Loading...
HomeMy WebLinkAboutSW8111108_HISTORICAL FILE_20111118STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 CIA 1 Q g DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 201 \ \ \ 18 YYYYMMDD . . , exr� w NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary November 18, 2011 Commanding Officer USMCB Camp Lejeune c/o Carl Baker, Deputy Public Works Officer Building 1005 Michael Rd. Camp Lejeune, NC 28547 Subject: State Stormwater Management Permit No. SW8 111108 P-705 Perimeter Street Parking Garage High Density Commercial Sand Filter Project Onslow County Dear Mr. Baker: The Wilmington Regional Office received a complete, modified State Stormwater Management Permit Application for P-705 Perimeter Street Parking Garage on November 17, 2011. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Session Law 2006-246, Session Law 2008-21 1 and Title 15A NCAC 2I-I.1000. We are forwarding Permit No. SW8 1 1 1 108 dated November 18, 2011, for the construction, operation and maintenance of the built -upon areas and BMP's associated with the subject project. This permit shall be effective from the date of issuance until November 18, 2021, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes, and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.ncoah.com. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Linda Lewis at (910) 796-7215. Sincerely, a2 Coleen Fi. Sullins, Director Division of Water Quality GDS/arl: S:\WQS\Stormwater\Permits & Projects\2011\111108 HD\2011 11 permit 111108 cc: C. Allan Bamforth, Jr., P.E. David Towler, USMCB Camp Lejeune Wilmington Regional Office Stormwater File Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 Service: 1-877-623-6748 1�rOne 1 Phone: 910-796-72151 FAX: 910-350.2004 \ Customer Internet:v .nmaterquality.org 1 V Ortt,l lCarolina a'n {urry//', State Stormwater Management Systems Permit No. SW8 111108 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY COMMERCIAL DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Commanding Officer USMCB Camp Lejeune P-705 Perimeter Street Parking Garage Perimeter St., Camp Lejeune, Onslow County FOR THE construction, operation and maintenance of one (1) closed Sand Filter in compliance with the provisions of Session Law 2006-246, 2008-211 and 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until November 18, 2021, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.7 of this permit. The stormwater control has been designed to handle the runoff from 138,198 square feet of impervious area. The sand filter will be limited to the treatment of that amount of built -upon area indicated in Section 1.2 and Section 1.7 of this permit, and as shown on the approved plans and drainage area map. The built -upon area for the future development is limited to 8,000 square feet.. 4. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the appropriate permitted stormwater control system. The grated cover over the sediment chamber is designed for H-10 loading because the filter is not subject to traffic loads. The sand chamber has no cover. The project shall provide a 50 foot wide buffer adjacent all surface waters, measured horizontally from and perpendicular to the normal pool of impoundments, the top of bank of both sides of rivers and streams, and the mean high water mark of tidal waters. Page 2 of 7 State Stormwater Management Systems Permit No. SW8 111108 7. The following design criteria have been permitted for the proposed sand filter and must be provided and maintained at design condition: Design Criteria DA 1 a. Drainage Area: acres -Onsite, ft2 -Offsite, ftz 3.43 149,469 0 b. Total BUA, ftz 138,198 c. Design Storm, in. 1.5 d. Adjusted WQV, ff 12,326 e. Provided WQV, ff : 12,778 f. HMax, feet 2.29 g. Bypass Weir Elevation, fmsl 20.79 h. Top of Sand Elevation, fmsl 18.5 i. Bottom elevation, FMSL 16.0 '. SHWT Elevation, FMSL: 18.00 k. Sand Filter Area, ftz 5,580 I. Sediment Area, As, ft 3,780 m. Sand Area Af, ft 1,800 n. Underdrain dia. (<40 hrs.) 6" It. SCHEDULE OF COMPLIANCE The stormwater management system shall be constructed in its entirety and operational for its intended use prior to the construction of any built -upon surface. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. Records of maintenance activities must be kept for each permitted BMP. The reports will indicate the date, activity, name of person performing the work and what actions were taken. 4. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of bypass structure, infiltration media, flow spreader, catch basins, piping and vegetated filter. g. A clear access path to the bypass structure must be available at all times. 6. The facilities shall be constructed in accordance with the approved plans and specifications, the conditions of this permit, and other supporting data. Page 3 of 7 State Stormwater Management Systems Permit No. SW8 111108 .7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 8. Clear and unobstructed access to the stormwater facilities shall be maintained at all times. 9. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Redesign or addition to the approved amount of built -upon area or to the drainage area. C. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. e. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 11. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 12. A copy of all application documents, the approved plans, and specifications shall be maintained on file by the Permittee at all times. III. GENERAL CONDITIONS This permit is not transferable to any person or entity except after notice to and approval by the Director. 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management. systems. Page 4 of 7 State Stormwater Management Systems Permit No. SW8 111108 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. Unless specified elsewhere, permanent seeding requirements for the stormwater controls must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2006- 246, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et. al. 11. The permittee shall submit a permit renewal application at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate documentation and the processing fee. Permit modified and reissued this the 18th day of November 2011. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION By Authority of the Environmental Management Commission Page 5 of 7 State Stormwater Management Systems Permit No. SW8 111108 P-705 Perimeter Street Parking Garage Stormwater Permit No. SW8 111108 Onslow County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 6 of 7 State Stormwater Management Systems Permit No. SW8 111108 Certification Requirements: .1. The drainage area to the BMP contains approximately the permitted acreage. 2. The drainage area to the BMP contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the appropriate BMP. 4. All roof drains are located such that the runoff is directed into the system 5. The bypass structure weir elevation is per the approved plan. 6. The bypass structure is located per the approved plans. 7. A grated cover is provided on the sediment chamber side. 8. A solid cover is provided on the sand chamber side. 9. The inlets are located per the approved plans and do not cause short- circuiting of the system. 10. The permitted amounts of filter chamber surface area and sediment chamber surface area have been provided. 11. The required volume can be contained in the sand filter. 12. All required design depths are provided. 13. All required parts of the system are provided. 14. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Regional Office David Towler, Camp Lejeune Page 7 of 7 DWQ USE ONLY Date Received Fee Paid Yermit Num //-/ - Amp.— 5 Applicable Rules: ❑ Coastal SW - 1995 ❑ Coastal SW - 2008 ❑ Ph 11- Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ Mgmt Plan: State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form ntay be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Perimeter Street Parking Garage 2. Location of Project (street address): City:MCAS New River, Camp Lejeune County:Onslow Zip:28547 3. Directions to project (from nearest major intersection): East on Douglas Rd. from Rt. 17. Turn right on Canal Street. Turn left on Perimeter Street 4. Latitude:34° 42' 35.64" N Longitude:77° 27' 26.28" W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ®New ❑Modification b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit number , its issue date (if known) , and the status of construction: ®Not Started ❑Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density NHigh Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major NSedimentation/Erosion Control: 6.5 ac of Disturbed Area ❑NPDES Industrial Stormwater 0404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: Fonn SWU-101 Version 07Jun2010 Page I of Cli I VED NOV 1 4 2011 BY: III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization:Commanding Officer, Marine Corps Base, Camp Leieune Signing Official & Title:Mr. Carl H. Baker, Jr., P.E., Deluty Publiic Works Director b. Contact information for person listed in item 1 a above: Street Address:1005 Michael Road City:MCB Camp Lejeune State:NC Zip:28547 Mailing Address (if applicable):1005 Michael Road City:CB Camp Leieune State:NC Zip:28547 Phone: (910 ) 451-2213 Fax: (910 ) 451-2927 Email:cart.h.baker@usmc.mil c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/i Signing Official & b.Contact information for person listed in item 2a above: Street Address: Mailing Address (if applicable): City: State Phone: ( ) Fax: 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: Mr. David Towler Signing Official & Title:Mr. Carl H. Baker, Jr., P.E., Deputy Publiic Works Director b.Contact information for person listed in item 3a above: Mailing Address: Public Works Division, Building 1005, Civil Design Branch City:MC13 Camp Lejeune State:NC Zip:28547 Phone: (910 ) 451-3238 ext. 3284 Fax: ( ) Email: david. towler@usmc.mil 4. Local jurisdiction for building permits: N/A - Federal Property Point of Contact: Phone #: ( ) R1 Form SWU-101 Version 07Jun2010 Page 2 of 6 N IV 1 4 2011 BY: I.V. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Stormwater will drain to an inlet and wing system to an underground concrete sedimentation and sandfilter BMP. The BMP discharge to an existingdrainage rainage ditch. 2. a. If claiming vested rights, identify the supporting documents provided and the date they Were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit _ Issued Date: ❑ Other: Date: b.lf claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW - 7995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the White Oak River basin. 4. Total Property Area: 6.5 acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area':6.5 acres Total project area shall be calculated to exclude the folloeoirrg fire normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal High Water (NHW) line or Mean High Water (MHW) line, and coastal wetlands landward from the NHW (or MHW) line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal u)etlaruds landzward of the NHW (or MHW) line vuny be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 48.8 % 9. How many drainage areas does the project have?l (For high density, count 1 for each proposed engineered stornrzwater BMP. For low density and other projects, use 1 for flue whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Draina e Area 1 Draina e Area Draina e Area Draina e Area _ Receiving Stream Name New River Stream Class * Si? 1 Stream Index Number * 19{7 I� Total Drainage Area (so 149,469 On -site Drainage Area (so 149,469 Off -site Drainage Area (so 0 Proposed Impervious Area** s 138,198 % Impervious Area** total 93 Impervious** Surface Area Drainage Area 1 Drainage Area Drainage Area Drainage Area _ On -site Buildings/Lots (so 449,45F I171 $ On -site Streets (so 4,8M531 On -site Parking (so 0 On -site Sidewalks (so -69-1 1-759 Other on -site (so 5,952 Future (so 8,000 Off -site (so 0 Existing BUA*** (sO 0 Total (sO: 138,198 * Stream Class and Index Number call be determined at: lrttp://portal.ucdenr.org oeb/mp/ps/csu/classifications Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Report only that amount of existing BUA that will remain after development. Do rot report any icxisting-BUA-that is to be removed and which will be replaced by nezo BUA. _E' C EJ. V�� Form SWU-101 Version 07Jun2010 Page 3 of 6 NOV 1 4 2011 ***Report only that amount of existing BUA that will remain after development. Do not report ally existing BUA that is to be removed and which will be replaced by new BUA. 11. How was the off -site impervious area listed above determined? Provide documentation. No off -site innpervious areas Proiects in Union County: Contact DIIQ Central Office staiflo check ifthe project is located Nithin a Threatened & Endangered Species watershed that may be subject to more stringent stornmarler requirements as per ACAC 02B.0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http://portal ncdenr orbweb/wq/ws/su/bmp-manual. Vl. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http�//portal ncdenr org/web/wq/ws/su/statesw/forms does. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map at http•//portal ncdertr.org/wLbZWqZWS/SL1 /maps.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http //portal ncdenr ors+/web/wq/ws/su/statesw/forms does. hmtials 1. Original and one copy of the Stormwater Management Permit Application Form. AO `, . / 2. Original and are copy of the signed anti notarized Deed Restrictions & Protective Covenants � J Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed signed and dated) and O&M agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to http'/ /www.envhelp ss org/pages/onestopexprehhnl for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/managementfor the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within hk mile of the site boundary, include the'h mile radius on the map. _ 7. Sealed, signed and dated calculations. 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. I. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. Form SWU-101 Version 07Jun2010 Page 4 of 6 N/A V'-- or& A u— A L. 4 N/ tt rVt� A Lb PRECEYVEl1� NOV 1 4 2011 BY: n: Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SH WT elevations (Please identify a'Lti elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"xll" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration 13N1Ps, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit far DWQ to verify the SHWT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: N/A Page No: N/A N/A 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC N/A Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item 1 a, 2a, and/or. 3a per NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. httu: / /www.secretarv.state.nc.us/Corporations/CScarch.aspx Vll. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http'//portnlncdenrorg/web/wq/ws/su/statesw/forms does. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holders) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:Anna Lee Bamforth P.E. L.S. LEED AP Consulting Firm: C. Allan Ban -forth Jr.,Engineer-Survevor Ltd Mailing Address:2207 Hampton Boulevard - City:Norfolk State:VA Zip:23517 Phone: (757 1 627-7079 Fax: (757 1 625-7434 Email:alb@babrnforth.com IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or type name of person listed in Contact Information, item 2a) certify that I own the property identified in this permit application, and thus give permission to (print at, hype name of person listed in Contact Information, item la) with (print or h./pe name of organization listed in Contact Information, item la) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. RECMUVRID� Form SWU-101 Version 07Jun2010 Page 5 of h L l 4 2011 ----- As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signature: Date: a Notary Public for the State of County of do hereby certify that before me this _ day of personally appeared and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission X. APPLICANT'S CERTIFICATION I, (print or hype name ofperson listed in Contact Informmtion, item 1a) Lai 1 H Baler certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective co enants will be reco ded, and that the proposed project complies with the requirements of the applicable stor w ter rules ynderNAAC 2H .1000, SL 2006-246 (Ph. II - Post Construction) or SL 2008-211. Date: /D -C —/ I,y V f o, t V 0 ( (-I S a Notary Public for the State of J&r- f1 CCtfo 1 I na , Countyof n ! o do hereb certify that 020t( I N. Ey-tt<e—(' personally appeared before me this _ day of f a 0/1 , and ackn wledge the due execution of the application for a stormwater permit. Witness my hand and official seal, .« SEAL My commission expires Form SW U-101 Version 07Jun2010 Page 6 of 6 NOV 1 4 2011 BY: ---- — MEMORY TRANSMISSION REPORT *w ` FILE NO. 607 DATE 11:21 12:59 TO S 917 57 62 57434 DOCUMENT PAGES 8 START TIME 11.21 12:59 END TIME 11.21 13:00 PAGES SENT 8 STATUS OR *** SUCCESSFUL TX NOTICE TIME :11-21-'ll 13:00 FAX NOA :910-350-2004 NAME :DENR Wilmington *** sr.ro nr No.ee eoroun® o<n.n moor or Eovlronmmr .na n.wr.+ a...,ur«. wum+o¢mo Rc�+oe.� om« ao...y t...:. rns..., co.<roor FAX OVER SHE E"1' Daw A«.non. 3ac.oury Dme: /�J��z"� —// No. Po6n. (oxcl. covarY Co: �p�l "�r�• �� � P6ona: (910) "�9G-']336 n.;..o ca.....:o.., ,.... :..r —. No a..os - [v.o) v9c-a a -. n'.., nm...... ". n..,i— E-0-, State of North Carollina Department of Environment and Natural Resources Wilmington Regional Office Beverly Fares Perdue, Governor FAX COVER SHEET DeeFreeman, Secretary Date: �� / No. Pages (excl. cover): To: %L ��,tJ° From: Jo Casmer Co: �%1%1 T//�T �' �n � Phone: (910) 796-7336 Fax: /j/J! �/— L — 7 �L /Fax: (910) 350-2004 Re: 127 Cardinal Drive Extension, Wilmington, NC 28405 0 (910) 796-7215 o An Equal Opportunity Affirmative Action Employer MEMORY TRANSMISSION REPORT TIME :11-21-'ll 13:04 FAX NO.1 :910-350-2004 NAME :DENR Wilmington FILE NO. 608 DATE 11.21 12:59 TO 8 919104512 97 6 DOCUMENT PAGES 8 START TIME 11.21 13:01 END TIME 11.21 13:04 PAGES SENT 8 STATUS OR *** SUCCESSFUL TX NOTICE *** S•vn of Norte Caro//va Dnpsrtmena of 8nvtron mev/ and Na a/ Rraouraer wuo./natnn Rq!/nna/ om� de.�arQ. F.o.w POMra. C varnnr FAX COVER SIiEE'S IMB lM1err.nn. 3ncrn/ary To: GA/G �i�.E � /� From: Jo Cnsmor State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Beverly Eaves Perdue, Governor FAX COVER SHEET Dee Freeman, Secretary Date: To: GAS �Ae Fax: �/� _ 7 -w->� No. Pages (excl. cover): From: Jo Casmer Phone: (910) 796-7336 Fax: (910)350-2004 127 Cardinal Drive Extension, Wilmington, NC 28405 o (910) 796-7215 o An Equal Opportunity Affirmative Action Employer <, y Q C. ALLAN BAMFORTH, JR. ENGINEER -SURVEYOR, LTD. OFFICE: MAILING ADDRESS 2207 HAMPTON BLVD. P.O. BOX 6377 NORFOLK, VA 23517 NORFOLK, VA 23508 PHONE: (757) 627-7079 FAx:757-625-7434 E-mail: dwc@bamforth.com To: NCDENR Wilmington Regional Office 127 N. Cardinal Dr. Express Permits Wilmington, NC 28405 WE ARE SENDING YOU THE FOLLOWING ITEMS: El Attached ❑ Shop Drawings ❑ Prints ❑ Specifications ❑ Copy of Letter LETTER OF TRANSMITTAL DATE: November 15, 2011 JOB 11.026 A'rm Ms. Linda Lewis RE: Perimeter Street Parking Garage MICAS New River ❑ Under separate cover via 0 Plans ❑ Reports 0 Calculations ❑ Other COPIES DATE NO. DESCRIPTION 2 FULL SIZE REVISED PLANS THESE ARE TRANSMITTED AS CHECKED BELOW: ❑ For Your Use 0 As Requested REMARKS: Ms. Lewis, ❑ For Approval ❑ Shop Drawing Action as Noted 0 For Review & Comment Storm pipe 25 to 26 was deleted from the stone schedule on sheet no. CG002. COPY TO: Anna Lee ►Bamforth, P.E., L.S., LEED AP RECT7_1`VED NOV 1 7 Z011 BY: k.. PERIMETER STREET PARKING GARAGE MCAS NEW RIVER CAMP LEJUENE, NORTH CAROLINA Stormwater Narrative: The project site is located within the Marine Corps Air Station New River military installation at Camp Lejeune, North Carolina. The purpose of this project is to construct a four story precast concrete parking garage with access ramps and two passenger elevators. The garage will contain 22 handicapped, 52 motorcycle, and 958 regular spaces. The structure will have a total footprint of approximately 90,000 square feet. The garage will be constructed to the east of Perimeter Street and over a segment of Canal Street. The primary entrance and exit to the facility will be by way of a relocated portion of Canal Street. Secondary one-way entry and exit will be provided from Perimeter Street. An accessible sidewalk will be provided from the northwest comer of the structure to Perimeter Street. Construction activities include clearing and grubbing, demolition of existing pavement, excavation, stormwater piping and structures, stormwater management BMP, utilities, grading, pavement and landscaping. Site Conditions The proposed project site consists of approximately 6.5 acres of wooded areas along the southwestern portion of the air station and 6.5 acres of disturbed area. The project site is gently sloping generally from the westerly to the easterly direction within the proposed construction area, with site elevations ranging from approximately 16 to 22 feet above MSL. An existing asphalt paved road (Canal Street) is bordered on each side by large drainage swales and is located within the footprint of the proposed parking garage. Cut and/or fill operations are not expected to exceed about 5 feet in order to establish the design grade elevations. As an exception, as much as 10 feet of fill will be required to establish final grade elevations in the isolated low lying drainage swales which are located within the construction areas. Stormwater This is a high density project. Stormwater management for the parking structure will be provided using a concrete sand filter with a bypass structure. The bypassed water will enter into another concrete chamber, which will serve as a detention basin. The parking structure footprint is approximately 90,000 square feet. However, included in the drainage area is runoff from 10% of each of the 3 bottom floors of the parking garage. This accounts for runoff from water that enters in through the side openings of the garage and gives a total square footage of approximately 117,178 draining to the BMP from the garage. The total drainage area to the BMP is approximately 3.25 acres with 0.18 acres of future impervious included in the design. This gives a total design drainage area of 3.43 acres with 3.17 acres of impervious. Fourteen areas drain via the proposed storm piping system to the new BMP. The discharge from the detention area, as well as any flow that bypasses the BMP, will drain to an existing ditch. The receiving stream for this project is Southwest Creek in the White Oak Basin, Stream Class C, IIPage NOV 1 4 2011 PERIMETER STREET PARKING GARAGE MCAS NEW RIVER CAMP LEJUENE, NORTH CAROLINA NSW, stream index number 19-17-(0.5). The proposed BMP is a closed sand filter and is designed according to the North Carolina Division of Water Quality, Stormwater Best Management Practices Manual, July 2007. No wetlands exist on the site. There is no off -site runoff coming onto the site. Road construction across other property will not be necessary to access this project. Soil Conditions The results of the field exploration indicated the presence of 3 to 5 inches of topsoil at the soil boring locations. Beneath the surficial topsoil, the native subsurface soils recovered at the boring locations and extending to the boring termination depth of 15 feet below current grades, generally consisted of SAND (SM, SC-SM) with varying amounts of Silt and Clay. As an exception, a deposit of"Lean" CLAY (CL) with varying amounts of sand was encountered at boring B-4 from 2 to 6 feet below existing site grades. The Standard Penetration Test (SPT) results, N-values, recorded within the granular soils ranged from 3 to 26 blows -per - foot (BPF), indicating a very loose to medium dense relative density. The Standard Penetration Test (SPT) results, N-values, recorded within the cohesive soils ranged from 6 to 10 blows -per - foot (BPF), indicating a medium stiff to stiff consistency. The groundwater level was recorded at the boring locations and as observed through the wetness of the recovered soil samples during the drilling operations. The initial groundwater table was measured to occur at a depth of about 9.0 feet below the existing site grades (elevation of about 8.0 MSL) at the boring B-3 and B-4 locations. Groundwater was not encountered at boring 13-1 and B-2 locations at the time of drilling to depths explored which is likely due to the influence of a deep drainage swale located in the immediate vicinity of these borings. The variation in groundwater depths are anticipated to have been contributed by the variations in existing site grade elevations and the associated distance between boring locations. The boreholes were backfilled upon completion for safety considerations. As such, the reported groundwater levels at these locations may not be indicative of the static groundwater level. Also, the soils recovered from boring 13-1 through B-4 locations were visually classified to identify color changes to aid in indicating the normal estimated Seasonal High Water Table (SHWT). It is noted that soil morphology may not be a reliable indicator of the SHWT. However, color distinctions (from orangish brown and tan to light gray and orangish brown; slightly mottled orangish brown -gray to slightly mottled gray-orangish brown) were generally observed within the soil profile of soil samples collected at the location of borings 13-1 through B-4. As such, the normal SHWT depth was estimated to occur at depths ranging from approximately 4 to 5 feet (borings 13-1 and B-2, respectively) and 3 feet (borings B-3 and B-4 locations) below the existing site grades. It should be noted that perched water conditions may occur throughout the site during periods of heavy precipitation and/or during the wet season. The perched condition is anticipated to occur in areas where shallow subsurface clayey soils were encountered. NOV 1 4 Z011 I 2 1 P a g c PERIMETER STREET PARKING GARAGE MCAS NEW RIVER CAMP LEJUENE, NORTH CAROLINA These soils will act as a restrictive layer allowing excessive moisture to accumulate within the overlying granular soils. The seasonal high groundwater table in the vicinity of the BMP was found to be around elevation 18.0. �: i�:;C�Ij,TED NOV l 4 Z011 BY:_--- 31Page ° \`P C. ALLAN BAMFORTH, JR. ENGINEER -SURVEYOR, LTD. OFFICE: MAILING ADDRESS 2207 HAMPTON BLVD. P.O. Box 6377 NORFOLK, VA 23517 NORFOLK, VA 23508 PHONE: (757) 627-7079 FAx:757-625-7434 E-mail: dwc@bamforth.com To: NCDENR Wilmington Regional Office 127 N. Cardinal Dr. Express Permits Wilmington, NC 28405 WE ARE SENDING YOU THE FOLLOWING ITEMS: 0 Attached LETTER OF TRANSMITTAL DATE: November 11, 2011 JOB 11.026 ATTN: Ms. Linda Lewis ` RE: Perimeter Street ' 'Parking Garages MCAS1NNew River (jam �I✓ � IIaal I I V� ❑ Under separate cover via ❑ Shop Drawings ❑ Prints 0 Plans 0 Calculations ❑ Specifications ❑ Copy of Letter ❑ Reports ❑ Other COPIES DATE NO. -DESCRIPTION 1 STORMWATER PLRMITSUBMITTAL 2 FULL SIZE PLANS THESE ARE TRANSMITTED AS CHECKED BELOW: ❑ For Your Use ❑ For Approval ❑ Shop Drawing Action as Noted 0 As Requested 0 For Review & Comment g g} T-?.._'�;IVFiPI' REMARKS: �' NOV 1 4 2011 BY: � COPY TO: Anna Lee Bamforth, P.E., L.S., LEER AP For DENR Use ONLY pp �� Reviewer (—L2� ��� North Carolina Department of Environment and I1_ (. 1 d Natural Resources Submit: 2 lJC � NCDENR Request for Express Permit Review Time: In t Confirm: It 0 — Z0 FILL-IN all the information below and CHECK the Permits) you are requesting for express review. FAX or Email the completed form to Express Coordinator along with a completed DETAILED narrative, site plan (PDF file) and vicinity map (same items expected in the application package of the protect location. Please include this form in the application package. • Asheville Region -Alison Davidson 828-296-4698;alison.davidson(p)ncmail.net • Fayetteville or Raleigh Region -David Lee 919-791-4203; david.lee(a ncmail.net • Mooresville & -Patrick Grogan 704-663-3772 or patrick.grogan(a)ncmail.net • Washington Region -Lyn Hardison 252-946-9215 or Ivn.hardison(u).ncmail.net • Wilmington Region -Janet Russell 910-350-2004 or fanet.russell(p ncmail.net NOTE: Project application received after 12 noon will be stamped in the following work day. TJo,) t , 2, 3 &kD:ov dCelpy_­t, Project Name: PERIMETER STREET PARKING GARAGE,County: ONSLOW 1�/C Applicant: CARL H. BAKER JR., P.E. Company: MCB CAMP LEJEUNE nc 7 Address: 1005 MICHAEL RD MCB City: CAMP LEJEUNE, State: NC Zip: 28547-_ deS , I Phone: 910-451-2213, Fax: 910-451-2927, Email: carl.h.baker@usmc.mil Physical Location: PERIMETER STREET, SOUTH OF DOUGLASS ROAD Project Drains into SOUTHWEST CREEK waters— Water classification CNSW (for classification see-http://h2o.enr.state.nc.us/bims/reports/reportsWB.html) Project Located in WHITE OAK River Basin. Is project draining to class ORW waters? N , within Y2 mile and draining to class SA waters N or within 1 mile and draining to class HQW waters? N Engineer/Consultant: ANNA LEE BAMFORTH Company: C. ALLAN BAMFORTH, JR. CE�VED Address: 2207 HAMPTON BLVD City: NORFOLK. Slate: VA Zip: 23517-_ OCT 1 8 2011 Phone: 757-627-7079, Fax: 757-625-7434. Email: alb@bamforth.com SECTION ONE: REQUESTING A SCOPING MEETING ONLY ❑ Scoping Meeting ONLY ❑ DWQ, ❑ DCM, ❑ DLR, ❑ OTHER: SW SW SW SW SW SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ Intermittent/Perennial Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Wetland (_linear ft or _acres) ❑ Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance ® State Stormwater. ❑ General ❑ SFR, ❑ SFR < 1 ac. ❑Bkhd & Bl Rmp, ❑ Clear & Grub, ❑ Utility ❑ Other ❑ Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ❑ Off -site [SW (Provide permit #)] ❑ High Density -Detention Pond _ # Treatment Systems ❑ High Density -Infiltration _ #Treatment Systems ❑ High Density -Bio-Retention _ # Treatment Systems ❑ High Density —SW Wetlands _ # Treatment Systems ® High Density -Other 1 # Treatment Systems 7❑ MOD:[] Major [I Minor ❑ Plan Revision ❑ Redev. Exclusion SW (Provide permit #) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront F ❑ Land Quality ® Erosion and Sedimentation Control Plan with 71 acres to be disturbed.(CK # (for DENR use)) SECTION THREE — PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scooino and express meetina reauest Wetlands on Site ❑ Yes ® No Buffer Impacts: ❑ No ❑ YES: —acre(s) Wetlands Delineation has been completed: ❑ Yes ❑ No Isolated wetland on Property ❑ Yes ❑ No US ACOE Approval of Delineation completed: ❑ Yes ❑ No 404 Application in Process w/ US ACOE: ❑ Yes ❑ No Permit Received from US ACOE ❑ Yes ❑ No rrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrr♦rrrrr rrrrrrrrrrrrrrrr Por DENR use only"*rrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrr Fee Solit for multiole permits: (Check# 1 Total Fee Amount E SUBMITTAL DATES Fee I SUBMITTAL DATES Fee CAMA $ Variance (❑ Maj; ❑ Min) $ SW (❑ HD, ❑ LD, ❑ Gen) I $ 401: $ LQS 1 $ Stream Deter,_ $ NCDENR EXPRESS March 2009 SAND FILTER DESIGN User Input required FILENAME: S:1WQS1Stormwaterlpermits & projects120111111108 HD12011 11 excel —SF 111108 Initial Run Date: 18-Nov-11 Reviewer: L. Lewis Last modified: 18-Nov-11 Project Number SW8 111108 PROJECT NAME: Perimeter Street Parking Garage - MCAS New River Sand Filter # 1 2 3 4 5 6 Receving Stream New River Classification SC Index Number 19-7 Onsite DA 149469 sf Offsite DA 0 sf Total DA 149469 0 0 0 0 0 sf Total DA acres 3.43 0.00 0.00 0.00 0.00 0.00 ac. Structure 117168 sf Street 5319 sf SW 1759 sf Other 5952 sf Future 8000 sf Total BUA 138198 0 0 0 0 0 sf Runoff Cc 0.92 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! REQUIRED VOLUME CALCULATIONS % Impervious 92.46% #DIV/0! #DIV/01 #DIV/0! #DIV/0! #DIV/0! % Rv factor, pre 0.05 0.05 . 0.05 0.05 : 0.05 0.05 Rv factor, post 0.882 #DIV/0! #DIV/01 #DIV/0! #DIV/0! #DIV/01 Design Storm in 1.5" volume 16481 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! cf 1 yr24 hr precip depth in 1 yr 24 hr pre vol N/A 0 0 0 0 0 cf 1 yr 24 hr post vol N/A #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! cf Post - Pre N/A #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! cf Total WQV 16481 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! cf WQV to store 12361 #DIV/01 #DIV/01 #DIV/0! #DIV/01 #DIV/01 cf REQUIRED SURFACE AREAS Designer's hmax 2.29 ft As+Af required 5398 #DIV/01 #DIV/01 #DIV/01 #DIV/01 #DIV/01 sf Min. As 1088 #DIV/01 #DIV/0! #DIV/0! #DIV/0! #DIV/0! sf Depth of Sand Bed 1.50 ft Min. At 1609 #DIV/0! #DIV/0! #DIV/01 #DIV/0! #DIV/0! sf C 0.98 0.95 0.9 1 0.98 overwrite irnecessary SURFACE AREAS & VOLUME PROVIDED CALCULATIONS As provided 3780 Af provided 1800 As+Af provided = 5580 0 0 0 0 Min. As+Af prov? OK #DIV/01 #DIV/01 #DIV/01 #DIV/01 Weir elevation 18.5 Offline Bypass 20.79 Top of Sand Elev. 18.5 Hmax provided 2.22 Hmax Met? YES Bottom of Sed. Ch. 16 Volume provided 12778 Min. Vol. Prov? YES DRAWDOWN CALCULATIONS 1y24hr storm intensity 1y24 hr pre -peak flov 0 Orifice Diameter 6 Orifice Area 0.196 Avg H on Orifice 1.26 Min. 40 hour flowrate 0.11 Orifice flowrate 1.168 Time to drawdown 2.9 sf sf 0 sf YorN fmsl fmsl #DIV/0! #DIV/01 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/01 0 0 0 0 0 cf #DIV/01 #DIV/01 #DIV/01 #DIV/01 #DIV/01 in/hr from NOAA chart #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! cfs Q=CiA in 0.000 0.000 0.000 0.000 0.000 sf ovcnvrite for non -circa 0.00 0.00 0.00 0.00 0.00 ft #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! cfs 0.000 0.000 0.000 0.000 0.000 cfs #DIV/01 #DIV/01 #DIV/01 #DIV/01 #DIV/01 hrs must be <ao NOTE- The 5.81 figure in the "Min. Af' area calculation assumes a 3.5 feet/day infiltration rate and a 40 hour drawdown time, which equates to 1.66 days. 3.5 x 1.66 = 5.81 feet. Sediment Chamber Drain? Note - the volume provided must be located above the surface of the sand, in the sand chamber and above the weir in the sediment chamber. The volume of the sediment chamber below the weir elevation is not included in the provided volume. Where an "offset" sand filter is provided, where the sediment chamber is physically located above the sand chamber such that the sediment chamber can draw down substantially into the sand chamber, then the volume of the sediment chamber from the weir to 6" above the bottom can be included in the storage volume provided. S Go For DENR Use ONLY RuV North Carolina Department of Environment and m m L!_ Lg Natural Resources Time. i.it 1 O NCDENR Request for Express Permit Review me I t Confirm: FILL-IN all the information below and CHECK the Permit(s) you are requesting for express review. FAX or Email the completed form to Express Coordinator along with a completed DETAILED narrative site plan (PDF file) and vicinity map (same items expected in the application package of the project location. Please include this form in the application package. • Asheville Region -Alison Davidson 828-296-4698;alison.davidson(a7ncmail.net • Fayetteville or Raleigh Region -David Lee 919-791.4203; david.lee(a)ncmail.net • Mooresville & -Patrick Grogan 704-663-3772 or patrick.urogan(a)ncmail net • Washington Region -Lyn Hardison 252-946-9215 or/yn.hardisonnncmail.net • Wilmington Region -Janet Russell910-350.2004 or'anet.russell(a)ncmail.net NOTE: Project application received after 12 noon will be stamped in the following work day Permits of request SW SW SW SW SW IC' ..-) Or to'Ll fn -Tues Oce.p- Project Name: P-705 PARKING GARAGE County:ONSLOW �e.v.� �� V� �•«f S�-,on ��,�`^S �r'H SLR Applicant: CARL H.BAKER JR. RE Company: MCB CAMP LEJEUNE Address: 1005 MICHAEL RD MCB City: CAMP LEJEUNE, State: NC Zip: 28547 Phone: 910-451-2213, Fax: 910-451-2927, Email: carl.h.baker@usmc.mil � ` e` Physical Location: PERIMETERSIREET. SOUTH OF DOUGLASS ROAD Project Drains into SOUTHWEST CREEK waters —Water classification CNSW (for classification see-http://h2o.enr.state.nc.usfbims/reports/reportsWB.htmll Project Located in WHITE OAK River Basin. Is project draining to class ORW waters? N , within Y2 mile and draining to class SA waters N or within 1 mile and draining to class HOW waters? N Engineer/Consultant: ANNA LEE BAMFORTH Company: C, ALLAN BAMFORTH JR Address: 2207 HAMPTON BLVD City: NORFOLK, State: VA Zip: 23517 Phone: 757-627-7079, Fax: 757-625-7434, Email: alb@bamforth.com SECTION ONE: REQUESTING A SCOPING MEETING ONLY ® Scoping Meeting ONLY ® DWQ, ❑ DCM, ® DLR, ❑ OTHER: SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ IntermittentlPerennial Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Wetland (_linear ft or _acres) ❑ Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance ❑ State Stormwater ❑ General ❑ SFR, ❑ SFR < 1 ac. ❑Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility [I Other ❑ Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ❑ Off -site [SW _ (Provide permit #)] ❑ High Density -Detention Pond _ # Treatment Systems ❑ High Density -Infiltration _ #Treatment Systems ❑ High Density -Bio-Retention _ # Treatment Systems ❑ High Density —SW Wetlands _ # Treatment Systems [—]High Density -Other # Treatment Systems /❑ MOD:❑ Major ❑ Minor ❑ Plan Revision ❑ Redev. Exclusion SW (Provide permits) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ❑ Land Quality ® Erosion and Sedimentation Control Plan with 71 acres to be disturbed.(CK # (for DENR use)) SECTION THREE — PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both soopino and express meeting request Wetlands on Site ❑ Yes ® No Buffer Impacts: ❑ No ❑ YES: —acre(s) Wetlands Delineation has been completed: ❑ Yes ❑ No Isolated wetland on Property ❑ Yes ❑ No US ACOE Approval of Delineation completed: ❑ Yes ❑ No 404 Application in Process w/ US ACOE: ❑ Yes ❑ No Permit Received from US ACOE ❑ Yes ❑ No +++++++++++r++++++++++++++++++r+r+«+++++r♦+++++++++++r++I�or l)I:NR uu: only++r+++++++++++++«r+++r+++++++«++++++++++++++++++++«+++r♦+++• Fee Solitformultiorer itst rChacke I r....i c....e�_.._.? SUBMITTAL DATES IFee SUBMITTAL DATES I Fee CAMA $ Variance (❑ Mal: ❑ Min) $ SW (❑ HD, ❑ LD, ❑Gen) $ 4N $ Los I Stream Deter,_ $ U � O � ,dl 0 N V, 0 5 Gof �J t— C� 1 For DENR Use ONLY p, 1 •i (J l 11 Reviewer: ILL A7jA North Carolina Department of Environment and t0 Natural Resources / Sub NCDENR Request for Express Permit Review Time: I t Confirm: 9 - 2 3 FILL-IN all the information below and CHECK the Permit(s) you are requesting for express review.IAX or Email the completed form to Express Coordinator along with a completed DETAILED narrative site plan (PDF file) and vicinity map (same items expected in the application package of the project location. Please include this form in the application package. • Asheville Region -Alison Davidson 828-296-4698;alison.davidson(g),ncmail.net • Fayetteville or Raleigh Region -David Lee 919-791.4203; david.lee(a)ncmaiLnet • Mooresville & -Patrick Grogan 704-663.3772 or patrick.grogan(dncmaiLnet • Washington Region -Lyn Hardison 252-946-9215 or lyn.hardison((DncmaiLnet • Wilmington Region -Janet Russell 910-350-2004 or janet.russell(ibncmail.net NOTE: Project application received after 12 noon will be stamped in the following work day. Permits of request SW SW SW SW SW IO 3or10� M —Tue5 Qc_e-P'•, Project Name:_P-705PARKING GARAGE 'County: ONSLOW t ie W 'V—:,0CX Applicant: CARL H. BAKER JR., P.E. -Company: MCB CAMP LEJEUNE Address: 1005 MICHAEL RD MCB City: CAMP LEJEUNE, State: NC Zip: 28547 Phone: 910-451-2213, Fax: 910-451-2927, Email: carl.h.baker@usmc.mil Physical Localion:PERIMETER STREET, SOUTH OF DOUGLASS ROAD Project Drains into SOUTHWEST CREEK waters — Water classification CNSW (for classification see-hftp://h2o.enr.state.nc.usthims/reports/reportsWB html) Project Located in WHITE OAK River Basin. Is project draining to class ORW waters? N , within Y, mile and draining to class SA waters N or within 1 mile and draining to class HOW waters? N Engineer/Consultant: ANNA LEE BAMFORTH Company: C. ALLAN BAMFORTH. JR. _ �v�° Address: 2207 HAMPTON BLVD City: NORFOLK, State: VA Zip: 23517-_ I ' ' - Phone: 757-627-7079, Fax: 757-625-7434, Email: alb@bamfonh.com 1 SECTION ONE: REQUESTING A SCOPING MEETING ONLY SEP 2 2 2011 `® Scoping Meeting ONLY ®DWQ, ❑ DCM, ® DLR, ❑ OTHER: _ SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ Intermittent/Perennial Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Wetland (_linear ft or _acres) ❑ Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance ,❑ State Stormwater ❑ General ❑ SFR, ❑ SFR < 1 ac. ❑Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Other ❑ Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ❑ Off -site [SW _ (Provide permit #)] ❑ High Density -Detention Pond _ # Treatment Systems ❑ High Density -Infiltration _ #Treatment Systems ❑ High Density -Bio-Retention _ # Treatment Systems ❑ High Density —SW Wetlands _ # Treatment Systems ❑ High Density -Other # Treatment Systems / ❑ MOD:❑ Major ❑ Minor ❑ Plan Revision ❑ Redev. Exclusion SW (Provide permit#) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ❑ Land Quality ® Erosion and Sedimentation Control Plan with 71 acres to be disturbed.(CK # (for DENR use)) SECTION THREE — PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scoping and express meeting request Wetlands on Site ❑ Yes ® No Buffer Impacts: ❑ No ❑ YES: _acre(s) Wetlands Delineation has been completed: ❑ Yes ❑ No Isolated wetland on Property ❑ Yes ❑ No US ACOE Approval of Delineation completed: ❑ Yes ❑ No 404 Application in Process w/ US ACOE: ❑ Yes ❑ No Permit Received from US ACOE ❑ Yes ❑ No +++++++++rr++++++++++++++++++++++++++++++r++++++++++++++For DENR use only++++++++++rr+r++++++++++++r+rr++++++++++++++++++++rrr+++r+++ Fee Solit for multiole permits: (Check # 1 Tetar Fee a.e„rr.n t SUBMITTAL DATES Fee SUBMITTAL DATES Fee CAMA $ Variance ([IMaj; El min) $ SW (❑ HD, ❑ LD, ❑ Gen) $ 401; $ LDS $ Stream Deter,_ I $ NCDENR EXPRESS March 2009 P-705 PARKING GARAGE MCAS NEW RIVER CAMP LEJUENE, NORTH CAROLINA Stormwater Narrative: The project site is located within the Marine Corps Air Station New River military installation at Camp Lejeune, North Carolina. The purpose of this project is to construct a four story precast concrete parking garage with access ramps and two passenger elevators. The garage will contain 22 handicapped, 52 motorcycle, and 958 regular spaces. The structure will have a total footprint of approximately 70,000 square feet. The garage will be constructed to the east of Perimeter Street and over a segment of Canal Street. The primary entrance and exit to the facility will be by way of a relocated portion of Canal Street. Secondary one-way entry and exit will be provided from Perimeter Street. An accessible sidewalk will be provided from the northwest corner of the structure to Perimeter Street. Construction activities include clearing and grubbing, demolition of existing pavement, excavation, stormwater piping and structures, stormwater management BMP, utilities, grading, pavement and landscaping. Site Conditions The proposed project site consists of approximately 7.1 acres of wooded areas along the southwestern portion of the air station and 7.1 acres of disturbed area. The project site is gently sloping generally from the westerly to the easterly direction within the proposed construction area, with site elevations ranging from approximately 16 to 22 feet above MSL. An existing asphalt paved road (Canal Street) is bordered on each side by large drainage swales and is located within the footprint of the proposed parking garage. Cut and/or fill operations are not expected to exceed about 5 feet in order to establish the design grade elevations. As an exception, as much as 10 feet of fill will be required to establish final grade elevations in.the isolated low lying drainage swales which are located within the construction areas. Stormwater This is a high density project. Stormwater management for the parking structure will be provided using a concrete sand filter with a bypass structure. The bypassed water will enter into another concrete chamber, which will serve as a detention basin. The total drainage area to the BMP is approximately 3.1 acres. Included in the drainage area is the runoff from 10% of each of the 3 bottom floors of the parking garage, accounting for runoff from water that enters in through the side openings of the garage. Fourteen areas drain via the proposed storm piping system to the new BMP. The discharge from the detention area, as well as any flow that bypasses the BMP, will drain to an existing ditch. The receiving stream for this project is Southwest Creek in the White Oak Basin, Stream Class C, NSW, stream index number 19-17-(0.5). The proposed BMP is a closed sand filter and is designed according to the North Carolina Division of Witter Quality, Stormwater Best Management Practices Manual, July 2007. No wetlands exist on the IIPage P-705 PARKING GARAGE MCAS NEW RIVER CAMP LEJUENE, NORTH CAROLINA site. There is no off -site runoff coming onto the site. Road construction across other property will not be necessary to access this project. Soil Conditions The soil field exploration indicated the presence of approximately I to 23 inches of topsoil material at the boring locations. In addition, approximately 2 feet of "Fill" material was encountered beneath the topsoil material at boring locations B-3, B-4, B-6, P-1, P-7, P-8, P-20, BMP-8 and BMP-9. The fill material consisted of SAND (SM) and SILT (ML) with varying amounts of Silt, Clay, Gravel and wood fragments. The fill material appears to have been previously placed as part of prior construction activities associated with the existing facilities located within the project area. The topsoil and fill material thicknesses are expected to vary at other locations throughout the site. Underlying the topsoil and fill materials and extending to the SPT boring termination depths of 15, 60 and 85 feet below the existing site grades, the natural subsurface soils were generally comprised of SAND (SP, SM, SC, and SP-SM) with varying amounts of Silt and Clay. The N-values recorded within these granular soils ranged from 2 to 100 blows -per foot (BPF) indicating a very loose to very dense relative density. Deposits of very soft to very stiff CLAY (CL) and medium stiff to stiff SILT (ML) were encountered within this stratum at varying depths between 0 to 23 feet below the existing site grade at boring locations B-1, B-3 through B-6, B-10 through B-12, B-15, B-I6, BMP-1, BMP-2, BMP-4, P-1 through P- 3, P-10, P-1 I, P-13 through P-15, P-19, P-21, P-23 through P-25, P-27 through P-29, P-41, P-44, P-52, P-53, P-56 and P-60. Also, the soils recovered from boring BMP-I through BMP-12 locations were visually classified to identify color changes to aid in indicating the normal estimated Seasonal High Water Table (SHW"r). It is noted that soil morphology may not be a reliable indicator of the SHWT. However, color distinctions (from tan to gray to tan and gray; brown to grayish brown; orangish brown to light gray) were generally observed within the soil profile of soil samples collected at the location of borings BMP-I through BMP-12. As such, the normal SH WT depth was estimated to occur at depths ranging from approximately 4 feet (borings BMP-1 through BMP-7); 6 feet (borings BMP-8 through BMP-10); 5 feet (boring BMP-I 1) and 5.5 feet (BMP-12) below the existing site grades. The groundwater level was recorded at the boring locations and as observed through the wetness of the recovered soil samples during the drilling operations. The initial groundwater table was measured to occur at depths ranging from 6 to 14.5 feet below the existing site grades (elevations from about 9.5 to 10.5 MSL) at the boring locations. As an exception, groundwater elevation at borings B-56 through B-59 was measure to occur at elevation 3.0 MSL which is likely due to the influence of a deep drainage Swale located in the immediate vicinity of these borings. The variation in groundwater depths are anticipated to have been contributed by the variations in existing site grade elevations and the associated distance SEP 2 2 2011 2 1 P a g e I 2 i 3 2 ' 3 P-705 PARKING GARAGE MCAS NEW RIVER CAMP LEJUENE, NORTH CAROLINA between boring locations. As such, the reported groundwater levels at these locations may not be indicative of the static groundwater level. The groundwater table in the vicinity of the BMP was found to be around elevation 9.5. C -VIVA D SEP 2 2 2011 3 1 P a g e CIVIL CALCULATIONS PERIMETER STREET PARKING GARAGE MARINE CORPS BASE CAMP LEJEUNE JACKSONVILLE, NORTH CAROLINA C. ALLAN BAMFORTH, JR.., ENGINEER -SURVEYOR, L'n) NORFOLK, VIRGINIA October 2011 x�.C�-:IV lD NOV 1 4 2011 Lry:5W71"1llG8 C A ��QyQ:o�k3S p��y 7 029841 uloi i� s BMP Calculations NOV 1 4 2011 °2; BMP CALCULATIONS PERIMETER STREET PARKING GARAGE MCAS, NEW RIVER, JACKSONVILLE, NC NOVEMBER 3, 2011 Basis of Design: The project site is gently sloping generally from the westerly to the easterly direction within the proposed construction area, with site elevations ranging from approximately 16 to 22 feet above MSL. An existing asphalt paved road (Canal Street) is bordered on each side by large drainage swales and is located within the footprint of the proposed parking garage. The Parking Garage project constructs a four story precast concrete parking garage with access ramps and two passenger elevators. The structure will have a total footprint of approximately 90,000 square feet. Included in the drainage area is the runoff from 10% of each of the 3 bottom floors of the parking garage, accounting for runoff from water that enters in through the side openings of the garage. This gives a total square footage of approximately 117,178 draining to the BMP from the garage. The garage will be constructed to the east of Perimeter Street and over a segment of Canal Street. The existing site is primarily wooded. The total drainage area to the BMP is approximately 3.25 acres with 0.18 acres of future impervious included in the design. This gives a total design drainage area of 3.43 acres with 3.17 acres of impervious. The water quality BMP provided is a closed sand filter with a detention area. It is designed so that the water initially fills the sediment basin and then the sand filter. The remaining volume for runoff restriction will enter into a third concrete chamber, which will serve as a detention basin. The discharge from the detention area, as well as any flow that bypasses the BMP, will drain to an existing ditch. Time of concentration was found using Seelye's Chart for overland flow and Kirpich Chart for ditch flow. Underdrain piping was sized using Darcy's Law and shall be designed to carry 2 —10 times the maximum flow. BMP calculations were performed using the Haestad Methods "Pond Pack" software and the backup reports are attached. Regional Requirements: Quality volume was determined using the runoff volume from the first inch and a half of rain. Quantity volume was calculated to restrict the flow to predeveloped conditions for the Wilmington 10-year storm event. Calculations have also been performed using the 1-year, 24- hour storm, Soil Group B. It is in conformance with North Carolina Division of Water Quality "Stormwater Best Management Practices Manual, July 2007". LID: Low -impact development is designed to mimic the predevelopment hydrologic conditions through various control functions. It is stated in the LID guidelines, that the design storm event shall be the 95th percentile rainfall depth or the required water quality depth as defined by State or local requirements, whichever is more stringent. In addition, the BMPs shall be designed to control all storm events, as stipulated by Local and State regulations, to handle the peak rate and/or volume of discharge. LID has been met by implementing the following: Peak Runoff Rote Control: Using a combination of a sand filter and detention basin, the outflow for the 10-year storm event has been restricted to pre -developed conditions per the State of North Carolina. I�R �lv Page 1 of 3 NOV 1 4 2011 BY:-_____ BMP CALCULATIONS PERIMETER STREET PARKING GARAGE MCAS, NEW RIVER, JACKSONVILLE, NC NoVEMBER 3, 2011 Water Quality Control. The State of North Carolina uses the 95th percentile storm for their water quality design. Therefore, a 1.5 inch design rainfall depth has been used and will satisfy both Regional and LID requirements. Area of Garage & Entrances —Sand Filter Water Quality Volume Use "Simple Method" Impervious Area: C = 0.95 CN = 98 Garage = 117168 sf Other Impervious = 13030 sf Future Impervious = 8000 sf Total Impervious Area = 130198 (current) + 8000 (future) = 138198 sf or 3.17 ac Total Grass = 11441 sf = 0.26 ac C = 0.30 CN = 69 Runoff Coefficient = Rv = 0.05 + 0.009 (1) I = Percent Impervious = 138198/149469 = 92.5% Rv = 0.05 + 0.009 (92.5) = 0.88 Volume = (Design Rainfall) (Rv) (Drainage Area) (1.5 in/12in/ft)(0.88)(3.43 acres) = 0.377 ac-ft or 16435 cu-ft Adjusted Water Quality Volume (WQVadj) = The volume that must be contained in the sediment basin and sand filter (above the sand) = (0.75)WQV = (0.75)16435 = 12326 cu. ft. 1-yr 24-hr Storm Predevelopment = 2.87 cfs , Z. J Postdevelopment = 9.10 cfs t �2E Minimum Sand Filter Bed Surface Area (J¢s15n� S Af = (WQV)(df)/(k)(t)(ha + df) WQV = Water Quality Volume, df = Filter Depth, K = Sand Permeability, t = Draining Time, ha = Average Head A = (16435 x 1.5)/(3.5)(1.66)(1.15 + 1.5) = 1601 sq. ft. Area Provided = (30)(60) = 1800 sq. ft. Minimum Sediment Basin Surface Area As = (240)(Rv)(Ad Acres)(Rd) (240)(0.88)(3.43)(1.5) = 1087 sq. ft. Area Provided = 15.75 x 60 x 4 = 3780 sf Page 2 of 3 RE' CIE' C/ E,� LNOV 1 4 2011 BY:_----- BMP CALCULATIONS PERIMETER STREET PARKING GARAGE MCAS, NEW RIVER, JACKSONVILLE, NC Maximum Head on Filter Hmaxfilter = WQVadj/(As + Af) 12326/(3780 + 1800) = 2.21 ft. Maximum Head Provided = 2.29 ft. > 2.21 ft. Storage Volume Volume = (Area of Filter +Area of Basin)(Max Head) (1800+ 3780)(2.29) = 12778 cu. ft. > 12326 cu. ft. (WQVadj) Underdrain System Q = flow rate of soil media = kiA = 0.387 cfs x 10 (safety factor) = 3.87 cfs k = Coefficient of Permeability of Filter Media = 3.5 in/hr i = Hydraulic Gradient = hf+ df = 2.65 ft df = Filter Bed Depth (ft) = 1.5 ft hf = Average Height of Water Above Filter Media (ft) = 2.29/2 = 1.15 A = filter bed area = 1800 sq. ft. NoVEMBER 3, 2011 OK (10) 6-inch pipes at 0.50% carry = 0.40 cfs x 10; 4.00 cfs/0.387 = 10.3 times max flow Detention Area Size Concrete Detention Chamber to Take Volume in Excess of Sand Filter Volume Impervious = 0.24 ac Grass/Woods = 3.06 ac Tc = 15 minutes C=0.95 CN=98 C=0.30 CN=69 i = 5.17 in/hr Allowable Outflow = CiA = (0.30 x 3.06) + (0.95 x 0.24) x 5.17 = 5.93 cfs Total Volume Required for 10-year Storm = 15055 cu. ft. (calculated by Pondpack) Total Volume Provided by Sediment Basin and Sand Filter Above Sand = 12778 cu. ft. Total Volume Required in Detention Area = 15055 —12778 = 2277 cu. ft. OK Total Volume Provided in Detention Area = (30 x 60) x 1.33 = 2394 cu. ft. > 2277 cu. ft. OK f cc Cc' IVEO Page 3of3 NOV 1 4 Z011 i `: BAP CALCULATIONS PERIMETER STREET PARKING GARAGE MCAS, NEW RIVER, JACKSONVILLE, NC NoVEMBER 3, 2011 Basis of Design: The project site is gently sloping generally from the westerly to the easterly direction within the proposed construction area, with site elevations ranging from approximately 16 to 22 feet above MSL. An existing asphalt paved road (Canal Street) is bordered on each side by large drainage swales and is located within the footprint of the proposed parking garage. The Parking Garage project constructs a four story precast concrete parking garage with access ramps and two passenger elevators. The structure will have a total footprint of approximately 90,000 square feet. Included in the drainage area is the runoff from 10% of each of the 3 bottom floors of the parking garage, accounting for runoff from water that enters in through the side openings of the garage. This gives a total square footage of approximately 117,178 draining to the BMP from the garage. The garage will be constructed to the east of Perimeter Street and over a segment of Canal Street. The existing site is primarily wooded. The total drainage area to the BMP is approximately 3.25 acres with 0.18 acres of future impervious included in the design. This gives a total design drainage area of 3.43 acres with 3.17 acres of impervious. The water quality BMP provided is a closed sand filter with a detention area. It is designed so that the water initially fills the sediment basin and then the sand filter. The remaining volume for runoff restriction will enter into a third concrete chamber, which will serve as a detention basin. The discharge from the detention area, as well as any flow that bypasses the BMP, will drain to an existing ditch. Time of concentration was found using Seelye's Chart for overland flow and Kirpich Chart for ditch flow. Underdrain piping was'sized using Darcy's Law and shall be designed to carry 2 —10 times the maximum flow. BMP calculations were performed using the Haestad Methods "Pond Pack" software and the backup reports are attached. Regional Requirements: Quality volume was determined using the runoff volume from the first inch and a half of rain. Quantity volume was calculated to restrict the flow to predeveloped conditions for the Wilmington 10-year storm event. Calculations have also been performed using the 1-year, 24- hour storm, Soil Group B. It is in conformance with North Carolina Division of Water Quality "Stormwater Best Management Practices Manual, July 2007". LID: Low -impact development is designed to mimic the predevelopment hydrologic conditions through various control functions. It is stated in the LID guidelines, that the design storm event shall be the 95th percentile rainfall depth or the required water quality depth as defined by State or local requirements, whichever is more stringent. In addition, the BMPs shall be designed to control all storm events, as stipulated by Local and State regulations, to handle the peak rate and/or volume of discharge. LID has been met by implementing the following: Peak Runoff Rate Control: Using a combination of a sand filter and detention basin, the outflow for the 10-year storm event has been restricted to pre -developed conditions per the State of North Carolina. Page 1 of 3 NOV 1 4 Z011 BY: BMP CALCULATIONS PERIMETER STREET PARKING GARAGE MCAS, NEW RIVER, JACKSONVILLE, NC NoVEMBER 3, 2011 Water Quality Control. The State of North Carolina uses the 95`h percentile storm for their water quality design. Therefore, a 1.5 inch design rainfall depth has been used and will satisfy both Regional and LID requirements. Area of Garage & Entrances —Sand Filter Water Quality Volume Use "Simple Method" Impervious Area: C = 0.95 CN = 98 Garage = 117168 sf Other Impervious = 13030 sf Future Impervious = 8000 sf Total Impervious Area = 130198 (current) + 8000 (future) = 138198 sf or 3.17 ac Total Grass = 11441 sf = 0.26 ac C=0.30 CN=69 Runoff Coefficient = Rv = 0.05 + 0.009 (1) I = Percent Impervious = 138198/149469 = 92.S% Rv = 0.05 + 0.009 (92.5) = 0.88 Volume = (Design Rainfall) (Rv) (Drainage Area) (1.5 in/12in/ft)(0.88)(3.43 acres) = 0.377 ac-ft or 16435 cu-ft Adjusted Water Quality Volume (WQVadj) = The volume that must be contained in the sediment basin and sand filter (above the sand) = (0.75)WQV = (0.75)16435 = 12326 cu. ft. 1-yr 24-hr Storm Predevelopment = 2.87 cfs Postdevelopment = 9.10 cfs Minimum Sand Filter Bed Surface Area Af = (WQV)(df)/(k)(t)(ha + df) WQV = Water Quality Volume, df = Filter Depth, K = Sand Permeability, t = Draining Time, ha = Average Head A = (16435 x 1.5)/(3.5)(1.66)(1.15.+ 1.5) =' 1601-sq. ft. Area Provided = (30)(60) = 1800 sq. ft. Minimum Sediment'Basin Surface Area As = (240)(Rv)(Ad Acres)(Rd) (240)(0.88)(3.43)(1.5) = 1087 sq. ft. Area Provided = 15.75 x 60 x 4 = 3780 sf Page 2 of 3 NOV 1 4 2011 i3Y: BMP CALCULATIONS PERIMETER STREET PARKING GARAGE MCAS, NEW RIVER, JACKSONVILLE, NC Maximum Head on Filter Hmaxfilter= WQVadj/(As + Af) 12326/(3780 + 1800) = 2.21 ft. Maximum Head Provided = 2.29 ft. > 2.21 ft. Storage Volume Volume = (Area of Filter+Area of Basin)(Max Head) (1800 + 3780)(2.29) = 12778 cu. ft. > 12326 cu. ft. (WQVadj) Underdrain System Q= flow rate of soil media = kiA = 0.387 cfs x 10 (safety factor) = 3.87 cfs k = Coefficient of Permeability of Filter Media = 3.5 in/hr i = Hydraulic Gradient = hf + df = 2.65 ft df = Filter Bed Depth (ft) = 1.5 ft hf = Average Height of Water Above Filter Media (ft) = 2.29/2 = 1.15 A = filter bed area = 1800 sq. ft. NOVEMBER 3, 2011 OK (10) 6-inch pipes at 0.50% carry = 0.40 cfs x 10; 4.00 cfs/0.387 = 10.3 times max flow Detention Area Size Concrete Detention Chamber to Take Volume in Excess of Sand Filter Volume Impervious = 0.24 ac Grass/Woods = 3.06 ac Tc = 15 minutes C=0.95 CN=98 C=0.30 CN=69 i = 5.17 in/hr Allowable Outflow = CiA = (0.30 x 3.06) + (0.95 x 0.24) x 5.17 = 5.93 cfs Total Volume Required for 10-year Storm = 15055 cu. ft. (calculated by Pondpack) Total Volume Provided by Sediment Basin and Sand Filter Above Sand = 12778 cu. ft. Total Volume Required in Detention Area = 15055 —12778 = 2277 cu. ft. OK Total Volume Provided in Detention Area = (30 x 60) x 1.33 = 2394 cu. ft. > 2277 cu. ft. OK Page 3 of 3 NOV 1 4 2011 by: Type.... SCS Unit Hyd. Summary Page 4.03 Name.... SCS UH 10 Tag: ..1 Event: 1 yr File.... K:\JOB-FILES\2011\11026\CALCS\PROJECTI.PPW SCS UNIT HYDROGRAPH METHOD Predevelopment 1 -yr 24 hour storm STORM EVENT: 1 year storm Duration = 1440.00 min Rain Depth = 3.5000 in Rain Dir = C:\HAESTAD\PPKW\RAINFALL\ Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = K:\JOB-FILES\2011\11026\CALCS\ HYG File - ID = WORK_PAD.HYG - SCS UH 10 ..1 Tc = 10.00 min Drainage Area = 3.430 acres Runoff CN= 69 -------------------------------------------- -------------------------------------------- Computational Time Increment = 1.333 min Computed Peak Time = 729.33 min Computed Peak Flow = 2.87 cfs Time Increment for HYG File = 3.00 min Peak Time, Interpolated Output = 729.00 min Peak Flow, Interpolated Output = 2.86 cfs -------------------------------------------- -------------------------------------------- DRAINAGE AREA ------------------- ID:SCS UH 10 CN = 69 Area = 3.430 acres S = 4.4928 in 0.2S = .8986 in Cumulative Runoff ------------------- .9540 in 11878 cu.ft HYG Volume... 11877 cu.ft (area under HYG curve) ' " •' UNIT HYDROGRAPH PARAMETERS •••" Time Concentration, Tc = 10.000 min (ID: None Selected) Computational Incr, Tm = 1.333 min = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 23.32 cfs Unit peak time Tp = 6.667 min Unit receding limb, Tr = 26.667 min Total unit time, Tb = 33.333 min S/N: 121901A06A84 C. Allan Bamforth, Jr., Engineer -Surveyor, Ltd. PondPack Ver: 7.0 (325) Compute Time: 09:46:12 Date: 11-03-2011 t-: :C aVIEII NOV 1 4 2011 3Y: Type.... SCS Unit Hyd. Summary Page 5.03 Name.... SCS UH 10 Tag: ..1 Event: 1 yr File.... K:\JOB-FILES\2011\11026\CALCS\PROIECTI.PPW SCS UNIT HYDROGRAPH METHOD Postclevelopment 1-yr, 24 hour storm STORM EVENT: 1 year storm Duration = 1440.00 min Rain Depth = 3.5000 in Rain Dir = C:\HAESTAD\PPKW\RAINFALL\ Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = K:\JOB-FILES\2011\11026\CALCS\ HYG File - ID = WORK PAD.HYG - SCS UH 10 ..1 Tc = 10.00 min Drainage Area = 3.430 acres Runoff CN= 96 -------------------------------------------- -------------------------------------------- Computational Time Increment = 1.333 min Computed Peak Time = 728.00 min Computed Peak Flow = 9.10 cfs Time Increment for HYG File = 3.00 min Peak Time, Interpolated Output = 729.00 min Peak Flow, Interpolated Output = 8.96 cfs WARNING: The difference between calculated peak flow and interpolated peak flow is greater than 1.50% -------------------------------------------- -------------------------------------------- DRAINAGE AREA ID:SCS UH 10 CN = 96 Area = 3.430 acres S = .4167 in 0.2S = .0833 in Cumulative Runoff ------------------- 3.0453 in 37917 cu.ft HYG Volume... 37916 cu.ft (area under HYG curve) ««.«• UNIT HYDROGRAPH PARAMETERS •' " ' Time Concentration, Tc = 10.000 min (ID: None Selected) Computational Incr, Tm = 1.333 min = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 23.32 cfs Unit peak time Tp = 6.667 min Unit receding limb, Tr = 26.667 min Total unit time, Tb = 33.333 min S/N: 121901A06A84 C. Allan Bamforth, Jr., Engineer -Surveyor, Ltd. PondPack Ver: 7.0 (325) Compute Time: 09:44:04 Date: 11-03-2011 `'.�vE LNOV 1 4 2011 BY:� --- ., \,A4i A•I C. Allan Bamforth, Jr. Engineer -Surveyor, Ltd. Norfolk, Virginia Project Number: 11.026 Project Name: Parking Garage Designed By: ATM Location: MCAS, New River Sheet 1 Date: 09/11 STORM SEWER DESIGN COMPUTATIONS From Point To Point Area Drain "A" Run- off Coeff CA Inlet Time Rain Fall Runoff "Q" CFS Invert Elevations Length of Pipe Slope of Pipe Dia. of Pipe Vei. of Pipe Capacity Flow Time Top Pipe Elev. Rim Elev. Cover Remarks Acres C Incre- ment Accum- ulated (min) (In) Incre- ment Accum- ulated Upper End Lower End (ft) (ft/ft) (In) (fps) (cfs) (min) (ft) (it) (ft) 1 2 0.06 0.90 0.05 0.05 50 0.35 21.60 21.51 44 0.0020 15 2.35 2.89 0.31 23.04 23.75 0.71 A = 2419 C = 0.90 A= C=0.20 7.0 2 3 0.03 0.36 0.01 0.06 53 0.41 21.51 21.08 217 0.0020 15 2.35 2.89 1.54 22.95 23.80 0.85 A = 275 C = 0.90 A= 951 C=0.20 6.9 3 5 0.03 0.41 0.01 0.07 6'7 0.47 21.08 20.81 134 0.0020 15 2,35 2.89 0.95 22.52 23.80 1.28 A = 437 C = 0.90 A = 1005 C = 0.20 6.7 4 5 0.67 0.90 0.61 0.61 5.0 4.27 20.84 20.81 5 0.0052 15 3.81 4.67 0.02 22.28 24.00 1.72 A = 29292 C = 0.90 A= C=0.20 7.0 5 7 0.04 0.26 0.01 0.69 7.6 4.49 20.56 20.12 218 0.0020 18 2.67 4.71 1.36 22.27 23.80 1.53 A = 176 C = 0.90 A = 1754 C = 0.20 6.5 6 7 0.67 0.90 0.61 0.61 5.0 4.27 20.40 20.37 5 0.0052 15 3.81 4.67 0.02 21.84 24.00 2.16 A = 29292 C = 0.90 A= C=0.20 7.0 7 14 0.04 0.26 0.01 1.31 9.0 7.99 19.62 19.43 126 0.0015 24 2.79 8.78 0.75 21.87 23.80 1.93 A = 176 C = 0.90 A = 1754 C = 0.20 6.1 8' 9 0.67 0.90 0.61 0.61 5.0 4.27 21.17 21.14 5 0.0052 15 3.81 4.67 0.02 22.61 23.80 1.19 A = 29292 C = 0.90 A= C=0.20 7.0 9 11 0.04 0.20 0.01 0.62 5.0 4.34 20.89 20.45 218 0.0020 18 2.67 4.71 1.36 22.60 23.80 1.20 A 9 = 1898 C = 0. 0 7.0 NOV 1 4 2011 C. Allan Bamforth, Jr. Engineer-Surveyor, Ltd. Norfolk, Virginia o Project Number: 11.026. Project Name:, Parking Garage Designed By: ATM Location: MCAS, New River Sheet 2 Date: 09/11 STORM SEWER DESIGN COMPUTATIONS From Point To point Area Drain "A' Run- off Coe CA Inlet Time Rain Fall Runoff "Q" CFS Invert Elevations Length of Pipe Slope of Pipe Dia. of Pipe Val. of Pipe Capacity Flow Time Top Pipe Elev. Rim Elev. Cover Remarks , Acres C Incre- ment Accum- ulaled (min) (in) Incre- ment Accum- ulated Upper End Lower End (ff) (tuff) (. in) fps) (fps) (cfs) ( min) (ft ) (ft ) ( ft) 10 11 0.67 0.90 0.61 0.61 50 4.27 20.73 20.70 5 0.0052 15 3.81 4.67 0.02 22.17 24.00 1.83 A = 29292 C = 0.90 A = C = 0.20 7.0 11 13 0.04 0.20 0.01 1.24 6.3 8.31 19.95 19.76 126 0.0015 24 2.79 8.78 0.75 22.20 23.80 1.60 A = 1898 C = 0.20 6 7 12 13 0.05 0.90 0.04 0.04 5.0 0.28 20.60 20.51 46 0.0020 15 2.35 2.89 0.33 22.04 24.36 2.32 A = 1992 C = 0.90 A= C=0.20 7.0 13 14 0.03 0.25 0.01 1.29 7.0 8.39 19.76 19.43 217 0.0015 24 2.79 8.78 1.30 22.01 23.80 1.79 A = 88 C = 0.90 A= 1176 C=0.20 6.5 14 15 0.03 0.41 0.01 2.62 8.3 16.24 18.93 18.88 24 0.0020 30 3.74 18.38 0.11 21.72 23.80 2.08 A = 437 C = 0.90 A = 1005 C = 0.20 6.2 15 16 - - - - 16.24 18.88 18.80 18 0.0044 30 5.55 27.26 0.05 21.67 23.75 2.08 A = C = 0.90 A = C = 0.20 15 17 - - - - 16.24 19.38 16.55 92 0.0308 24 12.66 39.78 0.12 21.63 23.75 2.12 Bypass 17 18 - - - - 16.24 16.55 16.00 18 39.78 0.02 18.80 23.18 4.38 Bypass R24 19 20 - - - - 5.41 15.00 14.00 56 30.33 0.10 17.25 22.50 5.25 A = C = 0.90 Leaving BMP A= C=0.20 R° CIlV��+ 140V 1 4 2011 BY: �y � s� - CC. Allan Bamforth, Jr. t Engineer -Surveyor, Ltd. Norfolk, Virginia Project Number: 11.026 Project Name: Parking Garage Designed By: ATM Location: MCAS, New River Sheet 3 Date: 09/11 STORM SEWER DESIGN COMPUTATIONS From Point To Point Area Drain -A' Run- off Cases CA Inlet Time Rain Fall Runoff 'C' CFS InvertElevations Length of Pipe Slope of Pipe Dia. of Pipe Val. of Pipe Capacity Flow Time Tap Pipe Elev. Rim Elev. Cover ' Remarks Acres C Inca- ment Accum- ulaletl (min) (in) Incre- ment Accum- Waited Upper End Lower End (ft) (fgft) (In) (fps) (cfs) (min) (ft) (ft) (f) 21 22 - - - - - 21.97 21.76 70 0.0030 15 2.89 3.55 0.40 23.41 23.80 0.39 A = C = 0. 0 A= C=0.20 23 24 - - - - - 21.21 21.00 70 0.0030 15 2.89 3.55 0.40 22.65 23.00 0.35 A = C = 0.90 A = C = 0.20 25 26 - - - - - 16.95 15.85 245 0.0045 24 4.84 15.21 0.84 19.20 23.00 3.80 A = C = 0.90 A = C = 0.20 NOV 1 4 2011 BY: Floatation Calculations :H1CZIZTE NOV 1 4 2011 i�v FLOATATION CALCULATIONS PERIMETER STREET PARKING GARAGE MCAS, NEW RIVER, JACKSONVILLE, NC OCTOBER 31, 2011 Check Ability of Sand Filter to Withstand Floatation Total Loads Weight of Sand Filter = Volume of Concrete x Concrete Load = Vol,,,,,, x 150 pcf reinforced concrete Weight of Sand = Area of Sand Filter x Depth of Sand x Sand Weight = Area x 1.5 ft x 100 pcf Weight of Grate = Square Footage of Grate x 37.67 lbs/sf Weight of Soil Above Footing = Footing Area x Soil Depth x Soil Weight = x 60 pcf Buoyant Force Acting on Sand Filter Volume of Concrete: Base = 8,256 cf Walls = 2,112.4 cf Weirs = 338,2 cf Columns = 9.2 cf Beams = 441.7 cf Total weight of concrete = 11,157.5 of x 150 pcf= 1,673,625 lbs Volume of Soil: Base area — Filter area = 8,256 — 7,874 = 245 sf Volume of soil = (382 sf x 7.15 ft depth of soil) + (126 x 1.85 depth of soil) = 2,964 cf Total weight of soil = 2,964 x 60 pcf = 177,840 lbs Volume of Sand: Area of sand = 1,800 sf Depth of sand = 1.5 ft Total weight of sand = 1,800 sf x 1.5 ft x 100 pef = 270,000 lbs Area of 4-inch Grating: Area of grating = 3,863 sf Total weight of grating = 3,863 sf x 37.67 lbs/sf = 145,519 lbs Total weight of filter = Concrete + Soil + Sand + Grating Total Filter weight = 2,266,984 lbs Page 1 44 201' .,NOV: FLOATATION CALCULATIONS PERIMETER STREET PARKING GARAGE MCAS, NEW RIVER, JACKSONVILLE, NC OCTOBER 31, 2011 Buoyant Force = Volume of filter structure x Weight of Water Volume of filter x 62.4 pcf Buoyant Force = 9,200 cf x 62.4 pcf = 574,080 Ibs Factor of Safety = Weight of Filter / Buoyant Force Factor of safety = 2,266,984 / 574,080 = 3.94 OK Page 2 NOV 1 4 Z011 Y: Sediment Basin Calculations NOV 1 4 2011 SEDIMENT BASIN CALCULATIONS PERIMETER STREET PARKING GARAGE MCAS, NEW RIVER, JACKSONVILLE, NC. Basis of Design: Size Sediment Basins for Perimeter Street Parking Garage site using the North Carolina Erosion and Sediment Control Planning and Design Manual, June 2006. Design Parameters: Minimum Volume Required = 1,800 cu. ft. / Acre of Disturbed Area Minimum Surface Area = 435 Square Feet / Qio Peak Inflow Minimum LNV Ratio = 2:1 Maximum LNV Ratio = 6:1 Minimum Depth = 2 feet Calculations: Basin 1: Disturbed Area — 6.5 acres C = 0.30, i = 7.0 (10 yr 15 min) Q10 =13.65 cfs Basin Size = 40 ft x 145 ft x 5.6 ft LNV Ratio = 145/40 = 3.6:1 > 2:1 < 6:1 OK Volume Required = 1,800 cu. ft. x 6.5 acres = 11,700 cf Volume Provided = 129.9 sf x 145 ft. = 18,835 cf > 11,700 cf OK Surface Area at 3:1 / Qio Peak Inflow = 6,061 sf 113.65 cfs = 444 sf / Qio > 435 sf OK Outlet Barrel Size Required Minimum Q2 = 9.50 cfs, i = 4.8 (2 yr / 5min) Slope = 0.20% Outlet Barrel Size Provided = 24-inch, Q = 10.14 cfs > 9.50 cfs OK Velocity = 3.23 fps NOV 1 4 2011 Silt Fence Calculations `': = NOV 1 4 2011 SEDIMENT FENCE CALCULATIONS PERIMETER STREET PARKING GARAGE MCAS, NEW RIVER, ,JACKSONVILLE, NC Design Criteria: From North Carolina Erosion and Sediment Control Manual, revised 6106, Chapter 6, section 6.62. Maximum Allowable = .25 ac / 100 ft of Silt Fence Given: Area = 4.55 Ac Silt Fence Length = 2,740 LF Slope < 2.0 % 2,740Lf Silt Fence x I = 27.4 Hundred Ft of Silt Fence Site 100Lf 4.6 Ac x 1-.0.17Ac per 100 Ft of Silt Fence < 0.25 ac / 100 ft OK Site 27.4 Silt Fence NOV 1 4 2011 Rip Rap Calculations m�� NOV 1 4 2011 JSI': RIP RAP CALCULATIONS PERIMETER STREET PARKING GARAG WAS, NEW RIVER, JACKSONVILLE, NC OCTOBER 31, 2011 Design Criteria: From North Carolina Erosion and Sediment Control Manual, remised 6106. North Carolina Deparlmenl of Transportation, Standard Specifications for Roads and Structures, 2002. Given: Qio = 13.65 cfs (Area = 6.5 ac, C = 0.30,i = 7.0) Slope = 0.2 % Outlet Pipe Diameter (Do) = 24-inches Tailwater Depth > 0.5D„ North Carolina Erasion and Sediment Control Manual, revised 6106. From page 8.06.4, figure 8.06b: Minimum Length of Apron (L,) = 9.0 ft d5o Rip Rap Size = 0.10 ft d,,,,,x = 1.5 x d50 = 0.15 ft Apron Thickness = 1.5 x d,,,;,x = 0.23 ft Apron Width at outlet pipe 3 Do = 6 ft Apron Width at L,, = 3 D„ + 0.4 La = 9.6 ft North Carolina Department of Transportation, Standard Specifications for Roads and Structures, 2002 Page 10-67, Table 1042-1 d50 = 2 inches d,,,ax = 6 inches Use Class A Rip Rap _ -2 _ CL7 J :�' NOV 44 2011 Ditch Velocity Calculations II NOV 1 4 2111 DITCH VELOCITY CALCULATIONS PERIMETER STREET PARKING GARAGE MCAS, NEW RIVER, JACKSONVILLE, NC Given: Use Manning's Equation for these calculations. Roughness coefficient, n, is 0.035 for grassed channel flow. Velocity is calculated for maximum flow for discharging pipes. Side slopes of the ditch are 3 to 1. Ditch 1: Assume Flow Area = Area of one 15-inch (Pipe Flowing Full) A = 7r(1.25)2/4 = 1.23 sc ft A = (X)(3X)/2 x 2 = 3X , Where X is the depth of flow in the ditch X = 0.64 ft Wetted Perimeter, WP = 4.05 Slope, S = (21.21-21.00)/80 = 0.0026 Hydraulic Radius, R = A/WP = 0.64/4.05 = 0.16 V = 1.49/n x RZ/3 x S" = 1.49/0.035 x 0.16z/3 x 0.0026112 = 0.64 fps Ditch 2: Assume Flow Area = Area of one 24-inch (Pipe Flowing Full) A = n(2)2/4 = 3.14 sq ft A = (X)(3X)/2 x 2 = 3X2 , Where X is the depth of flow in the ditch X = 1.02 ft Wetted Perimeter, WP = 6.46 Slope, S = (18.5-17.1)/60 = 0.023 Hydraulic Radius, R = A/W P = 1.02/6.46 = 0.16 V = 1.49/n x R211 x S11= 1.49/0.035 x 0.162/1 x 0.023" = 1.90 fps NOV 1 4 2011 3Y: _- -- SPECIFICATIONS PERIMETER STREET PARKING GARAGE MARINE CORPS BASE CAMP LEJEUNE JACKSONVILLE, NORTH CAROLINA C. ALLAN BAMFORTH, JR., ENGINEER -SURVEYOR, LTD NORFOLK, VIRGINIA October 2011 k�.;?'. e �T L1- NOV 1 4 Z011 BY: -- NICgRO//�i Sss ��3E'kL was. = 029041 I-01- I I 'may G1HE�e''? i,��L9 �FF�BA�`F��`\ PARKING GARAGE MCAS NEW RIVER, NC SECTION 01 57 13.00 22 EROSION AND SEDIMENT CONTROL 03/11 PART 1 GENERAL 1.1 REFERENCES 12PO705 e Projects No. 803726 The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only. ASTM INTERNATIONAL (ASTM) ASTM D 3787 (2007) Bursting Strength of Textiles - Constant -Rate -of -Traverse (CRT), Ball Burst Test ASTM D 4533 (2004; R 2009) Trapezoid Tearing Strength of Geotextiles ASTM D 4632 (2008) Grab Breaking Load and Elongation of Geotextiles - NORTH CAROLINA SEDIMENT CONTROL COMMISSION (NCSCC) NCSCC ESCM (2006; R 2009) Erosion and Sediment Control Planning and Design Manual 1.2 DESCRIPTION OF WORK The work includes the provision of temporary and permanent erosion control measures to prevent the pollution of air, water, and land within the project limits and in areas outside the project limits where work is accomplished in conjunction with the project. 1.3 SUBMITTALS Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES: SD-01 Preconstruction Submittals Construction Sequence Schedule; G SD-03 Product Data Sediment Fence Dust Suppressors Temporary Channel Liner Filter Fabric SECTION 01 57 13.00 22 Page 1 NOV 1 4 2011 i PARKING GARAGE MCAS NEW RIVER, NC 1.4 CONSTRUCTION SEQUENCE SCHEDULE 12P0705 e Projects No. 803726 Submit a Contractor furnished construction work sequence schedule, a minimum of 30 days prior to start of construction. The work schedule shall coordinate the timing of land disturbing activities with the provision of erosion control measures to reduce on site erosion and off site sedimentation. Installation of temporary erosion control features shall be coordinated with the construction of permanent erosion control features to assure effective and continuous control of erosion and pollution. 1.5 STATE APPROVED PLAN The erosion control plan indicated has been approved by the State. No additional State review and approval of the erosion control plan is required, unless the Contractor desires to modify the erosion control plan indicated. Should the Contractor desire to modify the State approved plan, a resubmittal to the State, including the State's approval is required prior to the start of construction. The contractor shall be responsible for any additional costs and time incurred as a result of the resubmittal of the previously approved erosion control plan. The contractor shall anticipate a minimum 45 day review period by the State. Provide and maintain erosion control measures in accordance with NCSCC ESCM, and as specified herein. PART 2 PRODUCTS 2.1 SEDIMENT FENCE 2.1.1 State Standard Sediment Fence NCSCC ESCM Standard 6.62, sediment fence (maximum height of 18 inches). 2.2 SILT FENCE DROP INLET PROTECTION 2.2.1 State Standard Drop Inlet Protection NCSCC ESCM Standard 6.51, using silt fencing. 2.3 CONSTRUCTION ENTRANCE 2.3.1 State Standard Construction Entrance 2.3.1.1 Aggregate NCSCC ESCM, Standard 6.06. 2.3.1.2 Filter Fabric A woven or nonwoven polypropylene, nylon, or polyester containing stabilizers and/or inhibitors to make the fabric resistant to deterioration from ultraviolet, and with the following properties: a. Minimum grab tensile strength (TF 25 41/ASTM D 4632) 180 pounds b. Minimum Puncture (TF 25 #4/ASTM D 3787) 75 psi in the weakest direction C. Apparent Opening Size 40-80 (U.S. Sieve Size) - d. Minimum Trapezoidal tear strength (TF 25 #2/ASTM D 4533) 50 pounds SECTION O1 57 13.00 22 Page 2 PARKING GARAGE MCAS NEW RIVER, NC 2.4 DUST SUPPRESSORS 12PO705 e Projects No. 803726 Calcium chloride, or other standard manufacturer's spray on adhesives designed for dust suppression. 2.5 TEMPORARY SEEDING 2.5.1 State*Standard Temporary Seeding Provide seed, lime„ fertilizer, and mulch in accordance with NCSCC ESCM, Standards 6.10 and 6.14. Provide straw mulch. 2.6 TEMPORARY CHANNEL LINER Provide temporary channel liner in accordance with NCSCC ESCM, Standard 6.17. PART 3 EXECUTION 3.1 CONSTRUCTION SEQUENCE SCHEDULE _ Stabilize areas for construction access immediately with gravel. Install principal sediment basins and traps before any major site grading takes place. Provide additional sediment traps, and sediment fences as grading progresses. Provide drop inlet protection around existing drainage structures, and inlet and outlet protection at the ends of new drainage systems. Stabilize graded and disturbed areas immediately after grading. Permanent stabilization shall be provided immediately on areas that have been final graded. Temporary seeding and mulching shall be provided on disturbed areas as specified in the paragraph entitled "Temporary Seeding. Installation of temporary erosion control features shall be coordinated with the construction of permanent erosion control features to assure effective and continuous control of erosion and sediment deposition. Remove temporary erosion control measures at the end of construction and provide permanent seeding. 3.2 SEDIMENT FENCES Install posts at the spacing indicated, and at an angle between 2 degrees and 20 degrees towards the potential silt load area. Sediment fence height shall be approximately 18 inches. Do not attach filter fabric to existing trees. Secure filter fabric to the post and wire fabric using staples, tie wire, or hog rings. Imbed the filter fabric into the ground as indicated. Splice filter fabric at support pole using a 6 inch overlap and securely seal. 3.3 DROP INLET PROTECTION Provide stakes evenly spaced around the perimeter of the drop inlet , a maximum of 3 feet apart. Stakes shall be driven immediately adjacent to the drainage structure, a minimum of 18 inches into the ground. The fabric shall be securely fastened to the outside of the stakes, with the bottom of the fabric placed into a trench and backfilled. 3.4 CURB INLET PROTECTION Provide wire mesh over the curb inlet opening so at mesh extends across the inlet cover and at least 12 SECTION 01 57 13.00 22 Page 3 least 12 inches of wire inches of wire mesh i NOV 1 4 Z011 Y: PARKING GARAGE MCAS NEW RIVER, NC 12P0705 e Projects No. 803726 extends across the gutter from the inlet opening, as indicated. Place stone on wire mesh against curb inlet. 3.5 CONSTRUCTION ENTRANCE Provide as indicated, a minimum of 6 inches thick, at points of vehicular ingress and egress on the construction site. Construction entrances shall be cleared and grubbed, and then excavated a minimum of 3 inches prior to placement of the filter fabric and aggregate. The aggregate shall be placed in a manner that will prevent damage and movement of the fabric. Place fabric in one piece, where possible. Overlap fabric joints a minimum of 12 inches. 3.6 DUST SUPPRESSORS Immediately dampen the surface before calcium chloride application. Apply dust suppressors on unsurfaced base, subbase and other unsurfaced travel ways. Apply calcium chloride at the rate of 1.0 to 1.25 pounds per square yard of surface for pellets for the initial application. For subsequent applications of calcium chloride, application rates may be approximately 75 percent of initial application rates. Do not apply when raining or the moisture conditions exceed that required for proper application. Apply other dust suppressors in accordance with manufacturers instructions. Protect treated surfaces from traffic for a minimum of 2 hours after treatment. Repeat application of dust suppressors as required tocontrol dust emissions. 3.7 TEMPORARY SEEDING 3.7.1 Time Restrictions Within 48 hours after attaining the grading increment specified herein, provide seed, fertilizer, mulch and water on graded areas when any of the following conditions occur: a. Grading operations stop for an anticipated duration of 30 days or more. b. when it is impossible or impractical tobringan area to finish grade so that permanent seeding operations can be performed without serious disturbance from additional grading.. C. Grading operations for a specific area are completed and the seeding seasons specified for permanent seeding are more than 30 days away. d. When an immediate cover is required to minimize erosion, orwhen erosion has occurred. e. Provide on erosion control devices constructed using soil materials. 3.7.2 Seeding Requirements 3.7.2.1 State Standard Seeding Requirements Provide seed, lime, fertilizer, and mulch in accordance with NCSCC ESCM, Standards 6.10 and 6.14. Provide straw mulch in an air dried condition, and secure mulch in place. SECTION O1 57 13.00 22 Page 4 PARKING GARAGE MCAS NEW RIVER, NC 3.7.2.2 Permanent Seeding 12PO705 e Projects No. 803726 Temporary seeding shall be removed, and permanent seeding shall be provided during the specified planting season. Provide seed, lime, fertilizer, and mulch in accordance with NCSCC ESCM, Standards 6.11 and 6.14. Provide seeding of Centipedegrass per Table 6.11s, Seeding No. 4CP. 3.8 TEMPORARY CHANNEL LINER Provide temporary channel liner in accordance with NCSCC ESCM, Standard 6.17. 3.9 MAINTENANCE AND INSPECTION Inspect erosion control devices after each rainfall and daily during pro longed rainfall. Remove sediment deposits after each rainfall or when sediment reaches approximately one-half the barrier height. Immediately repair damaged erosion control devices and damaged areas around and underneath the devices. Maintain erosion control devices to assure continued performance of their intended function. Modify the erosion control plan as required to control problem areas noticed after each inspection. Modifications shall be approved by the Contracting Officer. 3.10 CLEAN UP At the completion of the job, or when directed or approved by the Contracting Officer, temporary erosion control devices shall be removed. Erosion control devices and areas immediately adjacent to the device shall be filled (where applicable), shaped to drain and to blend into the surrounding contours, and provided with permanent seeding. Erosion control devices may remain in place after job completion when approved by the Contracting Officer. -- End of Section -- '7 NOV 1 4 2011 SECTION 01 57 13.00 22 Page 5 PARKING GARAGE MCAS NEW RIVER, NC SECTION 31 23 00.00 20 EXCAVATION AND FILL 02/11 PART 1 GENERAL 1.1 REFERENCES 12PO705 e Projects No. 803726 The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only. AMERICAN WATER WORKS ASSOCIATION (AWWA) AWWA C600 (2010) Installation of Ductile -Iron Water Mains and Their Appurtenances - ASTM INTERNATIONAL (ASTM) ASTM C 136 (2006) Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates ASTM C 33/C 33M (2011) Standard Specification for Concrete Aggregates ASTM D 1140 (2000; R 2006) Amount of Material in Soils _ Finer than the No. 200 (75-micrometer) Sieve ASTM D 1556 (2007) Density and Unit Weight of Soil in Place by the Sand -Cone Method ASTM D 1557 (2009) Standard Test Methods for .Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3) (2700 kN-m/m3) ASTM D 2321 (2011) Standard Practice for Underground - Installation of Thermoplastic Pipe for Sewers and Other Gravity -Flow Applications ASTM D 2487 (2010) Soils for Engineering Purposes (Unified Soil Classification System) ASTM D 4318 (2010) Liquid Limit, Plastic Limit, and Plasticity Index of Soils ASTM D 6938 (2010) Standard Test Method for In -Place Density and Water Content of Soil and Soil -Aggregate by Nuclear Methods (Shallow Depth) ASTM D 698 (2007el) Laboratory Compaction Characteristics of Soil Using Standard Effort (12,400 ft-lbf/cu. ft. (600 kN-m/cu. m.)) SECTION 31 23 00.00 20 'Page 1 NOV 1 4 Z011 i Y': PARKING GARAGE MCAS NEW RIVER, NC 12P0705 . e Projects No. 803726 NORTH CAROLINA DEPARTMENT OF TRANSPORTATION (NCDOT) NCDOT RS (2006) Standard Specifications for Roads and Structures U.S. ARMY CORPS OF ENGINEERS (USACE) EM 385-1-1 1.2 DEFINITIONS 1.2.1 Capillary water Barrier (2008; Errata 1-2010; Changes 1-3 2010; Changes 4-6 2011) Safety and Health Requirements Manual A layer of clean, poorly graded crushed rock, stone, or.natural sand or gravel having a high porosity which is placed beneath a building slab with or without a vapor barrier to cut off the capillary flow of pore water to the area immediately below a slab. 1.2.2 Degree of Compaction Degree of compaction is expressed as a percentage of the maximum density obtained by the test procedure presented in ASTM D 1557, for general soil types, abbreviated as percent laboratory maximum density. 1.2.3 Hard Materials Weathered rock, dense consolidated deposits, or conglomerate materials which are not included in the definition of "rock" but which usually require the use of heavy excavation equipment, ripper teeth, or jack hammers for removal. 1.2.4 Rock Solid homogeneous interlocking crystalline material with firmly.cemented, laminated, or foliated masses or conglomerate deposits, neither of which can be removed without systematic drilling and blasting, drilling and the use of expansion jacks or feather wedges, or the use of backhoe-mounted pneumatic hole punchers or rock breakers; -also large boulders, buried masonry, or concrete other than pavement exceeding 1/2 cubic yard in volume. Removal of hard material will not be considered rock excavation because of intermittent drilling and blasting that is performed merely to increase production. 1.2.5 Pile Supported Structure As used herein, a structure where both the foundation and floor slab are pile supported. 1.3 SUBMITTALS The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:' Submit 15 days prior to starting work. SD-06 Test Reports SECTION 31 23 00.00 20 Page 2 PARKING GARAGE 12PO705 MCAS NEW RIVER, NC eProjects No. 803726 Borrow Site Testing Fill and Backfill/Structural Fill Material Testing Porous fill test for capillary water barrier Density tests Copies of all laboratory and field test reports within 24 hours of the completion of the test. 1.4 DELIVERY, STORAGE, AND HANDLING Perform in a manner to prevent contamination or segregation of materials. 1.5 CRITERIA FOR BIDDING Base bids on the following criteria: a. Surface elevations are as indicated. b. Pipes or other artificial obstructions, except those indicated, will not be encountered. C. Ground water elevations indicated by the boring log were those existing -- at the time subsurface investigations were made and do not necessarily - represent ground water elevation at the time of construction. d. Material character is indicated by the boring logs. e. Hard materials and rock will not be encountered. f. Borrow material in the quantities required is not available on Government property. g. Blasting will not be permitted. Remove material in an approved manner. 1.6 REQUIREMENTS FOR SOIL FROM OFF GOVERNMENT PROPERTY Soils brought in from off Government property for use as backfill shall be tested as indicated below and not brought on site until Borrow Site Testing reports have been approved by the Contracting Officer. Do not furnish or transport soils onto the MCB Camp Lejeune when such act would violate the Comprehensive Environmental Response Compensation and Liability Act (CERCLA) or the General Statutes of North Carolina. Provide certification that all soil furnished under the contract contains no petroleum or hazardous or toxic materials as defined in DOD Instruction 4715.6, which implements 10 U.S.C. 2692. The following methods shall be used to determine if soil meets this standard: If the total amount of soil to be brought onto the MCB Camp Lejeune for a single contract is less than 200 cubic yards, certify the soil meets the standard by inspecting for "Apparent Contamination" (visual or other indications of contamination including abnormal or unnatural color, chemical or petroleum odors, or saturation with a chemical or petroleum). Soil which is contaminated, as determined by inspecting for "Apparent Contamination", shall not -be utilized on the MCB Camp Lejeune or outlying fields. SECTION 31 23 00.00 20 Page 3 I NOV 1 4 2011 PT: PARKING GARAGE MCAS NEW RIVER, NC 12PO705 e Projects No. 803726 If the total amount of soil to be brought onto the MCB Camp Lejeune for a single contract is greater than 200 cubic yards, provide certification that the soil meets the standard by analytical testing performed by a laboratory holding current certification from the North Carolina Department of Environment and Natural Resources,_ Division of Water Quality. Collect one representative sample of the soil to be used for each 200 cubic yards or fraction thereof, and analyze for Gasoline Range Organics, Diesel Range Organics, Oil and Grease, and 8 RCRA Metals (Totals). If any of the test results are greater than the Method Detection Limits for petroleum, the soil from which the sample was taken shall not be certified as meeting the standard. If any test results are greater than the following North Carolina soil -to -groundwater target concentrations for the.8 RCRA metals, the soil from which the sample was taken shall not be certified as meeting the standard. All units are mg/kg (ppm); Arsenic 26.2; Barium 848; Cadmium 2.72; Chromium 27.2; Lead 270.06; Mercury 0.0154; Selenium 12.2; and Silver 0.223. 1.7 QUALITY ASSURANCE 1.7.1 Utilities Movement of construction machinery and equipment over pipes and utilities during construction shall be at the Contractor's risk. Perform work adjacent to non -Government utilities as indicated in accordance with procedures outlined by utility company. Excavation made with power -driven equipment is not permitted within two feet of known Government -owned utility or subsurface construction. For work immediately adjacent to or for excavations exposing a utility or other buried obstruction, excavate by hand. Start hand excavation on each side of the indicated obstruction and continue until the obstruction is uncovered or until clearance for the new grade is assured. Support uncovered lines or other existing work affected by the contract excavation until approval for backfill is granted by the Contracting Officer. Report damage to utility lines or subsurface construction immediately to the Contracting Officer. 1.8 Regulatory Requirements Provide work and materials in accordance with applicable requirements of NCDOT RS. Divisions and Sections mentioned herein refer to those specifications. Paragraphs in NCDOT RS entitled "Method of Measurement" shall not apply. 1.9 Modification of References where term "Engineer" is used in NCDOT RS it shall be construed to mean Contracting Officer. Where term "state" is used, it shall mean "Federal Government". PART 2 PRODUCTS 2.1 SOIL MATERIALS 2.1.1 Satisfactory Materials Any materials classified by ASTM D 2487 as GW, GP, GM, GP -GM, GW-GM, GC, GP -GC, GM -GC, SW, SP, SM, SC, SP-SM, free of debris, roots, wood, scrap material, vegetation, refuse, soft unsound particles, and frozen, deleterious, or objectionable materials. Unless specified otherwise, the SECTION 31 23 00.00 20 Page 4 PARKING GARAGE MCAS NEW RIVER. NC 12PO705 e Projects No. 803726 maximum particle diameter shall be one-half the lift thickness at the intended location. 2.1.2 Unsatisfactory Materials Materials which do not comply with the requirements for satisfactory materials. Unsatisfactory materials also include man-made fills, trash, refuse, or backfills from previous construction. Unsatisfactory material also includes material classified as satisfactory which contains root and other organic matter, frozen material, and stones larger than 2 inches. The Contracting Officer shall be notified of any contaminated materials. 2.1.3 Common Fill Approved, unclassified soil material with the characteristics required to compact to the soil density specified for the intended location. 2.1.4 Backfill and Fill Material/Structural Fill Provide ASTM D 2487, classification GW, GW-GM, GP, GP -GM, SW, SW-SM, SP, SP-SM, SM,-with a ASTM D 4318 liquid limit less than 20; ASTM D 4318 plastic limit less than 6; percent by weight passing ASTM D 1140, No. 200 sieve less than 20; and free of rubble, organics, clay, debris, and other unsuitable material.. 2.1.5 Topsoil Natural, friable soil representative of productive, well -drained soils in the area, free of subsoil, stumps, rocks larger than one inch diameter, brush, weeds, toxic substances, and other material detrimental to plant growth. Amend topsoil pH range to obtain a pH of 5.5 to 7. 2.2 POROUS FILL FOR CAPILLARY WATER BARRIER ASTM C 33/C 33M fine aggregate grading with a maximum of 3 percent by weight passing ASTM D 1140, No. 200 sieve, or 1-1/2 inches and no more than 2 percent by weight passing the No. 4 size sieve or coarse aggregate Size 57, 67, or 77 and conforming to the general soil material requirements specified in paragraph entitled "Satisfactory Materials." 2.3 UTILITY BEDDING MATERIAL Except as specified otherwise in the individual piping section, provide bedding for buried piping in accordance with AWWA C600, Type 4, except as specified herein. Backfill to top of pipe shall be compacted to 95 percent of ASTM D 1557 maximum density. Plastic piping shall have bedding to spring line of pipe. Provide ASTM D 2321 materials as follows: a. Class I: Angular, 0.25 to 1.5 inches, graded stone, including a number of fill materials that have regional significance such as coral, slag, cinders, crushed stone, and crushed shells. b. Class II: Coarse sands and gravels with maximum particle size of 1.5 inches, including various graded sands and gravels containing small percentages of fines, generally granular and noncohesive, either wet or dry. Soil Types Gw, GP, SW, and SP are included in this class as specified in ASTM D 2487. SECTION 31 23 00.00 20 Page 5 rf-zE, =A NOV 1 4 2011 BY: PARKING GARAGE MCAS NEW RIVER, NC 2.4 BORROW 12P0705 e Projects No. 803726 Obtain borrow materials required in excess of those furnished from excavations from sources outside of Government property, except that borrow materials conforming to common fill and fill and backfill material may be obtained from the Government borrow pit. The Government borrow pit is located as indicated by the Contracting Officer. If the Government borrow pit is used, the Contractor shall perform clearing, grubbing, and stripping required for providing access to suitable borrow material. Dispose of materials from clearing and grubbing operations as specified in Section O1 57 19.00 20, TEMPORARY ENVIRONMENTAL CONTROL. 2.5 BURIED WARNING AND IDENTIFICATION TAPE Polyethylene plastic warning tape manufactured specifically for warning and identification of buried utility lines. Provide tape on rolls, 3 inch minimum width, color coded as specified below for the intended utility with warning and identification imprinted in bold black letters continuously over the entire tape length. Warning and identification to read, "CAUTION, BURIED (intended service) LINE BELOW�l or similar wording. Color and printing shall be permanent, unaffected by moisture or soil. warning Tape Color Codes Yellow: Electric Orange: Telephone and Other Communications Blue: Water Systems Green: Sewer Systems 2.5.1 Warning Tape Acid and alkali -resistant polyethylene plastic tape conforming to the width, color, and printing requirements specified above. Minimum thickness of tape shall be 0.003 inch. Tape shall have a minimum strength of 1500 psi lengthwise, and 1250 psi crosswise, with a maximum 350 percent elongation. 2.6 DETECTION WIRE FOR NON-METALLIC PIPING Detection wire shall be insulated single strand, solid copper with a minimum of 12 AWG. PART 3 EXECUTION 3.1 PROTECTION Shoring and Sheeting Provide shoring and sheeting where necessary. In addition to Section 25 A and B of EM 385-1-1, include provisions in the shoring and sheeting plan that will accomplish the following: a. Prevent undermining of pavements, foundations and slabs. b. Prevent slippage or movement in banks or slopes adjacent to the excavation. SECTION 31 23 00.00 20 Page 6 PARKING GARAGE MCAS NEW RIVER, NC 3.1.2 Drainage and Dewatering 12PO705 e Projects No. 803726 Provide for the collection and disposal of surface and subsurface water encountered during construction. 3.1.2.1 Drainage so that construction operations progress successfully, completely drain construction site during periods of construction to keep soil materials sufficiently dry. The Contractor shall establish/construct storm drainage features at the earliest stages of site development, and throughout construction grade the construction area to provide positive surface water runoff away from the construction activity and/or provide temporary ditches, swales, and other drainage features and equipment as required to maintain dry soils, prevent erosion and undermining of foundations. When unsuitable working platforms for equipment operation and unsuitable soil support for subsequent construction features develop, remove unsuitable material and provide new soil material as specified herein. It is the responsibility of the Contractor to assess the soil and ground water conditions presented by the plans and specifications and to employ necessary measures to permit construction to proceed. Excavated slopes and backfill surfaces shall be protected to prevent erosion and sloughing. Excavation shall be performed so that the site, the area immediately surrounding the site, and the area affecting operations at the site shall be continually and effectively drained. 3.1.2.2 Dewatering Groundwater flowing toward or into excavations shall be controlled to prevent sloughing of excavation slopes and walls, boils, uplift and heave in the excavation and to eliminate interference with orderly progress of construction. French drains, sumps, ditches or trenches will not be permitted within 3 feet of the foundation of any structure, except with specific written approval, and after specific contractual provisions for restoration of the foundation area have been made. Control measures shall be taken by the time the excavation reaches the water level in order to maintain the integrity of the in situ material. While the excavation is open, the water level shall be maintained continuously, at least 2 feet below the working level. Operate dewatering system continuously until construction work below existing water levels is complete. 3.1.3 Underground Utilities Location of the existing utilities indicated is approximate. The Contractor shall physically verify the location and elevation of the existing utilities indicated prior to starting construction. The Contractor shall scan the construction site with electromagnetic and sonic equipment and mark the surface of the ground where existing underground utilities are discovered. 3.1.4 Machinery and Equipment Movement of construction machinery and equipment over pipes during construction shall be at the Contractor's risk. Repair, or remove and provide new pipe for existing or newly installed pipe that has been displaced or damaged. ,SECTION 31 23 00.00 20 Page 7 NOV 1 4 2011 I PARKING GARAGE 12P0705 MCAS NEW RIVER, NC eProjects No. 803726 3.2 SURFACE PREPARATION 3.2.1 Clearing and Grubbing Unless indicated otherwise, remove trees, stumps, logs, shrubs, brush and vegetation and other items that would interfere with construction operations within the clearing limits indicated by the temporary sediment. Remove stumps entirely. Grub out matted roots and roots over 2 inches in diameter to at least 18 inches below existing surface. 3.2.2 Stripping Strip suitable soil for topsoil to a depth of 6 to 8 inches without contamination by subsoil material from the site where excavation or grading is indicated and stockpile separately from other excavated material. Additional undercut may be required in isolated areas to remove all unsuitable soil. Extend clearing and stripping laterally at least 5 feet beyond the perimeter of the proposed construction areas. Refer to boring logs and geotechnical information. Satisfactory material unsuitable for use as topsoil shall be stockpiled and used for backfilling if acceptable. Locate topsoil so that the material can be used readily for the finished grading. Where sufficient existing topsoil conforming to the material requirements is not available on site, provide borrow materials suitable for use as topsoil. Protect topsoil and keep in segregated piles until needed. 3.2.3 Unsuitable Material Remove vegetation, debris, decayed vegetable matter, sod, mulch, and rubbish underneath paved areas or concrete slabs. 3.3 EXCAVATION Excavate to contours, elevation, and dimensions indicated. Reuse excavated materials that meet the specified requirements for the material type required at the intended location. Keep excavations free from water. Excavate soil disturbed or weakened by Contractor's operations, soils softened or made unsuitable for subsequent construction due to exposure to weather. Excavations below indicated depths will not be permitted except to remove unsatisfactory material. Unsatisfactory material encountered below the grades shown shall be removed as directed. Refill with backfill and fill material and compact to 95 percent of ASTM D 1557 maximum density. Unless specified otherwise, refill excavations cut below indicated depth with backfill and fill material and compact to 95 percent of ASTM D 1557 maximum density. Satisfactory material removed below the depths indicated, without specific direction of the Contracting Officer, shall be replaced with satisfactory materials to the indicated excavation grade; except as specified for spread footings. Determination of elevations and measurements of approved overdepth excavation of unsatisfactory material below grades indicated shall be done under the direction of the Contracting Officer. 3.3.1 Pile Cap Excavation and Backfilling Excavate to bottom of pile cap prior to placing or driving piles, unless authorized otherwise by the Contracting Officer. Backfill and compact overexcavations and changes in grade due to pile driving operations to 95 percent of ASTM D 698 maximum density. SECTION 31 23 00.00 20 Page 8 PARKING GARAGE MCAS NEW RIVER'. NC 3.3.2 Pipe Trenches 12PO705 e Projects No. 803726 Excavate to the dimension indicated. Grade bottom of trenches to provide uniform support for each section of pipe after pipe bedding placement. Tamp if necessary to provide a firm pipe bed. Recesses shall be excavated to accommodate bells and joints so that pipe will be uniformly supported for the entire length. 3.3.3 Excavated Materials Satisfactory excavated material required for fill or backfill shall be placed in the proper section of the permanent work required or shall be separately stockpiled if it cannot be readily placed. Satisfactory material in excess of that required for the permanent work and all unsatisfactory material shall be disposed of as specified in Paragraph "DISPOSITION OF SURPLUS MATERIAL." 3.4 SUBGRADE PREPARATION Unsatisfactory material in surfaces to receive fill or in excavated areas shall be removed and replaced with satisfactory materials as directed by the Contracting Officer. The surface shall be scarified to a depth of 6 inches before the fill is started. Sloped surfaces steeper than 1 vertical to 4 horizontal shall be plowed,. stepped, benched, or broken up so that the fill material will bond with the existing material. When subgrades are less than the specified density, the ground surface shall be broken up to a minimum depth of 6 inches, pulverized, and compacted to .the specified density. when the subgrade is part fill and part excavation or natural ground, the excavated or natural ground portion shall be scarified to a depth of 12 inches and compacted as specified for the adjacent fill. Material shall not be placed on surfaces that are muddy, frozen, or contain frost. Compaction shall be accomplished by sheepsfoot rollers, pneumatic -tired rollers, steel -wheeled rollers, or other approved equipment well suited to the soil being compacted. Material shall be moistened or aerated as necessary to plus or minus 2 percent of optimum moisture. Minimum subgrade density shall be as specified herein. 3.4.1 Proof Rolling Proof rolling shall be done on an exposed subgrade free of surface water (wet conditions resulting from rainfall) which would promote degradation of an otherwise acceptable subgrade. After stripping, proof roll the existing subgrade of the building and paved areas with six passes of a dump truck loaded with 212 cubic feet of soil or 15 ton, pneumatic -tired roller. Operate the roller or truck in a systematic manner to ensure the number of passes over all areas, and at speeds between 2 1/2 to 3 1/2 miles per hour. When proof rolling under buildings, the building subgrade shall be considered to extend 5 feet beyond the building lines, and one-half of the passes made with the roller shall be in a direction perpendicular to the other passes. Notify the Contracting officer a minimum of 3 days prior to proof rolling. Proof rolling shall be performed in the presence of the Contracting Officer. Rutting or pumping of material shall be undercut as directed by the Contracting Officer and replaced with fill and backfill material. 3.5 FILLING AND BACKFILLING Fill and backfill to contours, elevations, and dimensions indicated. Compact each lift before placing overlaying lift. NOV 1 4 2011 —SECTION 31 23 00.00 20 Page 9 PARKING GARAGE MCAS NEW RIVER, NC 3.5.1 Common Fill Placement 12PO705 e Projects No. 803726 Provide for general site and under porous fill of pile -supported structures. Use satisfactory materials. Place in 10 inch lifts. Compact areas not accessible to rollers or compactors with mechanical hand tampers. Aerate material excessively moistened by rain to a satisfactory moisture content.. Finish to a smooth surface by blading, rolling with a smooth roller, or both. 3.5.2 Backfill and Fill Material Placement Provide for paved areas and utility trenches. Place in 10 inch lifts. Do not place over wet or frozen areas. Place backfill material adjacent to structures as the structural elements are completed and accepted. Backfill against concrete only when approved. Place and compact material to avoid loading upon or against the structure. 3.5.3 Backfill and Fill Material.Placement Over Pipes and at walls Backfilling shall not begin until construction below finish grade has been approved, underground utilities systems have been inspected, tested and approved;'forms removed, and the excavation cleaned of trash and debris. Backfill shall be brought to indicated finish grade. Heavy equipment for spreading and compacting backfill shall not be operated closer to foundation or retaining walls than a distance equal to the height of backfill above the top of footing; the area remaining shall be compacted in layers not more than 4 inches in compacted thickness with power -driven hand tampers suitable for the material being compacted. Backfill shall be placed carefully around pipes or tanks to avoid damage to coatings, wrappings, or tanks. Backfill shall not be placed against foundation walls prior to 7 days after completion of the walls. As far as practicable, backfill shall be brought up evenly on each side of the wall and sloped to drain away from the wall. 3.5.4 Porous Fill Placement Provide under floor and area -way slabs on a compacted subgrade. Place in 4 inch lifts with a minimum of two passes of a hand -operated plate -type vibratory compactor. 3.5.5 Trench Backfilling Backfill as rapidly as construction, testing, and acceptance of work permits. Place and compact backfill under structures and paved areas in 10 inch lifts to top of trench and in 10 inch lifts to one foot over pipe outside structures and paved areas. Place backfill in 4 to 6 inch lifts when hand compaction is used. 3.6 BORROW Where satisfactory materials are not available in sufficient quantity from required excavations, approved borrow materials shall be obtained as specified herein. 3.7 BURIED WARNING AND IDENTIFICATION TAPE Provide buried utility lines with utility identification tape. Bury tape 12 inches below finished grade; under pavements and slabs, bury tape 6 SECTION 31 23 00.00 20 Page 10 PARKING GARAGE MCAS NEW RIVER, NC inches below top of subgrade. 3.8 BURIED DETECTION WIRE 12PO705 e Projects No. 803726 Bury detection wire directly above non-metallic piping at a distance not to exceed 12 inches above the top of pipe. The wire shall extend continuously and unbroken, from manhole to manhole. The ends of the wire shall terminate inside the manholes at each end of the pipe, with a minimum of 3 feet of wire, coiled, remaining accessible in each manhole. The wire shall remain insulated over it's entire length. The wire shall enter manholes between the top of the corbel and the frame, and extend up through the chimney seal between the frame and the chimney seal. For force mains, the. wire shall terminate in the valve pit at the pump station end of the pipe. 3.9 COMPACTION Determine in -place density of existing subgrade; if required density exists, no compaction of existing subgrade will be required. 3.9.1 General Site Compact underneath areas designated for vegetation and areas outside the 5 foot line of the paved area to 85 percent of ASTM D 1557. 3.9.2 Structures, Spread Footings, and Concrete Slabs Compact top 12 inches of subgrades to 95 percent of ASTM D 1557. Compact fill and backfill material to 95 percent of ASTM D 1557. 3.9.3 Adjacent Area Compact areas within 5 feet of paved areas to 90 percent of ASTM D 1557. 3.9.4 Paved Areas Compact top 12 inches of subgrades to 95 percent of ASTM D 1557. Compact fill and backfill materials to 95 percent of ASTM D 1557. 3.10 FINISH OPERATIONS 3.10.1 Grading Finish grades as indicated within one -tenth of one foot. Grade areas to drain water away from structures. Maintain areas free of trash and debris. For existing grades that will remain but which were disturbed by Contractor's operations, grade as directed. 3.10.2 Topsoil and Seed Provide as specified in Section 61 57 13.00 22 EROSION AND SEDIMENT CONTROL. 3.10.3 Protection of Surfaces Protect newly backfilled, graded, and topsoiled areas from traffic, erosion, and settlements that may occur. Repair or reestablish damaged grades, elevations, or slopes. SECTION 31 23 00.00 20 Page 11' NOV 1 4 2011 PARKING GARAGE 12P0705 MCAS NEW RIVER, NC eProjects No. 803726 3.11 DISPOSITION OF SURPLUS MATERIAL Waste in Government disposal area indicated by Contracting Officer and O1 57 19.00 20, TEMPORARY ENVIRONMENTAL CONTROLS. 3.12 FIELD QUALITY CONTROL 3.12.1 Sampling Take the number and size of samples required to perform the following tests. 3.12.2 Testing - Perform one of each of the following tests for each material used. Provide additional tests for each source change. 3.12.2.1 Fill and Backfill/Structural Fill Material Testing Test fill and backfill material in accordance with ASTM C 136 for conformance to ASTM D 2487 gradation limits; ASTM D 1140 for material finer than the No. 200 sieve; ASTM D 4318 for liquid limit and for plastic limit; ASTM D 1557 for moisture density relations. 3.12.2.2 Porous Fill Testing Test porous fill in accordance with ASTM C 136 for conformance to gradation specified in ASTM C 33/C 33M. 3.12.2.3 Density Tests Test density in accordance with ASTM D 1556, or ASTM D 6938. When ASTM D 6938 density tests are used, verify density test results by performing an ASTM D 1556 density test at a location already ASTM D 6938 tested as specified herein. Perform an ASTM D 1556 density test at the start of the job, and for every 10 ASTM D 6938 density tests thereafter. Test each lift at randomly selected locations every 2000 square feet of existing grade in fills for structures and concrete slabs, and every 2500 square feet for other fill areas and every 2000 square feet of subgrade in cut. Include density test results in daily report. Bedding and backfill in trenches: One test per 50 linear feet in each lift. -- End of Section -- SECTION 31 23 00.00 20 Page 12 PARKING GARAGE MCAS NEW RIVER, NC SECTION 33 40 00 STORM DRAINAGE UTILITIES 02/10 PART 1 GENERAL 1.1 REFERENCES 12PO705 e Projects No. 803726 The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only. AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS (AASHTO) AASHTO M 198 (2010) Standard Specification for Joints for Concrete Pipe, Manholes, and Precast Box Sections Using Preformed Flexible Joint Sealants AMERICAN CONCRETE PIPE ASSOCIATION (ACPA) ACPA 01-102 (2000) Concrete Pipe Handbook ACPA 01-103 (2000) Concrete Pipe Installation Manual ASTM INTERNATIONAL (ASTM) ASTM C 231/C 231M (2010) Standard Test Method for Air Content of Freshly Mixed Concrete by the Pressure Method ASTM C 478 (2009) Standard Specification for Precast Reinforced Concrete Manhole Sections ASTM C 76 (2011) Standard Specification for - Reinforced Concrete Culvert, Storm Drain, and Sewer Pipe ASTM C 923 (2008) Standard Specification for Resilient Connectors Between Reinforced Concrete Manhole Structures, Pipes and Laterals ASTM C 990 (2009) Standard Specification for Joints for Concrete Pipe, Manholes and Precast Box Sections Using Preformed Flexible Joint Sealants ASTM D 1751 (2004; R 2008) Standard Specification for Preformed Expansion Joint Filler for Concrete Paving .and Structural Construction (Nonextruding and Resilient Bituminous Types) ASTM D 1752 (2004a; R 2008) Standard Specification for SECTION 33 40 00 Page 1 NOV 1 4 2011 PARKING GARAGE 12P0705 MCAS NEW RIVER, NC eProjects No. 803726 Preformed Sponge Rubber Cork and Recycled PVC Expansion U.S. GENERAL SERVICES ADMINISTRATION (GSA) FS A-A-60005 (Basic) Frames.Covers, Gratings, Steps, Sump and Catch Basin, Manhole 1.2 SUBMITTALS Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES: SD-03 Product Data Placing Pipe Printed copies of the manufacture's recommendations for installation procedures of the materials being placed, prior to installation. SD-07 Certificates Resin Certification 1.3 DELIVERY, STORAGE, AND HANDLING 1.3.1 Delivery and Storage Materials delivered to site shall be inspected for damage, unloaded, and stored with a minimum of handling. Materials shall not be stored directly on the ground. The inside of pipes and fittings shall be kept free of dirt and debris. Before, during, and after installation, plastic pipe and fittings shall be protected from any environment that would result in damage or deterioration to the material. Keep a copy of the manufacturer's instructions available at the construction site at all times and follow these instructions unless directed otherwise by the Contracting Officer. Solvents, solvent compounds, lubricants, elastomeric gaskets, and any similar materials required to install plastic pipe shall be stored in accordance with the manufacturer's recommendations and shall be discarded if the storage period exceeds the recommended shelf life. Solvents in use shall be discarded when the recommended pot life is exceeded. 1.3.2 Handling Materials shall be handled in a manner that ensures delivery to the trench in sound, undamaged condition. Pipe shall be carried to the trench, not dragged. PART 2 PRODUCTS 2.1 PIPE FOR STORM DRAINS Pipe for storm drains shall'be of the sizes indicated and shall conform to the requirements specified. 2.1.1 Concrete Pipe Manufactured in accordance with and conforming to ASTM C 76, Class III and V, SECTION 33 40.00 Page 2 PARKING GARAGE MCAS NEW RIVER. NC 12P0705 e Projects No. 803726 as indicated. 2.1.1.1 Joint Sealants Provide primers and lubricants as recommended by the manufacturer. Concrete pipe joints shall be suitable for use with the joint sealants specified. a. Butyl gaskets. b. AASHTO M 198, Type B preformed plastic gaskets. 2.2 DRAINAGE STRUCTURES 2.2.1 Flared End Sections Sections shall be of a standard design fabricated from reinforced concrete. Flared ends are included in the lengths of pipe indicated. 2.3 MISCELLANEOUS MATERIALS 2.3.1 Concrete Unless otherwise specified, concrete and reinforced concrete shall conform to the requirements for concrete under Section 03 30 00 CAST -IN -PLACE CONCRETE. The concrete mixture shall have air content by volume of concrete, based on measurements made immediately after discharge from the mixer, of 5 to 7 percent when maximum size of coarse aggregate exceeds 1-1/2 inches. Air content shall be determined in accordance with ASTM C 231/C 231M. The concrete covering over steel reinforcing shall not be less than 1 inch thick for covers and not less than 1-1/2 inches thick for walls and flooring. Concrete covering deposited directly against the ground shall have a thickness of at least 3 inches between steel and ground. Expansion -joint filler material shall conform to ASTM D 1751, or ASTM D 1752, or shall be resin -impregnated fiberboard conforming to the physical requirements of ASTM D 1752. 2.3.2 Precast Reinforced Concrete Drainage Structures Conform to ASTM C 478. Joints between precast concrete risers and tops shall -be rubber -type gaskets meeting the requirements of ASTM C 990 or AASHTO M 198, Type B gaskets. 2.3.3 Frame and Cover for Gratings FS A-A-60005 Cast iron, figure numbers as indicated. 2.4 RESILIENT CONNECTORS Flexible, watertight connectors used for connecting pipe to manholes and inlets shall conform to ASTM C 923. 2.5 EROSION CONTROL RIPRAP Provide'nonerodible rock not exceeding 15 inches in its greatest dimension and choked with sufficient small rocks to provide a dense mass with a minimum thickness ofas indicated. SECTION 33 40 00 Page 3 JNOV 1 4 2011 PARKING GARAGE 12P0705 MCAS NEW RIVER, NC eProjects No. 803726 PART 3 EXECUTION 3.1 EXCAVATION FOR STORM DRAINS AND DRAINAGE STRUCTURES Excavation of trenches, and for appurtenances and backfilling for culverts and storm drains, shall be in accordance with the applicable portions of Section 31 23 00.00 20, EXCAVATION AND FILL and the requirements specified below. 3.1.1 Trenching The width of trenches at any point below the top of the pipe shall be not greater than indicated to permit satisfactory jointing and thorough tamping of the bedding material under and around the pipe. Sheeting and bracing, where required, shall be placed within the trench width as specified, without any overexcavation. Where trench widths are exceeded, redesign with a resultant increase in cost of stronger pipe or special installation procedures will be necessary. Cost of this redesign and increased cost of pipe or installation "shall be borne by the Contractor without additional cost to the Government. 3.1.2 Removal of Unstable Material Where wet or otherwise unstable soil incapable of properly supporting the pipe, as determined by the Contracting Officer, is'unexpectedly encountered in the bottom of a trench, such material shall be removed to the depth required and replaced to the proper grade with select granular material, compacted as provided in paragraph BACKFILLING. When removal of unstable material is due to the fault or neglect of the Contractor while performing shoring and sheeting, water removal, or other specified requirements, such removal and replacement shall be performed at no additional cost to the Government. 3.2 BEDDING The bedding surface for the pipe shall provide a firm foundation of uniform density throughout the entire length of the pipe. 3.2.1 Concrete Pipe Requirements When no bedding class is specified or detailed on the drawings, concrete pipe shall be bedded in granular material minimum 4 inch in depth in trenches with soil foundation. Depth of granular bedding in trenches with rock foundation shall be 1/2 inch in depth per foot of depth of fill, minimum depth of bedding shall be 8 inch up to maximum depth of 24 inches. The middle third of the granular bedding shall be loosely placed. Bell holes and depressions for joints shall be removed and formed so entire barrel of pipe is uniformly -supported. The bell hole and depressions for the joints shall be not more than the length, depth, and width required for properly making the particular type of joint. 3.3 PLACING PIPE Submit printed copies of the manufacturer's recommendations for installation procedures of the material .being placed, prior to installation. Each pipe shall be thoroughly examined before being laid; defective or damaged pipe shall not be used. Plastic pipe shall be protected from exposure to direct sunlight prior to laying, if necessary to maintain SECTION 33 40 00 Page 4 PARKING GARAGE MCAS NEW RIVER, NC 12P0705 e Projects No. 803726 adequate pipe stiffness and meet installation deflection requirements. Pipelines shall be laid to the grades and alignment indicated. Proper facilities shall be provided for lowering sections of pipe into trenches. Pipe shall not be laid in water, and pipe shall not be laid when trench conditions or weather are unsuitable for such work. Diversion of drainage or dewatering of trenches during construction shall be provided as necessary. 3.3.1 Concrete'Pipe Laying shall proceed upgrade with spigot ends of bell -and -spigot pipe and tongue ends of tongue -and -groove pipe pointing in the direction of the flow. 3.4 JOINTING 3.4.1 Concrete Pipe 3.4.1.1 Flexible Joints Install pipe and fittings in accordance with paragraph entitled "General Requirements for Installation of Pipelines" of this section and with the provisions for rugger gasket jointing and jointing procedures of ACPA 01-103 or of ACPA 01-102, Chapter 9. Make joints with the gaskets previously specified for joints with this piping. Gaskets and jointing materials shall be as recommended by.the particular manufacturer in regard to use of lubricants, cements, adhesives, and other special installation requirements. Surfaces to receive lubricants, cements, or adhesives shall be clean and dry. Gaskets and jointing materials shall be affixed to the pipe not more than 24 hours prior to the installation of the pipe, and shall be protected from the sun, blowing dust, and other deleterious agents at all times. Gaskets and jointing materials shall be inspected before installing the pipe; any loose or improperly affixed gaskets and jointing materials shall be removed and replaced. The pipe shall be aligned with the previously installed pipe, and the joint pushed home. If, while the joint is being made the gasket becomes visibly dislocated the pipe shall be removed and the joint remade. 3.5 DRAINAGE STRUCTURES 3.5.1 Manholes and Inlets _ Construction shall be of reinforced concrete, plain concrete, or precast reinforced concrete; complete with frames and covers or gratings. Pipe connections to concrete manholes and inlets shall be made with flexible, watertight connectors. 3.6 BACKFILLING Perform earthwork operations in accordance with Section 31 23 00.00 20, EXCAVATION AND FILL. 3.6.1 Movement of Construction Machinery When compacting by rolling or operating heavy equipment parallel with the pipe, displacement of or injury to the pipe shall be avoided. Movement of construction machinery over a culvert or storm drain at any stage of construction shall be at the Contractor's risk. Any damaged pipe shall be repaired or replaced. SECTION 33 40 00 Page 5 PARKING GARAGE 12P0705 MCAS NEW RIVER, NC eProjects No. 803726 3.7 PIPELINE TESTING 3.7.1 Field Tests and Inspections . The Contracting Officer will conduct field inspections:` and witness field tests specified in this section. The Contractor shall perform field tests and provide labor, equipment, and incidentals required for testing. Be able to produce evidence, when required, that each item of work has`been constructed properly in accordance with the drawings and specifications. 3.7.2 Pipeline Testing . Check each straight run of pipeline for gross deficiencies by holding a light in a manhole; it shall show a practically full circle of light through the pipeline when viewed from the adjoining end of line. -- End of Section -- SECTION 33 40 00 Page 6 �`n PRELIMINARY REPORT OF SUBSURFACE INVESTIGATION & GEOTECHNICAL ENGINEERING SERVICES FOR . STORM WATER MANAGEMENT PERIMETER STREET PARKING GARAGE MARINE CORPS BASE CAMP LEJEUNE JACKSONVILLE, NORTH CAROLINA OCTOBER, 2011 i V ✓iL V S - Yi NOV 1 4 2011 GET Geotechnical • F,nvironmenfal -Testing PRELIMINARY REPORT OF SUBSURFACE INVESTIGATION AND GEOTECHNICAL ENGINEERING SERVICES Storm Water Management Parking Garage New River MCAS New River, Camp Lejeune, North Carolina G E T PROJECT NO: JX11-109G September 26, 2011 Prepared for C. Allan Bamforth, Jr., Engineer -Surveyor, Ltd 2207 Hampton Boulevard Norfolk, Virginia 23517 ATTN: Mrs. Anna Lee Bamforth, P.E. Prepared by GET Solutions, Inc. > C11 V11, NOV 1 4 2011 BY: 415 A Western Boulevard, Jacksonville, NC 28546 ♦ Phone 910-478-9915 ♦ Fax 910-418-9917 info@getsolutionsinc.com GET Gwwhnieal • Environmental •Tesffng TO: C. Allan Bamforth, Jr., Engineer -Surveyor, Ltd 2207 Hampton Boulevard Norfolk, Virginia 23517 Attn: Mrs. Anna Lee Bamforth, P.E. September 26, 2011 RE: Preliminary Report of Subsurface Investigation and Geotechnical Engineering Services Storm Water Management Parking Garage New River MCAS New River, Camp Lejeune, North Carolina G E T Project No: JX11-109G Dear Mrs. Bamforth: In compliance with your instructions, we have completed our Geotechnical Engineering Services for the referenced project. The results of this study, together with our recommendations, are presented in this report. Often, because of design and construction details that occur on a project, questions arise concerning subsurface conditions. G E T Solutions, Inc. would be pleased to continue its role as Geotechnical Engineer during the project implementation. We trust that the information contained herein meets your immediate need, and we would ask that you call this office with any questions that you may have. Respectfully Submitted, �H CARO G E T Solutions, Inc. f �OQ e4�� PE No. Glenn W. Hohmeier, P.E. �F�FA,GINE�P Senior Project Engineer W. H NC Reg. # 033529 CAR Camille A. Kattan, P.E. Principal Engineer SEAL NC Reg. # 014103 = 014103 �(f A \P. 415-A Western Boulevard • Jacksonville, NC 28546 • Phone: (910) 478-9915 • Fa :I(910),478-9917 , info@getsolutionsinc.com NOV 1 4 2011 BY: TABLE OF CONTENTS 1.0 PROJECT INFORMATION..............................................................................1 1.1 Project Authorization..............................................................................1 1.2 Project Location and Site Description....................................................1 1.3 Purpose and Scope...............................................................................1 2.0 FIELD AND LABORATORY PROCEDURES..................................................2 2.1 Field Exploration.................................................................................... 2 2.2 Laboratory Testing.................................................................................2 3.0 SITE AND SUBSURFACE CONDITIONS........................................................3 3.1 Site Geology..........................................................................................3 3.2 Subsurface Soil Conditions....................................................................3 3.3 Groundwater Information.......................................................................4 4.0 EVALUATION AND RECOMMENDATIONS...................................................5 4.1 Soil Permeability....................................................................................5 4.2 Structural Fill and Placement.................................................................6 4.3 Suitability of On -site Soils......................................................................6 5.0 CONSTRUCTION CONSIDERATIONS...........................................................7 5.1 Drainage and Groundwater Concerns...................................................7 5.2 Site Utility Installation.............................................................................7 5.3 Excavations........................................................................................... 8 6.0 REPORT LIMITATIONS...................................................................................9 APPENDIX I BORING LOCATION PLAN APPENDIX II BORING LOGS APPENDIX III GENERALIZED SOIL PROFILE APPENDIX IV HYDRAULIC CONDUCTIVITY WORKSHEETS APPENDIX V CLASSIFICATION SYSTEM FOR SOIL EXPLORATION NOV 1 4 2011 Preliminary Report of Subsurface Investigation and Geotechnical Engineering Services Seplember26,2011 Storm Water Management Parking Garage New River MICAS New River, Camp Lejeune, North Carolina GET Project No: JX11-109G 1.0 PROJECT INFORMATION 1.1 Project Authorization G E T Solutions, Inc. has completed our Geotechnical Engineering study forthe proposed Storm Water Management Parking Garage New River Project located within the MICAS New River, Marine Corps Base (MCB) Camp Lejeune, North Carolina. The geotechnical engineering services were conducted in general accordance with the scope presented in G E T Proposal No. PJX11-107G. Authorization to proceed with our subsurface investigation and geotechnical engineering services was received from Mrs. Anna Lee Bamforth of C. Allan Bamforth, Jr., Engineer -Surveyor, Ltd. 1.2 Project Location and Site Description The project site is located within the MCAS New River, Camp Lejeune, North Carolina. The construction at this site is planned to consist of building a storm water management facility to service the proposed multi -story parking garage. The site is located within a partially wooded tract (boring B-1 and B-2 locations) and partially open area of land near the intersection of Canal Street and Perimeter Road (boring B-3 and B-4 locations). The project site generally slopes from east to west with existing grades ranging from approximately 23 feet (MSL) along the east perimeter to about 17 feet (MSL) along the western side. The site is bordered to the north by a wooded tract of land, to the south by an open tract of land followed by existing MICAS New River facilities, to the east by a large drainage swale (from about 12 to 14 feet in depth) followed by existing MICAS New River facilities, and to the west by Canal Street followed by a wooded tract of land. 1.3 Purpose and Scope of Services: The purpose of this study was to obtain information on the general subsurface conditions at the proposed project site. The subsurface conditions encountered were then evaluated with respect to the available project characteristics. In this regard, engineering assessments for the following items were formulated: General assessment of the soils revealed by the borings performed at the proposed development. 2. General location and description of potentially deleterious material encountered in the borings that may interfere with construction progress or performance, including existing fills, surficial/subsurface organics, or expansive soils. RR,�C�iV,1 ; GET NOV 1 4 2011 BY: Preliminary Report of Subsurface Investigation and Geotechnical Engineering Services September26,2011 Storm Water Management Parking Garage New River MCAS New River, Camp Lejeune, North Carolina GET Project No: JX11-109G 3. Soil preparation and construction considerations including grading, and compaction, as well as providing Engineering criteria for placement and compaction of approved structural fill material, including weather and equipment effects. 4. Permeability (infiltration) values are provided based on the results of in -situ Saturated Hydraulic Conductivity Testing as well as our experience with similar soil conditions. Seasonal high groundwater table (SHWT) was also estimated. The scope of services did not include an environmental assessment for determining the presence or absence of wetlands or hazardous or toxic material in the soil, bedrock, surface water, groundwater or air, on or below or around this site. Any statements in this report or on the boring logs regarding odors, color, unusual or suspicious items or conditions are strictly for the information of the client. Prior to development of this site, an environmental assessment is advisable. 2.0 FIELD AND LABORATORY PROCEDURES 2.1 Field Exploration In order to explore the general nature and composition of the subsurface soils at this site, a total of four (4) 15-foot deep Standard Penetration Test (SPT) borings (designated as B-1 through B-4) were drilled by G E T Solutions, Inc. within the limits of the proposed storm water management basin areas. In addition, to aid in developing associated storm water management parameters, four (4) saturated hydraulic conductivity tests (in -situ) were completed within the proposed storm water management areas at the boring B-1 through B-4 locations. The boring locations were established and staked in the field by a representative of G E T Solutions, Inc. with the use of a Global Positions System unit as well as the "State Plane" coordinates selected from the project site plan. The approximate boring locations are shown on the attached 'Boring Location Plan" (Appendix 1), which was reproduced based on the site plan provided by C. Allan Bamforth, Jr., Engineer -Surveyor, Ltd. 2.2 Laboratory Testing Representative portions of all soil samples collected during drilling were sealed in glassjars and ziplock bags, labeled and transferred to our laboratory for classification and analysis. The soil classification was performed by a Geotechnical Engineer in accordance with ASTM D2488. Solutlons. Inc Preliminary Report of Subsurface Investigation and Geotechnical Engineering Services Storm Water Management Parking Garage New River MCAS New River, Camp Lejeune, North Carolina GET Project No: JX11-109G Septernber26,2011 Ten (10) representative soil samples were selected and subjected to laboratory testing, which included natural moisture and 4200 sieve wash testing and analysis, in order to corroborate the visual classification. These test results are provided in the following table (Table I — Laboratory Test Results) and are presented on the 'Boring Log" sheets (Appendix II), included with this report. Table I - Laboratory Test Results Boring No. Sample Type Depth (Feet) Natural Moisture "�o % Passing #200 Atterberg Limits LLIPUPI USCS Classification B-1 Split Spoon 2-4 16.6 35.7 Not Tested SC-SM B-1 Hand Auger 2-2.5 17.0 33.6 Not Tested SC-SM B-1 Split Spoon 4-6 17.0 40.1 Not Tested SC-SM B-2 Split Spoon 2-4 18.2 38.8 Not Tested SC-SM B-2 Hand Auger 2-2.5 16.5 32.3 Not Tested SC-SM B-3 Split Spoon 4-6 15.0 30.4 Non -Plastic SC-SM B-3 Hand Auger 1.5-2 12.8 47.0 Not Tested SC-SM B-4 Hand Auger 1.5-2 18.7 56.0 Not Tested CL B-4 Split Spoon 4-6 26.0 78.5 Not Tested CL B-4 Slit S oon 8-10 17.6 12.4 Non -Plastic SM 3.0 SITE AND SUBSURFACE CONDITIONS 3.1 Site Geology The project site lies within a major physiographic province called the Atlantic Coastal Plain. Numerous transgressions and regressions of the Atlantic Ocean have deposited marine, lagoonal, and fluvial (stream lain) sediments. The regional geology is very complex, and generally consists of interbedded layers of varying mixtures of sands, silts and clays. Based on our review of existing geologic and soil boring data, the geologic stratigraphy encountered in our subsurface explorations generally consisted of marine deposited sands, silts and clays. 3.2 Subsurface Soil Conditions: The results of our field exploration program indicated the presence of 3 to 5 inches of topsoil at the soil boring locations. Beneath the surficial topsoil, the native subsurface soils recovered at the boring locations and extending to the boring termination depth of 15 feet below current grades, generally consisted of SAND (SM, SC-SM) with varying amounts of Silt and Clay. As an exception, a deposit of "Lean" CLAY (CL) with varying amounts of sand was encountered at boring B-4 from 2 to 6 feet below existing site grades. The Standard Penetration Test (SPT) results, N-values, recorded within the granular soils ranged from 3 to 26 blows -per -foot (BPF), indicating a very loose to medium dense relative density. The Standard Penetration Test (SPT) results, N-values, recorded within the cohesive soils li-�,c:::.i�<,r:= GET NOV 1 4 2011 BSI: Preliminary Report of Subsurface Investigation and Geotechnical Engineering Services September26,2011 Storm Water Management Parking Garage New River MCAS New River, Camp Lejeune, North Carolina GET Project No: JX11-109G ranged from 6 to 10 blows -per -foot (BPF), indicating a medium stiff to stiff consistency. The subsurface description is of a generalized nature provided to highlight the major soil strata encountered. The records of the subsurface exploration are included on the "Boring Log" sheets (Appendix II) and in the "Generalized Soil Profile" (Appendix III), which should be reviewed for specific information as to the individual borings. The stratifications shown on the records of the subsurface exploration represent the conditions only at the actual boring locations. Variations may occur and should be expected between boring locations. The stratifications represent the approximate boundary between subsurface materials and the transition may be gradual or occur between sample intervals. It is noted that the topsoil designation references the presence of surficial organic laden soil, and does not represent any particular quality specification. This material is to be tested for approval prior to use. 3.3 Groundwater Information: The groundwater level was recorded at the boring locations and as observed through the wetness of the recovered soil samples during the drilling operations. The initial groundwater table was measured to occur at a depth of about 9.0 feet below the existing site grades (elevation of about 8.0 MSL) at the boring B-3 and B-4 locations. Groundwater was not encountered at boring B-1 and B-2 locations at the time of drilling to depths explored which is likely due to the influence of a deep drainage swale located in the immediate vicinity of these borings. The variation in groundwater depths are anticipated to have been contributed by the variations in existing site grade elevations and the associated distance between boring locations. The boreholes were backfilled upon completion for safety considerations. As such, the reported groundwater levels at these locations may not be indicative of the static groundwater level. Also, the soils recovered from boring B-1 through B-4 locations were visually classified to identify color changes to aid in indicating the normal estimated Seasonal High Water Table (SHWT). It is noted that soil morphology may not be a reliable indicator of the SHWT. However, color distinctions (from orangish brown and tan to light gray and orangish brown; slightly mottled orangish brown -gray to slightly mottled gray-orangish brown) were generally observed within the soil profile of soil samples collected at the location of borings B-1 through B-4. As such, the normal SHWT depth was estimated to occur at depths ranging from approximately 4 to 5 feet (borings B-1 and B-2, respectively) and 3 feet (borings B-3 and B-4 locations) below the existing site grades. It should be noted that perched water conditions may occur throughout the site during periods of heavy precipitation and/or during the wet season. The perched condition is anticipated to occur in areas where shallow subsurface clayey soils were encountered. These soils will act as a restrictive layer allowing excessive moisture to accumulate within the overlying granular soils. Solutions.lnc Preliminary Report of Subsurface Investigation and Geotechnical Engineering Services Sepember26,2011 Storm Water Management Parking Garage New River MCAS New River, Camp Lejeune, North Carolina GET Project No: JX11-109G Groundwater conditions will vary with environmental variations and seasonal conditions, such as the frequency and magnitude of rainfall patterns, as well as man-made influences, such as existing swales, drainage ponds, underdrains and areas of covered soil (paved parking lots, sidewalks, etc.). Seasonal groundwater fluctuations of ± 2 feet (or more) are common in the project's area; however, greater fluctuations have been documented. We recommend that the contractor determine the actual groundwater levels at the time of the construction to determine groundwater impact on the construction procedures. 4.0 EVALUATION AND RECOMMENDATIONS Our recommendations are based on previously discussed project information, our interpretation of the soil test borings and laboratory data, and our observations during our site reconnaissance. If the proposed construction should vary from what was described, we request the opportunity to review our recommendations and make any necessary changes. 4.1 Soil Permeability Four (4) infiltration test boreholes were prepared (boring locations B-1 through B-4) utilizing a planer auger to remove soil clippings from their base. Infiltration testing was performed at a depth corresponding to an elevation of approximately 2.0 to 2.5 feet below the existing site grades at the boring B-1 and B-2 locations and approximately 1.5 to 2.0 feet below the existing site grades at the boring B-3 and B-4 locations. Infiltration testing was then conducted within the vadose zone utilizing a Precision Permeameter and the following testing procedures. A support stand was assembled and placed adjacent to the borehole. This stand holds a calibrated reservoir (2000 ml) and a cable used to raise and lower the water control unit (WCU). The WCU establishes a constant water head within the borehole during testing by use of a precision valve and float assembly. The WCU was attached to the flow reservoir with a 2-meter (6.6 foot) braided PVC hose and then lowered by cable into the borehole to the test depth elevation. As required by the Glover solution, the WCU was suspended above the bottom of the borehole at an elevation of approximately 5 times the borehole diameter. The shut-off valve was then opened allowing water to pass through the WCU to fill the borehole to the constant water level elevation. The absorption rate slowed as the soil voids became filled and an equilibrium developed as a wetting bulb developed around the borehole. Water was continuously added until the flow rate stabilized. The reservoir was then re -filled in order to begin testing. During testing, as the water drained into the borehole and surrounding soils, the water level within the calibrated reservoir was recorded as well as the elapsed time during each interval. The test was continued until relatively consistent flow rates were documented. During testing the quick release connections and shutoff valve were monitored to ensure that no leakage occurred. The flow rate (Q), height of the constant water level (H), and borehole diameter (D) were used to calculate KS utilizing the Glover Solution. NOV 1 4 2011 GET Q� B`�': Preliminary Report of Subsurface Investigation and Geotechnical Engineering Services Seplember26,2011 Storm Water Management Parking Garage New River MCAS New River, Camp Lejeune, North Carolina GET Project No: JX11-109G Based on the field testing and corroborated with laboratory testing results (published values compared to classification results), the hydraulic conductivity of the shallow soils is tabulated below (Table II) and is presented on the "Hydraulic Conductivity Worksheet" (Appendix IV), included with this report. Table II — Infiltration Test Results Hydraulic Test 4200 Conductivity Infiltration Test Depth Sieve Classification cm/sec (feet) (%) in/hour cm/sec B-1 2 to 2.5 33.6 SC-SM 0.107 7.58E-05 B-2 2 to 2.5 32.3 SC-SM 0.064 4.53E-05 B-3 1.5 to 2 47.0 SC-SM 0.130 9.14E-05 B-4 1.5 to 2 56.0 CL 0.004 2.99E-06 4.2 Structural Fill and Placement Any material to be used for backfill or structural fill should be evaluated and tested by G E T Solutions, Inc. prior to placement to determine if they are suitable for the intended use. Suitable "structural fill material should consist of sand or gravel containing less than 20 percent by weight of fines (SP, SP-SM, SM, SW, SW-SM, GP, GP -GM, GW, GW-GM), having a liquid limit less than 20 and plastic limit less than 6, and should be free of rubble, organics, clay, debris and other unsuitable material. All structural fill should be compacted to a dry density of at least 95 percent of the Modified Proctor maximum dry density (ASTM D1557). In general, the compaction should be accomplished by placing the fill in maximum 10-inch loose lifts and mechanically compacting each lift to at least the specified minimum dry density. A representative of G E T Solutions, Inc. should perform field density tests on each lift as necessary to assure that adequate compaction is achieved. 4.3 Suitability of On -site Soils Based on the laboratory testing program, the shallow subsurface SAND (SM) soils encountered at the boring locations (beneath the topsoil) appear to meet the criteria recommended in this report for reuse as structural fill. Additionally, it is anticipated that any soils excavated on -site and proposed to be re -used as backfill, will require stockpiling and air drying in order to establish a moisture content suitable for compaction. Soil deposits excavated at the site and noted to contain significant amounts of organics should not be used as fill and/or backfill within the proposed construction areas. Further classification testing (natural moisture content, gradation analysis, and Proctor testing) should be performed in the field during construction to evaluate the suitability of excavated soils for reuse as fill and backfill. • Soludons. Inc Preliminary Report of Subsurface Investigation and Geotechnical Engineering Services September26,2011 Storm Water Management Parking Garage New River MCAS New River, Camp Lejeune, North Carolina GET Project No: JX11-109G Backfill material in utility trenches within the construction areas should consist of structural fill (as described above), and should be compacted to at least 95 percent of ASTM D1557. This fill should be placed in 4 to 6 inch loose lifts when hand compaction equipment is used. 5.0 CONSTRUCTION CONSIDERATIONS 5.1 Drainage and Groundwater Concerns: It is expected that dewatering may be required for excavations that extend near or below the existing groundwater table. Dewatering above the groundwater level could probably be accomplished by pumping from sumps. Dewatering at depths below the groundwater level will likely require well pointing. It is recommended that the contractor determine the actual groundwater levels at the time of the construction to determine groundwater impact throughout the project site and at specific proposed excavation locations. It would be advantageous to construct all fills early in the construction. If this is not accomplished, disturbance of the existing site drainage could result in collection of surface water in some areas, thus rendering these areas wet and very loose. Temporary drainage ditches should be employed by the contractor to accentuate drainage during construction. 5.2 Site Utility Installation: The base of the utility trenches should be observed by a qualified inspector prior to the pipe and structure placement to verify the suitability of the bearing soils. Based on the results of our field exploration program it is expected that the utilities and structures located at depths greater than about 10 feet below current grades may bear in wet, loose sandy soils. In these instances the bearing soils will likely require some stabilization to provide suitable bedding. This stabilization is typically accomplished by providing additional bedding materials (No. 57 stone). In addition depending on the depth of the utility trench excavation, some means of dewatering may be required to facilitate the utility installation and associated backfilling. Excavations extending below the groundwater level will likely require well pointing. Generally, the subsurface Sand (SM) soils encountered at the boring locations appear to meet the criteria recommended in this report for reuse as structural fill. Accordingly, bulk soil sampling and classification testing is recommended to be performed to substantiate the suitability of their intended use at the time of construction. Additionally, stockpiling and allowing the soils to air dry may be required in order to obtain a moisture content suitable for compaction procedures. NOV 1 4 2011 BY: Solutions, Inc. Preliminary Report of Subsurface Investigation and Geotechnical Engineering Services Septernber26,2011 Storm Water Management Parking Garage New River MICAS New River, Camp Lejeune, North Carolina GET Project No: JX11-109G 5.3 Excavations: In Federal Register, Volume 54, No. 209 (October, 1989), the United States Department of Labor, Occupational Safety and Health Administration (OSHA) amended its "Construction Standards for Excavations, 29 CFR, part 1926, Subpart P". This document was issued to better insure the safety of workmen entering trenches or excavations. It is mandated by this federal regulation that all excavations, whether they be utility trenches, basement excavation or footing excavations, be constructed in accordance with the new (OSHA) guidelines. It is our understanding that these regulations are being strictly enforced and if they are not closely followed, the owner and the contractor could be liable for substantial penalties. The contractor is solely responsible for designing and constructing stable, temporary excavations and should shore, slope, or bench the sides of the excavations as required to maintain stability of both the excavation sides and bottom. The contractor's responsible person, as defined in 29 CFR Part 1926, should evaluate the soil exposed in the excavations as part of the contractor's safety procedures. In no case should slope height, slope inclination, or excavation depth, including utility trench excavation depth, exceed those specified in local, state, and federal safety regulations. We are providing this information solely as a service to our client. G E T Solutions, Inc. is not assuming responsibility for construction site safety or the contractor's activities; such responsibility is not being implied and should not be inferred. Solutions, Inc Preliminary Report of Subsurface Investigation and Geotechnical Engineering Services September26,2011 Storm Water Management Parking Garage New River MCAS New River, Camp Lejeune, North Carolina GET Project No: JX11-109G 6.0 REPORT LIMITATIONS The recommendations submitted are based on the available soil information obtained by G E T Solutions, Inc. and the information supplied by the client for the proposed project. If there are any revisions to the plans for this project or if deviations from the subsurface conditions noted in this report are encountered during construction, G E T Solutions, Inc. should be notified immediately to determine if changes in our recommendations are required. If G E T Solutions, Inc. is not retained to perform these functions, G E T Solutions, Inc. can not be responsible for the impact of those conditions on the geotechnical recommendations for the project. The Geotechnical Engineer warrants that the findings, recommendations, specifications or professional advice contained herein have been made in accordance with generally accepted professional geotechnical engineering practices in the local area. No other warranties are implied or expressed. After the plans and specifications are more complete the Geotechnical Engineer should be provided the opportunity to review the final design plans and specifications to assure our engineering recommendations have been properly incorporated into the design documents, in order that the earthwork recommendations may be properly interpreted and implemented. At that time, it may be necessary to submit supplementary recommendations. This report has been prepared for the exclusive use of the Client and their consultants for the specific application to the proposed Storm Water Management Parking Garage New River Project located within the MICAS New River, Marine Corps Base (MCB) Camp Lejeune, military installation in North Carolina. _I;u V NOV 1 4 2011 APPENDICES BORING LOCATION PLAN II BORING LOGS III GENERALIZED SOIL PROFILE IV HYDRAULIC CONDUCTIVITY WORKSHEETS V CLASSIFICATION SYSTEM FOR SOIL EXPLORATION NOV 1 4 2011 APPENDIX I BORING LOCATION PLAN I NOV 1 4 2011 i_ '. .'I I.I C V ICI, f�l 1�':'I •: �\ e• •�(o � \�t� I � I q*`1r\ x�•vssivmlO nmI! /.: �?'.".'.\V`i.",`ifE.' BORING LOCATION PLAN PROJECT: Storm Water Management Parking Garage New River SCALE: As Drawn MCAS New River Camp Lejeune, North Carolina DATE: 9/26/2011 PROJECT NO: JX11-109G PLOT BY: GH CLIENT: C. Allan Bamforth, Jr., Engineer -Surveyor, Ltd NOV 1 I NOV 1 4 2011 GETPROJECT: wsear.e..x�.,..,m.narq BORING LOG B-1 Storm Water Management Parking Garage New River CLIENT: C. Allan Bamforth Jr. Engineer -Surveyor LTD PROJECT LOCATION: MCAS New River, Camp Leieune, NC PROJECT NO.: JX11-109G BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: 22 MSL DRILLER: GET Solutions, Inc. LOGGED BY: gwh DRILL METHOD: Rotary Wash Mud Drilling DATE: 9-7-11 DEPTH TO WATER - INITIAL': 4 _ AFTER 24 HOURS: Z _ CAVING> - c 0 i1i(2 a m o E S o �, Description U a N a 6 rn Z a> rn m 'all rn o m a N i e TEST RESULTS Plastic Limit H Liquid Limit Moisture Content - • N-Value - 10 20 40 60 70 3 5 9 16 7 16 10 3. 5 0.1 4-inches of Topsoil 1 17 ss z z .i:...:...:...:...:...:... ....... .... ..... j .. .......... ....... .:... /...'...: ..[...: ........ .... ............................... .3 Brown, moist, Silty fine to medium SAND (SM), Very Loose Orangish brown and tan, moist, Silty, Clayey fine to medium SAND (SC-SM), Loose Estimated SHWT @ 4.0 feet below site grade 2 15 ss z n Z ' 3 16 ss a 5 9 Light gray and orangish brown, moist, Silty, Clayey fine to medium SAND (SC-SM), Loose 15 4 14 ss e 8 10 Light gray and orangish brown, moist, Silty fine to medium SAND (SM), Loose to Medium Dense 5 16 ss a 9 a 6 17 ss ,0 a 10 iiiii 7 15 ss s 5 Boring terminated at 15 ft. li��iC„�a'J ..�• .v NOV 1 4 2011 BY: z z 30 10 35 Notes: SS = Split Spoon Sample ST = Shelby Tube Sample HA = Hand Augerht of Sample BS = Bulk Sample *The initial oroundwater readino may not he indicative ofthe static groundwater level WOH = PAGE 1 of 1 Standard Penetration Tests were performed in the field in general accordance with ASTM D 1586. GETPROJECT: BORING LOG B-2 Storm Water Management Parking Garage New River CLIENT: C. Allan Bamforth Jr. Engineer -Surveyor LTD PROJECT LOCATION: MCAS New River, Camp Leleune, NC PROJECT NO.: JX11-109G BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: 23 MSL DRILLER: GET Solutions, Inc. LOGGED BY: gwh DRILL METHOD: Rotary Wash Mud Drilling DATE: 9-7-11 DEPTH TO WATER - INITIAL': 4 _ AFTER 24 HOURS: 3 _ CAVING> L o `^ Wp c t2 5. 01 E r„ n o D6;$Cfl llOf1 P L 2 a E o n z a> E n a d E M H N o m m _ > Z\ ry u TEST RESULTS Plastic Limit H Liquid Limit Moisture Content - • N-Value - 10 20 30 40 50 60 70 0 0 4 7 12 15 8 14 8 24 8 4-inches of Topsoil 1 17 ss 2 p s % ;..y.-.,-........ j . . . . — . — / / . . . . . _- .. ... ... ...... .. .3 Brown and tan, moist, Silty fine to medium SAND (SM), Very Loose 20 Orangish brown and tan, moist, Silty, Clayey fine to medium SAND (SC-SM), Loose 4 Whitish tan, moist, Poorly Graded fine to medium SAND (SP-SM) with trace Silt, Medium Dense Estimated SHWT @ 5 feet below site grade ?6 `.! p p _ ; ; 2 3 18 18 ss ss 3 e 4 a `! q 21 ss ' s 8 15 Light gray and orangish brown, moist, Silty fine to medium SAND (SM), Loose to Medium Dense 5 16 as 6 n 4 10 4 6 15 ss a e 7 16 ss y Boring terminated at 15 ft. 30 10 .to 35 -1 Notes: SS = Split Spoon Sample ST = Shelby Tube Sample HA = Hand Auger Sample =e BS Bulk Sampl PAGE 1 of 1 Standard Penetration Tests were performed in the field in general accordance with ASTM D 1586. GETPROJECT: cnna...1•o-.«�.�m.,m� BORING LOG B-3 Storm Water Management Parking Garage New River CLIENT: C. Allan Bamforth Jr. Engineer -Surveyor LTD PROJECT LOCATION: MICAS New River, Camp Leleune, NC PROJECT NO.: JX11-109G BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: 17 MSL DRILLER: GET Solutions, Inc. LOGGED BY: qwh DRILL METHOD: Rotary Wash Mud Drilling DATE: 9-8-11 DEPTH TO WATER -INITIAL*: S 9 AFTER 24 HOURS: k _ CAVING> L o J Wo nJE_ n o�, Description n C� w n c m Z n> rM 0 n d u~ ' m n v Z oo o TEST RESULTS Plastic Limit H Liquid Limit Moisture Content - • N-Value- 10 20 30 40 50 60 70 3 5 9 16 17 16 7. 0 4-inches of Topsoil .3 Brown, moist, Silty fine to medium SAND (SM), Very Loose ?!;;; 1 17 ss 2 z z ` IT' I :.I ...... _.....:.......:... � :.1. ....:...:...:...:...:... �' / .:.. .:...:. .:. ..:... j j j .. .....:...:.. .:. .. _.:...: _.:...:...:...:_.:... Orangish brown and tan, moist, Silty, Clayey fine to medium SAND (SC-SM). Loose Estimated SHWT @ 3 feet below site grade 2 15 ss 2 z s 4 3 16 ss a s s 10 Light gray and orangish brown, moist, Silty, Clayey fine to medium SAND (SC-SM), Loose ..... 4 14 SS 8 g 1e Light gray and orangish brown, moist to wet, Silty fine to medium SAND SM , Loose to Medium Dense - ( ) 5 16 ss s y - 4 6 17 55 10� j 5 Boring terminated at 15 ft. V ...J _✓ NOV 1 4 2011 z -1 30 10 -1 35 Notes: SS = Split Spoon Sample ST =Shelby Tube Sample HA =Hand Auger Sample BS = Bulk Sample PAGE 1 of 1 Standard Penetration Tests were performed in the field in general accordance with ASTM D 1586. GETPROJECT: r .ea�•r.r,...,W r..,� BORING LOG B-4 Storm Water Management Parking Garage New River CLIENT: C. Allan Bamforth Jr. Engineer -Surveyor, LTD PROJECT LOCATION: MCAS New River, Camp Leleune, NC PROJECT NO.: JX11-109G BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: 17 MSL DRILLER: GET Solutions, Inc. LOGGED BY: gwh DRILL METHOD: Rotary Wash Mud Drilling DATE: 9-8-11 DEPTH TO WATER - INITIAL': V 9 AFTER 24 HOURS: T _ CAVING> S c D W M L m p E L w d p Description t m n E Z m n> E> y n d E in t- N [O o> m n Z\ o N x TEST RESULTS Plastic Limit H Liquid Limit Moisture Content- • N-Value - 10 20 30 40 50 60 70 6 6 10 26 13 5 5 6. B 1210 5-inches of Topsoil liiii ..... 1 19 ss 2 24 5 j j / _..S _.. .. ...... .......:...:...:... :( ..:1.... . .:. .:... - /' l: ..................: i .:...:...:. _ .:...:...: .. . ... ...... ...... ... ...... .... al .4 Brown, moist, Silty fine to medium SAND (SM), Very Loose Slightly mottled orangish brown -gray, moist, Sandy "Lean" CLAY (CL), Medium Stiff Estimated SHWT @ 3 feet below site grade 2 22 ss 4 3 n 2 3 4 20 18 ss ss 4 10 13 13 11 lightly mottledgray-orangish brown, moist, Sand Lean" Clay CL 9 Y Y" Y( ). Stiff 1 Light gray, moist, Silty fine to medium SAND (SM), Medium Dense Light gray and orangish brown, moist to wet, Silty fine to coarse SAND (SM), Medium Dense 1 Dark gray, wet, Silty fine to medium SAND (SM) with trace Clay, Loose :::: . S 6 18 24 ss ss 9 6 s s 3 4 4 IT IT 7 17 ss 4 3 6 Boring terminated at 15 ft. 25 30 10 -15 35 Notes: SS = Split Spoon Sample ST = Shelby Tube Sample HA = Hand Auger Sample BS = Bulk SampleHammer I PAGE 1 of 1 Standard Penetration Tests were performed in the field in general accordance with ASTM D 1586. APPENDIX III GENERALIZED SOIL PROFILE NOV 1 4 2011 BY: 25 25 BJ2✓ J 2 2 91 22 22 ,2 E' C6 NM=165 20 0 = 3 0 NM=170 NM=16.6 d d B] da 5 9 P ai NM=17.0 67 2 2 2 2 88 12 5 88 I 8 ID - B l 15 15 44 3d 3a 98 ' 9 11 '56 ad 6d 88 S9 fi10 109 i[ NM=150 NM=26.0 ]] 8 8 1013 _ 4 2 810 1311 10 z 0 a3 z w 55 98 96 ` W 55 all 6 — = NM=17.6 ID9 12 ]] 3d 5 5 ss a2 55 36 0 0 5 5 r '50ata-�ym¢QI5 Topsoil < < : GET Solutions, Inc. Silty Sand N GENERALIZED SOIL PROFILE � 0- . N � HUHILUNIAL DRAWN BY/APPROVED BY DATE DRAWN SCALE: Silty Clayey Sand OJ 9/26/2011 SCALE: P=5' gwh J i Storm Water Management Parking Garage New ,,,. Peelygraded Sand pp l_i;� �Atesut l-1 River 0 Lean Clay FIGURE NUMBER PROJECT NO. JXI 1-109G %/� APPENDIX IV HYDRAULIC CONDUCTIVITY WORKSHEETS NOV 1 4 2011 G E T Solutions, Inc. SATURATED HYDRAULIC CONDUCTIVITY WORKSHEET Sheet No.: 1 of 1 Project Name.: Storm Water Mang. Park, Gar. New River Location.......: MCAS New River, Camp Lejeune, Terminology and Solution Boring No ...... : B-1 Date .............: 9/22/2011 Ksat: Saturated hydraulic conductivity Investigators.: B. Cone/C. Forney File No.........: JX11-109G Q: Steady-state rate of water Flow into the soil Boring Depth.: 2.5 ft WCU Base. Ht. h: 15.0 cm H: Constant height of water in borehole Boring Dia..... : 8.3 cm WCU Susp. Ht. S: 15.2 cm r: Radius of cylindrical borehole Boring Rad. (r): 4.15 cm Const. Wtr. Ht. H: 30.2 cm Ksat = 0[sinh-1(H/r) - (r2/H2+1),5 + r/H] / (2pH2) [Glover Solution] VOLUME ml Volume Out ml a TIME hr:min:sec a/ Elapse Time Flow Rate Q ml/min[alb] --- Ksat Equivalent Values--------- hr:min:sec min b (cm/min)^ cm/sec(cm/day) in/hr ft/da 120 10:00:00 AM 110 10 10:00:34 AM 0:00:34 0.57 17.65 0.006 9.29E-05 8.0 0.132 0.26 100 10 10:01:11 AM 0:00:37 0.62 16.22 0.005 8.54E-05 7.4 0.121 0.24 90 10 10:01:49 AM 0:00:38 0.63 15.79 0.005 8.31 E-05 7.2 0.1181 0.24 80 10 10:02:29 AM 0:00:40 0.67 15.00 0.005 7.90E-05 6.8 0.1121 0.22 70 10 10:03:12 AM 0:00:43 0.72 13.95 0.0041 7.35E-05 6.3 0.1041 0.21 60 10 10:03:56 AM 0:00:44 0.73 13.64 0.004 7.18E-05 6.2 0.102 0.20 50 10 10:04:41 AM 0:00:45 0.75 13.33 0.004 7.02E-05 6.1 0.100 0.20 40 10 10:05:31 AM 0:00:50 0.83 12.00 0.004 6.32E-05 5.5 0.090 0.18 30 10 10:06:18AM 0:00:47 0.78 12.77 0.004 6.72E-05 5.8 0.095 0.19 20 10 10:07:02 AM 0:00:44 0.73 13.64 0.004 7.18E-05 6.2 0.102 0.20 Natural Moisture: 17.0% % Passing #200 : 33.6% ESTIMATED FIELD KSAT:1 0.005 7.58E-05 6.6110.1071 0.21 USCS Class.: SC-SM Consistency: Loose Depth to an Impermeable Layer: NA = Notes: Ksat Class Moderately Low Structure/Fabric: NA Slope/Landsc: NA Depth to Bedrock ...................: NA Precision Permeameteim G E T Solutions, Inc. SATURATED HYDRAULIC CONDUCTIVITY WORKSHEET Sheet No.: 1 of 1 Project Name.: Storm Water Mang. Park. Gar. New River Location.......: MCAS New River, Camp Le'eune, Terminology and Solution Boring No......: B-2 Date .............: 9/22/2011 Ksat : Saturated hydraulic conductivity Investigators.: B. Cone/C. Forney File No.........: JX11-109G Q: Steady-state rate of water flow into the soil Boring Depth.: 2.5 ft WCU Base. Ht. h: 15.0 cm H: Constant height of water in borehole Boring Dia..... : 8.3 cm WCU Susp. Ht. S: 15.2 cm r: Radius of cylindrical borehole Boring Red. (r): 4.15 cm Const. Wtr. Ht. H: 30.2 cm Ksat=Q[sinh-1(H/r)-(r2/H2+1),5+r/H]/(2pH2) [Glover Solution] VOLUME ml Volume Out ml a TIME hr:min:sec al Elapsed Time Flow Rate Q ml/min) [a/b] ------- Ksat Equivalent Values ------ hr:min:sec min b (cm/min cm/sec(cm/day) in/hr ft/da 120 10:30:00 AM 115 5 10:30:49 AM 0:00:49 0.82 6.12 0.002 3.22E-05 2.8 0.0461 0.09 110 5 10:31:27 AM 0:00:38 0.63 7.89 0.002 4.16E-05 3.6 0.0591 0.12 105 5 10:32:04 AM 0:00:37 0.62 8.11 0.003 4.27E-05 3.7 0.0611 0.12 100 5 10:32:36 AM 0:00:32 0.53 9.38 0.003 4.94E-05 4.3 0.070 0.14 95 5 10:33:10 AM 0:00:34 0.57 8.82 0.003 4.65E-05 4.0 0.066 0.13 90 5 10:33:43 AM 0:00:33 0.55 9.09 0.003 4.79E-05 4.1 0.0681 0.14 85 5 10:34:16 AM 0:00:33 0.55 9.09 0.003 4.79E-05 4.1 0.068 0.14 80 5 10:34:48 AM 0:00:32 0.53 9.38 0.003 4.94E-05 4.3 0.070 0.14 75 5 10:35:20 AM 0:00:32 0.53 9.38 0.003 4.94E-05 4.3 0.070 0.14 70 5 10:35:54 AM 0:00:34 0.57 8.82 0.003 4.65E-05 4.0 0,066 0.13 Natural Moisture: 16.5% % Passing #200 : 32.3% ESTIMATED FIELD KSAT: 0.003 4.53E-05 3.9 0.0641 0.13 USCS Class.: SC-SM I Consistency: Loose Depth to an Impermeable Layer: NA Notes: Ksat Class Moderately Low = Structure/Fabric: N Slope/Landsc: NA Depth to Bedrock ...................: NA Precision PenneametePp G E T Solutions, Inc. SATURATED HYDRAULIC CONDUCTIVITY WORKSHEET Sheet No.: 1 of 1 Project Name.: Storm Water Mang. Park. Gar. New River Location.......: MCAS New River, Camp Lejeune, N Terminology and Solution Boring No......: B-3 Date .............: 9/22/2011 Ksat : Saturated hydraulic conductivity Investigators.: B. Cone/C. Forney File No.........: JX11-109G 0: Steady-state rate of water flow into the soil Boring Depth.: 2.0 ft WCU Base. Ht. h: 15.0 cm H: Constant height of water in borehole Boring Dia..... : 8.3 cm WCU Susp. Ht. S: 15.2 cm r: Radius of cylindrical borehole Boring Rad. (r): 4.15 cm Const. Wtr. Ht. H: 30.2 cm Ksat = 0[sinh-1(H/r) - (2/1-12+1),5 . r[H] / (2pH2) [Glover Solution] VOLUME ml Volume Out ml a TIME hr:min:sec a/ Elapse Time Flow Rate O ml/min sib ------------- Ksat E uivalent Values------------ hr:min:sec min b cm/min cm/sec (cm/day)in/hr ft/da 3100 11:50:00 AM - _ _ _ 3090 10 11:50:31 AM 0:00:31 0.52 19.35 0.006 1.02E-04 8.8 0.1441 0.29 3080 10 11:51:03 AM 1 0:00:32 0.53 18.75 0.006 9.87E-05 8.5 0.1401 0.28 3070 10 11:51:37 AM 0:00:34 0.57 17.65 0.006 9.29E-05 8.0 0.132 0.26 3060 10 11:52:09 AM 0:00:32 0.53 18.75 0.006 9.87E-05 8.5 0.140 0.28 3050 10 11:52:45 AM 0:00:36 0.60 16.67 0.0051 8.78E-05 7.6 0.124 0.25 3040 10 11:53:21 AM 0:00:36 0.60 16.67 0.005 8.78E-05 7.6 0.124 0.25 3030 10 11:53:56 AM 0:00:35 0.58 17.14 0.005 9.03E-05 7.8 0.128 0.26 3020 10 11:54:33 AM 0:00:37 0.62 16.22 0.005 8.54E-05 7.4 0.121 0.24 3010 10 11:55:09 AM 0:00:36 0.60 16.67 0.005 8.78E-05 7.61 0.124 0.25 3000 10 11:55:47 AM 0:00:38 0.63 15.79 0.005 8.31 E-05 7.2 0.118 0.24 Natural Moisture: 12.8% % Passing #200 : 47.0% ESTIMATED FIELD KSAT: 0.005 9.14E-05 7.9 0.1301 0.26 USCS Class.: SC-SMI Consistency: Loose Depth to an Impermeable Layer: NA = Notes: Ksat Class Moderately Low Structure/Fabric: NA Slope/Landsc: NA Depth to Bedrock ...................: NA Precision PermeameteP G E T Solutions, Inc. SATURATED HYDRAULIC CONDUCTIVITY WORKSHEET Sheet No.: 1 of 1 Project Name.: Storm Water Mang. Park. Gar. New Rive Location.......: MCAS New River, Camp Lejeune, N Terminology and Solution Boring No......: B-4 Date .............: 9/22/2011 Ksat : Saturated hydraulic conductivity Investigators.: B. Cone/C. Forney File No.........: JX11-109G 0: Steady -stale rate of water flow into the soil Boring Depth.: 2.0 ft WCU Base. HL h: 15.0 cm H: Constant height of water in borehole Boring Dia..... : 8.3 cm WCU Susp. Ht. S: 15.2 cm r: Radius of cylindrical borehole Boring Rad. (r): 4.15 cm Const. Wtr. Ht. H: 30.2 cm Ksat = 0[sinh-1(H/r) - (01-12+1).5. r/H] / (2pH2) [Glover Solution] VOLUME ml Volume Out ml a TIME hr:min:sec a/ Elapsed Time Flow Rate O ml/min) [a/b] ------- Ksat E uivalent Values-------- hr:min:sec min b (cm/min cm/sec(cm/day) in/hr ft/da 70 10:55:00 AM 69 1 10:56:34 AM 0:01:34 1.57 0.64 0.000 3.36E-06 0.3 0.005 0.01 68 1 11:00:03 AM 0:03:29 3.48 0.29 0.000 1.51E-06 0.1 0.002 0.00 67 1 11:01:30 AM 0:01:27 1.45 0.69 0.000 3.63E-06 0.3 0.005 0.01 66 1 11:03:11 AM 0:01:41 1.68 0.59 0.000 3.13E-06 0.3 0.004 0.01 65 1 11:04:35 AM 0:01:24 1.40 0.71 0.0001 3.76E-06 0.3 0.005 0.01 64 1 11:05:45 AM 0:01:10 1.17 0.86 0.000 4.51 E-06 0.4 0.0061 0.01 63 1 11:07:22 AM 0:01:37 1.62 0.62 0.000 3.26E-06 0.3 0.005 0.01 62 1 11:10:18 AM 0:02:56 2.93 0.34 0.000 1.80E-06 0.2 0.003 0.01 61 1 11:12:58 AM 0:02:40 2.67 0.38 0.000 1.97E-06 0.2 0.003 0.01 Natural Moisture: 18.7% % Passing #200 : 56.0% ESTIMATED FIELD KSAT:j 0.000 2.99E-06 0.31 0.004 0.01 USCS Class.: CL Consistency: Medium Stiff Depth to an Impermeable Layer: NA Notes: Ksat Class =Low Structure/Fabric: NA Slo pe/Landsc: NA Depth to Bedrock ...................: NA Precision Permeametd' APPENDIX V CLASSIFICATION SYSTEM FOR SOIL EXPLORATION NOV 1 4 2011 GET LrolMmimf •Lngmnwnbl •Te,Nng Virginia Beach Office 204 Grayson Road Virginia Beach, VA 23462 (757)518-1703 Williamsburg Office 1592 Penniman Rd. Suite E Williamsburg, Virginia 23185 (757)564-6452 CLASSIFICATION SYSTEM FOR SOIL EXPLORATION EBzabeth City Office 504 East Elizabeth St. Suite 2 Elizabeth City, NC 27909 (252)335-9765 Standard Penetration Test WTI. N-value Standard Penetration Tests (SPT) were performed in the field in general accordance with ASTM D 1586, The soil samples were obtained with a standard 1.4" I.D., 2" O.D., 30" long split -spoon sampler. The sampler was driven with blows of a 140 lb. hammer falling 30 inches. The number of blows required to drive the sampler each 6-inch increment (4 increments for each soil sample) of penetration was recorded and is shown on the boring logs. The sum of the second and third penetration increments is termed the SPT N-value. NON COHESIVE SOILS (SILT, SAND, GRAVEL and Combinations) Relative Density Very Loose 4 blows/ft. or less Loose 5 to 10 blows/ft. Medium Dense 11 to 30 blows/ft. Dense 31 to 50 blows/ft. Very Dense 51 blows/ft. or more Particle Size Identification Boulders 8 inch diameter or more Cobbles 3 to 8 inch diameter Gravel Coarse 1 to 3 inch diameter Medium t/p to 1 inch diameter Fine t/q to 1/z inch diameter Sand Coarse 2.00 man to 1/a inch (diameter of pencil lead) Medium 0.42 to 2.00 mm (diameter of broom straw) Fine 0.074 to 0.42 cam (diameter of human hair) Silt 0.002 to 0.074 man (cannot see particles) CLASSIFICATION M BOIS (ASTM D 2487 and D 2488) Coarse Grained Soils More than 50% retained on No. 200 sieve GW - Well -graded Gravel GP - Poorly graded Gravel GW-GM - Well -graded Gravel w/Silt GW-GC - Well -graded Gravel w/Clay GP -GM - Poorly graded Gravel w/Silt GP -GC - Poorly graded Gravel w/Clay GM - Silty Gravel GC - Clayey Gravel GC -GM - Silty, Clayey Gravel SW - Well -graded Sand SP - Poorly graded Sand SW-SM - Well -graded Sand w/Silt SW -SC - Well -graded Sand w/Clay SP-SM - Poorly graded Sand w/Silt SP-SC - Poorly graded Sand w/Clay SM - Silty Sand SC - Clayey Sand SC-SM - Silty, Clayey Sand Fine -Grained Soils 50°h or more passes the No. 200 sieve CL - Lean Clay CL-ML - Silty Clay ML - Silt OL - Organic Clay/Silt Liquid Limit 50%or greater CH - Fat Clay MH - Elastic Silt OH - Organic Clay/Silt Highly Organic Soils PT - Peat COHESIVE SOILS (CLAY, SILT and Combinations) Consistency Very Soft 2 blows/ft. or less Soft 3 to 4 blows/ft. Medium Stiff 5 to 8 blows/ft. Stiff 9 to 15 blows/ft. Very Stiff 16 to 30 blows/ft. Hard 31 blows/ft. or more Relative Proportions Destsipcive Term Percent Trace 0-5 Few 5-10 Little 15-25 Some 30-45 Mostly 50-100 Strata Changes In the column "Description" on the boring log, the horizontal lines represent approximate strata changes. outndwater Readings Groundwater conditions will vary with environmental variations and seasonal conditions, such as the frequency and magnitude of rainfall patterns, as well as tidal influences and man-made influences, such as existing swales, drainage ponds, underdrains and areas of covered soil (paved parking lots, side walks, etc.). Depending on percentage of fines (fraction smaller than No 200 sieve size), coarse -grained soils are classified as follows: Less than 5 percent GW, GP, SW,SP More than 12 percent GM, GC, SM, SC 5 to 12 percent Borderline cases requiring dual symbols Plastiaty Chart 60 50 x 40 0 >3 00 U 20 g 10 0 0 CL CH %o An 7n an en 11 Page 1 of 1 GET Revision 12/12/07 LIQUID LIMIT (LL) (%) A'- y' I� P r mk OPIUM i p k May l l wo Am Jay T;a. - �.� t x.r, At 1 �(r kiFp cf ils 0,0>••'r14 � f I' h f�*'. I.: .. }a .r r 9 n.... .... ? ..- k n� a �(i% ;y,'�; >yd " $��IL e _� jh i v C f'Y drf. !t DW, n at - a Y�}r o"u :.fi L + F xQ s v not 4�5 '+,yak ea x sowl e1,0 n 5 x of y , h id^i,)� �,. L pL;+C Y �M •I ( �. f}�L';? yllt � 1N if i� 3t'�'i � �f 4.n F s « n rFs i � ���" k 6 b, mF��i SIX, 4,'. . ,6 a $ f i LSs--.`J b� Y. 1 1� itvM&�P' �'�.a • ? if., r _ +M _ ' Ism - r a( i L � l L f gyp} y�`11MGi{�pE` ss b a kJ, m t: j � + YR.*dS'A'/Mil'i y4�e �� Y i' 00 M1 J it 11 Yljy^i� 4,}salt y �I, y ;yv ^F lC:�d, a + i t �PyFi '' E fj da iEls+ +��Vicki y �yj'a�y'Hll 1`. �if p ?Lys .q I 1� ti � -• h T iAf D ili �I 1 L'9 rA qmd\ A t . M1 .J.� r i 1 I t 4 tR 9 ti ,+.�C1{#3i 0 Y V 'RAF w d a A 1 , 1 k L ,�eax3 �Y +my MR W aF a 3 . 1r it I M MMp 4P 2?R a'�JJ'. P hiss D r. i { F'f .. F },y�' p } ryry;/ � C + ��j f, TW.N­ ) pt V ' atjt ,N y, PQ N'Jt 8' `b* k v dl -^ r 9 '~ w`"3�L" ( ; q� y e� y ill ►., �+"-,�_' a , , f' M1� , t p) I � i I i att,#C�8 %.iY �alvtC+�iltig ka ..., a'Y".s .,enf 9'r<. a ., , _ _