Loading...
HomeMy WebLinkAboutSW8080813_HISTORICAL FILE_20110708STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 UR 08 13 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS & HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE I-o \1 0-10 8 YYYYMMDD �r NCDENR North Carolina Department of Environment and Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director July 8, 2011 Commanding Officer USMC - Camp Lejeune c/o Carl Baker, Deputy Public Works Officer Building 1005 Michael Rd. Camp Lejeune, NC 28547 Natural Resources Subject: State Stormwater Management Permit No. SW8 080813 TECOM (SOI) Interim Facilities and Field Training Facility P1269 Camp Devil Dog High Density Project Onslow County Dear Mr. Baker: Dee Freeman Secretary The Wilmington Regional Office received a complete, modified State Stormwater Management Permit Application for TECOM (SOI) Interim Facilities and P1269- Camp Devil Dog on July 8, 2011. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Session Law 2006-246, Session Law 2008-211 and Title 15A NCAC 2H.1000. We are forwarding modified Permit No. SW8 080813 dated July 8, 2011, for the construction, operation and maintenance of the built -upon areas and BMP's associated with the subject project. This permit shall be effective from the date of issuance until September 25, 2018, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. The modifications covered by this permit include: 1. Expanding the project's built -upon area to include the Field Training Facility with three buildings, a water tank, and associated paved parking. 2. Adding two wet detention ponds, DA1- P1269 and DA2- P1269. 3. Removing one of the previously permitted Sand Filters, DA1- TECOM. This runoff is now directed into the Wet Detention Basin in DA1- P1269. The remaining five previously permitted sand filters remain covered by this permit. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a petition with the Office of Administrative Hearings (OAH). The petition must conform to Chapter 150E of the North Carolina General Statutes, and must be filed with the OAH within thirty (30) days of receipt of this permit. A petition is considered filed when it is received in the Office of Administrative Hearings during normal office hours. The OAH accepts filings Monday through Friday between the hours of 8:00 a.m. and 5:00 p.m., except for official state holidays. The petition may be filed by facsimile (fax) or electronic mall by an attached file (with restrictions) - provided the signed original, one (1) copy and a filing fee (if a filing fee is required by NCGS §150B-23.2) is received in the OAH within seven (7) business days following the faxed or electronic transmission. Unless such demands are made this permit shall be final and binding. You should contact the OAH with all questions regarding the filing fee and/or the details of the filing process. The mailing address, telephone and fax numbers for the Office of Administrative Hearings are: 6714 Mail Service Center, Raleigh, NC 27699-6714. Telephone 919-733-2698. FAX 919-733-3378. Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 1 V One�L, Phone: 910-796-7215 1 FAX. 910-350.20041 Customer Sawa: 1-877-623-6748 OlffiCa[Otltla Internet: w ncwaterqualily.org ��/a a Linn /ly An Equal Opportunity l Affirmative Action Employer L[` 11` State Stormwater Management Systems Permit No. SW8 080813 If you have any questions, or need additional information concerning this matter, please contact Linda Lewis at (910) 796-7215. Sincerely, F � een H. Sullins, Director Division of Water Quality GDS/arl: S:\WQS\Stormwater\Permits & Projects\2008\080813 HD\2011 07 permit 080813 cc: Howard Resnik, P.E., Coastal Site Design Wilmington Regional Office Stormwater File Page 2 of 9 State Stormwater Management Systems Permit No. SW8 080813 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Commanding Officer, USMCB Camp Lejeune TECOM (SOI) Interim Facilities and P1269 Field Training Facility - Camp Devil Dog Town Point Rd., Camp Lejeune, Onslow County FOR THE construction, operation and maintenance of five (5) sand filters and two (2) wet detention ponds in compliance with the provisions of Session Law 2006-246 and 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until September 25, 2018, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS .1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Sections 1.7 and 1.8 of this permit. The sand filter stormwater controls labeled DA2-, DA3-, DA4-, DA5- and DA6- (TECOM), have been designed to handle the runoff from 6,846; 6,846; 16,355; 6,600; and 6,600 square feet of impervious area, respectively. The wet detention pond stormwater controls labeled DA1-P1269 and DA2-P1269 have been designed to handle the runoff from 68,977 and 170,860 square feet of impervious area, respectively. 3. Wet detention pond DA1-P1269 must be operated with a level spreader and 30' vegetated filter strip system designed to pass the peak flow from the 10 year storm in a non -erosive manner. All other BMP's do not require an LSNFS. 4. The tract will be limited to the amount of built -upon area indicated in the application and per the approved plans. 5. The runoff from all built -upon area within the permitted drainage areas of this project must be directed into the appropriate permitted stormwater control system. Page 3 of 9 State Stormwater Management Systems Permit No. SW8 080813 6. A 50' wide vegetative buffer must be provided adjacent surface waters, measured horizontally from and perpendicular to the normal pool of impounded structures, the top of bank of both sides of streams and rivers and the mean high waterline of tidal waters. The following design criteria have been provided in the TECOM sand filters to meet SL 2006-246, and must be maintained at design condition: Design Criteria DA2 DA3 DA4 DA5 DA6 a. Draina a Area: acres 0.16 0.16 0.38 0.15 615 Onsite, ft : 6,846 6.846 16,355 6,600 6,600 Offsite, ftZ: None None None None None b. Total Impervious Surfaces, ftZ: 6,846 6,846 16,355 6,600 6,600 Onsite, ftZ: 6,846 6,846 16,355 6,600 6,600 Offsite, ft: None None None None None c. Design Storm, in. 1.5 1.5 1.5 1.5 1.5 d. Media Depth, ft: 1.5 1.5 1.5 1.5 1.5 e. Maximum Head, It, 4.5 4.5 5.5 4.5 4.5 f. Sediment Chamber Surface Area: 9. Sand Chamber Surface area: 73 73 73 73 140 140 70 70 70 70 h. Total Permitted Storage Volume, ft3: 657 657 1,540 630 630 i. Drawdown orifice, inches: 4 4 4 4 4 . Draw Down Time, hrs: 31 31 38 31 31 k. Receiving Stream / River Basin: Southwest Creek / WOK02 I .Stream Index Number: 19-17-(0.5 m. Classification of the Water Body: C, NSW 8. The following design criteria have been provided in the P1269 wet detention ponds to meet SL 2008-211, and must be maintained at design condition: Design Criteria Units DA1 DA2 a. Drainage Area Onsite Offsite acres Ft Ft 2.53 110,313 0 7.63 332,363 0 b. Total Impervious Surfaces Ft 68,977 170,860 c. Rules Cite 2008 2008 d. Design Storm Inches 1.5 1.5 e. Average Design Depth Feet 3.0 4.0 f. TSS removal efficiency% 85% 90% . Permanent Pool Elev. FMSL 21.5 20.5 h. Perm. Pool Surface Area FtZ 7,250 19,041 i. Permitted Storage Volume Ft3 8,627 21,562 . Temporary Storage Elev. FMSL 22.50 21.50 k. Pre-dev. Discharge rate Cfs 2.0 6.1 I. Controlling Orifice (Pinches 1.5 2.5 m. Orifice flow rate Cfs .033 .09 n. Permitted Foreba V01ume Ft' 3,240 12,784 o. Max. Fountain HP HP N/A '% . Receiving Stream/River Basin Southwest Creek/WOK02 . Stream Index Number 19-17- 0.5 F. Classification of Water Body C NSW II. SCHEDULE OF COMPLIANCE The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. Page 4 of 9 State Stormwater Management Systems Permit No. SW8 080813 During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of wet pond slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of the inlet/outlet/bypass structures, sand filter media, level spreader, catch basins, piping and vegetated filter. g. A clear access path to the outlet/bypass structure must be available at all times. 4. Records of maintenance activities must be kept for each permitted BMP and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. The permittee shall submit to the Division of Water Quality an annual summary report of the maintenance and inspection records for each BMP. The report shall summarize the inspection dates, results of the inspections, and the maintenance work performed at each inspection. 6. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 8. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. Access to the stormwater facilities shall be available at all times. 10. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 11. A copy of this permit and the approved plans and specifications shall be maintained on file by the Permittee at all times. Page 5 of 9 State Stormwater Management Systems Permit No. SW8 080813 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shallsubmit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 13. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Redesign or addition to the approved amount of built -upon area or to the drainage area. C. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. d. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. III. GENERAL CONDITIONS This permit is not transferable to any person or entity ekcept after notice to and approval by the Director. At least 30 days prior to a change of ownership, or a name change of the permittee or of the project, or a mailing address change, the permittee must submit a completed and signed Name/Ownership Change form to the Division of Water Quality, accompanied by the supporting documentation as listed on the form. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. Neither the sale of the project area in whole or in part, nor the conveyance of common area to a third party shall be considered an approved permit transfer request. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. Page 6 of 9 State Stormwater Management Systems Permit No. SW8 080813 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2006- 246, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et.al. 11. The permittee shall submit a permit renewal application at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate documentation and the processing fee. Permit modified and reissued this the 81' day of July 2011. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION By Authority of the Environmental Management Commission Page 7 of 9 State Stormwater Management Systems Permit No. SW8 080813 TECOM (SO1) Interim Facilities and Field Training Facility P1269 - Camp Devil Dog Stormwater Permit No. SW8 080813 Onslow Countv Designer's Certification 1, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 8 of 9 State Stormwater Management Systems Permit No. SW8 080813 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet/bypass structure is located per the approved plans. 7. The orifice for the wet pond is correctly sized and is at the proper elevation. 8. A Trash Rack is provided on the outlet/bypass structure. 9. All slopes are grassed with permanent vegetation. 10. Vegetated slopes are no steeper than 3:1. 11. The inlets are located per the approved. plans and do not cause short- circuiting of the system. 12. The permitted amounts of surface area and/or volume have been provided. 13. All required design depths are provided. 14. All required parts of the system are provided such as a forebay, vegetated shelf. etc. 15. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Regional Office Page 9 of 9 DWQ USE ONLY ate Received Fee Paid Permit Number aU s CW`x' # 73(oS P I SCU080 Applicable ules: ❑ Coastal SW -1995 Coastal SW - 2008 ❑ Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ Mgmt Plan: State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied far use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): TECOM (SOI) Interim Facilities Camp Devil Doggy P-1269 DD (SOI) 2. Location of Project (street address): City:Camp Lejeune County:Onlsow Zip:28547-2539 3. Directions to project (from nearest major intersection): Approximately 5.3 miles South of the Intersection of US 17 and NC 24 if traveling North on US 17 right onto Verona Loop Road. Travel 0.2 miles turn left ontoTown Point Road. Travel 1.3 Miles Turn left onto Perimeter Road. Site is located 0.15 miles up on both sides of the Road 4. Latitude:34° 41' 16" N Longitude:77° 27 28" W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ❑New ®Modification b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit numberSW8 080813 , its issue date (if known)9/25/2008 and the status of construction: ❑Not Started ❑Partially Completed* ® Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density []Drains to an Offsite Stormwater System []Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ❑NPDES Industrial Stormwater ®Sedimentation/Erosion Control: 18 ac of Disturbed Area 7404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: FormSWU-101 Version07July2009 PageIof6 IPI. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the proiect): Applicant/Organization:MARINE CORPS BASE, CAMP LEiEUNE Signing Official & Title:Carl Baker,Deputy Public Works Officer b.Contact information for person listed in item I above: Street Address:BLDG 1005 MICHAEL ROAD City:MCB CAMP LEiEUNE State:NC Zip:28542 Mailing Address (if City: Phone: (910 ) 451-2213 Email:carl.h.baker@usmc.mil State: Fax: (910 ) 451-2927 c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Signing Official & b.Contact information for person listed in item 2a above: Street Address: City: Mailing Address (if applicable): City: Phone: ( 1 State: Zip: Fax: 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: Signing Official & Title: b.Contact information for person listed in item 3a above: Mailing Address: City: Phone: ( ) Fax: 4. Local jurisdiction for building permits: Camp Lejeune Point of Contact: Phone #: ( ) Wv "0// Form SWU-101 Version 07July2009 Page 2 of 6 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Runoff will be directed to wet basins, via catch basins, grassed swales and stormwater conduit. Existing buildings that have sandfilters will use the gutter collections systems to direct runoff to the sandfilters. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUDApproval Date: ❑ Valid Building Permit Issued Date: Other: tk 5W 0?0n;t Date: 9-Z5-2C0 b.Identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑✓ -Ph II - Post Construction 3. Stormwater runoff from this project drains to the White Oak River basin. 4. Total Property Area: 17.23 acres 5. Total Coastal Wetlands Area: n/a acres 6. Total Surface Water Area: 0 acres Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area': 17.23 acres Total project area shall be calculated to exclude the followin the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal High Water (NHW) line or Mean High Water (MHW) line, and coastal wetlands landward from the NHW (or MHW) line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or MHW) line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 48.6 % 9. How many drainage areas does the project have?9 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin lnformation ,''[ , .Drains e Area; : Drains e Area , :`. Drains e Area Drainage Area,", Receiving Stream Name Stream Class * Stream Index Number Total Drainage Area (sf) On -site Drainage Area (sf) Off -site Drainage Area (sf) Proposed Impervious Area** (so % Impervious Area" (total) 1m ervious"Surface Area ", >`` n 'Drama e Area,: 'Drainage Area , ;' Drainage Area Draina' e Area"_= 1On-site Buildings/Lots (so bn-site Streets (so n-site Parking (sf) On -site Sidewalks (sf) Other on -site (sf) Future (sf) Off -site (sf) Existing BUA*** (sf) Total (sf): * Stream Class and Index Number can be determined at: http://`h2o.enr.state.nc.uslbimsZ=orts/regortsWB.html "* Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. *** Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and which will be replaced by new BUA. Form SWU-101 Version 07July2009 Page 3 of 6 SW8 080813 : Total Drainage Drainage Area 1 Drainage Area 2 Basin Information TECOM & P1269 P1269 P1269 Receiving Stream Name Southwest Creek Southwest Creek Southwest Creek Receiving Stream Class C;NSW C;NSW C;NSW Stream Index Number 19-17-(0.5) 19-17-(0.5) 19-17-(0.5) Total Drainage area (sf) 759,455 sf or 17.43 acres 110,313 sf or 2.53 acres 332,363 sf or 7.63 acres Onsite Drainage Area (sf) 759,455 sf or 17.43 acres sf or - acres sf or - acres Off site Drainage Area (sf) sf or - acres sf or - acres sf or - acres Proposed Impervious' Area 368,944 sf or 8.47 acres 68,977 sf or 1.58 acres 170,860 sf or 3.92 acres % Impervious' Area (total) 48.6 % 62.5 % 51.4% Imoervious' Surface Area On -site Buildings/Lots (sf) 83,750 sf or 1.92 acres 0 sf or - acres 25,331 sf or 0.58 acres On -site Streets (sf) 0 sf or - acres 0 sf or - acres 0 sf or - acres On -site Parking (sf) 31,848 sf or 0.73 acres 31,848 sf or 0.73 acres 0 sf or - acres On -site Sidewalks (sf) 38,012 sf or 0.87 acres 0 sf or - acres 38,012 sf or 0.87 acres Other on -site (sf) 19,549 sf or 0.45 acres 7,250 sf or 0.17 acres 12,299 sf or 0.28 acres Future (sf) 25,750 sf or 0.59 acres 4,750 sf or 0.11 acres 21,000 sf or 0.48 acres Off -site (sf) 0 sf or - acres 0 sf or - acres 0 sf or - acres Existing BUA (sf) 170,035 sf or 3.90 acres 25,129 sf or 0.58 acres 74,218 sf or 1.70 acres Total: 368,944 sf or 8.47 acres 68,977 sf or 1.58 acres 170,860 sf or 3.92 acres Basin Information Drainage Area 3 P1269 Drainage Area 4 P1269 Receiving Stream Name Southwest Creek Southwest Creek Receiving Stream Class C;NSW C;NSW Stream Index Number 19-17-(0.5) 19-17-(0.5) Total Drainage area (sf) 155,812 sf or 3.58 acres 117,720 sf or 2.70 acres Onsite Drainage Area (sf) 155,812 sf or 3.58 acres 117,720 sf or 2.70 acres Off site Drainage Area (sf) 0 Proposed Impervious' Area 55,038 sf or 1.26 acres 30,822 sf or 0.71 acres % Impervious` Area (total) 35.3% 26.2% Imoervious• Surface Area On -site Buildings/Lots (sf) 11,826 sf or 0.27 acres 3,346 sf or 0.08 acres On -site Streets (sf) 0 sf or - acres 0 sf or - acres On -site Parking (sf) 0 sf or - acres 0 sf or - acres On -site Sidewalks (at) 0 sf or - acres 0 sf or - acres Other on -site (sf) 0 sf or - acres 0 sf or - acres Future (sf) 0 sf or - acres 0 sf or - acres Off -site (sf) 0 sf or - acres 0 sf or - acres Existing BUA (sf) 43,212 sf or 0.99 acres 27,476 sf or 0.63 acres Total: 55,038 sf or 1.26 acres 30,822 sf or 0.71 acres RECEIVED JUN 1 7 Z011 BY: COASTAL SITE DESIGN, PC PO BOX 4041 WILMINGTON, NC 28406 5f 5r- Drainage Area 1 Drainage Area 2 Drainage Area 3 Basin Information TECOM TECOM TECOM Receiving Stream Name Southwest Creek Southwest Creek Southwest Creek Receiving Stream Class C;NSW C;NSW C;NSW Stream Index Number 19-17-(0.5) 19-17-(0.5) 19-17-(0.5) Total Drainage area (sf) 6,846 sf or 0.16 acres 6,846 sf or 0.16 acres Onsite Drainage Area (sf) 6,846 sf or 0.16 acres 6,846 sf or 0.16 acres Off site Drainage Area (sf) DAII (TECOM) has been deleted 0 sf or - acres 0 sf or - acres Proposed Impervious' Area and will be sent to DA 1 P1269 6,846 sf or 0.16 acres 6,846 sf or 0.16 acres % Impervious' Area (total) 100.0% 100.0 % Impervious' Surface Area On -site Buildings/Lots (sf) 6,846 sf or 0.16 acres 6,846 sf or 0.16 acres On -site Streets (sf) 0 sf or - acres 0 sf or - acres On -site Parking (sf) 0 sf or - acres 0 sf or - acres On -site Sidewalks (sf) 0 sf or - acres 0 sf or - acres Other on -site (sf) 0 sf or - acres 0 sf or - acres Future (sf) 0 sf or - acres 0 sf or - acres Off -site (sf) 0 sf or - acres 0 sf or - acres Existing BUA (sf) 0 sf or - acres 0 sf or - acres Total: 6,846 sf or 0.16 acres 6,846 sf or 0.16 acres Basin Information 5'( Drainage Area 4 TECOM 5F Drainage Area 5 TECOM %_ Drainage Area 6 TECOM Receiving Stream Name Southwest Creek Southwest Creek Southwest Creek Receiving Stream Class C;NSW C;NSW C;NSW Stream Index Number 19-17-(0.5) 19-17-(0.5) 19-17-(0.5) Total Drainage area (sf) 16,355 sf or 0.38 acres 6,600 sf or 0.15 acres 6,600 sf or 0.15 acres Onsite Drainage Area (sf) 16,355 sf or 0.38 acres 6,600 sf or 0.15 acres 6,600 sf or 0.15 acres Off site Drainage Area (sf) - sf or - acres sf or - acres sf or - acres Proposed Impervious' Area 16,355 sf or 0.38 acres 6,600 sf or 0.15 acres 6,600 sf or 0.15 acres % Impervious' Area (total) 100.0 % 100.00% 100.0 % Impervious' Surface Area On -site Buildings/Lots (sf) 16,355 sf or 0.38 acres 6,600 sf or 0.15 acres 6,600 sf or 0.15 acres On -site Streets (sf) 0 sf or - acres 0 sf or - acres 0 sf or - acres On -site Parking (sf) 0 sf or - acres 0 sf or - acres 0 sf or - acres On -site Sidewalks (sf) 0 sf or - acres 0 sf or - acres 0 sf or - acres Other on -site (sf) 0 sf or - acres 0 sf or - acres 0 sf or - acres Future (sf) 0 sf or - acres 0 sf or - acres 0 sf or - acres Off -site (sf) 0 sf or - acres 0 sf or - acres 0 sf or - acres Existing BUA (at) 0 sf or - acres 0 sf or - acres 0 sf or - acres Total: 16,355 sf or 0.38 acres 6,600 sf or 0.15 acres 6,600 sf or 0.15 acres RECEIVED JUN 1 7 2011 BY: COASTAL SITE DESIGN, PC PO BOX 4041 WILMINGTON, NC 28406 11. How was the off -site impervious area listed above determined? Provide documentation. Projects in Union County: Contact DWQ Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements as per NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded fromhttp://h2o.enr.state.nc.us/su/bmp forms.htm. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from hdp://h2o.enr.state.nc.us/su/bmp forms.htm. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map athU://h2o.enr.state.nc.us/su/msi maps.htm.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://h2o.enr.state.nc.us/su/bmp forms.htm. 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to hap://www.envhelp.org/12ages/onestopexpress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/management for the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within 11h mile of the site boundary, include the 11h mile radius on the map. 7. Sealed, signed and dated calculations. 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. I. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document).. p. Vegetated buffers (where required). lnf 'als Alf. X, 91le, Ale, le. [4 tie JU1v 1 3 2011 Form SWU-101 Version 07July2009 Page 4 of 6 a Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"xll" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to verify the SHWT prior to submittal, (910) 796-7378.) (F 1//'� A copy of the most current property deed. Deed book: Page No: For corporations and limited liability corporations (LLC): Provide documentation from the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per NCAC 21-1.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. httl2://www.secretary.state.nc.us/CoEporations/CSearch.gVx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http://h2o.enr.state.nc.us/su/bmi2 forms.htm#deed restrictions. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signatures) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ, and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:Howard Resnik, PE Consulting Firm: Coastal Site Design PC Mailing Address:Po BOX 4041 City: W ilmingion Phone: (910 ) 791-4441 Em ail: howa rdQcoastalsitedesi gn.com State:NC Zip:28406 Fax: (910 ) 791-1501 IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or type name of person listed in Contact Information, item 2a) . certify that I own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information, item 1a) with (print or type name of organization listed in Contact Information, item lb) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. — V- JUN 1 3 2011 Form SWU-101 Version 07July2009 Page 5 of 6 As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signatu a Notary Public for the State of do hereby certify that before me this _ day of County of personally appeared and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, WINV II My commission X. APPLICANT'S CERTIFICATION I, (print or hjpe name of person listed in Contact Information, item 2) Carl Baker, Depuht Public Works Officer certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater rules unger 15A NCAC 2H .1000, SL 2006-246 (Ph. II - Post Construction) or SL 2005-211. Date: fo - 7 �/ U I CL— NC r r l S , a Notary Public for the State of I VO4 CO-rOl 1 Ad -,County of 6 Vl S OW do hereby certify that Q o,Y' czk e r personally appeared before me this 2 day of J(A vhe-- A CW , and ack wled e the due e ✓��cuuption of.�the'application for a stormwater permit. Witness my hand and official seal, , Z 7l�y� SYLVIA NORRIS NOTARY PUBLIC ONSLOW COUNTY, C MYCOMMISSIONEXPIRES_ W15 -------------- SEAL My commission expires f 5 JU1V 1 3 Z011 Form SWU-101 Version 07July2009 Page 6 of 6 Lewis,Lincla From: Lewis, Linda Sent: Wednesday, July 06, 2011 5:23 PM To: 'Rodney Wright; 'Howard Resnik' Subject: FW: TECOM and P-1269 at Camp Devil Dog SW8 080813 It looks like you have 2 different level spreader details, on sheet CS1-124 and one on sheet CS-502. They both have different elevations. Please remove the one that doesn't apply and keep the correct one. It's not necessary to have duplicate details — that only causes confusion. Linda Lewis NC Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Lewis,Linda Sent: Wednesday, July 06, 2011 4:59 PM To: 'Rodney Wright'; 'Howard Resnik' Subject: TECOM and P-1269 at Camp Devil Dog SW8 080813 Rodney / Howard: The changes to the plans and details for the level spreader look fine, but the level spreader supplement form needs to be revised to reflect the following changes: 1. The elevation at the downslope base of the level lip needs to be changed from 20.00 to 19.93. 2. The slope of the filter from the lower side of the level lip to the end of the filter needs to be revised from 0.67% to (19.93 — 19.8) / 30 = 0.43%. Thanks, Linda Lewis NC Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. Russell, Janet To: Hallinan, Mark Cc: Lewis,Linda Subject: RE: SW8 080813 Mod. Camp Devil Dog Mark, Linda is on vacation today and was on vacation last Thursday and Friday as well. She should return tomorrow. The Stormwater permit will be mailed to Carl Baker at Camp Lejeune and faxed to Mr. Baker and the design engineer once issued. I will be glad to fax you a copy of the permit when it is issued. Janet From: Hallinan, Mark fmailto:mhallinanCalwalshgroup.coml Sent: Tuesday, July 05, 2011 11:13 AM To: Lewis,Linda Cc: Pritchard, Melissa J.; Russell, Janet; Rodney Wright; Howard Resnik; Smith, Charles (Norfolk); Clay, Katlin Subject: RE: SW8 080813 Mod. Camp Devil Dog Linda — Rodney Wright dropped off the requested information below this past Thursday 6/30/11 per your comments below. We are hopeful that this last round of clarifications is to your satisfaction and we can move forward with the express permit. We are eager to obtain the permit, and anything that we can do to facilitate this process please let me know. It is my understanding that the permit will be sent directly to NAVFAC's office. Would it be possible to obtain a faxed copy of the permit for our records when it is made available? Rhonda was able to fax over a copy of the E&S permit which was very helpful for the project. Thanks, and anything I can do to help, just let me know. Mark Mark P. Hallinan LEED GA Project Manager; The Walsh Group P-1269 Field Training Facility 111 Perimeter Road, Camp Devil Dog Next to bldg #DD40 Camp Lejeune, NC 28540 Office: 910-219-3612 Fax: 910-219-3616 Cellular: 757-417-5530 From: Lewis,Linda [mailto:linda.lewisCalncdenr govl Sent: Tuesday, June 28, 2011 9:39 AM To: Howard Resnik; Rodney Wright Cc: Hallinan, Mark; Pritchard, Melissa J.; Russell, Janet Subject: SW8 080813 Mod. Camp Devil Dog Howard & Rodney: COASTAL SITE DESIGN, PC Wilmington, NC 28406 Phone: 910 791-4441 Fax: 910 791-1501 License # C-2710 June 30, 2011 Linda Lewis North Carolina Department of Environment and Natural Resources Express Storm Water 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Re: Express Storm Water Modification to SW8 080813 Onslow County CSD Project No. 1 1-0245 Dear Linda: Enclosed please find: two (2) copies of the revised sheets CSI-115,124,125,502 PB response to comments issued on 6/28/11 Please call if you have any questions. Very truly yours, Rodney ri Encl.: As noted above cc: Archer Western REED .`. �� v 2011 _ ,VF-D JUN 3 0 2011 BY:- --- RECEIVED I JUN 3 0 2011 PAGE 1 OF 1 " ,,.. 1 CODES: A. ACCEPT COMMENT —WILL BE CORRECTED, ADDED, OR CLARIFIED. OVERSIGHT REVIEW B. DESIGNER WILL EVALUATE. COMMENT AND RESOLUTION SHEET C. DELETE COMMENT D. DEPARTMENT TO EVALUATE. DOCUMENT CONTROL NUMBER: 796466 PACKAGE NUMBER: REVIEWER(S): NCDENR DATE: 06/29/11 DESCRIPTION: P1269 FIELD TRAINING FACILITY, DEVIL DOG REVIEW TYPE: FINAL DISCIPLINE: STORMWATER MANAGEMENT CRM: SOI ITEM No. SPEC. No 0) COMMENTS CODE(2) RESPONSE (2) FINAL DISPOSITION(3) 1 CS1-124 The level spreader should be oriented to receive A Due to grading constraints and the the discharge from the pond parallel to the flow, not ponds proximity of the existing at right angles. With the level spreader situated at ditch we had to reconfigure the right angles to the pipe, larger flows will bypass the outlet structure to include a blind Swale. Please refer to Figure 8-9 in Section manhole that will redirect the flow 8.3.5 of the BMP Manual and make the appropriate parallel to the level spreader. changes. 2 CS1-124 The blind Swale behind the level spreader should A Elevations have been provided. have an upper lip elevation that is below the invert of the pipe, and a lower lip elevation that is lower than the upper lip elevation. Please specify these elevations on the vegetated filter detail on sheet CS1-124, as well as the elevation at the end of the filter itself, and submit 2 copies of that revised sheet. 3 CS1-125 The BUA for Pond #2 is still reported on sheet A BUA on Pond #2 has been revised CS1-125 as being 174,860 sf, but the sealed on sheet CS1-125 to reflect the calculations and the supplement use 170,860 sf. calculations. (1) Indicate drawing no./page no. or use "G" for general comment. Note: The intended use of this form is to provide a means for the Department to raise (2) To be filled out by Design/Builder. issues or concerns associated with the Design/Builders designs. However, it is (3) To be determined in subsequent comment resolution meeting/discussion (list date). the Design/Builders responsibility to determine what action is necessary to resolve those issues in accordance with the contract. J:\24015A-MCB-CAMP-LEJEUNE\WORKING\03 CIVIL\CIVIL\ES\2011 0629 COMMENT RES.DOCX Lewis,Linda From: Lewis, Li nda Sent: Tuesday, June 28, 2011 9:39 AM To: 'Howard Resnik'; Rodney Wright Cc: 'Hallinan, Mark', 'Pritchard, Melissa J.', Russell, Janet Subject: SW8 080813 Mod. Camp Devil Dog Howard & Rodney: A couple of problems with the revised application: The level spreader should be oriented to receive the discharge from the pond parallel to the flow, not at right angles. With the level spreader situated at right angles to the pipe, larger flows will bypass the blind swale. Please refer to Figure 8-9 in Section 8.3.5 of the BMP Manual and make the appropriate changes. The blind swale behind the level spreader should have an upper lip elevation that is below the invert of the pipe, and a lower lip elevation that is lower than the upper lip elevation. Please specify these elevations on the vegetated filter detail on sheet CS1-124, as well as the elevation at the end of the filter itself, and submit 2 copies of that revised sheet. The BUA for Pond #2 is still reported on sheet CS1-125 as being 174,860 sf, but the sealed calculations and the supplement use 170,860 sf. Please submit the requested information by July 6, 2011. Linda Lewis NC Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 Education is the progressive discovery of our own ignorance. -Will Durant E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. COASTAL SITE DESIGN, PC Wilmington, NC 28406 Phone: 910 791-4441 Fax: 910 791-1501 License N C-2710 June 17,2011 Linda Lewis North Carolina Department of Environment and Natural Resources Express Storm Water 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Re: Express Storm Water Modification to SW8 080813 Onslow County CSD Project No. It -0245 Dear Linda: Enclosed please find: - two (2) copies of the revised sheets CS-124-125 - one (1) copy of the revised SW calculations package - revised pond supplements - revised LS-VFS supplement - revised DA breakdown for PI269 drainage areas. Items: l updated Bentley stormwater calcs to reflect new SST that was submitted on 6/10. The updated calcs address the majority of the comments issued. 2 added areas to SST for forebays. 3 revised plan sheets and supplements to match calculations. 4 added DA 3 & 4 back to application Please call if you have any questions. Very truly yours, V I Rodne right Encl.: As noted above Rr T`-TVED JUN 1 7 2011 is cc: Archer Western r .. �N�CAR oA . c 2; oFESS/ 1 .33 NJ \ . 411111110, F �25 YEAR$ Stormwater Management Narrative and Calculations P1269 Devil Dog SOI Camp Lejeune, North Carolina April 22, 2011 Revised May 20, 2011 Revised June 6,1011 Revised June 15, 2011 Prepared by: Parsons erinckerhoff 6161 Kempsville Circle, Suite 110 Norfolk, Virginia 13501 sw 76?0813 VED JUN 1 7 2011 l- - I Table of Contents I. Introduction.............................................................................................................................3 ProjectDescription..................................................................................................................3 ExistingSite Conditions...........................................................................................................3 II. Hydrology................................................................................................................................3 III. Pre- and Post Development Conditions..................................................................................4 IV. Water Quality Analysis...........................................................................................................5 SW M-1....................................................................................................................................5 SW M-2....................................................................................................................................6 V. Stormwater Design.................................................................................................................6 VI. Conclusion.............................................................................................................................7 AppendixA Mapping...................................................................................................................8 Appendix B Stage -Storage Tables and Routing Analysis.............................................................16 Appendix C NCDENR Supplemental Forms................................................................................49 Appendix D Storm Sewer Calculations.......................................................................................57 Appendix E Ditch and Culvert Calculations................................................................................60 �1�)VED IJUN 1 7 2011 2 1 P a g e I. Introduction Project Description The purpose of this project is to construct three buildings, a water tank, and associated paved areas and parking. The project is located at Camp Lejeune's Devil Dog Field Training Facility in Onslow County. The purpose of this report is to analyze the drainage design of the project area and determine stormwater management necessary to comply with North Carolina Department of Natural Resources (NCDENR) requirements to modify the existing state stormwater management permit SW8 080813. Existing stormwater permit SW8 080813 covers six (6) sand filters. These sand filters are to remain in place and will still be permitted in the modification. Current approved TECOM (SO1) Interim Facilities plans are supplied with the Field Training Facility plans to make a complete set and permit application. Existing Site Conditions The Devil Dog Field Training Facility project site is approximately 18 acres and is considered high density development. The terrain for the site is relatively flat with slopes not exceeding 2%. The existing site has problems with erosion control, sustaining vegetation and flooding or standing water. The existing storm system is filled with sediment and inadequately sized compounding the drainage problems onsite. The project site drains to the Non -SA waters of either Mill Run or Hicks Run and then eventually to Southwest Creek. Southwest Creek is located in the White Oak river basin, its Index number is 19-17-(6.5) and its class is C; HOW; NSW. Mill Run and Hicks Run are both class C; NSW. H. Hydrology In accordance with NCDOT criteria, the hydrological analysis for the proposed site was completed using the Rational Method for culverts, storm drains and ditches and the Modified Rational equation for storm water management. The rainfall intensity values were found using the NOAA rainfall data for Snead's Ferry rain gauge and the time of concentration determined using Seelye and Kirpich methods. The predevelopment and post -development conditions are divided into 4 primary drainage areas. Drainage area 1 is located east of Command Post Road and north of Perimeter Road. This area is 2.53 acres post -development and drains by overland flow to either a storm sewer system or ditch and then into SWM-1. SWM-1 outfalls to a vegetative buffer and existing ditch which eventually drains north to Hicks Run and Southwest Creek. Drainage area 2 is located on the south side of the project site and drains to the east. This area is 7.63 acres post -development. This area drains into SWM-2 using overland flow, existing JUN 1 7 2011 1 3( P a g e ditches, proposed ditches, and proposed storm sewer. SWM-2 outfalls to an improved ditch and culvert which eventually drains south to Mill Run and Southwest Creek. Drainage area 3 is includes a large portion of main site building and roads on the west side of the site and drains north off the project site using existing ditches and existing storm sewer system. The contributing drainage area was 5.87 acres predevelopment. Post -development drainage area 3 is 3.58 acres which reduces peak flows, TSS, and nutrient loading downstream. Drainage area 4 is located on the east side of the project site and drains to the north. This area decreased from 3.42 acres predevelopment to 2.70 acres post -development which reduces peak flows, TSS, and nutrient loading downstream. DA 4 drains using existing ditches and culverts which eventually outfall into Southwest Creek. Drainage area maps are located in Appendix A. III. Pre- and Post Development Conditions This project includes construction of three buildings, a water tank, associated paved areas and parking. The overall site predevelopment impervious is 22% with 160,952 square feet of impervious land cover. The post -development site is 45% impervious with 325,613 square feet of impervious land. An overall site map showing existing and proposed impervious areas is located in Appendix A. Two (2) wet detention basins are proposed for the project site to provide stormwater treatment and reduce runoff from existing and proposed development. Table 1 below gives the pre- and post development flows, for both stormwater management facilities, found using the Modified Rational Method and NOAA Atlas 14 rainfall intensities from Sneads Ferry rain gauge located approximately 3 miles from Camp Lejeune. Table 1— Summary of Pre and Post Development Conditions Predevelopment Flow (cfs) Post development Flow (cfs) 1-yr 1-yr SWM-1 3.93 0.05 SWM-2 8.50 0.71 Table 2 — Summary of Pre and Post Development Drainage Areas Existing DA (SF) Proposed DA (SF) DA 1 135,980 110,313 DA 2 180,545 332,363 DA 3 255,697 155,812 DA 4 148,855 117,720 Total 721,077 716,208 JUN 1 7 2011 4 1 P a g e Table 3 —Summary of Pre and Post Development Impervious Conditions Devil Dog SOI Post Development Impervious Areas Total Existing Impervious (SF) Total Proposed Impervious (SF) Total Future Impervious (SF) Total Impervious (SF) DA 1 25,129 39,098 4,750 68,977 DA 2 74,218 75,642 21,000 1 170,860 DA 3 43,212 11,826 0 55,038 DA 4 27,476 3,346 0 30,822 325,697 Impervious % 1 23% 1 1 45% Drainage areas for both wet detention basins are located in Appendix A. IV. Water Quality Analysis SWM-1 SWM-1 provides storage and treatment of stormwater runoff from all 110,313 square feet of drainage area 1. This basin discharges to a 50' vegetated buffer at elevation 20.0'. The average depth of the basin is 3.0 feet and the design total suspended solids removal is 85%. A 10-foot wide vegetated shelf is provided with 6 inches below the permanent pool elevation and the outside edge is 6 inches above the permanent pool elevation. The forebay volume is 21.7% of the total permanent pool volume. Total nitrogen removal is 25% and total phosphorus removal is 40%. The table below provides other dimensions and elevations for SWM-1. Table 4—SWM-1 Elevations and Dimensions SWM #1 DIMENSIONS ELEVATION PERMANENT POOL 7,250 SF 21.50 TEMPORARY POOL 9,502 SF 22.50 POND BOTTOM 1,662 SF 17.00 SEDIMENT CLEANOUT BOTTOM 1,000 SF 16.00 TOP OF DAM WIDTH 5.0' WIDE 24.50 DRAWDOWN ORIFICE 1.5" 21.50 TOP OF RISER 4'X4' BOX 23.00 OUTLET PIPE INVERT IN 24 LF 18" RCP @ 2.0% 20.50 OUTLET PIPE INVERT OUT 20.00 JUN 1 7 2011 5 1 P a g e SWM-2 SWM-2 provides storage and treatment of stormwater runoff from all 332,363 square feet of drainage area 2.The average depth of the basin is 4.0 feet and the design total suspended solids removal is 90%. A 10-foot wide vegetated shelf is provided with 6 inches below the permanent pool elevation and the outside edge is 6 inches above the permanent pool elevation. The forebay volume is 21.5% of the total permanent pool volume. Total nitrogen removal is 25% and total phosphorus removal is 40%. The table below provides other dimensions and elevations for SWM-2. Table 5—SWM-2 Elevations and Dimensions SWM q2 DIMENSIONS ELEV. PERMANENT POOL 19,041 SF 20.50 TEMPORARY POOL 23,049 SF 21.50 POND BOTTOM 6,191 SF 15.00 SEDIMENT CLEANOUT BOTTOM 4,934 SF 14.00 TOP OF DAM WIDTH 10.0' WIDE 24.50 DRAWDOWN ORIFICE 2.5" 20.50 TOP OF RISER 4' x 4' BOX 22.00 OUTLET PIPE INVERT UP 36 LF 24" RCP @ 0.83% 20.50 OUTLET PIPE INVERT DOWN 20.00 Stage storage tables and routing models for both stormwater management facilities are located in Appendix B. NCDENR Supplemental Forms are located in Appendix C. V. Stormwater Design Storm sewer systems have been designed according to NCDOT criteria using the Rational Method and rainfall intensities provided by NOAA for Sneads Ferry rain gauge. Storm sewer systems have been designed for the 10 year storm occurrence for the area. An analysis was done on the existing storm sewer system and it was determined that two of the pipes are inadequate to convey the contributing flow even after decreasing the size of the contributing drainage area with new proposed storm sewer which drains to SWM-2. Storm sewer calculation spreadsheets are located in Appendix D. Culverts have been designed according to NCDOT criteria using the Rational Method and rainfall intensities provided by NOAA for Sneads Ferry rain gauge. Culverts have been designed for the 10 year storm occurrence for the area. Culvert calculation spreadsheets are located in Appendix E. JUN 1 7 2011 6 1 P a g e Ditches have been designed according to NCDOT criteria using the Rational Method and rainfall intensities provided by NOAA for Sneads Ferry rain gauge. Ditches have been designed for the 10 year storm occurrence for the area. Ditch calculation spreadsheets are located in Appendix E. VI. Conclusion This report summarizes the watershed analysis for Camp Lejeune's Devil Dog Field Training Facility Project. Approximately 129,661 square feet of new impervious are planned for the project site. Additionally, 5,000 square feet of future impervious was included in the calculation for SWM-1 and 21,000 square feet of future impervious was included in the calculations for SWM-2 to accommodate a site master plan incorporating 20 years of development (2010- 2030). Increased impervious area is mitigated for both quantity and quality through the use of two wet detention basins. These wet detention basins are treating 239,837 square feet of existing and proposed impervious areas. This value is 110,176 square feet more than the required amount of impervious area that must be treated to comply with NCDENR regulations. RECEIVED JUN 1 7 2011 BY:- 7 1 P a g e u wrmromyHm�wuunauV�.�i.+t,>nnoanwwaa rn.q.mu,mx.nap�,vx Assn r t IIIIIIIIIIIIIIIG I off rn.q.mu,mx.nap�,vx Assn r t IIIIIIIIIIIIIIIG I off I O N 111 O O v ®� T O m 0 0 { s ovnxrx�rvi or r c xnw roux rnciunrs wcmcExirva cownery NAVAL FACILITIES ENGINEERING COMMAND — MID ATLANTIC pp f 4 q � figg; [ 3 � IIIII� '- pa a ,uvknn wwna w au � � � I IIII o:u: �'I• r MCB CAMP LEJEUNE UCKSDNJILLE,NDRRI CARDLINA [ 1; IIII 5 tt••}� P1269 FIELD TRAINING FACILITY, DEVIL DOG SOI a IIII IIIIII0 :�' Q� o a'ul IIII 9 _ POST DEVELOPMENT 1 CAPTURED IMPERVIOUS AREAS J i I I 14 E PLAN NORTH (1) W. 120' SCALE:I"= 60' I/ V DA -1 C) I ril = ".135,980 SF- .... ...... JE PERRJERp ROAD - - ------------ DA 4 = 1,48-,l f 155.SF\3 I DA1,2 180, 545 SF\ I CEIVEE) JUN 1 7 2011 '=BY Kp:w-iAc g � z cn 20 ;Fc 0 0 W LL a) CD wN F.. woons,;f7 I V Ir k i B � 460p✓ ?��axx� <��9s4. n Em PROPOSED DESGRIPnON PERMFBOUMDARY STORM WATER MANAGEMEN r FACILITY swm-l.) GONDUrr OUR -ET PROTECTKW X EMERGENCY SPILLWAY UA I < .54A%,j. z.N., DA 4 1,17,,720,SF ` `� ` O (2.70 AC n v DA 3 = 155,812 SF (3.58 AC) _HPiltTER 11A1 —T— Hill j ZL511-z- DA 2 = 332363 S i(7MAC) b' I -- �a..—l' Try//// t -------- ---- - ------ IIIRWE�, ROIG A I R�A� FR 1 CEIVEJE) JUN 1 7 2011 BY: --- —.- I --- -- r INSETW PLAN NORTH (D W. 120 SCALE:I"= 60' NP-17AC ME I SWM-1 WET DETENTION BASIN STAGE -STORAGE TABLE: ELEVATION (FT) AREA (SF) 17 1662 18 2513 19 3724 20 4799 21 5957 pp 21.5 7250 Top Shelf 22 8895 State Storage 22.5 9502 23 10109 24 11381 volume at permanent pool (elev. 21.5) _ 1.5" storage volume provided (elev. 22.5) _ total volume of basin = surface area at bottom of 10:1 shelf = volume at bottom of 10:1 shelf = surface area at top of 10:1 shelf = volume at top of 10:1 shelf = minimum forebay volume = INCREMENTAL VOLUME (CF) 0 2073 3099 4250 5368 2992 4029 4598 4902 10739 17782 8627 26409 4803 14790 8895 21811 3240 SWM-1 - Forebay Elevation (FT) Area (SF) Incremental Volume (CF) Accumulative Volume (CF) 17 266 0 0 18 431 372 372 19 623 549 921 20 840 752 1673 21 1082 978 2651 21.5 1212 589 3240 STORAGE (CF) cf cf cf sf cf sf cf cf 4029 8627 13529 24268 JUN 1 7 2011 IBY:- SWM-2 WET DETENTION BASIN STAGE -STORAGE TABLE: INCREMENTAL STORAGE ELEVATION (FT) AREA (SF) VOLUME (CF) (CF) 15 6191 0 16 7574 6871 17 9076 8314 18 10691 9872 19 12421 11545 Bottom Shelf 20 16138 14239 pp 20.5 19,041 8785 Top Shelf 21 22100 10276 10276 State Storage 21.5 23049 11286 21562 22 24012 11764 33326 23 25979 24989 58315 volume at permanent pool (elev. 20.5) = 59626 cf 1.5" storage volume provided (elev. 21.5) = 21562 cf total volume of basin = 81188 cf surface area at bottom of 10:1 shelf = 16138 sf volume at bottom of 10:1 shelf = 50841 cf surface area at top of 10:1 shelf = 22100 sf volume at top of 10:1 shelf = 69902 cf minimum forebay volume = 12784 cf SWM-2 - Forebay Elevation (FT) Area (SF) Incremental Volume (CF) Accumulative Volume (CF) 15 1011 0 0 16 1419 1197 1197 17 1888 1631 2828 18 2413 2124 4952 19 2996 2672 7624 20 3635 3277 10901 20.5 3976 1883 12784 JUN 1 7 0011 '=iY: Table of Contents i Table of Contents +x++wxw+xx*+wwxw+xwwxw MASTER SUMMARY +xwxw++w+xxx++xxxxx+++ Watershed....... Mod. Rational Grand Summary ........ 1.01 Master Network Summary ............. 1.02 +xxx++++++++++++++ DESIGN STORMS SUMMARY ****+++++++++x+++++ Camp Lejeune.... Rational Storms .................... 2.01 ++x+«+x«++«+«+++«+++++ RAINFALL DATA *****x+++++++++++xxxx+x Snead's Ferry 1 1 I-D-F Table ........................ 3.01 +++++++*++++++++++++++ TC CALCULATIONS *****++++++++++++++++ DA I............ PRE Tc Calcs ........................... 4.01 DA 1............ POST Tc Calcs ........................... 4.03 +++++++++++++++++++++++ POND VOLUMES +++++++++++++++++++++++ POND 1.......... Vol: Elev-Area ..................... 5.01 ++++xwwx+x+xxx+xxx++ OUTLET STRUCTURES wwwwwwxwwwxw+xwwwwwww Outlet 1........ Outlet Input Data .................. 6.01 RFCJ;` I `V ED JUN 1 7 2011 ,,. S/N: Bentley PondPack (10.01.04.00) 3:34 PM Bentley Systems, Inc. 6/2/2011 Table of Contents ii Table of Contents (continued) Individual Outlet Curves ........... 6.04 xxx*+++x+++++++++++++++ POND ROUTING ****«xxx++xxxxx«x+x«x+x POND 1 OUT 1 Pond Routing Summary ............... 7.01 ****************** RATIONAL METHOD CALCS ******************* DA 1............ Rational Predev. Peak Q ............ 8.01 DA I............ 1 Mod. Rational Graph ................ 8.02 Mod. Rational Storm Calcs .......... 8.03 Mod. Rational Hyg .................. 8.04 DA 1............ PRE C and Area ......................... 8.05 DA 1............ POST C and Area ......................... 8.06 RECEEIVED JUN 1 7 2011 BY: S/N: Bentley PondPack (10.01.04.00) 3:34 PM Bentley Systems, Inc. 6/2/2011 Type.... Mod. Rational Grand Summary Page 1.01 Name.... Watershed File.... J:\29015A-MCB-Camp-LeJeune\Working\03 Civil\Stormwater\Melissa\Devil Dog\29015-PO * MODIFIED RATIONAL METHOD * ---- Grand Summary For All Storm Frequencies ---- Q = CiA * Units Conversion; Where Conversion = 43560 / (12 * 3600) ............................................................................ Area = 2.520 acres Tc = .1330 hrs ............................................................................ VOLUMES Freq. Adjusted Duration I Qpeak Allowablel Inflow Storage years 'C' hrs in/hr cfs cfs I cu.ft cu.ft ------------------------------------------------------ 2 .629 .4000 3.8340 6.13 I--------------------- 4.70 1 8830 4317 10 .629 .6500 4.0190 6.43 6.34 1 15041 6100 100 .629 .7000 5.4800 8.76 8.62 1 22086 9157 1 .629 .4000 3.2060 5.13 3.93 1 7383 3610 JUN 1 7 2011 SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:34 PM 6/2/2011 Type.... Master Network Summary Page 1.02 Name.... Watershed File.... J:\29015A-MCB-Camp-LeJeune\Working\03 Civil\Stormwater\Melissa\Devil Dog\29015-PO MASTER DESIGN STORM SUMMARY Default Network Design Storm File, ID Return Event ------------ 10 100 1 Rainfall Type I-D-F Curve I-D-F Curve I-D-F Curve I-D-F Curve Camp Lejeune IDF ID Snead's Ferry 2 Snead Ferry 10 y Snead's Ferry 10 Snead's Ferry 1 MASTER NETWORK SUMMARY Modified Rational Method Network (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Return HYG Vol Qpeak Qpeak Node ID Type Event cu.ft Trun hrs cfs DA 1 AREA 2 8693 L .1330 6.13 DA 1 AREA 10 14897 L .1330 6.43 DA 1 AREA 100 21890 L .1330 8.76 DA 1 AREA 1 7269 L .1330 5.13 *OUT 10 JCT 2 8433 .5500 .14 *OUT 10 JCT 10 14639 .7000 3.20 *OUT 10 JCT 100 21648 .7500 6.52 *OUT 10 JCT 1 7001 .5000 .05 POND 1 IN POND 2 8737 .1500 6.13 POND 1 IN POND 10 14943 .1500 6.43 POND 1 IN POND 100 21953 .1500 8.76 POND 1 IN POND 1 7306 .1500 5.13 Max Max WSEL Pond Storage ft cu.ft JUN 1 7 2011 S/N: Bentley PondPack (10.01.04.00) 3:34 PM Bentley Systems, Inc. 6/2/2011 Type.... Master Network Summary Page 1.03 Name.... Watershed File.... J:\24015A-MCB-Camp-LeJeune\Working\03_Civil\Stormwater\Melissa\Devil Dog\24015-PO MASTER NETWORK SUMMARY Modified Rational Method Network (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Max Return HYG Vol Qpeak Qpeak Max WSEL Pond Storage Node ID Type Event cu.ft Trun hrs cfs ft cu.ft POND 1 OUT POND 2 8433 .5500 .14 22.51 26683 POND 1 OUT POND 10 14639 .7000 3.20 22.90 30446 POND 1 OUT POND 100 21648 .7500 6.52 23.17 33249 POND 1 OUT POND 1 7001 .5000 .05 22.36 25238 �.'1 C':T74�,IV� ED JUN 1 7 2011 S/N: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:34 PM 6/2/2011 Type.... I-D-F Table Page 3.01 Name.... Snead's Ferry 1 Tag: 1 Event: 1 yr File.... J:\24015A-MCB-Camp-LeJeune\Working\03_Civil\Stormwater\Melissa\Devil Dog\24015-PO Storm... Snead's Ferry 1 Tag: 1 Rainfall -Intensity -Duration Curve Time, hrs Intens., in/hr .0830 5.9400 .1670 4.7400 .2500 3.9500 .5000 2.7100 1.0000 1.6900 2.0000 1.0300 3.0000 .7400 6.0000 .4500 12.0000 .2700 24.0000 .1500 JUN 1 7 2011 B SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:34 PM 6/2/2011 Type.... Tc Calcs Page 4.01 Name.... DA 1 Tag: PRE File.... J:\24015A-MCB-Camp-Le Jeune\Working\03 Civil\Stormwater\Melissa\Devil Dog\24015-PO ........................................................................ ........................................................................ TIME OF CONCENTRATION CALCULATOR ........................................................................ ........................................................................ Segment #1: Tc: User Defined Segment #1 Time: .4000 hrs Total Tc: .4000 hrs ------------------------- t-y � JUN 1 7 2011 i S/N: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:34 PM 6/2/2011 Type.... To Calcs Page 4.03 Name.... DA 1 Tag: POST File.... J:\24015A-MCB-Camp-LeJeune\Working\03 Civil\Stormwater\Melissa\Devil Dog\24015-PO ........................................................................ ........................................................................ TIME OF CONCENTRATION CALCULATOR ........................................................................ ........................................................................ Segment #1: Tc: User Defined ------------------------------------------------------------------------ Segment #1 Time: .1330 hrs Total Tc: .1330 hrs r: � : T VED JUN 1 7 2011 S/N: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:34 PM 6/2/2011 Type.... Vol: Elev-Area Name.... POND 1 Page 5.01 File.... J:\24015A-MCB-Camp-LeJeune\Working\03_Civil\Stormwater\Melissa\Devil Dog\24015-PO Elevation Planimeter (ft) (sq.in) _________________ 17.00 ----- 18.00 ----- 19.00 ----- 20.00 ----- 21.00 ----- 21.50 ----- 22.00 ----- 22.50 ----- 23.00 ----- 24.00 Area Al+A2+sgr(A1*A2) Volume Volume Sum (sq.ft) ______________ (sq.ft) ____ _ (cu.ft) _ (cu.ft) _ _ _ _ _ 1662 0 0 0 2513 6219 2073 2073 3724 9296 3099 5172 4799 12750 4250 9422 5957 16103 5368 14789 6999 19413 3236 18025 8895 23784 3964 21989 9502 27590 4598 26587 10109 29412 4902 31489 11381 32216 10739 42228 POND VOLUME EQUATIONS * Incremental volume computed by the Conic Method for Reservoir Volumes. Volume = (1/3) * (EL2-EL1) * (Areal + Area2 + sq.rt.(Areal*Area2)) where: EL1, EL2 = Lower and upper elevations of the increment Areal,Area2 = Areas computed for EL1, EL2, respectively Volume = Incremental volume between EL1 and EL2 JUN 1 7 2011 F Y: S/N: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:34 PM 6/2/2011 Type.... Outlet Input Data Name.... Outlet 1 Page 6.01 File.... J:\24015A-MCB-Camp-LeJeune\Working\03 Civil\Stormwater\Melissa\Devil Dog\24015-PO REQUESTED POND WS ELEVATIONS: Min. Elev.= 17.00 It Increment = .50 ft Max. Elev.= 24.00 ft ++++++++++++++++++++++++++++++++++++++++++++++ OUTLET CONNECTIVITY ++++++++++++++++++++++++++++++++++++++++++++++ ---> Forward Flow Only (UpStream to DnStream) <--- Reverse Flow Only (DnStream to UpStream) < --- > Forward and Reverse Both Allowed Structure No. Outfall E1, ft E2, ft ----------------- ---- ------- --------- --------- Inlet Box RO ---> CO 22.500 24.000 Orifice -Circular 00 ---> CO 21.500 24.000 Culvert -Circular CO ---> TW 20.500 24.000 Tw SETUP, IS Channel I2>EC_t, /JUN 1 7 2011 Bjl SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:34 PM 6/2/2011 Type.... Outlet Input Data Name.... Outlet 1 Page 6.02 File.... J:\24015A-MCB-Camp-LeJeune\Working\03_Civil\Stormwater\Melissa\Devil Dog\24015-PO OUTLET STRUCTURE INPUT DATA Structure ID = RD Structure Type = Inlet Box ------------------------------------ # of Openings = 1 Invert Elev. = 22.50 ft Orifice Area = 9.0000 sq.ft Orifice Coeff. _ .600 Weir Length = 4.00 ft Weir Coeff. = 2.800 K, Reverse = 1.000 Mannings n = .0000 Kev,Charged Riser = .000 Weir Submergence = No Structure IO = 00 Structure Type = Orifice -Circular ------------------------------------ # of Openings = 1 Invert Elev. = 21.50 ft Diameter = .1250 ft Orifice Coeff. _ .600 FR `lam4 Y x ;7- D JUN 1 7 2011 BY: S/N: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:34 PM 6/2/2011 Type.... Outlet Input Data Name.... Outlet 1 Page 6.03 File.... J:\29015A-MCB-Camp-LeJeune\working\03 Civil\Stormwater\Melissa\Devil Dog\29015-PO OUTLET STRUCTURE INPUT DATA Structure ID = CO Structure Type = Culvert -Circular ------------------------------------ No. Barrels = 1 Barrel Diameter = 1.5000 ft Upstream Invert = 20.50 ft Dnstream Invert = 20.00 ft Horiz. Length = 25.00 ft Barrel Length = 25.01 ft Barrel Slope = .02000 ft/ft OUTLET CONTROL DATA... Mannings n = .0130 Ke = .2000 (forward entrance loss) Kb = .018213 (per ft of full flow) Kr = .2000 (reverse entrance loss) HW Convergence = .001 +/- ft INLET CONTROL DATA... Equation form = 1 Inlet Control K = .0045 Inlet Control M = 2.0000 Inlet Control c = .03170 Inlet Control Y = .6900 T1 ratio (HW/D) = 1.085 T2 ratio (HW/D) = 1.187 Slope Factor = -.500 Use unsubmerged inlet control Form 1 equ. below T1 elev. Use submerged inlet control Form 1 equ. above T2 elev. In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 & T2... At T1 Elev = 22.13 ft ---> Flow = 7.58 cfs At T2 Elev = 22.28 ft ---> Flow = 8.66 cfs ',I V V_ JUN 1 7 2011 S/N: Bentley PondPack (10.01.04.00) 3:34 PM Bentley Systems, Inc. 6/2/2011 ' Type.... Pond Routing Summary Page 7.01 Name.... POND 1 OUT Tag: 1 Event: 1 yr File.... J:\29015A-MCB-Camp-LeJeune\Working\03_Civil\Stormwater\Melissa\Devil Dog\29015-PO Storm... Snead's Ferry 1 Tag: 1 LEVEL POOL ROUTING SUMMARY HYG Dir = J:\29015A-MCB-Camp-LeJeune\working\03_Civil\Stormwater\Melissa\Devil D Inflow HYG file = work_pad.hyg - POND 1 IN 1 Outflow HYG file = work pad.hyg - POND 1 OUT 1 Pond Node Data = POND 1 Pond Volume Data POND 1 Pond Outlet Data = Outlet 1 No Infiltration INITIAL CONDITIONS Starting WS E1ev = 21.50 ft Starting Volume = 18025 cu.ft Starting Outflow .00 cfs Starting Infiltr. _ .00 cfs Starting Total Qout= .00 cfs Time Increment = .0500 hrs INFLOW/OUTFLOW HYDROGRAPH SUMMARY Peak Inflow Peak Outflow -------------- Peak Elevation Peak Storage = = 5.13 cfs .05 cfs ----------------- = 22.36 ft 25238 cu.ft MASS BALANCE (cu.ft) at .1500 hrs at .5000 hrs ---------------- + Initial Vol = 18025 + HYG Vol IN = 7306 - Infiltration = 0 - HYG Vol OUT = 7001 - Retained Vol = 18296 Unrouted Vol = -33 cu.ft (.952% of Inflow Volume) 11.11�CY_ir V ,v✓ JUN 1 7 2011 SIN: Bentley PondPack (10.01.04.00) 3:34 PM Bentley Systems, Inc. 6/2/2011 1 Type.... Rational Predev. Peak Q Page 8.01 Name.... DA 1 Event: 1 yr File.... J:\24015A-MCB-Camp-LeJeune\Working\03_Civil\Stormwater\Melissa\Devil Dog\24015-PO Storm... Snead's Ferry 1 Tag: 1 SUMMARY OF RATIONAL METHOD PEAK DISCHARGES --- PREDEVELOPED CONDITIONS --- Q = CiA * Units Conversion; Where Conversion = 43560 / (12 * 3600) Tag Freq File IDF Curve 1 1 Snead's Ferry 1 Tc = .4000 hrs Tag Freq C C adj ----------------------------- I C I Area I Peak Q (years) factor final in/hr acres I CIS ----- 1 ------ 1 ----- .390 ------ 1.000 -----------------------------1 .390 3.2060 ----------------------------- 3.120 1 ---------- 3.93 4 +/ V'L D JUN 1 7 2011 S/N: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:34 PM 6/2/2011 Type.... Mod. Rational Hyg Page 8.04 Name.... DA 1 Tag: 1 Event: 1 yr File.... J:\24015A-MCB-Camp-LeJeune\Working\03_Civil\Stormwater\Melissa\Devil Dog\24015-PO Storm... Snead's Ferry 1 Tag: 1 MODIFIED RATIONAL METHOD HYDROGRAPH Q = CiA * Units Conversion; Where Conversion = 43560 / (12 * 3600) Tag Freq File IDF Curve 1 1 Snead's Ferry 1 Td = .4000 hrs ----------------------------- Tag Freq C C adj I C I Area Peak Q (years) factor final in/hr acres I cfs --------------------------------I---------- 1 1 .629 1.000 1 .629 3.2060 2.520 1 5.13 ----------------------------- HYG file = J:\24015A-MCB-Camp-LeJeune\Working\03_Civil\Stormwater\Melissa\Devi HYG ID = DA 1 HYG Tag = 1 ----------------------------------- Peak Discharge = 5.13 cfs Time to Peak = .1330 hrs HYG Volume = 7269 cu.ft ----------------------------------- WARNING: Hydrograph truncated on left side. HYDROGRAPH ORDINATES (cfs) Time I Output Time increment = .0500 hrs hrs I --------- Time on left represents time for first value in each row. I----------------------------- .0330 1 1.27 3.20 5.13 5.13 5.13 .2830 5.13 5.13 5.13 3.86 1.93 .5330 .00 .00 RFC FWED JUN 1 7 2011 S/N: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:34 PM 6/2/2011 0 Table of Contents i Table of Contents x+x+x+x+x+«x«x«++«+«x« MASTER SUMMARY **x++xxxxxxx+x+xx+xxxx Watershed....... Mod. Rational Grand Summary ........ 1.01 Master Network Summary ............. 1.02 +++++«++++++++++«+ DESIGN STORMS SUMMARY *+«+++++«+++«+«+«+« Camp Lejeune.... Rational Storms .................... 2.01 ++++++++++++++++++++«+ RAINFALL DATA **«++«+««+x«««x+«+««««+ Snead's Ferry 1 1 I-D-F Table ......................... 3.01 x+xxxx«xx+xx««*++xxxxx TC CALCULATIONS x++++xx+x+++++xxxx+xx DA 2............ PRE Tc Calcs ........................... 4.01 DA 2............ POST Tc-Calcs ........................... 4.03 +xx«++xxxxxxxxxx+xxxx++ POND VOLUMES x+xxx+++x+x«x«x+++«+««+ POND 2.......... Vol: Elev-Area ..................... 5.01 xxx+«+«xxxxxx+xxxxxx OUTLET STRUCTURES ********************* Outlet 1........ Outlet Input Data .................. 6.01 M c7;11c�D I JUN 1 7 2011 S/N: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:27 PM 6/2/2011 e Table of Contents ii Table of Contents (continued) Individual Outlet Curves ........... 6.04 xx+xxxxxxx+xxxxxx«x+«+« POND ROUTING «««««««««««x««««««««x«« POND 2 IN Node: Pond Inflow Summary .......... 7.01 POND 2 OUT 1 Pond Routing Summary ............... 7.03 �`ll-.t Y ED JUN 1 7 2011 SIN: Bentley PondPack (10.01.04.00) 3:27 PM Bentley Systems, Inc. 6/2/2011 Type.... Mod. Rational Grand Summary Page 1.01 Name.... Watershed File.... J:\24015A-MCB-Camp-LeJeune\Working\03_Civil\Stormwater\Melissa\Devil Dog\24015-PO w D"I ODINN7� * ---- Grand Summary For All Storm Frequencies ---- * # Q = CiA * Units Conversion; Where Conversion = 43560 / (12 * 3600) ............................................................................ Area = 7.630 acres To = .3600 hrs ............................................................................ VOLUMES Freq. Adjusted Duration I Qpeak Allowablel Inflow Storage years 'C' hrs in/hr cfs cfs I cu.ft cu.ft ------------------------------------------------------ 2 .561 .6833 2.8063 12.11 I--------------------- 10.14 1 29797 10758 10 .561 .7167 3.8097 16.44 13.38 1 42423 16498 100 .561 .7833 5.1550 22.25 17.76 1 62744 26199 1 .561 .6667 2.3700 10.23 8.50 1 24550 8845 !UN 1 7 2011 S/N: Bentley PondPack (10.01.04.00) 3:27 PM Bentley Systems, Inc. 6/2/2011 Type.... Master Network Summary Page 1.02 Name.... Watershed File.... J:\24015A-MCB-Camp-Lejeune\Working\03 Civil\Stormwater\Melissa\Devil Dog\24015-PO MASTER DESIGN STORM SUMMARY Default Network Design Storm File, ID Return Event ------------ 10 100 1 Rainfall Type --------------- I-D-F Curve I-D-F Curve I-D-F Curve I-D-F Curve Camp Lejeune iul=4r, Snead's Ferry 2 Snead Ferry 10 y Snead's Ferry 10 Snead's Ferry 1 MASTER NETWORK SUMMARY Modified Rational Method Network (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=LeftSRt) Return HYG Vol Qpeak Qpeak Node ID Type Event cu.ft Trun hrs cfs DA 2 AREA 2 29786 L .3600 12.11 DA 2 AREA 10 42436 L .3600 16.44 DA 2 AREA 100 62725 L .3600 22.25 DA 2 AREA 1 24559 L .3600 10.23 *OUT 10 JCT 2 29515 1.0000 1.83 *OUT 10 JCT 10 42164 .9500 5.65 *OUT 10 JCT 100 62421 .9500 11.68 *OUT 10 JCT 1 24301 1.0000 .71 POND 2 IN POND 2 29748 R .4000 12.11 POND 2 IN POND 10 42398 R .4000 16.44 POND 2 IN POND 100 62655 R .4000 22.25 POND 2 IN POND 1 24535 R .4000 10.23 Max Max WSEL Pond Storage ft cu.ft !UN 1 7 2011 S/N: Bentley PondPack (10.01.04.00) 3:27 PM Bentley Systems, Inc. 6/2/2011 Type.... Master Network Summary Page 1.03 Name.... Watershed File.... J:\29015A-MCB-Camp-LeJeune\Working\03 Civil\Stormwater\Melissa\Devil Dog\29015-PO MASTER NETWORK SUMMARY Modified Rational Method Network (*Node-Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left6Rt) Return HYG Vol Qpeak Node ID Type Event cu.ft Trun hrs POND 2 OUT POND 2 29515 1.0000 POND 2 OUT POND 10 42164 .9500 POND 2 OUT POND 100 62421 .9500 POND 2 OUT POND 1 24301 1.0000 Max Qpeak Max WSEL Pond Storage cfs ft cu.ft 1.83 21.77 87586 5.65 22.11 95652 11.88 22.53 105868 .71 21.60 83454 I~ j JUN 1 7 2011 S/N: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:27 PM 6/2/2011 Type.... I-D-F Table Page 3.01 Name.... Snead's Ferry 1 Tag: 1 Event: 1 yr File.... J:\29015A-MCB-Camp-LeJeune\Working\03_Civil\Stormwater\Melissa\Devil Dog\29015-PO Storm... Snead's Ferry 1 Tag: 1 Rainfall -Intensity -Duration Curve Time, hrs Intens., in/hr .0830 5.9400 .1670 4.7400 .2500 3.9500 .5000 2.7100 1.0000 1.6900 2.0000 1.0300 3.0000 .7400 6.0000 .4500 12.0000 .2700 24.0000 .1500 JUN 1 7 2011 SIN: Bentley PondPack (10.01.04.00) 3:27 PM Bentley Systems, Inc. 6/2/2011 Type.... Tc Calcs Name.... DA 2 Tag: PRE Page 4.01 File.... J:\24015A-MCB-Camp-LeJeune\Working\03_Civil\Stormwater\Melissa\Devil Dog\24015-PO ........................................................................ ........................................................................ TIME OF CONCENTRATION CALCULATOR ........................................................................ ........................................................................ Segment #1: Tc: User Defined Segment #1 Time: .2775 hrs ------------------------------------------------------------------------ ----------------------- ------------------------- Total Tc: .2775 hrs JUN 1 7 2011 S/N: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:27 PM 6/2/2011 Type.... Tc Calcs Name.... DA 2 Tag: POST Page 4.03 File.... J:\24015A-MCB-Camp-LeJeune\Working\03 Civil\Stormwater\Melissa\Devil Dog\24015-PO ........................................................................ ........................................................................ TIME OF CONCENTRATION CALCULATOR ........................................................................ ........................................................................ ------------------------------------------------------------------------ Segment #1: Tc: User Defined ------------------------------------------------------------------------ Segment #1 Time: .3600 hrs Total Tc: .3600 hrs i JUN 1 7 2011 SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:27 PM 6/2/2011 Type.... Vol: Elev-Area Name.... POND 2 Page 5.01 File.... J:\24015A-MCB-Camp-LeJeune\Working\03 Civil\Stormwater\Melissa\Devil Dog\24015-PO Elevation Planimeter Area Al+A2+sgr(A1*A2) (ft) ------------------------------------------------- (sq.in) (sq.ft) (sq.ft) 15.00 ----- 6191 0 16.00 ----- 7574 20613 17.00 ----- 9076 24941 18.00 ----- 10691 29617 19.00 ----- 12421 34636 20.00 ----- 16138 42717 20.50 ----- 19041 52709 21.00 ----- 22100 61655 21.50 ----- 23049 67719 22.00 ----- 24012 70587 23.00 ----- 25979 74967 POND VOLUME EQUATIONS Volume Volume Sum (cu.ft) (cu.ft) ---------------------- 0 0 6871 6871 8314 15185 9872 25057 11545 36602 14239 50841 8785 59626 10276 69902 11286 81188 11764 92953 24989 117942 * Incremental volume computed by the Conic Method for Reservoir Volumes. .Volume = (1/3) * (EL2-EL1) * (Areal + Area2 + sq.rt.(Areal*Area2)) where: EL1, EL2 = Lower and upper elevations of the increment Areal,Area2 = Areas computed for EL1, EL2, respectively Volume = Incremental volume between EL1 and EL2 1 JUN 1 7 2011 S/N: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:27 PM 6/2/2011 Type.... Outlet Input Data Name.... Outlet 1 Page 6.01 File.... J:\29015A-MCB-Camp-LeJeune\Working\03 Civil\Stormwater\Melissa\Devil Dog\29015-PO REQUESTED POND WS ELEVATIONS: Min. Elev.= 15.00 ft Increment = .25 ft Max. Elev.= 23.00 ft OUTLET CONNECTIVITY ---> Forward Flow Only (Upstream to DnStream) <--- Reverse Flow Only (DnStream to Upstream) < --- > Forward and Reverse Both Allowed Structure No. Outfall El, ft E2, ft Inlet Box RO ---> CO 21.500 23.000 Orifice -Circular 01 ---> CO 20.500 23.000 Culvert -Circular CO ---> TW 19.000 23.000 TW SETUP, DS Channel Ii>.: LJUN 1 7 2011 S/N: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:27 PM 6/2/2011 Type.... Outlet Input Data Name.... Outlet 1 Page 6.02 File.... J:\29015A-MCB-Camp-LeJeune\Working\03 Civil\Stormwater\Melissa\Devil Dog\29015-PO OUTLET STRUCTURE INPUT DATA Structure ID = RO Structure Type = Inlet Box # of Openings ------- = 1 Invert Elev. = 21.50 ft Orifice Area = 9.0000 sq.ft Orifice Coeff. _ .600 Weir Length = 4.00 ft Weir Coeff. = 2.800 K, Reverse = 1.000 Mannings n = .0000 Kev,Charged Riser = .000 Weir Submergence = No Structure ID = 01 Structure Type = Orifice -Circular ------------------------------------ # of Openings = 1 Invert Elev. = 20.50 ft Diameter = .2100 ft Orifice Coeff. _ .600 (' 1 E1V !UN 1 7 2011 T3z:_ - - SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:27 PM 6/2/2011 Type.... Outlet Input Data Name.... Outlet 1 Page 6.03 File.... J:\29015A-MCB-Camp-LeJeune\Working\03 Civil\Stormwater\Melissa\Devil Dog\29015-PO OUTLET STRUCTURE INPUT DATA Structure ID Structure Type --------------- No. Barrels Barrel Diameter Upstream Invert Dnstream Invert Horiz. Length Barrel Length Barrel Slope = CO = Culvert -Circular ------------------ 2.0000 ft = 19.00 ft 18.70 ft = 36.00 ft 36.00 ft _ .00833 ft/ft OUTLET CONTROL DATA... Mannings n = .0130 Ke = .2000 Kb = .012411 Kr = .2000 HW Convergence = .001 INLET CONTROL DATA... Equation form = 1 Inlet Control K = .0045 Inlet Control M = 2.0000 Inlet Control c = .03170 Inlet Control Y = .6900 T1 ratio (HW/D) = 1.091 T2 ratio (HW/D) = 1.193 Slope Factor = -.500 (forward entrance loss) (per ft of full flow) (reverse entrance loss) +/- ft Use unsubmerged inlet control Form 1 equ. below T1 elev. Use submerged inlet control Form 1 equ. above T2 elev. In.transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 & T2... At T1 Elev = 21.18 ft ---> Flow = 15.55 cfs At T2 Elev = 21.39 ft ---> Flow = 17.77 cfs JUN 1 7 2011 SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:27 PM 6/2/2011 Type.... Node: Pond Inflow Summary Page 7.01 Name.... POND 2 IN Event: 1 yr File.... J:\29015A-MCB-Camp-LeJeune\Working\03_Civil\Stormwater\Melissa\Devil Dog\29015-PO Storm... Snead's Ferry 1 Tag: 1 SUMMARY FOR HYDROGRAPH ADDITION at Node: POND 2 IN HYG Directory: J:\29015A-MCB-Camp-LeJeune\Working\03_Civil\Stormwater\Melissa\Devil Dog\ __________________________________________ Upstream Link ID Upstream Node ID HYG file HYG ID HYG tag _______________________________________________________ ADDLINK 10 DA 2 DA 2 1 INFLOWS TO: POND 2 IN ---------------------------- HYG file HYG ID ---------------------------- DA 2 ---- Volume HYG tag cu.ft 1 24559 Peak Time Peak Flow hrs cfs ---------------------- .3600 10.23 TOTAL FLOW INTO: POND 2 IN ---------------------------------------- Volume Peak Time Peak Flow HYG file HYG ID HYG tag cu.ft hrs cfs __________________________________________________________________________ POND 2 IN 1 24535 .4000 10.23 I JUN172011 L_ - S/N:, Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:27 PM 6/2/2011 Type.... Node: Pond Inflow Summary Page 7.02 Name.... POND 2 IN Event: 1 yr File'.... J:\24015A-MCB-Camp-LeJeune\Working\03_Civil\Stormwater\Melissa\Devil Dog\24015-PO Storm... Snead's Ferry 1 Tag: 1 TOTAL NODE INFLOW... HYG file = HYG ID = POND 2 IN HYG Tag = 1 ----------------------------------- Peak Discharge = 10.23 cis Time to Peak = .4000 hrs HYG Volume = 24535 cu.ft ----------------------------------- WARNING: Hydrograph truncated on right side. HYDROGRAPH ORDINATES (cfs) Time I Output Time increment = .0500 hrs hrs I --------- Time on left represents time for first value in each row. I-------------------------------------------------------------- .0000 1 .00 1.42 2.84 4.26 5.68 .2500 7.10 8.52 9.95 10.23 10.23 .5000 10.23 10.23 10.23 10.23 9.24 .7500 1 7.86 6.44 5.02 3.60 2.18 1.0000 1 .76 .09 i \fit-y ♦ i .t Y �ED JUN 1 9 2011 -. 1 Y S/N: Bentley PondPack (10.01.04.00) 3:27 PM Bentley Systems, Inc. 6/2/2011 Type.... Pond Routing Summary Page 7.03 Name.... POND 2 OUT Tag: 1 Event: 1 yr File.... J:\29015A-MCB-Camp-LeJeune\Working\03_Civil\Stormwater\Melissa\Devil Dog\29015-PO Storm... Snead's Ferry 1 Tag: 1 LEVEL POOL ROUTING SUMMARY HYG Dir = J:\29015A-MCB-Camp-LeJeune\Working\03_Civil\Stormwater\Melissa\Devil D Inflow HYG file = NONE STORED - POND 2 IN 1 Outflow HYG file = NONE STORED - POND 2 OUT 1 Pond Node Data = POND 2 Pond Volume Data = POND 2 Pond Outlet Data = Outlet 1 No Infiltration INITIAL CONDITIONS Starting WS Elev = 20.50 ft Starting Volume = 59626 cu.ft Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Total Qout= .00 cfs Time Increment = .0500 hrs INFLOW/OUTFLOW HYDROGRAPH SUMMARY Peak Inflow = 10.23 cfs at .4000 hrs Peak Outflow = .71 cfs at 1.0000 hrs ----------------------------------------------------- Peak Elevation = 21.60 ft Peak ___------- ______________________________________________ Storage = __----------------------------------------- 83454 cu.ft MASS BALANCE (cu.ft) __________________________ + Initial Vol = 59626 + HYG Vol IN = 24535 - Infiltration = 0 - HYG Vol OUT = 24301 - Retained Vol = 59831 Unrouted Vol = -8 cu.ft (.039$ of Inflow Volume) WARNING: Inflow hydrograph truncated on right side. JUN 1 7 Z011 BY: S/N: Bentley PondPack (10.01.04.00) 3:27 PM Bentley Systems, Inc. 6/2/2011 GRASS LINED DITCH 1 PtrojeCfDescriptwn' � -h4 6xy is an �` ; ie ;6e k `a, ++ice � �` � _ " Friction Method Manning Formula Solve For Normal Depth 'f .. F _ '4 7r o +'a� s+^. Roughness Coefficient 0.030 Channel Slope 0.01200 fUft Left Side Slope 3.00 ft/ft (H:V) Right Side Slope 3.00 ft/ft (H:V) Bottom Width 0.00 ft Discharge 1.86 ft'/s Results Normal Depth 0.53 it .Flow Area 0.86 ft' Wetted Perimeter 3.38 It Hydraulic Radius 0.25 ft Top Width 3.21 it Critical Depth 0.47 ft Critical Slope 0.02274 Wit Velocity 2.17 ft/s Velocity Head 0.07 it Specific Energy 0.61 it Froude Number 0.74 Flow Type Subcntical ,GVFinput bata Downstream Depth 0.00 it Length 0.00 ft Number Of Steps 0 - .:. GVF Output-0ata " �ti "� ,. Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft ''-'C✓"�� Downstream Velocity Infinity fUs Upstream Velocity Infinity ftls JUN 1 7 2011 Normal Depth 0.53 it Critical Depth 0.47 it Channel Slope 0.01200 fttft Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.11.00.03] 6114/2011 10:20:42 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1.203-755-1666 Page 1 of 2 GRASS LINED DITCH 1 ,GVF Output Data`^ Critical Slope 0.02274 fttft -.- ,r 4 " JUN 1 7 2011 Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.11.00.03] 611412011 10:20:42 AM 27 Siemens Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 2 of 2 GRASS LINED DITCH 2 Project Description r �. Friction Method Manning Formula Solve For Normal Depth Input Data Roughness Coefficient 0.030 Channel Slope 0.00875 ft/ft Left Side Slope 3.00 ft/ft (H:V) Right Side Slope 3.00 ft/ft (H:V) Bottom Width 0.00 It Discharge 2.30 fN/s Results Normal Depth 0.61 ft Flow Area 1.13 fN Wetted Perimeter 3.88 ft Hydraulic Radius 0.29 ft Top Width 3.68 It Critical Depth 0.52 ft Critical Slope 0.02210 ft/ft Velocity 2.04 ft/s Velocity Head 0.06 It Specific Energy 0.68 ft Froude Number 0.65 Flow Type Subcritical ;GVF Input Data - Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.00 ft Profile Description .Profile Headloss 0.00 ft Downstream Velocity Infinity ft/s —;,---,-�— Upstream Velocity Infinity ft/s Normal Depth 0.61 ft JUN 1 7 2011 Critical Depth 0.52 ft Channel Slope 0.00875 ft/ft Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster 108.11.00.03) 6/14/2011 10:21:48 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA *1-203-755-1666 Page 1 of 2 Critical Slope GRASS LINED DITCH 2 0.02210 ft/ft Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.11.00.03] 6/14/2011 10:21:48 AM 27 Siemens Company Drive Suite 200 W Watertown, CT 06795 USA-1-203-755-1666 r---Pager2-of-2 JUN 1 7 2011 GRASS LINED DITCH 3 Friction Method Manning Formula Solve For Normal Depth Roughness Coefficient 0.030 Channel Slope 0.00343 ftlft Left Side Slope 3.00 ft/ft (H:V) Right Side Slope 3.00 ft/ft (H:V) Bottom Width 0.00 ft Discharge 6.18 ft'/s Normal Depth Flow Area Wetted Perimeter Hydraulic Radius Top Width Critical Depth Critical Slope Velocity Velocity Head Specific Energy Froude Number Flow Type Subcdtical 1.06 ft 3.37 fe 6.70 It 0.50 It 6.36 ft 0.77 ft 0.01937 ft/ft 1.83 ft/s 0.05 It 1.11 ft 0.44 Downstream Depth 0.00 It Length 0.00 It Number Of Steps 0 GVF Outptit Data r s�s'rval � �a♦pff� ���, e � � r � �u � x ;,` � y °'�:� �;r' a � �`, Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity ftls 7� Upstream Velocity Infinity fVs JUN 1 7 2011 Normal Depth 1.06 It Critical Depth 0.77 ft �. Channel Slope 0.00343 ft/ft Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.11.00.031 6M4/2011 10:46:46 AM 27 Siemens Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 2 , VF Output Data Critical Slope GRASS LINED DITCH 3 0.01937 Wit - V L JUN 1 7 2011 Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.11.00.03] 6/14/2011 10:46:46 AM 27 Slemons Company Drive Suite 200 W Watertown, CT 06795 USA •1-203-755-1666 Page 2 of 2 GRASS LINED DITCH 4 F�ojecYDescription` w' , -,, „- -• ,.. - ; . . , Friction Method Manning Formula Solve For Normal Depth Input Data �,111. � ,.: v„a,, .- �' a - Roughness Coefficient 0.030 Channel Slope 0.02250 ft/ft Left Side Slope 3.00 ft/ft (H:V) Right Side Slope 3.00 ft/ft (H:V) Bottom Width 2.00 It Discharge 1.60 ft'/s i Rt3sults, t .4 vS .'. C G t 1. n $ Y h5 " Normal Depth 0.24 It Flow Area 0.66 ft' Wetted Perimeter 3.53 ft Hydraulic Radius 0.19 ft Top Width 3.45 ft Critical Depth 0.24 ft Critical Slope 0.02354 ft/ft Velocity 2.43 ft/s Velocity Head 0.09 It Specific Energy 0.33 ft Froude Number 0.98 Flow Type SubcMical GVF lnput-bata "'. , ' " 77 Downstream Depth 0.00 ft Length 0.00 It Number Of Steps 0 GVF Output.Data a. . d, )r'a a r ,a Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft =BY: - Bentley GRASS LINED DITCH 4 ,GVF`Wo6t6a6' Critical Slope 0.02354 fttft Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.11.00.03] 6/14/2011 10:47:39 AM 27 Slemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 2 of 2 L JUN 1 7 Z011 • GRASS LINED DITCH 5 ProlectDescriptlon. Friction Method Manning Formula Solve For Normal Depth Input Data Roughness Coefficient 0.030 Channel Slope 0.00343 ft/ft Left Side Slope 3.00 ftift (H:V) . Right Side Slope 3.00 ft/ft (H:V) Bottom Width 0.00 ft Discharge 2.67 fN/s )Results Normal Depth 0.77 ft Flow Area 1.80 fN Wetted Perimeter 4.89 ft Hydraulic Radius 0.37 ft Top Width 4.64 ft Critical Depth 0.55 ft Critical Slope 0.02167 ft/ft Velocity 1.49 ft/s Velocity Head 0.03 ft Specific Energy 0.81 ft Froude Number 0.42 Flow Type Subcdlical .. GVF Inp6tDaYa 1 s .r 777*7 7 < Downstream Depth (Length Number Of Steps 0.00 0.00 0 ft ft GVFOutputData ',, r •,_ ° _;..�`. «;� °� Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft ..'.�• �. ✓•- -� Downstream Velocity Infinity ft/s JUN 1 7 2011 Upstream Velocity Infinity ft/s Normal Depth 0.77 ft Critical Depth 0.55 ft Channel Slope 0.00343 ftlft Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.11.00.03] 6/14/2011 10:48:33 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 2 GRASS LINED DITCH 5 GVF`Output Data ' r, Critical Slope 0.02167 ft/ft JUN172011 Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.11.00.03] 6/14/2011 10:48:33 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203.755.1666 Page 2 of 2 GRASS LINED DITCH 6 Pctr 'escriptwn,. Friction Method Manning Formula Solve For Normal Depth Input Data", lM -,s,,t a } Roughness Coefficient 0.030 Channel Slope 0.01060 fUft Left Side Slope 3.00 ft/ft (H:V) Right Side Slope 3.00 ft/ft (H:V) Bottom Width 2.00 It Discharge 1.60 fl'/s ..Results' Normal Depth 0.30 It Flow Area 0.86 ft' Wetted Perimeter 3.88 ft Hydraulic Radius 0.22 If Top Width 3.78 It Critical Depth 0.24 It Critical Slope 0.02354 ft/ft Velocity 1.86 ft/s Velocity Head 0.05 It Specific Energy 0.35 It Froude Number 0.69 Flow Type Subcritical GGVF Input'Data, r.�e= ,� _ v„ ..>�°. '-•» , .'„ ., ... ;,,.'; Downstream Depth 0.00 It Length 0.00 ft Number Of Steps 0 GVF"Output Data ' "' Upstream Depth 0.00 It Profile Description Profile Headloss 0.00 IfE71 Downstream Velocity Infinity fUsUpstream Velocity Infinity ft/s Normal Depth 0.30 ft Critical Depth 0.24 ft Channel Slope 0.01060 ft/ft Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.11.00.03] 6114/2011 10:49:22 AM 27 Siemens Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 2 GRASS LINED DITCH 6 GW Output Data Critical Slope 0.02354 ft/ft JUN 1 7 Z011 Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster 108.11.00.03) 6/14/2011 10:49:22 AM 27 Slemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 2 of 2 GRASS LINED DITCH 7 Project Description . Friction Method Manning Formula Solve For Normal Depth :1np.Ut Data .'i: 4 ,' A 11 .? Roughness Coefficient 0.030 Channel Slope 0.00440 ft/ft Left Side Slope 3.00 fUft (H:V) Right Side Slope 3.00 ft/ft (H:V) Bottom Width 2.00 ft Discharge 12.60 fN/s Results` `x Normal Depth 1.04 ft Flow Area 5.28 ft' Wetted Perimeter 8.55 ft Hydraulic Radius 0.62 ft Top Width 8.21 ft Critical Depth 0.75 ft Critical Slope 0.01748 ft/ft Velocity 2.38 ft/s Velocity Head 0.09 ft Specific Energy 1.12 ft Froude Number 0.52 Flow Type Subcritical GVF Input0ata Downstream Depth 0.00 ft Length 0.00 It Number Of Steps 0 GVF Output,Data ", '� �• Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 It — Tl Downstream Velocity Infinity Ws Upstream Velocity Infinity ft/s JUN 1 7 1011 Normal Depth 1.04 ft Critical Depth 0.75 ft Channel Slope 0.00440 fVft Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster 108.11.00.03] 6114/2011 10:50:10 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA 41-203-755-1666 Page 1 of 2 GRASS LINED DITCH 7 ,GVF Output -Data = ` Critical Slope 0.01748 fUft i JUN 1 7 2011 Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.11.00.031 6/14/2011 10:50:1DAM 27 Siemens Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 2 of 2 GRASS LINED DITCH 8 Project�Descrption; Friction Method Manning Formula Solve For Normal Depth Roughness Coefficient 0.030 Channel Slope 0.00400 ft/ft Left Side Slope 3.00 ft/ft (H:V) Right Side Slope 3.00 ft/ft (H:V) Bottom Width 2.00 ft Discharge 11.80 ft3/s Normal Depth 1.03 ft Flow Area 5.21 fl' Wetted Perimeter 8.49 ft Hydraulic Radius 0.61 ft Top Width 8.16 it Critical Depth 0.72 ft Critical Slope 0.01763 ft/ft Velocity 2.26 f /s Velocity Head 0.08 ft Specific Energy 1.11 It Froude Number 0.50 Flow Type Subcritical Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 �GV butpu Bata Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft- Downstream Velocity Infinity fVs .- Upstream Velocity Infinity ft/s JUN 1 7 2011 Normal Depth 1.03 ft Critical Depth 0.72 ft 10y'._--------- Channel Slope 0.00400 ft/ft Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.11.00.03] 6/1412011 10:50:25 AM 27 Siemens Company Drive Suite 200 W Watertown, CT 06795 USA +1.203.755-1666 Page 1 of 2 Cntical Slope GRASS LINED DITCH 8 0.01763 fUft JUN172011 Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.11.00.031 611412011 10:50:25 AM 27 Siemens Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 2 of 2 GRASS LINED DITCH 9 Project Description ' Friction Method Manning Formula Solve For Normal Depth Roughness Coefficient 0.030 Channel Slope 0.00580 ft/ft Left Side Slope 3.00 ft/ft (H:V) Right Side Slope 3.00 ft/ft (H:V) Bottom Width 5.00 ft Discharge 10.54 fN/s Normal Depth 0.65 ft Flow Area 4.48 fN Wetted Perimeter 9.08 ft Hydraulic Radius 0.49 ft Top Width 8.87 ft Critical Depth 0.47 ft Critical Slope 0.01851 ft/ft Velocity 2.35 ft/s Velocity Head 0.09 ft Specific Energy 0.73 ft Froude Number 0.58 Flow Type Subcntical ,GVF'InpuYData' ; Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 OUtput,Data 'GVF Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity fUs 1171 RE CEL51 �j i Upstream Velocity Infinity Ws Normal Depth 0.65 ft JUN 1 7 2011 Critical Depth 0.47 ft Channel Slope 0.00580 f 1ft BY • Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.11.00.03) 6/14/2011 10:21:26 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1.203-755-1666 Page 1 of 2 ,GVFOu�^-- 7 Critical Slope GRASS LINED DITCH 9 0.01851 fUft JUN 1 7 2011 Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.11.00.03] 611412011 10:21:26 AM 27 Siemens Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 2 of 2 GRASS LINED DITCH 10 Project Description � ' Friction Method Manning Formula Solve For Normal Depth �riput Data � .->.`-t-.. • : y ,� - Roughness Coefficient 0.030 Channel Slope 0.01291 ft/ft Left Side Slope 3.00 ft/ft (H:V) Right Side Slope 3.00 ft/ft (H:V) Discharge 11.80 W/s Results Normal Depth 1.05 It Flow Area 3.33 ft' Wetted Perimeter 6.66 ft Hydraulic Radius 0.50 ft Top Width 6.32 ft Critical Depth 0.99 ft Critical Slope 0.01777 ft/ft Velocity 3.54 ft/s Velocity Head 0.20 It Specific Energy 1.25 ft Froude Number 0.86 Flow Type Subcdtical GVFlnput.Data r Downstream Depth 0.00 It Length 0.00 It Number Of Steps 0 ,GVFOutput Data Upstream Depth 0.00 ft Profile Description Profile Headless 0.00 ft Downstream Velocity Infinity ft/s _ _ T JiA `v Upstream Velocity Infinity ft/s-? - Normal Depth 1.05 ft JUN 1 7 2011 Critical Depth 0.99 ft Channel Slope 0.01291 ft/ft bY; Critical Slope 0.01777 ft/ft Bentley Systems, Inc. Hassled Methods Solution Center' Bentley FlowMaster [08.11.00.03) 6/14/2011 10:46:24 AM 27 Siemens Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 GRASS LINED DITCH 11 Project Description •'� - Friction Method Manning Formula Solve For Normal Depth iInput Data Roughness Coefficient 0.030 Channel Slope 0.00200 ft/ft Left Side Slope 3.00 ft/ft (H:V) Right Side Slope 3.00 ft/ft (H:V) Bottom Width 2.00 ft Discharge 7.07 fN/s ' 4 Normal Depth 0.95 ft Flow Area 4.61 ft2 Wetted Perimeter 8.01 ft Hydraulic Radius 0.58 ft Top Width 7.70 ft Critical Depth 0.55 ft Critical Slope 0.01892 ft/ft Velocity 1.53 ft/s Velocity Head 0.04 ft Specific Energy 0.99 It Froude Number 0.35 Flow Type Subcritical GW In 'ut Data P .- Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Output Data , Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft • Downstream Velocity Infinity ft/s ' `�`�`—"`""� Upstream Velocity Infinity ft/s JUN 1 7 2011 Normal Depth 0.95 ft Critical Depth 0.55 ft - Channel Channel Slope 0.00200 ft/ft Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.11.00.03) 6/14/2011 10:47:08 AM 27 Siemens Company Drive Suite 200 W Watertown, CT 06795 USA *1-203-755-1666 Page 1 of 2 ,GVF Output'Data , Critical Slope GRASS LINED DITCH 11 0.01892 fUft JUN 1 7 2011 3Y: Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.11.00.03] 6114/2011 10:47:08 AM 27 Siemens Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 2 of 2 a GRASS LINED DITCH 12 hr6j 6ct D-esc ipt Friction Method Manning Formula Solve For Normal Depth Input -Data-, Roughness Coefficient 0.030 Channel Slope 0.00400 ft/ft Left Side Slope 3.00 ft/ft (H:V) Right Side Slope 3.00 ft/ft (H:V) Bottom Width 2.00 ft Discharge 21.87 ft-/s R esdlts Normal Depth 1.36 ft Flow Area 8.25 ft2 Wetted Perimeter 10.59 It Hydraulic Radius 0.78 ft Top Width 10.15 It Critical Depth 0.99 ft Critical Slope 0.01623 ft/ft Velocity 2.65 ft/s Velocity Head 0.11 ft Specific Energy 1.47 ft Froude Number 0.52 Flow Type Subcritical ,GVF input Data Downstream Depth 0.00 ft Length 0= ft Number Of Steps 0 4, Ld Yf'b ut Ii u t � Data Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity ft1s Upstream Velocity Infinity ftts Normal Depth 1.36 ft I J U N 1 7 2011 Critical Depth 0.99 ft Channel Slope 0.00400 ft/ft Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.11.00.03] 6/1412011 10:47:58 AM 27 Siemens Company Drive Suite 200 W Watertown, CT 06795 USA +1.203-755-1666 Page 1 of 2 GRASS LINED DITCH 12 GVF Output Data - Critical Slope 0.01623 Rift JUN 1 7 2011 Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.11.00.031 6/14/2011 10:47:58 AM 27 Siemens Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 2 of 2 GRASS LINED DITCH 13 Project Description . '-: ' Friction Method Manning Formula Solve For Normal Depth ,Input Data:, _` .. ,. • Y Roughness Coefficient 0.030 Channel Slope 0.00200 fVft Left Side Slope 3.00 ft/ft (H:V) Right Side Slope 3.00 ft/ft (H:V) Bottom Width 2.00 ft Discharge 11.10 fN/s .Results' .. Normal Depth 1.17 ft Flow Area 6.45 ft' Wetted Perimeter 9.40 ft Hydraulic Radius 0.69 ft Top Width 9.02 it Critical Depth 0.70 ft Critical Slope 0.01778 ft/ft Velocity 1.72 ft/s Velocity Head 0.05 ft Specific Energy 1.22 ft Froude Number 0.36 Flow Type Subcritical GVF-InputData' Downstream Depth 0.00 It Length 0.00 It Number Of Steps 0 G-VF Output Data • ` ` Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity ft/s Upstream velocity Infinity ft/ s JUN 1 7 2011 Normal Depth 1.17 It Critical Depth 0.70 ft Channel Slope 0.00200 ft/ft Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.11.00.031 W14/2011 10:48:16 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 2 GRASS LINED DITCH 13 ,GVF Output Data Critical Slope 0.01778 fttft �. i JUN 1 7 2011 Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.11.00.03] 6114/2011 10:48:16 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1.203-755-1666 Page 2 of 2 GRASS LINED PD1 Project Description .:: ', ; _, - Friction Method Manning Formula Solve For Normal Depth Input D� ata r„�ny;�';; t Roughness Coefficient 0.030 Channel Slope 0.01291 fUft Left Side Slope 3.00 ft/ft (H:V) Right Side Slope 3.00 flft (H:V) Bottom W idth 0.00 ft Discharge 11.80 fN/s Normal Depth 1.05 ft Flow Area 3.33 fit' Wetted Perimeter 6.66 ft Hydraulic Radius 0.50 fit Top Width 6.32 ft Critical Depth 0.99 fit Critical Slope 0.01777 ft/ft Velocity 3.54 ft/s Velocity Head 0.20 ft Specific Energy 1.25 ft Froude Number 0.86 Flow Type Subcritical ,GVF Input Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 ,GVF Output Data , Upstream Depth 0.00 It Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s JUN 1 7 Z011 Normal Depth 1.05 ft z< . Critical Depth 0.99 ft— Channel Slope 0.01291 ft/ft Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.11.00.03) 6/1412011 10:48:56 AM 27 Siemens Company Drive Suite 200 W Watertown, CT 06795 USA t1-203-755-1666 Page 1 of 2 GRASS LINED PD1 GVFOutput Data r� Critical Slope 0.01777 fUft IJUN 1 7 2011 Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.11.00.03] 611412011 10:48:56 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 2 of 2 GRASS LINED PD2 Projetl'on Friction Method Manning Formula Solve For Normal Depth ;Input Data < Roughness Coefficient 0.030 Channel Slope 0.00800 ft/ft Left Side Slope 3.00 ft/ft (H:V) Right Side Slope 3.00 ft/ft (H:V) Bottom Width 2.00 ft Discharge 21.87 fP/s ,. Result's' Normal Depth 1.16 ft Flow Area 6.37 ft2 Wetted Perimeter 9.35 it Hydraulic Radius 0.68 It Top Width 8.97 It Critical Depth 0.99 ft Critical Slope 0.01623 ft/ft Velocity 3.43 ft/s Velocity Head 0.18 ft Specific Energy 1.34 It Froude Number 0.72 Flow Type Subcdtical ,GVF Input Data, Downstream Depth 0.00 It Length 0.00 If Number Of Steps 0 GVF Output Data Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft '-7•T��-7-.-.-,-;-., Downstream Velocity Infinity Ws Upstream Velocity Infinity ft/s JUN 1 7 2011 Normal Depth 1.16 fit Critical Depth 0.99 It Channel Slope 0.00800 ft/ft Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.11.00.03) 6/14/2011 10:49:44 AM 27 Slemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 2 GRASS LINED PD2 GV,F`OutpuYData'.'' F Critical Slope 0.01623 ft/ft .... T--, �JJUN 1 7 2011 J •1 Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.11.00.031 6/14/2011 10:49:44 AM 27 Siemens Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 2 of 2 GRASS LINED PD3 Pr6jecf Description Friction Method Manning Formula Solve For Normal Depth Input Data: Roughness Coefficient 0.030 Channel Slope 0.00800 ft/ft Left Side Slope 3.00 ft/ft (H:V) Right Side Slope 3.00 ft/ft (H:V) Bottom Width 0.00 It Discharge 7.50 Wis RResults .; ; a.; r Normal Depth 0.97 ft Flow Area 2.84 ft2 Wetted Perimeter 6.15 It Hydraulic Radius 0.46 ft Top Width 5.83 ft Critical Depth 0.83 ft Critical Slope 0.01888 ft/ft Velocity 2.64 ft/s Velocity Head 0.11 ft Specific Energy 1.08 ft Froude Number 0.67 Flow Type Subcritical GVF°InputData� rr,; Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Outpyt Data, Upstream Depth 0.00 ft Profile Description Profile Headless 0.00 It=Y:: Downstream Velocity Infinity Pos Upstream Velocity Infinity ft/s Normal Depth 0.97 ftCritical Depth 0.83 ft Channel Slope 0.00800 ft/ft Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.11.00.03] 6/14/2011 10:55:42 AM 27 Slemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 2 GRASS LINED PD3 GVF. Output Data' Critical Slope 0.01888 ft/ft JUN 1 7 Z011 Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.11.00.03] 6/14/2011 10:55:42 AM 27 Siemens Company Drive Suite 200 W Watertown, CT 06795 USA •1-203-755-1666 Page 2 of 2 Parsons Brinckerhoff Project: I(Camp LeJeune Location: Jacksonville, NC Description: Culvert Analysis Design Year: 10 Year for Capacity Design Lisa Bass 4/20/2011 Rev 5/20111 checked by LRW Inlet Outlet Area Area C Tc 110 010" 010 total) Inv Inv Size Length Roadway Headwater HW Velocity TW Inlet/Outlet Skew From To acre From min in1hr cfs cfs ft fl in Ft. Elevation Allowed Design Yr Design Yr Controlled EX CG33 Sevreretl area 1054 21.30 21.08 2400 40M 2600 23.80 2304 56 20.00 inlet 0W CG13 CG14 0.48 D,Wswale 0.35 10.00 7.34 12 11..6 20.50 20.00 18.00 4a 00 23.50 23.30 us"] 74 2120 inlet 000 CG17 CG18 0.25 DItcNSw o 0.45 10.00 T3 09 `°126 - 19,70 1950. 18.00 42W 2370 23,70 .22.70 T5: 20.50 12220 outlet 0W Exit Y- Exit 0.54 Di,tVtt k 0.75 10.00 7.34 3.0 156 ' 19,28 1 18.82 2400 5000 n.70 23.30 21.50 1 5.8 20.40 wt.t 000 CG7 CG8 0.54 Ditm 0.40 10.00 7.34 16 . le 1975 1935 15M 6200 23.W 2300 20.50 15 20.40 outlet 0.W CG5 CG6 0.41 Po'ng Lot Areal 0.95 5.00 9,18 38 .' 16 21.60 21.20 1500 7200 24W 23.N 22M 34 Outlet ow CG3 CG4 0.38 Parking Lot Area2 0.95 5.00 9.18 33 33 21.50 21.W 15.W 74W 24.00 23.99 2300 4.2. 22W I utlet 0.W CG1 CG2 0.31 Parv4tg Lot Area 0.95 5.00 9.18 2.7 2.7 21.55 W00 1500 10 W 2400 230 22.90 34 n10 outlet 0.00 CG15 CG16 0.33 Ditch 0.75 5.00 9.18 23 2.3 21,95 21,25 isw 8100 23W 22.W 22.90 le 22.25 outlet 000 CG38 CG39 2.53 SWW2AND DITCH 0.30 5.00 9.18 7.0 11.1 18.65 18.40 24,W 35W 2220 22.00 2092 3.5- MM inlet ow F77:rsfing culverts exiUng the system JUN 1 7 2011 �I lBMG-I I rwrammw*saiou nvrvwmwwur�nx BORING LOCATION PLAN PROJECT: P-1269 Devil Dog SOI, Field Training Facility RECEIVED MCB Camp Lejeune, North Carolina JUN 1 7 2011 PROJECT NO: JX10-114G CLIENT: Archer Western Contractors, LTD BY' SCALE: As Drawn DATE: 3/7/2011 PLOT BY: GH I BORING LOG BM P-1 PROJECT: P-1269 Devil Dog SOI - Field Training Facility CLIENT: Archer Western Contractors, LTD PROJECT LOCATION: MCB Camp Lejeune, NC PROJECT NO.: JX10-114G BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: DRILLER: GET Solutions, Inc. LOGGED BY: gwh DRILLING METHOD: Rotary Wash Mud Drilling DATE: 2-17-11 DEPTH TO WATER - INITIAL': S 9 AFTER 24 HOURS: _ _ CAVING> -C c Z x Wo a d E o. d o Description a (� a d Z n' n °' rn ~ 3 fO m n m Z oo 4N v TEST RESULTS Plastic Limit H Liquid Limit Moisture Content -• N-Value - 10 20 30 40 50 60 70 0 0 5 5 7 g 5-' g 4-inches of Topsoil .:..:..:. :: .... ...... ...'..'. 1 24 ss 3 2 3 ' .:...:...:... :...: ...:...:... is ............................. .:...:...:...:...:...:...:... ...:... t...: '...:... ............................... s. ...:. ..:...:...:... :... :... :... -0.3 Orangish brown and tan, moist, Clayey fine to medium SAND (Sc), Loose 2 17 ss 3 3 3 2 5 Light gray amd orangish brown, moist, Clayey fine to medium SAND (SC),Loose Estimated SHWT @ 4 feel 8 Z. Orangish brown and light gray, moist to wet, Silty fine to medium SAND(SM), Loose '::': .. .. ..' ...... ': 3 19 ss 3 4 4 4 5 23 24 ss ss 3 3 32 3 2 10 a Boring terminated at 10 ft. JUN 1 7 2011 BY:_ -- 15 B 20 9 25 30 10 35 Notes: SS = Split Spoon Sample ST = Shelby Tube Sample HA = Hand Auger Sample GET ' BORING LOG BM P-6 PROJECT: P-1269 Devil Dog SOI - Field Training Facility CLIENT: Archer Western Contractors, LTD PROJECT LOCATION: MCB Camp Lejeune, NC PROJECT NO.: JX10-114G BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: DRILLER: GET Solutions, Inc. LOGGED BY: gwh DRILLING METHOD: Rotary Wash Mud Drilling DATE: 2-18-11 DEPTH TO WATER - INITIAL': V AFTER 24 HOURS: a CAVING> S c wo a d a m a d Description n m a o Z a. n c' uEci 3 m do a m Z oo a v TEST RESULTS Plastic Limit H Liquid Limit Moisture Content- • N-Value - 10 20 30 40 50 60 70 0 0 5 6 9 11 7 1.1 4-inches of Topsoil ::::: 1 23 ss 3 2 z .:. ..:... :...: ...:...:. ..: ... . ..................:....... ... .... .... / ... .......................... .. ...:...: :. .t... ................ . .3 Tan, moist, Silty fine to medium SAND (SM) with trace Clay, Loose Tan and orangish brown, moist, Sandy Lean CLAY (CL), Medium stiff 2 21 ss 3 3 3 2 5 Light gray and orangish brown, moist, Clayey fine to medium SAND (SC), Loose to Medium Dense Estimated SHWT @ 4 feet :'':'::': 2.2._� ...... 3 24 ss 3 4 5 4 24 ss 5 5 5 5 23 ss 4 3 4 10 a Boring terminated at 10 ft. LJUN172011 BY:_-- 15 s zo 25 30 10 35 Notes: SS = Split Spoon Sample ST = Shelby Tube Sample HA = Hand Auger Sample BS = Bulk Sample 1 t Lewis,Linda From: Lewis,Linda Sent: Tuesday, June 14, 2011 5:59 PM To: 'Rodney Wright'; Howard Resnik Cc: Russell, Janet Subject: Devil Dog SW8 080813 Mod. Rodney I've got a few questions regarding the revised submittal I'm trying to reconcile the pond design calculations in the booklet and on the plans with the new stage -storage tables and supplement forms. I initially received a booklet titled Stormwater Management Narrative and Calculations. In Section IV. Water Quality Analysis, there are tables with dimensions and elevations for each pond. These tables were not updated and now reflect different information than has been provided on the 2 sheets I received on June 13, 2011, with the stage -storage tables (SST's) for each pond. This is why I prefer that ALL the calculations be in one place. That way they all get updated. The SST for Pond 1 is very confusing and reports conflicting information 1. The surface area at elevation 20 is 4799, but the surface area at elevation 21 is only 3 sf larger, 4803? Is that correct? 2. Based on adding the incremental volumes reported in the SST starting at elevation 17, and going up to the permanent pool elevation at 21.5, the permanent pool volume (PPV) is 17,215 cf. The lower half of the SST calculations report a PPV of 14,223 cf. 3. The lower half of the SST calculations report that the 1.5" storage volume provided at elevation 23 is 4029 cf. The upper half of the SST calculations indicate that the storage elevation for Pond 1 is 22.5, not 23, and the storage volume provided at 22.5 is 8627 cf, not 4029 cf. 4. The lower part of the SST calculations report that the surface area provided at the bottom of the shelf is 4799. The upper part of the SST calculations indicates that the bottom of the shelf is at elevation 21, which has a corresponding surface area of 4803 sf. The supplement reports that the area at the bottom of the shelf is 4503. 5. The lower part of the SST calculations report that the surface area at the top of the shelf is 7250 sf. The upper part of the SST calculations indicates that the permanent pool area is 7250, and that the top of the shelf is at elevation 22, with a corresponding surface area of 8895. 6. The forebay SST has no areas. It only reports incremental and accumulated volumes. Please add the associated areas at each elevation in order to check the numbers. 7. The plan calculations for Pond 1 show that the temporary pool area at 22.5 is 10,109 sf. Further down, the same area of 10,109 is reported at elevation 23. The supplement for Pond 1 reports the temporary pool area as 9,502 sf. 8. Please recalculate the orifice size using the minimum 1.5" design volume. I think you may have used the permanent pool volume (17215 cf) to size the orifice instead of the temporary pool volume of 8450 Cf. For Pond #2, there are a few less discrepancies: 1. The supplement reports the temporary pool area as 24012 sf. Both the plan calculations and the SST report the temporary pool area as 23049 sf. 2. The lower half of the SST indicates that the 1.5" storage volume is provided at elevation•22.0, but the supplement and plan calculations both list the temporary pool elevation as 21.5. 3. As with Pond 1, the forebay SST provides no areas, only incremental and accumulated volumes. - Please add the associated areas. , ✓OV 3 2011 1' In the application itself, I notice that the area information for DA3 and DA4 has been removed. I remember saying initially that since neither of these DA's provided a BMP, that they could be removed from the application, however, before we adjourned the meeting, I decided that we needed to keep these DA's 3 & 4 in order to account for the new untreated BUA being proposed in those DA's. It also helps to balance out the "Overall" DA column. Please provide the revised information prior to June 21, 2011. Linda Lewis NC Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 Education is the progressive discovery of our own ignorance. -Will Durant E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. RECO J U N 10 2011 June 10, 2011 Linda Lewis North Carolina Department of Environment and Natural Resources Express Storm Water 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Re: Express Storm Water Modification to SW8 080813 Onslow County CSD Project No. 1 1-0245 Dear Linda: Enclosed please find: Items: COASTAL SITE DESIGN, PC PO Box 4041 Wilmington, NC 28406 Phone: 910 791-4441 Fax: 910 791-1501 License It C-2710 two (2) copies of the revised stormwater plans one (1) copy of the pond volume spreadsheets revised page 3 of the stormwater application revised pond supplements revised DA breakdown for PI269 drainage areas. vegetative filter supplement 1 PP dimensioned on pgs CS I-1 10, 113-114 2 The PP contour has been added to sheets CS 1-124,125 3 The impervious dimensions have been added to supplemental sheet 5 labeled 'Post Development Captured Impervious Areas" 4 Pond Volume chart is enclosed to be added to stormwater calculations. 5 Pond Supplements have been revised and are enclosed. 6 Veg. Filter supplement enclosed. 7 O&M for Veg. Filter has been sent to BASE for signature. Hoping to have it first of the week. 8 Veg. filter detail has been added to plans. Please call if you have any questions. Very truly yours, Rodney right Encl.: As noted above cc: Archer Western RECEIVED JUN 13 2011 BY: Lewis,Linda From: Lewis, Li nda Sent: Thursday, June 09, 2011 10:07 AM To: 'Rodney Wright' Cc: 'howard@coastalsitedesign.com' Subject: TECOM / P1269 at Devil Dog Rodney I started going over the calculations and have a few questions. First, let me say that while computer programs like HydroCAD and PondPak are useful to you for design purposes, they should only be used to support your design calculations that are submitted to the Division. The computer calculations are very spread out and hard to follow. I'm really not sure what I'm looking at. I spent most of the remaining time from our meeting yesterday trying to decipher the calculations and figure out if I had what I needed. The calculations should provide support for the values you enter into the supplement form, such as percent impervious, Rv value, required permanent pool surface area, minimum required storage volume, required and provided forebay volume, and orifice sizing. A separate table of area, elevation, incremental volume and accumulated volume just for the forebay is most helpful. In addition to simplified design calculations, here are my review comments: Pond 1 is designed with 85% TSS, therefore, a vegetated filter is required. Please provide calculations, a completed supplement and a signed O&M. Please add the filter location and a detail to the plans. The temporary pool volume reported on the supplements for both ponds is really large. It appears that you may have reported the volume beginning from the bottom of the pond up to the temporary pool elevation. The temporary pool volume is the volume located between the permanent pool elevation and the temporary pool elevation. The 1 year 24 hour precipitation depth is reported on the supplement as 0.2 inches. Based on NOAA data, this depth is closer to 3.7". As we discussed in the meeting yesterday, the following items also need to be addressed: 1. Dimension the proposed buildings. 2. Add the permanent pool contour, dimensions for the contour, and label its elevation on the detail sheet for each pond. 3. Correct the drainage area and built -upon areas reported on the supplement form for DA1. Linda Lewis NC Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 Education is the progressive discovery of our own ignorance. -Will Durant E-mail correspondence to and from this address may be subject to the North Carolina Public Records,L_aw and may be disclosed to third parties. ✓UN 13 Z�l> Wilmington, NC 28405-3845 Re: Express Storm Water Modification to SW8 080813 Onslow County CSD Project No. 1 1-0245 Dear Linda: Enclosed please find: - two (2) copies of the stormwater plan - one (1) copy of the stormwater calculations - stormwater application - pond supplements - O&M for ponds - $4,000 check, Please call if you have any questions. Very truly yours, �4� Rodney Wright Encl.: As noted above cc: Archer Western Russell, Janet From: Towler CIV David W [david.towler@usmc.mil] Sent: Wednesday, May 18, 2011 8:23 AM To: Russell, Janet Cc: Bradshaw CIV Thomas C Subject: RE: K Range Permits & Devil Dog Janet, One after the other would be best. Please schedule Rodney/Howard first. Thanks, David -----Original Message ----- From: Russell, Janet rmailto:ianet.russell(dncdenr.govl Sent: Tuesday, May 17, 2011 16:31 To: Towler CIV David W Subject: RE: K Range Permits & Devil Dog David, do you want both engineering firms in the room at the same time or one after the other? Jaent -----Original Message ----- From: Towler CIV David W rmailto:david.towler(@usmc.mill Sent: Tuesday, May 17, 2011 3:52 PM To: Russell, Janet; Bradshaw CIV Thomas C Subject: RE: K Range Permits & Devil Dog Janet, I've spoken with the involved parties. Go ahead and arrange the meetings on May 26. V/r, David W. Towler Marine Corps Base, Camp Lejeune Public Works Division, Bldg 1005 Civil Design Branch Phone: (910)451-3238 ext. 3284 -----Original Message ----- From: Russell, Janet rmailto:ianet.russell(dncdenr.govl Sent: Monday, May 16, 2011 15:57 To: Towler CIV David W; Bradshaw CIV Thomas C Subject: K Range Permits & Devil Dog David 1 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. s For DENR Use 0 80 813 �p� Reviewer: �A North Carolina Department of Environment and Submit: �•1Natural Resources eo NCDENR Request for Express Permit Review Time: 0 Confirm: •s [ FILL-IN all the information below and CHECK the Permit(sJ you are requesting for express review. FAX or Email the completed form to Express Coordinator along with a completed DETAILED narrative, site plan (PDF file) and vicinity map (same items expected in the application package of the project location. Please include this form in the application package. • Asheville Region -Alison Davidson 828-296-4698;alison.davidson(a2ncmaiLnet • Fayetteville or Raleigh Region -David Lee 919.791.4203; dayid.Ie&(@.ncmail.net • Mooresville & -Patrick Grogan 704-663.3772 or patrick.gropan(r ncmail.net • Washington Region -Lyn Hardison 252-946.9215 or lyn.hardison(a)ncmail.net • Wilmington Region -Janet Russell 910-350-2004 or janet.russell(7a ncmail.net NOTE: Project application received after 12 noon will be stamped in the following work day. SW SW SW SW SW Project Name: Pl 269 DEVIL DOG County: ONSLOW Applicant: CARLL BAKER Company: MARINE CORPS BASE, CAMP LEJEUNE Address: BLDG 1005 MICHAEL ROAD City: MCB CAMP LEJEUNE, State: INC Zip: 28547 Phone: 910-451-2213, Fax: 910-451-2927, Email: carl.h.baker@usmc.mil V Physical Location: INTERSECTION OF PERIMETER ROAD AND COMMAND POST ROAD Project Drains into CNSW waters - Water classification 19-17 0.5) (for classification see-hftp://h2o,enr.state.nc.usibims/reports/reportsWB.html) Project Located in WHITE OAK River Basin. Is project draining to class ORIN waters? N , within Y2 mile and dr 'rti11g to:class.SA.waters.N -or within 1 mile and draining to class HOW waters? N h t':UElVED Engineer/Consultant: HOWARD RESNIK Company: COASTAL SITE DESIGN, PC MAY p 6 2011 Address: PO BOX4041 City: WILMINGTON, State: NC Zip: 28406 Phone: 910-791-4441, Fax: 910-791-1501, Email: HOWARD@COASTALSITEDESIGN.COM BY. SECTION ONE: REQUESTING A SCOPING MEETING ONLY --- — _ ® Scoping'Meeting ONLY ® DINO, ❑ DCM, ® DLR, ❑ OTHER: SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ Intermittent/Perennial Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Wetland (_linear It or _acres) ❑ Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance State Stormwater ❑ General . ❑ SFR, ❑ SFR < 1 ac. ❑Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Other ❑ Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ❑ Off -site [SW (Provide permit #)] ❑ High Density -Detention Pond 0 # Treatment Systems ❑ High Density -Infiltration _ #Treatment Systems ❑ High Density -Bio-Retention _ # Treatment Systems ❑ High Density —SW Wetlands _ # Treatment Systems ❑ High Density -Other _ # Treatment Systems / ❑ MOD:❑ Major ❑ Minor ❑ Plan Revision ❑ Redev. Exclusion SW (Provide permit #) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information . ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ❑ Land Quality ❑ Erosion and Sedimentation Control Plan with - acres to be disturbed.(CK # (for DENR use)) SECTION THREE — PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scoDino and express meeting reauest Wetlands on Site ❑ Yes ® No Buffer Impacts: ❑ No ❑ YES: —acre(s) Wetlands Delineation has been completed: ❑ Yes ❑ No Isolated wetland on Property ❑ Yes ❑ No US ACOE Approval of Delineation completed: ❑ Yes ❑ No 404 Application in Process wl US ACOE: ❑ Yes ❑ No Permit Received from US ACOE ❑ Yes ❑ No +*+***+++++++++++++++«++++««+«++++*+*«*+++++++++++***++«For DENR use Fee Split for multiple permits: (Check# 1 \ TotalFeeAmount E SUBMITTAL DATES Fee I SUBMITTAL DATES Fee CAMA $ Variance (❑ Maj; ElMin) $ SW (❑ HD, ❑ LD, ❑ Gen) $ 401: $ LQS $ Stream Deter,_ $ 0608 13 G r,,J NCDENR EXPRESS March 2009 hp c dov LaserJet 5550 printers [hf:l job storage status p"a,ge 1 Error: Unable to store job at printer Reason: Insufficient disk space for this job Solution: Delete some files from the disk before resending this job. I. Introduction Project Description The purpose of this project is to construct three buildings, a water tank, and associated paved areas and parking. The project is located at Camp Lejeune's Devil Dog Field Training Facility in Onslow County. The purpose of this report is to analyze the drainage design of the project area and determine what stormwater management is necessary to comply with North Carolina Department of Natural Resources (NCDENR) requirements to modify the existing state stormwater management permit SW8 080813. Existing Site Conditions The Devil Dog Field Training Facility project site is approximately 30 acres and is considered high density development. The terrain for the site is relatively flat with slopes not exceeding 2%. The existing site has problems with erosion control, sustaining vegetation and flooding or standing water. The existing storm system is filled with sediment and inadequately sized compounding the drainage problems onsite. The project site drains to the Non -SA waters of either Mill Run or Hicks Run and then eventually to Southwest Creek. Southwest Creek is located in the White Oak river basin, its Index number is 19-V-(6.5) and its class is C; HQW; NSW. Mill Run and Hicks Run are both class C; NSW. Il. Hydrology , _ In accordance with NCDOT criteria, the hydrological analysis for the proposed site was completed using the Rational Method for culverts, storm drains and ditches and the Modified Rational equation for storm water management. The rainfall intensity values were found using the NOAA rainfall data for Snead's Ferry rain gauge and the time of concentration determined using Seelye and Kirpich methods. The predevelopment and post -development conditions are divided into 5 primary drainage areas. Drainage area 1 is located east of Command Post Road and north of Perimeter Road. This area decreased from 3.12 acres predevelopment to 2.52 acres post -development and drains by overland flow to either a storm sewer system or ditch and then into SWM-1. SWM-1 outfalls to a level spreader and existing ditch which eventually drains north to Hicks Run and Southwest Creek. Drainage area 2 is located on the south side of the project site and drains to the east. This area increased from 2.44 acres predevelopment to 5.58 acres post -development. This area drains into SWM-2 using overland flow, existing ditches and proposed storm sewer. SWM-2 outfalls to a level spreader and existing ditch which eventually outfalls to Mill Run and Southwest Creek. Drainage area 3 is located. in the middle of the site between Semac Road and Phase Line Road. It drains to the north using existing ditches and existing storm sewer system. The contributing 3(Page RR �10EIVED MAY 062011 i3Y: Richard Woodruff, City Manager City of Jacksonville P.O. Box 128 Jacksonville, NC 28541-0128 Tony Cahoon, Public Works Director Carteret County 521 Hedrick Street Beaufort, NC 28516 drainage area was 2.45 acres predevelopment. Post -development drainage area 3 is 1.10 acres which drains into existing storm sewer and outfalls to drainage area 4. Drainage area 4 is located on the west side of the project site and drains to the north. This area decreased from 3.08 acres predevelopment to 2.30 acres post -development and drains using existing ditches and culverts into an unnamed tributary of Hicks Run and eventually into Southwest Creek. Drainage area 5 is located on the east side of the project site and drains to the north. This area increased from 2.97 acres predevelopment to 3.06 acres post -development and drains using existing ditches and culverts which eventually outfall into Southwest Creek. Drainage area maps are located in Appendix A. I11. Pre and Post Development Conditions This project includes construction of three buildings, a water tank, associated paved areas and parking. The predevelopment site is 27% impervious with 8.17 acres of impervious land cover. The post -development site is 36%impervious with 10.85 acres of impervious land. Two (2) wet detention basins are proposed for the project site to provide stormwater treatment and reduce runoff from existing and proposed development. The table below gives the pre and post development flows found using the Modified Rational Method and NOAA Atlas 14 rainfall intensities from Sneads Ferry rain gauge located approximately 3 miles from Camp Lejeune. Table 1—Summary of Pre and Post Development Conditions Predevelo ment Flow cfs Post -development Flow cfs 2-yr 30-yr 100-yr 2-yr 10-yr 100-yr SWM-1 4.70 6.34 8.62 0.0 0.03 1 0.23 SWM-2 5.37 7.09 9.41 0.0 0.0 1 0.29 Proposed onsite buildings/lots for the project site are approximately 81,893 SF. Proposed onsite parking and streets is approximately 34,848 SF. Existing built -upon areas for the project site is approximately 355,885 SF. IV. Water Quality Analysis SWM-1 SWM-1 provides storage and treatment of stormwater runoff from all 2.53 acres of drainage area 1, 1.5 of which is impervious land. This basin discharges to a level spreader at elevation 20.0' which distributes the flow across a 30 foot long vegetative filter. The average depth of the 4 1 P a g e Permit: W00029601 Owner- Facility: Carolina Investments Inc Inspection Date: 12/19/2007 Inspection Type: Reconnaissance Reason for Visit: Routine Inspection Summary: A facility follow-up inspection was conducted on December 19, 2007. The facility has been given approval to begin operations. Page: 2 basin is 3.0 feet and the design total suspended solids removal is 85%. A 10-foot wide vegetated shelf is provided with 6 inches below the permanent pool elevation and the outside edge is 6 inches above the permanent pool elevation. The forebay volume is 21.7% of the total permanent pool volume. Total nitrogen removal is 25% and total phosphorus removal is 40%. The table below provides other dimensions and elevations for SWM-1. Table 2 - SWM-1 Elevations and Dimensions SWM#1 DIMENSIONS ELEVATION NORMAL POOL 6,996 SF 21.50 TEMPORARY POOL 2,95345F 22.62 POND BOTTOM 2,7325F 18.00 SEDIMENT CLEANOUT BOTTOM 1,500 SF 17.00 TOP OF DAM WIDTH 3' 25.00 DRAWDOWN ORIFICE 2.5" 21.50 TOP OF RISER 4' DIA 22.62 HIGH FLOW BYPASS OUTLET PIPE INVERT IN 100 LF 18" RCP @ 0.7% 21.50 OUTLET PIPE INVERT OUT 21.00 WATER QUALITY OUTLET OUTLET PIPE INVERT IN 68 LF 4" DIP @ 0.5% 20.50 OUTLET PIPE INVERT OUT 20.00 SWM-2 SWM-2 provides storage and treatment of stormwater runoff from 4.95 acres, 3.66 acres of which is impervious land. This basin discharges to a level spreader at elevation 21.0' which distributes the flow across a 30 foot long vegetative filter. The average depth of the basin is 3.5 feet and the design total suspended solids removal is 85%. A 10-foot wide vegetated shelf is provided with 6 inches below the permanent pool elevation and the outside edge is 6 inches above the permanent pool elevation. The forebay volume is 19.3% of the total permanent pool volume. Total nitrogen removal is 25%and total phosphorus removal is 40%. The table below provides other dimensions and elevations for SWM-2. Table 3-SWM-2 Elevations and Dimensions _ _ SWM#2 DIMENSIONS ELEV. NORMALPOOL 3.5,700SF 22.50 TEMPORARY POOL 70,044SF 23.77 POND BOTTOM 9,331SF 19.00 SEDIMENT CLEAN OUT BOTTOM 7,678SF 18.00 TOP OF DAM WIDTH 3' 26.00 DRAWDOWN ORIFICE 4" 22.50 TOP OF RISER 4' DIA 23.77 HIGH FLOW BYPASS OUTLET PIPE INVERT UP 96 LF 24" RCP @ 0.5% 20.50 OUTLET PIPE INVERT DOWN 20.00 WATER QUALITY OUTLET OUTLET PIPE INVERTUP 68LF4"DIP @ 0.7% 21.50 OUTLET PIPE INVERT DOWN 21.00 5 1 P a g e IVED MAY 0 6 2011 Ir N.C. DEPARTMENT OF EN DIVISION OF MARINFA Name: MENT ANP NATURAL RES RCES ES — WE Y ACTIVITY RE RT eek Ending (Fr ida ' . DAY/ CHARGE SUB- SN OF BRIEF DE DATE OBJECT ACTIVITY ELENT ELFINiE RE IED SAT. DMF SUN. -7Z DMF T. MON. DM 7 TUES. DMF . DMF THUR. F FRI. DMF7Z PLANNED ACTIVITIES FO P-COMING WEEK TOT H URS: J I certify that the above is an aecXte account ofaccomplislied and planned activitiessr the period SI GNATU SUPERVISOR'S SIGNA Stormwater management facility routing models are located in Appendix B. NCDENR Supplemental Forms are located in Appendix C. IV. Stormwater Design Storm sewer systems have been designed according to NCDOT criteria using the Rational Method and rainfall intensities provided by NOAA for Sneads Ferry rain gauge. Storm sewer systems have been designed for the 10 year storm occurrence for the area. An analysis was done on the existing storm sewer system and it was determined that two of the pipes are inadequate to convey the contributing flow even after decreasing the size of the contributing drainage area with new proposed storm sewer which drains to SWM-2. Storm sewer calculation spreadsheets are located in Appendix D. Culverts have been designed according to NCDOT criteria using the Rational Method and rainfall intensities provided by NOAA for Sneads Ferry rain gauge. Culverts have been designed for the 10 year storm occurrence for the area. Culvert calculation spreadsheets are located in Appendix E. V. Conclusion This report summarizes the watershed analysis for Camp Lejeune's Devil Dog Field Training Facility Project. Approximately 2.68 acres of new impervious are planned for the project site. Increased impervious area is mitigated for both quantity and quality through the use of two wet detention basins. These wet detention basins are treating 5.16 acres of existing and proposed impervious areas. MAY 0 6 2U11 N.C. DEPARTMENT DIVISION OF Name: .ONMENT AND ATURAL RESOURCES FRIES — WEE - - - l' REPORT eek Ending (Friday): DAY/ CHARGE SUB- BRIEF DESCR[PTIO F DATE OBJECT ACTIV ELEMENT ELEMENT OURS WORK PERFORM SAT. DMF ZSUN. TUES. DMF WED. THUR. DMF FRI. DMF PLANNED ACT TIES FOR UP -COMING WEFK TOT H URS: 1 cerofy t the above is an accurate account o(accoinplished antl planned S .NATURE SUPERVISOR'S SIGNA the period r \\VAV AA ". ��AvN �VAv ('�m A v (sl v• .�{. b' a /�ow'w J�_1K_.F:��°� \p !I\ M O fig �::�\\ 1j', I { '�-: "i ,�-•'-'---t-� ,...�I`(—," x � — -fib I I��I.7ij�a9' p" _....1 'f'' b 90 �.� Sim Pm IILP;c EI ED MAY 0 6 2U11 T_iY.. job sfiorage stat�us p"a•ge 1 Error: Unable to store job at printer Reason: Insufficient disk space for this job Solution: Delete some files from the disk before resending this job. 1 2 3 4 5 - ih Ell • I-1'�-ITi'T�1� ITT-T-TTTt-T�� - 4 9 9�+ c� I� srre vcw � -p -- V7 csi-ni 1 2 3 I RPCEIVE-D MAY 0 6 2011 the and data. 1 Ile, e 1 1�;,4 V 0 C51-113 R'E C.E+ IV)E+ I� MAY 06 Z011 N.C. DEPARTMENT OF DIVISION OF MARINE Name: ONMENT AND NATURAL RE OURCES ERIES — WEEKLY ACTIVITY ORT Week Ending day): DAY/ CHARGE SUB- BRIEF D CRIPTION OF DATE OBJECT ACTIVITY ELEMENT ELFMF,NT HOURS WO PERFORMED SAT. DMF SUN. DMF MON. DMF TUES. DMF WED. Divi TH DMF FRI. DMF PLANNED ACTIVITIES F6R UP -COMING WRE TOTAL A URS: 1 certify that the a�c - an accurate account of accomplis�nd planned activities for the period SUPERVISOWS l [ 3 q 5 i s it �3 _ e � e .• 3 , chi\ \� a e a�' =� _ \ �D iu �a NPUFAC .41 4 e� ill n SRE PLW rn... CS7-11q 1 2 9 4 5 --- MAY 0 6 2011 t For Metals, only ground water samples are restricted. For more information, please contact Ellen Stafford (919-733-3908, ext. 213).