRAP. 7. CULVERT INLET (CIP) SHALL BE PLACED ON THE INSTALLED CULVERTS. 8. OUTLET PROTECTION (OP) SHALL BE PLACED AT OUTLET OF ALL PIPES ON SITE. 9. CHECK DAMS (CD) SHALL BE INSTALLED IN EXISTING DITCHES AND SWALES. 10. DIVERSION DITCH (OD) SHALL BE INSTALLED TO DIVERT SEDIMENT -LADEN WATER TO APPROPRIATE TRAPS OR STABLE OUTLETS. 11. ONE TEMPORARY SEDIMENT TRAP (ST) WILL BE CONSTRUCTED ON THE SITE. EROSION AND SEDIMENT CONTROL NOTES I. UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE NORTH CAROLNA EROSION AND SEDIMENT CONTROL PLANNING DESIGN MANUAL (REVISED MARCH 2O09). 2. THE CONTRACTOR SHALL APPLY PERMANENT OR TEMPORARY SOIL STABILIZATION TO ALL DENUDED OR DISTURBED AREAS IMMEDIATELY AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. SOIL STABILIZATION MUST ALSO BE APPLIED TO :DENUDED OR DISTURBED. AREAS WHICH MAY NOT BE AT FINAL GRADE BUT WHICH WILL REMAIN UNDISTURBED FOR LONGER THAN 21 DAYS. SOIL STABILIZATION MEASURES INCLUDE VEGETATIVE ESTABLISHMENT, MULCHING AND THE EARLY APPLICATION OF GRAVEL BASE MATERIAL ON AREAS TO BE PAVED. 3. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE INSTALLED PRIOR TO OR AS THE FIRST STEP IN CONSTRUCTION. 4. THE FREES CONSTRUCTION PERMIT REQUIRES EROSION CONTROL DEVICES AND STORM OUTFALLS BE INSPECTED WEEKLY (EVERY 7 CALENDAR DAYS) AND WITHIN 24 HOURS OF A .5 INCH RAIN EVENT IT WILL BE THE RESPONSIBIUTY OF THE CONTRACTOR TO CONDUCT THESE INSPECTIONS AND MAINTAIN RECORDS UNTIL THE AREA HAS STABILIZATION, EVIDENT BY 95% VEGETATING GROWTH FOR AREAS PROVIDED SEEDING. TO FACILITATE RAINFALL MONITORING A RAIN GAUGE IS REQUIRED TO BE ON SITE. ONCE STABILIZATION HAS BEEN ACCOMPLISHED INSPECTION RECORDS ARE TO BE FORWARDED TO THE GOVERNMENT AND ALL TEMPORARY EROSION/SEDIMENTATION CONTROL DEVICES REMOVED. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING COMPLIANCE WITH ALL PERMITS AND PLANS, ANY CHANGES MUST BE APPROVED BY THE STATE PRIOR TO EXECUTION. A COPY OF THE EROSION AND SEDIMENTATION CONTROL PUN, LETTER OF APPROVAL, AND NPDES CONSTRUCTION PERMIT MUST BE MAINTAINED BY THE CONTRACTOR AT THE ONSITE OFFICE. 5. THE CONTRACTOR SHALL LIMIT SITE ACCESS BY CONSTRUCTION VEHICLES TO ENTRANCES PROTECTED BY A STONE CONSTRUCTION ENTRANCE. SEDIMENT SHALL BE REMOVED FROM PAVED AREAS ON A DAILY BASIS. 6. STOCKPILES OF SOIL AND OTHER ERODIBLE MATERIALS SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES. THE CONTRACTOR IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANENT STABILIZATION FOR STOCKPILES ON SITE AS WELL AS FOR MATERIALS TRANSPORTED FROM THE PROJECT SITE. 7, THE CONTRACTOR SHALL MONITOR AND TAKE PRECAUTIONS TO CONTROL DUST INCLUDING (BUT NOT LIMITED TO) USE OF WATER, MULCH, OR CHEMICAL DUST ADHESIVES AND CONTROL OF CONSTRUCTION SITE TRAFFIC. 8. EFFLUENT FROM DE -WATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT ADJACENT PROPERTIES, WETLANDS, INFILTRATION BASINS, WATERWAYS OR THE STORM DRAINAGE SYSTEM. 9, THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF ANY ADDITIONAL CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED NECESSARY BY THE PLAN APPROVING AUTHORITY. 10. TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ARE NOT TO BE REMOVED UNTIL ALL DISTURBED AREAS ARE STABILIZED. AFTER STABILIZATION IS COMPLETE. ALL MEASURES SHALL BE REMOVED WITHIN 30 DAYS. TRAPPED SEDIMENT SHALL BE SPREAD AND SEEDED. 1L ANY SEDIMENT THAT HAS. BEEN TRANSPORTED BEYOND THE PROJECT LIMITS SHALL BE REMOVED. RESPONSIBLE MAINTENANCE CONTACT: ROICC 12. ALL BORROW MATERIAL SHALL BE PROVIDED FROM AN APPROVED BORROW PIT. ALL SOIL WASTE SHALL BE TRANSPORTED OFF GOVERNMENT PROPERTY TO AN APPROVED LANDFILL. ! FEB 14 20113 'l Z 4 I F� 1 sB d 5 8 m iA 1 1 2 1 3 1 4 1 5 Y 0000 a pp 5 O / / / / / / / / / / / / /O O O 000 O O O O 000000 „ ®, O O O O O O O O O 000000 00 000000 000000 Ht6 — _ — 29 COMO MH 000000 UNKNOWN MH-� 199�— \\\ !il 08 OOO o 19 0 11 19B�19.B 199 110, 19 O . �� ,$Q FD ILH � 00000 I 2B I o oo0 26, 000 0 0 �]gp r188 /DA / (OR! 41LLCOI JDO C1 �� pOtli —_- O / - ...,b4 ----_0 - - 186— OOo _ _ _ _ _ _ \ TELEPHONE MHO© .�/ \ _ _ - B6 o Woo / Oo 000/ .$J \ �198 .I9J 295 \ _. . Jp5 0 196 �/ PB r /O \ m•\ wr � \ r il.J .JO9/ ♦$1\ -30— JOl .IZI J0.6 b 00,00 \ \ \ ¢WM avR YRI o.. WD t ara wwa YptKYYY Y PMVt \ \ 'b' _ / �B i/ � s zzz AREA B 1 Comm. MH /AREA A ` \ / 6.9 TOTAL: 0.11 ACRES IMPERVIOUS:0.00ACRES F o DNK "°"`tTAJ_;,p/77ACRES rJ1., J1.1 / �/�rAft GRASS: 0.11 ACRES F IMPERVIOUS: 0.00 ACRES J GRASS: 0.77 ACRES _ .J/.6 _„— / 60/ / B / O d J14 \) 29 / / Q ¢� r JLI a Jl6 / - 26 / 9 �B// 1).J Z7 - _ . 29 z W li Z W . JI.p 1)3 / // .1� K\ I MJ 9 (n o Fcm FEB 14 2013 g z gY:�j 70 > ��llllll-ll-f-Nfl /40' 0 10' 20' x, m 12 C-601 1 2 3 4 r tip-- - -- -- - - - - - - - - - - - - - -- --- -- -- -- — — — -- - -- - - - - -- lX—f - _. _ L yy� fib I j 1 - - '> � X —� _ 1 ) vo ..br .�+ 3 ���i l i urv,M1'lµry 'i - 1.F AREA 1 —a---�—tea--- TOTAL. 0.88 ACRES (: IMPERVIOLIS,`0.31 ACRES GRASS' 0.57 ACRES \ FEB 14 2013 0 10 20' = 20' I[ I1 I[ $z o E 5 / N ~ J .I tlo z z £0 Q z o a Q o z w W W O Q w Z z � O � w N w5 O J o � � U33 N 1 z 40' 1 Imo.. —2-6 o k 2635 L G� 00O0;00°O°o°O°O o0p 0 0 0 0 0 00. O°0o0 'O-°° +T O 1Oo 0 0 ., '.+ °° 00 '� ' °0° . O 00 :. I 00000°° o 000, 0¢0 I i SHALLOW WATER PLANTS O O O O 0O000O°O 00000000 SHALLOW LAND PLANTS 10•� •���•��• I1y0 1 ON -CENTER PLANT SPACING 0 G) 0 \ • 0001 PLANT SPACING ✓ -/ ✓ -/ 3/4 D< ON -CENTER SHRUB OR GROUNDCOVER (AT TIME OF PLANTING) CURB.ETC.(WHEREE OCCURS)gNC, ' SHRUB OR GROUNDCOVER (ULTIMATE GROWTH) PLAN PLANT SPACING C 4 NO SCALE rl SET PLUMB MULCH (4' DEEP) WEED CONTROL FABRIC FlN1912 GRADE NOTE: SET TOP aF R 'lt 1� I BALL 2 INCHES ABOVE Sv \\ FINISHED GRADEy PLANTING TABS PLANTING SOIL MIXTURE THROUGHDUT ENTIRE BED) REMOVE BURLAP FROM TOP 1/3 OF ROOT BALL EXISTING SOIL TWO TIMES ROOT BALL DIAMETER SHRUB PLANTING C 5 NO sDxE BOTANIGL RME COMMON NAME PERCENT OF AREA (OTY OF PLANTS) SIZE SPICING ON CENTER DETAIL ACORNUS SUBCORDATUM SWEETFLAG 205 52 4' POT 18' AUSMA BUBDDRDA7DM WATER PLANTAIN 155 39 4 POT 18' IRIS VIRGINICA BLUE FLAG IRIS 15% 39 4' POT 18' JUNCUS EFFUSUS VAR. SOLUTUS SOFT RUSH 20% 52 4' POT 18' PONTEDERW CORDATA PICKERELWEED 20% 52 4' POT 18' SCIRPUS CYPERINUS WOOLGRASS 105 26 4' POT 18' ASCLEPLAS INCARNATA SWAMP MILKWEED 20% (86) 4' POT 18' C4 CAREX TENERA QUILL SEDGE 30% (128) 4' POT 18' C4 LOBELIA CARDINALIS CARDINAL FLOWER 15% (64) 4' POT 78' C4 LOBELIA SIPHILBICA GREAT BLUE LOBELIA 15% (64) 4' POT 18' C4 SACCHARUM BALDWINII STARRUSH WHRETOP 20% (86) 4' POT 18' C4 NOTES: 1. PLANTS SHALL BE PLACED IN INFORMAL MOSAIC MASSINGS TO APPEAR AS A 'NATURAL' POND. PLANT MASSINGS SHALL VARY BETWEEN 100 SQUARE FEET AND 500 SQUARE FEET. VERIFY LAYOUT PRIOR TO INSTALLATION WITH CONTRACTING OFFICER. 2. ALL PUNTS SHALL BE MAINTAINED AND GUARANTEED FOR 365 CALENDAR DAYS (SEE SPECIFICATIONS) (�A SHELF AND SLOPE PLANTING SCHEDULE m MAR 2 0 Z013 5 1114 OC iRk O o Z € Z N Y $C o a a 0 z A A w 2 Q O ¢ � a a N 2 g z w OR 0 O CJCff IS€ g�G z cm d i 1 12639662 1 Y