Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW8070925_HISTORICAL FILE_20071010
STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 o�p�i25 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2 00-1 l U 10 YYYYMMDD -.t W n 7-F9Q G Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources October 10. 2007 Mr. Carl M. Baker Deputy Public Works Division U.S. Marine Corps Camp Lejeune 1005 Michael Street Camp Lejeune, NC 28547 Subject: Permit No. SW8 070925 P-671 Aircraft Fire Rescue Facility High Density Project Onslow County Dear Mr. Baker: Coleen H. Sullins Director Division of Water Quality The Wilmington Regional Office received a complete Stormwater Management Permit Application for P-671 Aircraft Fire Rescue Facility on September 25, 2007. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 070925 dated October 10, 2007, for the construction of the subject project. This permit shall be effective from the date of issuance until October 10, 2017 and shall be subject to the conditions and limitations as specified therein, and does not supercede any other agency permit that may be required. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within sixty (60) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact either Paul Bartlett at (919) 733-5083 X235 or me at (910) 796-7215. Edward Beck Regional Supervisor Surface Water Protection Section ENB/ptb: S:\WQS\STORMWATER\PERMIT\070925.oct 07 cc: James W. Farrell, P.E., Hoggard-Eure Associates, P.C. Mike Morris, Onslow County Inspections Paul T. Bartlett, P.E. Wilmington Regional Office Central Files North Carolina Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Phone (910) 796-7215 Wilmington Regional Office Internet: www.newateraualitv.ore Fax (910)350-2004 One No hCarolina Aaturatty Customer Service 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer— 50% Recycledl10% Post Consumer Paper State Stormwater Management Systems Permit Number SW8 070925 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules and Regulations PERMISSION IS HEREBY GRANTED TO Carl M. Baker and U.S. Marine Corps Camp Lejeune P-671 Aircraft Fire Rescue Facility Curtis Road, MCAS New River, Onslow County FOR THE construction, operation and maintenance of an overall 30% low density development with two wet detention ponds for treatment of pockets of high density in compliance with the provisions of 15A NCAC 2H..1000 (hereafter referred to as the "stormwater rules') .and the approved stormwater management plans and specifications, and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. The Permit shall be effective from the date of issuance until October 10, 2017 and shall be subject to the following specific conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This permit covers the construction of 101,558 square feet of built -upon area for the entire project. This permit makes no allocation for any future built -upon area. 3. The overall tract built -upon area percentage for the project must be maintained at 30%, as required by Section .1005 of the stormwater rules. The low density areas are permitted for runoff conveyance by sheet flow, and the runoff from the high density pockets is treated by two wet detention ponds. 4. Approved plans and specifications for projects covered by this permit are incorporated by reference and are enforceable parts of the permit. 5. The only runoff conveyance systems allowed in the low density area will be vegetated conveyances such as swales with minimum side slopes of 3:1 (H:V) as defined in the stormwater rules and approved by the Division. 6. No piping is allowed in the low density area except that minimum amount necessary to direct runoff beneath an impervious surface such as a road or to provide access. Page 2 of 9 State Stormwater Management Systems Permit Number SW8 070925 7. Unless specified elsewhere, permanent seeding requirements for the swales and stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 8. Low density areas covered by this permit will maintain a minimum 30 foot wide vegetative buffer between all impervious areas and surface waters. 9. Roof drains in low density areas must terminate at least 30' from the Mean High Water line. 10. The stormwater systems to treat the runoff generated by the designated high density areas have been approved for the management of stormwater runoff as described in Section 1.13 on page 3 of this permit. The systems designated as North Pond and South Pond have been approved to treat a maximum of 37,331 ft2 and 29,619 ft2 of built -upon area, respectively. 11. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final platsfor the project will be recorded showing all such required easements, in accordance with the approved plans. 12. The runoff from all built -upon area in the designated high density pockets must be directed into the permitted stormwater control system. 13. The following design elements have been permitted for the wet detention pond stormwater facilities, and must be provided at all times. Design Criteria North Pond South Pond a. Drainage Area, acres: Onsite, it' Offsite, it' 1.79 77,878 None 1.83 79,603 None b. Total Impervious Surfaces, ft' (1) Buildings (2) Roads/Parking (3) Other (4) Offsite 37,331 5,267 31,046 1,018 None 29,619 5,267 21,095 3,257 None c. Design Storm, inches 1.0 1.0 d. Pond Depth, feet 3.08 3.00 e. TSS removal efficiency 90 90 f. Permanent Pool Elev., FMSL 14.0 14.0 g. Penn. Pool Surface Area, ft' 8,070 6,352 In. Permitted Storage Volume, ft' 4,535 3,588 i. Temporary Storage Elev., FMSL 14.5 14.5 j. Controlling Orifice, "0 pipe 1.0 1.0 k. Permitted Forebay Volume, ft' 5,195 4,515 I. Receiving Stream/River Basin New River / White Oak m. Stream Index Number 19-(15.5) n. Classification of Water Body SC; NSW o. Max. fountain horsepower 1/8 1/8 Page 3 of 9 State Stormwater Management Systems Permit Number SW8 070925 II. SCHEDULE OF COMPLIANCE The permittee shall not fill in, alter, or pipe any drainage feature (such as swales) shown on the approved plans as part of the stormwater management system without applying for a revision to the permit and receiving approval from the Division. The permittee is responsible for verifying that the proposed built -upon area does not exceed the allowable built -upon area. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. Prior to the subdivision and/or sale of this project, in whole or in part, the following deed restrictions must be recorded with the Office of the Register of Deeds: a. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW8 070925, as issued by the Division of Water Quality under NCAC 21-1.1000. b. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the Stormwater Management Permit. c. These covenants are to run with the land and be binding on all persons and parties claiming under them. d. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. e. Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the Division of Water Quality. f. Construction of additional built -upon area in excess of 101,558 square feet will require a permit modification. g. Construction of additional impervious areas such that low density requirements are no longer met must be submitted to DWQ and a permit modification must be issued prior to construction. An engineered system will be required to collect and treat the runoff from all built -upon area associated with the project, including that area permitted under the low density option. h. Filling in or piping of any vegetative conveyances (ditches, swales, etc.) associated with this development, except for average driveway crossings, is strictly prohibited by any persons. i. A minimum 30' wide vegetated buffer area shall be provided between surface waters and all impervious surfaces. 5. A copy of the recorded restrictions must be received in this Office within 30 days of the date of sale. 6. Filling in or piping of any vegetative conveyances (ditches, swales, etc.) associated with the permitted development, except for average driveway crossings, is strictly prohibited by any persons. Page 4 of 9 State Stormwater Management Systems Permit Number SW8 070925 7. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans , including, but not limited to, those listed below: a. Any revision to the approved plans, regardless of size. b. Project name change. c. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area. e. Further subdivision, acquisition, or sale of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval was sought. f. Filling in, altering or piping any vegetative conveyance shown on the approved plan. The Director may determine that other revisions to the project should require a modification to the permit. 8. Swales and other vegetated conveyances for low density areas and the stormwater management system for high density pockets shall be constructed in their entirety, vegetated, and be operational for their intended use prior to the construction of any built -upon surface. 9. During construction, erosion shall be kept to a minimum and any eroded areas of the swales or other vegetated conveyances will be repaired immediately. 10. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals, but not limited to: a. Inspections (once every 6 months for detention ponds) b Sediment removal. c. Mowing, and revegetating of the side slopes and vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of side slopes'in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins, and piping. g. Access to the outlet structure must be available at all times. 11. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work, and what actions were taken. 12. Within 30 days of completion of the project, the permittee shall certify in writing that the project has been constructed in accordance with the approved plans. 13. The permittee shall submit all information requested by the Director or his representative within the time frame specified in the written information request. 14. Decorative spray fountains will be allowed in the stormwater treatment system, subject to the following criteria: a. The fountain must draw its water from less than 2' below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. c. The falling water from the fountain must be centered in the pond, away from the shoreline. d. The maximum horsepower for a fountain in each pond is 1/8 horsepower. Page 5 of 9 State Stormwater Management Systems Permit Number SW8 070925 15. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 16. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in,accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 17. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 18. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 19. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the -approved plans, prior to construction. 20. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. III. GENERAL CONDITIONS Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to an enforcement action by the Division of Water Quality, in accordance with North Carolina General Statutes 143-215.6A to 143-215.6C. 2. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance, or termination does not stay any permit condition. 3. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules, and regulations contained in Title 15A of the North Carolina Administrative Code, Subchapter 2H.1000; and North Carolina General Statute 143-215.1 et. al. 4. This permit is not transferable except after notice to and approval by the Director. The Director may require modification or revocation and reissuance of the permit to change the name and incorporate such other requirements as may be necessary. A formal permit request must be submitted to the Division of Water Quality accompanied by the appropriate fee, documentation from both parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits, and may or may not be approved. The permittee is responsible for compliance with all permit conditions until the Director approves the transfer. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. Page 6 of 9 State Stormwater Management Systems Permit Number SW8 070925 6. The permittee grants permission to DENR Staff to enter the property during normal business hours for the purpose of inspecting all components of the stormwater management facility. 7. The permittee shall notify the Division of any name, ownership or mailing address changes within 30 days. 8. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state and federal) which have jurisdiction. Permit issued this the 10th day of October 2007 NORT CAROLINA EN 0 ENTAL MANAGEMENT COMMISSION ------ --- -- -------------------------------------------------- for Coleen H. Sullins, Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW8 070925 Page 7 of 9 State Stormwater Management Systems Permit Number SW8 070925 Page 1 of 2 Stormwater Permit No. SW8 070925 P-671 Aircraft Fire Rescue Facility Onslow Countv Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 8 of 9 State Stormwater Management Systems Permit Number SW8 070925 Page 2 of 2 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11.. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Regional Office Mike Morris, Onslow County Build ing'Inspections Page 9 of 9 i OFFICE USE ONLY 11 Date Received Fee Paid I Permit Number O— — Un v ' mo o StL O 2 9 zSo'"7 - o . PAe V x1, axe a, k if 338i7 State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): US MARINE CoRps CAmp LE)eumE. 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): MR. CARL QaKF2 17onu�ta ';1,lot ic wnQKS 0%*\ANI'o,J 3. Mailing Address for person listed in item 2 above: 1005 MICV,Ael sTRe-c-T City: CAMP Le!S2uNE State: rlC Zip: 28s4l Telephone Number: 4. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): P- lol I A i aC RAFT 'PI 2E 1Ze5CuE IAC IL.I T Y 5. Location of Project (street address): —Cu R-TiS 2ONC\ . MCAS New (zwe R City: CPtMp Lq2urJE County: ONSLOW G. Directions to project (from nearest major intersection): �KOM G ACE En0TRA/0(t i SOu TR ON C6t RTI S 2OAC) . .T'I,IST 5o,.. rL i2 ExiSTWR 3Btittroi.x AS84-O 7. Latitude: 34—P42t 30" N Longitude: %10 2%t 2 S" H( of project 8. Contact person who can answer questions about the project: tt// Name: TAMPS VAR12.ELL- Telephone Number II. PERMIT INFORMATION: 1. Specify whether project is (check one): _New Renewal Modification Form SWU-101 Version 3.99 Page I of 4 9IIt407-6,J eev. �.2 Sw8 07692r 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number and its issue date (if known) 3. Specify the type of project (check one): Low Density _High Density _Redevelop _General Permit _Other (Ut ve,raW /_.i7 �40<14! 7ft H ) Additional Project Requirements (check applicable blanks): _CAMA Major /Sedimentation/Erosion Control _404/401 Permit NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. 2. Stormwater runoff from this project drains to the A I k a t River basin. 3. Total Project Area: )ot 75 acres 5. How many drainage areas does the project have? 12 - 4. Project Built Upon Area: o[ I t 1 % 6. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as belowrT'i ra�007 001ZT1 l POAI O 'r SotA-FK POtJD >F %oTAL Basin Information Drainage Area 1 Drainage Area 2 PkalG Receiving Stream Name New kwo P e wet Heio Alver Receiving Stream Class Sc SW SC S ytJ Drainage Area 0-76 S F F 2Z1 Existing Impervious* Area k 10c) Z r 4 %ag Proposedlmpervious"Area I SSo Impervious* Area (total) % 31 2"O "70o Impervious' Surface Area Drainage Area 1 Drainage Area 2 On -site Buildings 5 ZG ri 526 7 o 53 On -site Streets On -site Parking 31 o` (P On -site Sidewalks IoI9325 ti 2�5 Other on -site Off -site BY PASS 0 Total: 3 ( 33 Total: aq 0 57 Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. -6y-0ASS AjzEA2, r\)oT inSCILA6PC\- Form SWU-101 Version 3.99 Page 2 of 4 7. How was the off -site impervious area listed above derived? N A IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. 1. The following covenants are intended to ensure ongoing compliance with state stormwater management permit number as issued by the Division of Water Quality. These covenants may not be changed or deleted without the consent of the State. PM A410 ��� 2. No rnor'e than N square feet of any lot shall be covered by structures or impervious materials. Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood decking or the water surface of swinuning pools. 3. Swales shall not be filled in, piped, or altered except as necessary to provide driveway crossings. 4. Built -upon area in excess of the permitted amount requires a state stormwater management permit modification prior to construction. 5. All permitted runoff from outparcels or future. development shall be directed into the permitted stormwater control system. These connections to the stormwater control system shall be performed in a manner that maintains the integrity and performance of the system as permitted. By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Form SWU-102 Wet Detention Basin Supplement Form SWU-103 Infiltration Basin Supplement Form SWU-104 Low Density Supplement Form SWU-105 Curb Outlet System Supplement Form SWU-106 OffSiteSystem Supplement FormSWU-107 Underground Infiltration Trench Supplement Form SWU-108 Neuse River Basin Supplement Form SWU-109 Innovative Best Management Practice Supplement Form SWU-101 Version 3.99 Page 3 of 4 VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Regional Office. 1. Please Indicate thatyou have provided the following required information by initialing In the space provided next to each Item. Initials • Original and one copy of the Stormwater Management Permit Application Form • One copy of the applicable Supplement Form(s) for each BMP • Permit application processing fee of $420 (payable to NCDENR) • Detailed narrative description of stormwater treatment/management • Two copies of plans and specifications, Including: - Development/Project name - Engineer and firm -Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another Individual or firm so that they may provide Information on your behalf, please complete this section. \\ Designated agent (Individual or firm): I OGG ARQ- EU eE A-ssoc t Fl - e S Phone: ( —1J5' ) 78'y'7iJ-)U VIII. APPLICANT'S CERTIFICATION State �L�- zip: Fax: ( ' 7Ei� ) $/8i%�%�i`/�n I, (print or type name of person listed In General Information, Item 2) C NP_ L_ 1A , &,r 4 i<IR, certify that the Information Included on this permit application form is, to the best of my knowledge, correct and that the project will b constructed In conformance with the approved plans, that the required deed restrictions and protective cov a its will be recorded, that the proposed project complies with the requirements of 15A NCAC 2H .1000 / // A Date: �— 6 Form SWU-101 Version 3.99 Page 4 of 4 �. TRANSACTION REPORT P. 01 OCT-16-2007 TUE 09:53 AM FOR: NCDENR 9103502004 >K � SEND '� � DATE START RECEIVER TX TIME PAGES TYPE /0T`E M# DP � OCT-16 09:51 AM 917574847498 1'30" 10 FAX TX OK 886 k TOTAL 1M 30S PAGES: 10 � 1< State Of h Carolina Department of Environment and aural Resources Wilmington Regional Office MicbaelF. E'ns/ey, Governor Date: To; Co: Fax: Re: FAX COVER SHEET /D %` p JAih�S tea. r/'E// p ar•d'E"rir� �/ /- 757- V*54- 7 �� S iVrN4ft G. Ross, Jr, Secretary No. Pages (excl. cover):_ From: O GQ Phone: Fax: -1s cve 910 350-2004 ' n /�7 .4r-. • L� � to r d c a `, 127 Cardinal Drive E"Sion, Wilmington, NC 2W5 • (91 U) 796.7215 • An E99j DF1ortunity Affirm ive A coon Employer State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Michael F. Easley, Governor William G. Ross, Jr., Secretary Date: To: Co: Fax: Re: FAX COVER SHEET / D 11`ZO - T ✓A/hr5 �4. /'/'E// / 757- Zf8tl 8 No. Pages (excl. cover): From: Phone: IF — 7 74 7 Z `f S 7 9 Fax: (910)350-2004 ro'0y e -YC 0Pin,f a.ffa,C- hed- Aa"-d co'0s/ 127 Cardinal Drive Extension, Wilmington, NC 28405 • (910) 796-7215 • An Equal Opportunity Affirmative Action Employer 5k n C K Hoggard-Sure _AssociatesP.G. ENGINEERS SURVEYORS PLANNERS 757-484-9670 - fax: 757-484-7498 - 901 Porl(entre Parkway, Suite 5 - Portsmouth, Viroinio 23704 September 24, 2007 DENR-DWQ Stormwater Unit Archdale Building 12th Floor, Room 1209E 512 N. Salisbury St.�+F,tVE Raleigh, NC 27604 ATTN: Mr. Paul Bartlett, P.E. 'Z 5 Re: Aircraft Fire Rescue Facility S Marine Corps Base $`c Camp Lejeune, North Carolina Our File No. 2724.02.06 Project ID: Onslo-2008-017 Dear Mr. Bartlett: Hoggard I Eure Associates, P.C. respectfully requests the review of the above referenced project. Included in this submittal package are the following: V1. Two (2) full size copies each of the revised drawings, C-107, C-110, C-111. C-113, C-114, C-503 & C-504. j,,,2. Two (2) SWU-101, page 2 of 4, Revised as requested. V3. Two (2) SWU-102, page 1 of 4, South Pond, Revised for pond outlet size as requested. Check for IS 1,000.00 Responses to each comment are indicated below: 1. Please clarify the Project Area and Project built -Upon Area in Sections 111.3 and 111.4 of the application. The disturbed area or contract area (listed as 6.7 ac. In the calculations) must equal the listed Project Area in the application (10.75 ac) in order to have a project built -upon area of 21.7% The total project area, 10.75 acres is taken as the area bounded by North and South Ditches, Curtis Road and Longstaff Street. The contractor is limited to this area. Not all of this area is to be disturbed. The project area is divided into two drainage areas, North — 6.46 ac, and South — 4.29 ac. The disturbed area, 6.78 acre, is the area within the site that is actually disturbed. The total impervious area being constructed by this project is 2.33 acres. 2.33 acres of impervious in a 10.75ac total site = 21.7% impervious. /2.Please provide 3 columns for the table in Section 111.6 of the application: (a) one for each drainage area to the Ponds North and South (do not include "bypass" areas); and (b) one for the Total Project Area (see Item #1 above) and include impervious areas in square feet. Three columns have been provided on the revised calculation as requested. The total site area remains 10.75 acres. 3. Please clarify the drainage from the vehicle wash pad. Wash Water is considered a process discharge and needs to be discharged to a POTW and separated from stormwater discharge. i Drainage from the vehicle wash rack shall be directed towards the sanitary sewer system. The runoff water shall enter the curb inlet. There will be a 1 ft grit trap, sump. Above the grit trap will bean outfall pipe to the sanitary sewer system. The line to the sanitary sewer will be valved to direct flow from the wash operation to sewer and flow from rain water to the ditch. Please see revised detail C4 on Sheet C-503, and revised site plan Sheet C-107. 4No comment 4. �5. / Please label the orifice diameter and invert elevations for both ponds on Sheet C-504, Detail V/ C2. Orifice diameters and inverts labeled on detail. This information was previously provided on plan sheets C-111 & C-114 6� For the Ponds' orifices: (a) please increase the Pond South orifice diameter to 1"minimum c/ (3/4" too likely to plug and 1" results in approx. 2.4 day drawdown); and (b) provide a screen mesh over both inlets or provide a 450 bend on an inlet pipe to place the inlet to the orifices below the permanent pool to prevent plugging. - Orifice size increased to 1" �p Detail D3, Sheet C-114, indicated 450 bend on previous submittal. Screen mesh added to detail. 7' Please label "4 O.C. max' for the bars on the Beehive Frame and Grate in Detail C2 of Sheet v C-504 Note to detail edited. �Zvegetated Please provide a cross-section detail: (a) labeling bottom permanent and temporary pool, and SHWT elevations, vegetated shelf, and side slopes for each pond that illustrates the shelf; and (b) referencing the vegetation plan on sheet C-001. Please see Detail D3 on Sheet C-114. SHWT added to section, vegetated shelf clarified. Reference to C-001 added. All other information was present on original documents. / Please label: Ponds vegetated shelf in the plan view on Sheet C-111; and (b) clarify the 2 FESs on Sheet C-111 (it appears that the discharge pipe from the Ponds' outlet structure to the FES was omitted). Vegetated shelf clarified with hatching. Outlet pipe indicated on Utility drawing. We typically turn off pipes on grading plan for clarity. Pipe added to grading plan for permit purposes. I hope these responses satisfy your review requirements. Please let me know as soon as possible if you require any additional information. yours, P.C. W. Farrell, P.E. State of North Carolina Department of Environment and Natural Resources Division of Water Quality Wetlands and Stormwater Branch 1617 Mail Service Center Raleigh, NC 27699-1617 Michael F. Easley, Governor FAX COVER SHEET William G. Ross, Jr., Secretary Date: 9/24/07 No. of Pages: 2 (Incl. Cover) To: Jim Farrell From: Paul Bartlett Company: Hoggard-Eure Water Quality Section - Stormwater FAX #: (757) 484-7498 FAX #: 919-733-9612 Phone #: 919-733-5083 X235 C7ac) ZS� DWQ Stormwater Project Number: SW8 unassigaed Project Name: P-671 AFRF MESSAGE: Jim, As requested, Form SWU-101, page 2 of application attached. Paul f�GG ENB\ptb: S:\WQS\STORMWATER\ADDI NFO\2007\P671 AFRF2FAXunassign.sep07 1617 Mail Service Center, Raleigh, NC 27699-1617 Telephone (919) 733-5083 FAX (919) 733-9612 An Equal Opportunity Affirmative Action Employer Sep,21. 2007 3:41PM HOGGARD EURE Y"x 919-733 - 361Z_ No.4755 P. 1 yggarrd-Eure kssoclates. " PEAL WWPv s %.he ft 157.4K9610 , F4e7914W490 90ttaiCEnAaRrkrar.9du5 - PMmaI9.ftaieVO4 September 21, 2007 DENR-DWQ Stormwater Unit Archdale Building Ir Floor, Room 1209E 512 N. Salisbury St. Raleigh, NC 27604 ATTN: Mr. Paul Bartlett, P,E. Re: Aircraft Fire Rescue Facility Marine Corps Base Camp Lejeune, North Carolina Our File No. 2724.0206 Project ID: Onslo-2008-017 Dear Mr. Bartlett: Hoggard / Eure Associates, P.C. respectfully requests a delay of one day, pushing the data of return documents until September 26, 2007. 1 have been out of the office and only received the document on the moming of Friday September 21, 2007, The required documents will be sent via UPS and be in your office at 8:00 am on the morning of September 26, 2007 I have faxed and e-mailed this notice. At this time a Mailed letter would not be received by your office in a timely manner. .it11;�Y P.C. Farrell, P.E. p State of North Carolina (Nr. Department of Environment and Natural Resources �o Division of Water Quality Wetlands and Stormwater Branch 1617 Mail Service Center Raleigh, NC 27699-1617 � r� I iS Michael F. Easley, Governor Will am G. Ross, Jr., Secretary FAX COVER SHEET Date: 9/20/07 No. of Pages: 3 (Incl. Cover) To: Jim Farrell From: Paul Bartlett Company: Hoggard-Eure Water Quality Section - Stormwater FAX #: (757) 484-7498 FAX #: 919-733-9612 Phone #: 919-733-5083 X235 07C i 2) DWQ Stormwater Project Number: SW8 yuria i7^v n Q Project Name: P-671 AFRF MESSAGE: 0� sr..^ A Jim, A Request for Additional Information is attached for the subjegje)�ignpl will be mailed to Mr. Baker, and a copy will be mailed to y�o ��� If you use a courier service, please send to my attention at: NCDENR — Div. Of Water Quality Archdale Building, 12th floor, Room1209E 512 N. Salisbury St. Raleigh, NC 27604 /U ENB\ptb: S:\WQS\STORMWATER\ADDINFO\2007\P671AFRFunassigned.sept07 1617 Mail Service Center, Raleigh, NC 27699-1617 Telephone (919) 733-5083 FAX (919) 733-9612 An Equal Opportunity Affirmative Action Employer Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality September 20, 2007 Mr. Carl Baker Deputy Public Works Division USMC Camp Lejeune 1005 Michael Street Camp Lejeune, NC 28547 Subject: Request for Additional Information Stormwater Project No. SW8 unassigned P-671 Aircraft Fire Rescue Facility Onslow County Dear Mr. Baker: The Wilmington Regional Office received a Stormwater Management Permit Application for P-671 Aircraft Fire Rescue Facility on September 17, 2007. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. %Please clarify the Project Area and Project Built -Upon Area in Sections 111.3 and 111.4 of / the application. The disturbed area or contract area (listed as 6.7 ac in the calculations) t must equal the listed Project Area in the application (10.75 ac) in order to have a project built -upon area of 21.7%. Please provide 3 columns for the table in Section 111.6 of the application: (a) one for each drainage area to Ponds North and South (do not include "bypass" areas); and (b) llV// one for the Total Project Area (see Item #1 above) and include impervious areas in square feet. 3Please clarify the drainage from the vehicle wash pad. Wash water is considered a v process discharge and needs to be discharged to a POTW and separated from stormwater discharge. Please label the orifice diameter and invert elevation for both Ponds on Sheet #C-504, Detail62. ry 6. For the Ponds' orifices: (a) please increase the Pond South orifice diameter to 1" minimum (3/4" too likely to plug & 1" results in approx. 2.4 day drawdown); and (b) provide a screen mesh over both inlets or provide a 450 bend on an inlet pipe to place the inlet to the orifices below the permanent pool to prevent plugging. Please label 'A" O.C. max." for the bars on the Beehive Frame and Grate in Detail C2 of Sheet #C-504. 8. Please provide a cross-section detail: (a) labeling bottom, permanent and temporary pool, and SHWT elevations, vegetated shelf, and side slopes for each pond that illustrates the vegetated shelf; and (b) referencing the vegetation plan on Sheet #C-001. N""off�` hCarolina Naturally Wetlands and Stormwater Branch 1617 Mail Service Center Raleigh, NC 27699-1617 Phone (919) 733-5083 Internet: h2o.enr.state.nc.us 512 N. Salisbury St. Raleigh, NC 27604 FAX (919) 733-9612 An Equal OpportunitylAff rmative Action Employer - 50 % Recycletl110% Post Consumer Paper Mr. Carl Baker September 20, 2007 9. Please label: the Ponds' vegetated shelf in the plan view on Sheet#C- 1.11; ands -clarify the 2 FESs on Sheet #C-111 (it appears that the discharge pipe from the Ponds' outlet structure to the FES was omitted). Additional fees, not to exceed 50% of the original permit application fee, may be charged for subsequent reviews due to the insufficiency of a permit application, as specified by Section 11.4A of S.L. 2003-284. Because the application has significant permitting issues/deficiencies, a resubmittal fee of $1,000 will be required in order for this project to remain in the express program. Please note that this request for additional information is in response to a partial, preliminary review. The requested information should be received by this Office prior to September 25, 2007, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (919) 733-5083 X235. Since ly, 7, Paul T. Bartlett, P.E. Environmental Engineer ENB/ptb: S:\WQS\STORMWATERWDDINFO\2007\P761AFRFunassigned.sept07 cc: James W. Farrell, P.E., Hoggard-Eure Associates Paul Bartlett DEVELOPED DRAINAGE AREAS 1.TO POND NORTH = 1.79 AC 2. BYPASS TO NORTH = 3.98AC 3.TO POND SOUTH = 1.83AC 4. BYPASS TO SOUTH = 3.1 5AC - • _._ J vv - ------ - ♦ J t,. : %—/ 1 2p01 2.3b �e� of b GRAPHIC SCALE: - ts I-f/e 7 ;:,.. � y. i a WET DETENTION POND ANALYSIS FILE NAME: S:\WQSISTORMWATER\EXCELSPREADSHEETSIPOND1070925.WK1 PROJECT#:SWB 070925 REVIEWER: P.Bartlett PROJECT NAME: P-671 Aircraft Fire Rescue Facility Original Run Date: Last Modified: 09-Oct-07 Pond North Pond South Pond 3 Pond 4 Pond 5 Pond 6 Receiving Stream: New River/White Oak Classification: SC; NSW Index Number: 19-(15.5) Onsite DA, sf= 77878.00 79603.00 Offsite DA, sf = 0.00 0.00 Total Drainage Area: 77878.00 79603.00 0.00 0.00 0.00 0.00 Built -Upon Area Buildings/Lots, sf= Streets/Parking, sf= Sidewalk/Concrete, sf= Other, sf= Offsite, sf= Total Built -upon Area: Surface Area %impervious 47.94% 37.21% #DIV/O! #DIV/O! #DIV/01 #DIV/O! Design Depth, ft: 3.08 3.00 TSS (85% Or 90°/%): 90 90 SAIDA ratio 5.37% 4.22% #DIV/O! #DIV/01 #DIV/O! #DIV/O! Req. Min. Surface Area 4184 3360 #DIV/01 #DIV/O! #DIV/01 #DIV/O! Volume Calculations Design Storm, inches: 1 1 Rational Cc= 0.57 . 0.49 #DIV/O! #DIV/01 #DIV/01 #DIV/O! Rational Volume, cf: 3724 3252 #DIV/O! #DIV/01 #DIV/O! #DIV/O! Rv = 0.481 0.385 #DIV/O! #DIV/0! #DIV/O! #DIV/O! Min. Req. Volume= 3124 2553 #DIV/01 #DIVI01 #DIV/01 #DIV/01 Bottom Elevation= 8.00 7.00 Permanent Pool Elev= 14.00 14.00 Perm Pool Area= 8070.00 6352.00 Temp. Pool Elevation= 14.50 14.50 Temp.Pool Area= 10068.00 7998.00 Total Volume Prov. = 4534.50 3587.50 0.00 0.00 0.00 0.00 Forebay Volume Permanent Pool Vol.= 24859.00 19144.00 Req. Forebay Volume= 4971.8 3828.8 0 0 0 0 Prov, Forebay Volume= 5195.00 4515 Percent=(22>%>18) 21% 24% #DIV/O! #DIV/01 #DIV/O! #DIV/O! Pond 1 Pond 2 Pond 3 Pond 4 Pond 5 Pond 6 Drawdown Orifice/Weir Avg. Head, ft = 0.23 0.23 0.00 0.00 0.00 0.00 Average Flow Q2, cfs 0.018 0.015 #DIV/O! #DIV/01 #DIV/01 #DIV/O! Average Flow Q5, cfs 0.007 0.006 #DIV/0! #DIV/O! #DIV/01 #DIV/O! Q2 Area, sq. in. = 1.13 0.92 #DIV/O! #DIV/01 #DIWO! #DIV/O! Q5 Area, sq. in. = 0.45 0.37 #DIV/O! #DIV/01 #DIV/O! #DIV/O! No. of Orifices 1 1 Orifice Diameter, in.= 1 1 Orifice Area, sq. in. = 0.785 0.785 0.000 0,000 0.000 0.000 Weir Height, inches= Weir Length, inches= - Weir C = #DIV/O! #DIV/O! #DIV/O! #DIV/01 #DIV/01 #DIV/O! Weir L', eff. length= -0.046 -0.046 0.000 0.000 0.000 0.000 Avg. Flowrate, Q, cfs = 0.013 0.013 0.000 0.000 0.000 0.000 Drawdown, days = 2.9 2.4 #DIV/01 I #DIV/01 I #DIVI01 #DIVI01 Im m m m m = = m w m m m m m m m m m m STORMWATER MANAGEMENT PERMIT APPLICATION EXPRESS PERMITTING OPTION Original SEP 1 I AIRCRAFT FIRE RESCUE FACILITY MARINE CORPS BASE CAMP LEJEUNE, NORTH CAROLINA September 14, 2007 �Qo E S/p' SEAL 027192 = \` ` HOGGARD/EURE ASSOCIATES. P.0 ENGINEERS/SURVEYORS/PLANNERS 901 PORTCENTRE PARKWAY SUITE 5 PORTSMOUTH, VIRGINIA 23704 (757)484-9670 TABLE OF CONTENTS STORMWATER MANAGEMENT REQUEST FOR EXPRESS PERMIT REVIEW APPLICATION 1.0 PROJECT NARRITIVE 1.1 Project Description 1.2 Existing Site Conditions 1.3 Developed Site Conditions 1.4 Adjacent Areas 1.5 Off — Site Areas 1.6 Soils 1.7 Critical Areas 1.8 Stormwater Runoff Considerations 2.0 DRAINAGE CALCULATIONS 2.1 PREDEVELOPED DRAINAGE CHARACTERISTICS 2.2 DEVELOPED DRAINAGE CHARACTERISTICS 2.3a EXISTING DRAINAGE AREA MAP 2.3b DEVELOPED DRAINAGE AREA MAP 2.4 DISTURBED AREA MAP 2.5 DISTANCE OF POND TO RIVER MAP 2.6 BASIN CHARACTERISTICS; 2, 10, & 100 YR STORM FREQUENCIES - Hydrologic Report - Summary of Peak Flow Rates - NORTH - Hydrologic Report - Summary of Peak Flow Rates — SOUTH 2.7 TEMPORARY SEDIMENT TRAP SIZING 2.8 WET POND CALCULATIONS - North Pond - South Pond 2.9 WET DETENTION POND VOLUME CALCULATIONS 4.0 APPENDICES 4.1 Applicable Project Specifications Section 01 56 10 "Erosion and Sediment Control' Section 01 57 19.00 20 "Temporary Environmental Controls" Section 31 23 00.00 20 "Excavation and Fill' Section 32 92 19 "Seeding" 4.2 Geotechnical Report 4.3 USGS Maps Aircraft Fire Rescue 1 OF 4 September 14, 2007 2724.02.06 APA Reviewer NCDENR Submit ' North Carolina Department of Environment and Natural Resources 127 Cardinal Drive Extension, Wilmington, NC 28405 (910) 796-7215 FAX (910)350-200 Time Request for Express Permit Review Confirm FILL-IN all information below and CHECK required Permit(s). FAX to Express Coordinator along with a detailed narrative and vicinity map of the project location. R Projects must be submitted by 5:00 pm the day before the review date, unless prior arrangements are made. APPLICANT Name/Title: Mr. Carl Baker Deputy Public Works Division Company United States Marine Corps Camp Leieune Address: 1005 Michael Street City: Camp Leleune Zip 28547 County ONSLOW Phone 910-451-2213 Fax 910-451-2927 Email carl.h.baker(a)usmc.mil PROJECT Name P-671 Aircraft Fire Rescue Facility County ONSLOW PROJECT DRAINS TO New River (Stream name) in the White Oak RIVER BASIN ENGINEER/CONSULTANT INFORMATION: Name James Farrell PE Company Hoccard-Eure Associates, PC Address 901 Portcenter Parkway Suite 5 City Portsmouth State VA Zip 23704_ Phone 757-484-9670 Fax 757-484-7498 Email iim(a)hoggard-eure.com ------------------------------------------------------------------------------------------------------------------------------------------------------------------------ State or National Environmental Policy Act (SEPA or NEPA) — EA or EIS Required? ❑Yes ®No ------------------------------------------------------------------------------------------------------------------------------------------------------------------------ ❑STREAM ORIGIN DETERMINATION # of Stream calls Stream Name ® STORMWATER ❑ Low Density ® High Density -Detention Pond ❑ High Density - Other (check all that apply) ❑ Low Density -Curb & Gutter ❑ High Density -Infiltration ❑ Off -site Wetlands MUST be addressed below Plan Revision -------------------------------------- ❑ COASTAL l---------------------------------------❑------9 ❑Excavation &Fill ------------------------------- Brid es &Culverts Stru------------------------ ❑Structures Information MANAGEMENT ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront —--- ---------- -- ---- --- --- ---- ---- - --- - --- ----------------- --- ----- ------ ---- ---------- -- --- ------ ---- ® LAND QUALITY ® Erosion and Sedimentation Control Plan with 6.7 acres to be disturbed ---------------------------------------------------------------------------------------------------------------------------------------------------------------------- WETLANDS (401) Wetlands on Property ? ❑ Yes ® No Isolated Wetlands on Property? ❑ Yes ® No (Check all that apply) Wetlands will be impacted? ❑ Yes ® No Wetland impacts: 0.0 acre(s) Wetlands delineation has been completed? ❑ Yes ® No ❑ Buffers impacted: Acre(s) PLEASE SEE ATTACHED FORM DD1391, PAGE 4 SACOE Approval of Delineation completed? ❑ Yes ® No ' 404 Application in Process w/USACOE? ❑ Yes ® No / Permit recv'd from USACOE❑Yes ❑ No 401 Application Required? ❑ Yes ® No If Yes, ❑ Regular ❑ Express 'Additional fees, not to exceed 50% of the original Express Review permit application fee may be charged for subsequent reviews due to the insufficiency of the permit application. ' Total Fee:$ Stormwater $ Date Received CAMA $ ' LQS $ 401 $ Project Name P-671 Aircraft Fire Rescue Facility Stormwater Express Questionnaire (6/15/2007) 1. What is the applicant's full legal name? US Marine Corps, Camp Leieune ❑If a corporation, LLC or Partnership is involved, what is that name? If it's an LLC, is it ❑ manager -managed or ❑ member -managed? What is the applicant's title within the corporation, LLC or partnership? Will an agent (someone other than the applicant) be signing the application? N Yes LJ No If Yes, what is the agent's name and title? Mr. Carl Baker Deputy Public Works Division El Please note the application signature requirements are listed in NCAC 2H.1003 (e). In summary, only the sole proprietor of a sole proprietorship, the designated manager, member - manager, president or vice president of a corporation or LLC, the general partner of a partnership, or a ranking official of a municipality may sign permit applications and supplements. The signature of the engineer or other agent can be accepted only if accompanied by a signed letter of authorization from one of the aforementioned individuals. Corporations, LLC's and Partnerships must be registered with the NC Secretary of State's Office, and be active. Please note that spelling, capitalization, and punctuation are extremely important. Please provide the entity name exactly as on file with the NC Secretary of State. 2 Where is the project located? County ONSLOW Nearest Town/City MICAS New River (Attach a detailed vicinity map with both local street names and SR, NC, US or Interstate highway numbers, plus other relevant information such as town or city names, directions to, etc. Show the nearest intersection of two major roads on the vicinity map. A major road is any 1, 2 or 3 digit NC, US or interstate highway.) If the project is located in Brunswick, Onslow or New Hanover Counties, NPDES Phase 11 Post - Construction rules will apply. 3. What is the name of the receiving stream? NEW RIVER What River Basin is it located in? WHITE OAK ' What is the classification of the receiving stream? SC For SA or SR waters, a separate scaled topographic map will be required. The project must be accurately located on the map and the % mile radius from the property corner closest to the SA or SR receiving stream must be drawn on the map. 4. If the project is high density, what type of stormwater management BMP's are being proposed? (check all that apply) Wet Detention Infiltration Trench Infiltration Basin Sand Filter 8 8 Bio-retention Wetlands Alternative Offsite Dry Detention Other Grassed Swales How many separate BMP's are being proposed? 1 2 3 4 5 6 7 8 9 10 11 12 Other 5. Is there offsite runoff from the adjacent properties or public right-of-way that will drain into any of 1 the proposed BMP's on the project and is not being diverted? ❑ Yes ® No 6. Is an access road across other property required to access the project? ❑ Yes ® No 7. Is there any existing development or pre-1988 existing BUA located on the property? (Please provide documentation & delineate and identify on the plans.) Yes ® No 8. For high density projects, has all of the proposed BUA been collected? ® Yes ❑ No (If not, attach a separate explanation sheet) 9. Will the project involve the subdivision and sale of property? ❑ Yes ® No Page 1 of 2 Project Name P-671 Aircraft Fire Rescue Facility I 1 1 i 1 Is the subdivision ❑ residential or ❑ commercial? How many lots are proposed? N/A (Deed restrictions are required for all residential, commercial, low density or high density sub- divisions. Specific language for the various types of subdivisions is available from DENR.) 10. Have the wetlands been delineated? ❑ Yes ® No (All projects require either a signed wetlands delineation map or a wetlands report to be submitted with the application. Only a trained professional may provide information regarding the presence or absence of wetlands.) Please see attached Government Form DD1391 stating no wetlands on site. 11. Are wet detention ponds or other engineered controls proposed to be located adiacent wetlands? MYes ® No (If, yes, a physical means to prevent the dewatering of the wetland must be provided, or the SHWT must be provided to demonstrate that the permanent pool of the BMP is above the SHWT and will not dewater the wetlands over time. Where possible, all BMP's and swales should outlet into back the wetland (with level spreaders). 12. For infiltration projects, has a site visit been completed with the DENR soils scientist to verify the soil type, water table and infiltration rate provided in the soils report? ❑ Yes ® No If yes, what was the date of the site visit? Include a copy of the consultant's soil report with the application. 13. Does the project propose Level Spreaders at the outlet of all engineered controls and swales prior to entering surface waters or wetlands? ❑ Yes ® No (The purpose of the level spreader is to reduce the energy of the incoming runoff and to promote diffuse sheet flow to prevent erosion and scour into the receiving waters or wetlands.) 14. Is this project a modification to an existing permit, part of a larger subdivision, or is it a lot that will be treated in a BMP under a previously issued permit? ❑ Yes ® No If yes, what is the name of the permitted facility? What is the permit number of the permitted facility? Is the permitted facility in compliance with its permit? Yes No Have the deed restrictions been recorded? Yes No H Have the deed restrictions been submitted? Yes No Has the Designer's Certification been submitted? Yes No 15. Do the plans reflect all information as listed in 15A NCAC 2H.1003 (g)? ® Yes ❑ No 16. Have all of the design requirements of each proposed BMP been met? ® Yes ❑ No (If not, attach a separate explanation sheet. Please note that the Express program is not set up to handle any type of deviation from the standard design.) ' 17. For each BMP in all high density projects, and low density curb outlet swale projects, has a drainage area delineation map been provided? Z Yes ❑ No ' 18. . Any revisions made to.the application as a result of this review may cause changes to the other documentation. Plans, calculations, application, and supplements should be reviewed for any necessary changes. For example, changing the orifice size will require a modification to the calculations, the pond details on the plans, and page 1 of the supplement. �i ' Page 2 of 2 1.Component FY 2006 1[ILIT Y IOA PROplt11»I 2.Date NAVY 05 AUG 2004 3. Installation and Location/UIC: 625737,iAIRCRAFT . Project Title MARINE CORPS AIR STATION NBN RIVER FIRE AND RESCUE FACILITY JACKSONVILLE, NORTH CAROLINA ' S.Program Element 6.Category C6,1e 7. Project Number e. Project Cost ($000) 14120 P671 4,310 9. OO 9 1 ROMELTZ0 Ita9 ON Quantity Unit Cost Cost($000) AIRCRAFT FIRE AND RESCUE FACILITY (1 400 8) m2 1,152 AIRCRAFT RESCUE AND FIREFIGHTINd'(12,40 m2 1,152 2,370.44 2,940 (2,730) SP) BUILT-IN HQUIPMENT Lg TECHNICAL OPERATING MANUALS LS (40) INPORMATION SYSTMS Lg (40) ANTI-TERRORISM/PORCE PROTECTION. I' LS (0) SPECIAL COSTS 14 (30) SUPPORTING FACILITIES I (30) SPECIAL FOUNDATION FEATURES LS 810 ELECTRICAL UTILITIES LS (90) MECHANICAL UTILITIES LS (370) PAVING AND BITS nUMOVBMITrS LS MiVIROtDtIBeTI'AL MITIGATION LS ((40) 0) SUBTOTAL (140) cowr:mcy (St) 3,750 TOTAL CONTRACT COST 290 SION (5.71;) 3,940 SUBTOTAL 220 DESIGN/BUILD - DESIGN COST (4.t) 4,160 TOTAL REQUEST ROtIDIDBD ISO TOTAL RAT 4,310 EQUIPMENT FROM OTHER APPROPRIATIONS 4,310 (190) Guidance Unit Cost Analysis category OM QddaM&: 06idmoe Code/Facility 8a0 Area Project else aim Cost Yacalatlon chit Gold. Coat sin Brnya Fctr Peer Fetr latr Coat 14120 AIRCRAFT RasCOa AND • 2,522 75002 FrumIG64I"a I 1152e2 .9904 .960 1.019436346 2,370.44 10. Description of Proposed Congt*uatLoni Construct a single story, high bay buildi , slab on grade, with structural steel framing, pile foundations and rei*Orced Made beams, exterior brick and masonry veneer, .interior concrete masonry unit (CM�T) bloc: walls, and sloped standing seam metal roof system. Provide insulated glass ndowe n metal frames with blast resistant construction and 2 X 2 drop intical ceilings with 2 X 4 flouresoest lighting. The facility will include alarm/c cati /dispatch center, training Facilities, living quarters for male and female peresnel i luding ADA rest rooms with showers, kitchen/dining/dayroom areas, adm}41istrat On spaces, maintenance/repair/storage areas, nn v..— I, . 1 Dec 76 Page No. 1 1.Compoaent Fr 2006 NILIT OCTION PROGRAM 2.Date NAVY 05 AUG 2004 3. Installation and Location/UIC: 1 62573 4. Project Title MARINE CORPS AIR STATION NM RIVER AIRCRAFT FIRE AND RESCUE FACILITY JACKSONVILLE, NORTH CAROLINA S.Program Element 6.Category a 7. Project Number 8. Project Cost ($000) 14120 P671 4,310 and other support spaces as requi . S ctrical systems include fire alarms with mass notification, emergency generator l , Inforation Systems, and radio signal antennae. Mechanical systems include plumb , fir protection systems, and heating ventilation and air conditioning (HVAC). Support fac sties include site and building utilities connections (water, sanitary and Ia or a rare, electrical, telephone, local area network (LAN) and cable television. Pav and to improvements include bituminous POV parking, roadway access for emergency vshilC es POV'a, building apron for emergency vehicles, sidewalks, and landscaping. The w faci ity will provide stalls for 6 emergency vehicles. Sustainable features will be i luded in the design, development, and cnnstruction for the project in 0rdan with Executive Order 13123 and other laws and executive orders. 11. Requireaemt: FACILITY PL&MK32(G DATA Category Cade Requiremen DM to Substandard Inadequate Deficit/Surplus 14120 AIRCRAFT 1248 m2 870 0 0 -378 FIRS&RESCUE �. STATION NOTRB: SCOPR: The project scope was derived us" NAVF P-80 for category code 141.20 •Aircraft Fire and Rescue Station*. Historical d..pta frco the existing facility and improvements required were used in developing these ce requirements. PROJA=: Construct an Aircraft Rescue and Fiirefi " building with close proximity to the aircraft flight lines, runways, aaq taxiw ays. (current Mission) RSQIIIRffi1'P: I Adequate and efficiently configurel facilities to support an Aircraft Rescue and Fire Pighting mission in support of Metins Ai raft Group (MG) 26, with 94 aircraftj Marine Aircraft Group (MAO) 29 with 79 al craft; and HAKE with 2 VC-12B aircraft for a total of 175 aircraft permanently statiI oneat MCAS Now River, CURRENT BITUATION: The existing building co -locates rcraft Rescue with the Structural Fire Department. The facility lacks space to incl storage areas or sufficient space for.personnel and emergency vehicles. Aircraft Re p ently has only 3 stalls within the bay to park the emergency vehicles. They Darr tly ve 7 vehicles, 5 of which need to be in the .... �...,,. ���,. .. I 1 Dec 76 Page No. 2 i.Component 8Y 2006 NNILIT UMON PROORAN 2.Date NAVY 05 AUG 2004 3. Installation and Location/UIC: 62573 Project Title MARINE CORPS AIR STATION NEW RIVERI 14. AIRCRAFT FIRE AND RESCUE FACILITY JACKSONVILLE, NORTH CAROLINA 5-Program Element 6.Category 7. Project Number 8. Project Cost ($000) 14120 P671 4,310 building to protect them from i emant Mather. The unit presently bee to find maintenance hangar space to park veh lee that will not fit in the Aircraft Rescue facility. The current facility 1 cke wo3anIg ' restroome resulting in the women using the unisex restroome by hanging a Big on thi door. The current facility has no storage space available for equipment, and t , or supply which has had to be located in a building 2 miles away from the main fact ty. This has the potential to cause delayed response in emergency conditions.: IMPACT IF NOT PXOVID>D: The undersized, flood prone facility j zee emergency rg cY response time and risks the lose of personnel and valuable equipment 1 The unit will be forced to park the emergency response vehicles where ever they tan Mo room and risk freezing and damaging these valuable assets. The unit will continue to work out of two undersized buildings separated by miles. ADDITI02D1L: ECOn-40 A1ternati4*a �dered: a. Statue Quo: I This is not a viable alternative. The e$1Lsting facility in not large enough to house the number of people and the amount 6� equip t and vehicles required to perform this mission. b. Renovation/Modernization: I This is not a viable alternative— The Sting facility does not have the neceeeary area for storage and equipment. ROWVOtion wjj 1 cost 75t of new construction. c. Lease: This is not a viable alternative.l Thane no facilities near enough to the airfield surfaces to lease. d. New Construction: This is the only viable alternative. He .construction provides a facility that will meet the requirements for space and prcmcimlty�to the airfield surfaces. e. Other Alternatives: N/A f. Analysis Results: New construction is the only viable alto ties. 12. enpplamumtal Data: Site Approval Yee, obtained date : 1 Dec 76 1 Page No. 3 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1.Component Fr 2006 NIL1" ION PA0a8Al! a:Dete NAVY Os ADO 2004 3. Installation and Location/UIC: 1 062573 4. Project Title MARINE CORPS AIR STATION NEW RIVER! AIRCRAFT FIRE AND RRSCDR FACILITY JACKSONVILLE, NORTH CAROLINA i 5.Program Element 6.Category C' 7. Project Number S. Project Cost ($000) 14120 P671 4,310 ® No,expected approval date: Issues (If yes, please provide disc Dion Yee NO X DDESE, AICUZ, Airfield, BMR or v X Endangered species/senaitii habi X Air quality X Cultural/archeological roe as ' E Clearing of trees E Known contamination at eel ted e X Operational problems E Traffic patterns impact X Existing utilities upgrade E Ordnance sweep required prior to Planning : Consistent with Master Plan or Eaed/Regi ❑X Yea No, why not: Host Nation Approval : N/A National Capital Region Approval N/A NEPA Documentation Complete Yes 0 No Level of NEPA : X Categorical Exclusion Environmental Assessment (, ) Environmental Impact Stat t (I Memorandum of Negative Dec, ion Mitigation Issues Yee No II X Wetlands replacement/enhandejneat X Hasardous waste II X Contaminated soil/water X other Environmental Cleanup : N/A Project Issues Yes No DD Form 1391 C 1 Dec 76 issue) : Development Page No. 4 1.Component FY 2006 KlUT OW IIG'PION PROGRAM 2.Date NAVY I 05 AUG 2004 3. Installation and Location/UIC: 62573 4. Project Title MARINE CORPS AIR STATION NEW RIVER i. AIRCRAFT FIRE AND RESCUE FACILITY JACKSONVILLE, NORTH CAROLINA S.Program Element 6.Category C e 7. Pzojacf Number 8. Project Cost ($00D) 14120 P671 4,310 i Yee No j iSystem safety X Soils - foundation and sei- c tions: I, X Construction/operational pelmits X�Local air quality/vastawate,z permilm Complies with Final Governixg Standard (Environmental standard for Spain, Italy 6 Greece) X Land Acquisition (i.e. location, tity) X Technical Operating Manuals R Feasibility/Constructibilit in FY X Historical Preservation X Does the facility have an ' rhead crane requirement? X Navy Crane Center contacted to ass t with dev. of crane estimate (lifting capacity < 10-Cone)? �_JX� Navy Crane Center contacted to coo procurement and timelines (lifting capacity >. 10-tone)? F—] F_X7, Physical Security: Shielding SCIF Fencing IDS Other Type: i Budget Estimate Summary Sheet: i Item Q�1 i, Ouantitv Unit Cost Total BUILT-IN EQUIPMENT L6 37,500 Back-up Generator 60 RN EA 1.00 22,500.00 22,500 Vehicle Exhaust System HA j 6.00 2,500.00 15,000 Special Construction Features: item U 4 Quantity Unit Coat Total TECHNICAL OPERATING MANUALS Is 40,000 GHSI RA 1 40,000.00 40,000 ' uu Form 1'"" U 1 Dec 76 Page No. 5 II I.Component FY 2006 KILr?A#:Y IIClIbu YhOOitm 2:Date i' 05 AUG 2004 3. Installation and Location/UIC: #2573 4. Project Title MARINE CORPS AIR STATION NEW RIVER AIRCRAFT FIRS AND RESCUE FACILITY JACKSONVILLE, NORTH CAROLINA i S.Program Element 6.Category Co4e7. project Number 8. Project Cost ($000) 14120 !I P671 4,310 Item Quantity Unit Cost Total INFORMATION SYSTEMS �, 69,581 Mass Notificationm2 1152 32.05 36,922 Telephone and LAN I� 1152 19.00 21,868 STY m2 1152 9.35 10,771 ANTI-TERRORISM/PORCR PROTECTION L$ 28,858 Laminated Windows/Doors piQ ��. 1152 25.05. 28,858 SPECIAL COSTS LS 31,770 Standing Seam Metal Roof 012 ! 1059 30.00 31,770 Utilities and Site Improvemente: Item Quantity Unit Cost Total SPECIAL FOUNDATION FEATURES XIS 91,035 Pile Foundation a2 1071 85.00 91,035 ELECTRICAL UTILITIES L6 ! 368,453 Communications, voice.data m ! 2529 111.00 280,719 Primary Electric m 75 310.00 23,250 Transformer E.A 1 19,459.00 19,459 Secondary electric in 35 715.00 25,025 Exterior Lighting '8 2,500.00 20,000 MECHANICAL UTILITIES L 39,360 Water Service 120 98.00 11,760 Sanitary Sewer 120 230.00 27,600 PAVING AND SITE IMPROVEMENTS LIS I 165, 200 Excavation/grading m2 I_ 5000 5.00 25,000 POV Pavement m2 1200 26.00 31,200 Fire Apparatus and Road Pavement m 3500 30.00 105,000 Landscaping CII2 I 800 5.00 4,000 ENVIRONMENTAL MITIGATION LS 138,900 Building Stormwater Planters S�+ I 500 60.00 30,000 Parking Biofiltration Bede Sir 7260 15.00 108,900 DO Form 1391 C Page No. 6 1 Dec 76 I 1 I 1 1 1 1 11 1 C I1i.component I Fr 2006 MILIT11� CON��ION PROfi"M 2.Date 05 AUG 2004 3. Installation and Location/UIC: MARINE CORPS AIR STATION NEW RIVER JACKSONVILLE, NORTH CAROLINA ,. 4. Project Title AIRCRAFT FIRE AND RESCUE FACILITY 5-Program Element I6.Ca2tegory Ccide 17.. Project Number IS. Project Coot ($000) I L. Estimated Design Data: 1. Statue: (A) Date Design or Parametric Cosi: stim (B) Date 35% Design or Parametric;L st E (C) Date Design Completed (D) Percent Completed as of SSP7 3R (E) Percent Completed as of JAM4Y (P) Type of Design Contract (G) Parametric Estimate used to lop (H) Energy study/Life cycle anal ye s pe: 2. Basis: (A) Standard or Definitive Design! (B) Where Design Was Previously Used: 3. Total Cost (C) a (A) + (8) a (D). + (R) (A) Production of Plans and Specificati< (8) All other Design Costs (C) Total (D) contract (E) In -House 4. Contract Award 5. Construction Start 6. Construction Complete, B. Equipment associated with this project JOINT USE CERTIFICATION: The Director Land Use and Military Department, Headquarters Marine Co: for joint use potential. Unilater operational considerations, and lo, Activity POC: David D. Turner Attachmaataz MILCON CHECKLIST Site Plan Facility Planning Documents)/P-BO Other DO Form 1391 C 1 Dec 76 Started ate Complete $0 $0 will be provided from other appropriations: on Branch, Installations and Logistics an that thin project has been considered tion is recommended. Mission requirements, incompatible with use by other components. Phone No: 910-449-5401 Page No. 7 I' ® _ i � � � � � � � �. � � � � � � � � r1.0 PROJECT NARRATIVE 1.1 Project Description: ' The existing site is located between Curtis Road and Longstaff Street, just south of the aircraft parking apron at MCAS, New River. Latitude: 340 42' 30" N Longitude: 770 26' 2.95" W The project consists of the construction of a 10,258 square foot Fire Station, concrete aprons for fire truck parking, site utilities, access to Curtis Road, and remote gravel parking lot located 460' east of the proposed building. Between the building and the gravel parking lot shall be two (2) wet detention ponds. 1.2 Existing Site Conditions: The site is currently undeveloped and exists as a grassed field area traversed by a gravel and broken asphalt drive connecting Curtis Road to Operations building AS840. A scattering of trees are located to the southeast of the new building site. Drainage ditches / swales are located both south and north of the site. Both ditches flow in ' an easterly direction, joining west of Longstaff Street. After the ditches join, the flow is piped under Longstaff Street and flows to the New River. At the closest point the New River is approximately 415' east of Longstaff Street. Between the ditches, Curtis Road and Longstaff Street is approximately 10.75 acres. 6.46 acres flowing north and 4.29 acres flowing south. The runoff flows mostly north and south to the bordering ditches. 1.3 Developed Site Conditions: ' As part of this project, the new Aircraft Fire Rescue Facility (AFRF) will be located east of the Curtis Road and west of Longstaff Street, approximately centered between the north and ' south ditches. ' The AFRF building will be supported by an emergency vehicle access road from Curtis Road. Pavements shall be constructed for building access and parking. A vehicle wash down area shall between the building and Curtis Road. Drainage from this area shall pass thru a sumped curb inlet for capturing grit and then an oil water separator before being discharged 6 into the e south ditch. NWC oft ' The paved areas shall be connected to the Wet Detention ponds by grassed swales located both northeast and southeast of the AFRF building. The wet detention ponds shall be sized to maintain flows to pre-existing conditions as tabulated below in section 1.8, with additional detailed calculations in section 2.6. 1 Aircraft Fire Rescue 2 OF 4 September 14, 2007 2724.02.06 A gravel parking lot and access road from Longstaff Road shall be constructed east of the AFRF site. Runoff from the gravel areas shall be captured in grassed swales with stone check dams before entering the north ditch. Associated site utilities include water for domestic and fire fighting use, and sanitary sewer. 1.4 Adjacent Areas: ' The site is located between Curtis Road and Longstaff Street. It is bounded on the north by an airfield and support buildings and on the south by a housing development. ' 1.5 Off -site Areas: No off site areas will be disturbed for the construction of this project. ' 1.6 Soils: ' Additional Geotechnical information was provided in a report by ECS Carolinas, LLP, dated January 18, 2007. No Appreciable organic topsoil was reported at boring locations. ' Groundwater depths were observed to range from 0.6 to 4 feet below the existing grade. At the infiltration test location, ground water was encountered at a depth of 36 inches below existing grade. Based on infiltrations tests at a depth of 12 inches, a rate of 3.2 inches per hour was obtained. Seasonal high water table at infiltration test location estimated at 17 inches below grade. Additional soil data is provided the geotechnical report, attached. 1.7 Critical Areas: There are no critical areas located on this site. Cl 1 1 L ' Aircraft Fire Rescue 3 OF 4 September 14, 2007 2724.02.06 I 1.8 Stormwater Runoff Considerations: 1 .I u 1 Storm water runoff from the Fire Station site area is currently split between the two (2) ditches to the north and south of the site which connect downstream. Both ditches flow to the east toward the New River. The site has been divided into two drainage areas: North, and South. The North area sheet flows to the ditch on the north border of the site. The South area flows to the southern ditch. Pre and Post developed flows are tabulated below: Pre -developed North Runoff (cfs) 2YR = 6.60 10YR = 8.80 100YR= 12.00 Pre -developed South Runoff (cfs) 2YR = 5.40 10YR = 7.30 ' 100YR= 10.20 Pre -developed Total Runoff (cfs) 2YR = 12.00 10YR = 16.10 100YR= 22.20 Developed Runoff North (cfs) 2YR = 6.83 10YR = 9.26 100YR= 13.08 Developed Runoff South (cfs) 2YR = 4.50 10YR = 6.38 100YR= 9.16 Developed Runoff Total (cfs) 2YR = 11.33 (5.6% decrease) 10YR = 15.64 (2.9% decrease) 100YR= 22.24 (0.2% increase) Sizes of the North and South drainage areas change after the site development. Below are the characteristics of the pre and post drainage areas: ' Pre -developed North 6.46 acres Developed North To Pond 1.79 acres ' To Ditch 3.98 acres Total 5.77 acres 1 [J Pre -developed South 4.29 acres Developed South To Pond 1.83 acres To Ditch 3.15 acres Total 4.98 acres ' Aircraft Fire Rescue 4 OF 4 September 14, 2007 2724.02.06 2.1 PREDEVELOPED DRAINAGE CHARACTERISTICS File: 2724.02.06 Project: Aircraft Fire Rescue Location: Camp Lejeune, NC Design: JWF Date: 6/1 /2007 Revision'. Yr. Storm: 10 N Value: 0.013 North South Site Area: 6.46 SF AC "C A*C Grassed, Good Condition 279044 6.41 0.30 1.92 Impervious Area 2180 0.05 0.90 0.05 281224 0.30 Weighted C % Impervious: 0.8% Site Area: 4.29 SF AC "C" A*C Grassed, Good Condition 184485 4.24 0.30 1.27 Impervious Area 2528 0.06 0.90 0.05 187013 0.31 Weighted C TOTAL Impervious: 1.4 % Site Area: 10.75 SF AC "C' A*C Grassed, Good Condition 463529 10.64 0.30 3.19 Impervious Area 4708 0.11 0.90 0.10 468237 0.31 Weighted C Impervious: 1.0 % 2.2 DEVELOPED DRAINAGE CHARACTERISTICS File: 2724.02.06 Project: Aircraft Fire Rescue Location: Camp Lejeune, NC Design: CPS Date: 6/1/2007 Revision: Yr. Storm: 10 N Value: 0.013 North To Pond Site Area. 1.79 SF AC 'C'. A*C Grassed, Good Condition 40547 0.93 0.30 0.28 Impervious Area 37331 0.86 0.90 0.77 77873 0,59 Weighted C % Impervious: North To Bypass Site Area: 47.9 % 3.98 SF AC "C.. A*C Grassed, Good Condition 141919.2 3.26 0.30 0.98 Impervious Area 31528.8 0.72 0.90 0.65 173448 0.41 Weighted C % Impervious: 18.2 % South To Pond Site Area: 1.83 SF AC "C" A*C Grassed, Good Condition 49984 1.15 0.30 0.34 Impervious Area 29619 0.68 0.90 0.61 796D3 0.52 Weighted C % Impervious: 37.2 % South To Bypass Site Area: 3.15 SF AC "C., A*C Grassed, Good Condition 134212 3.08 0.30 0.92 Impervious Area 3080 0.07 0.90 0.06 137292 0.31 Weighted C % Impervious: 2.2 % TOTAL Site Area: 10.75 SF AC "C., A*C Grassed, Good Condition 366662.2 8.42 0.30 2.53 Impervious Area 101558.8 2.33 0.90 2.10 468221 0.43 _ Weighted C % Impervious: 21.7 % mim m mMINI m m M. m! M M m EXISTING DRAINAGE AREAS 1. EX.. DRAIN AREA NORTH = 6.46 2. EX. DRAIN AREA SOUTH = 4.29 11 2.3a GRAPHIC SCALE: DEVELOPED DRAINAGE AREAS 2.3b 1.TO POND NORTH = 1.79 AC 2. BYPASS TO NORTH = 3.98AC 3.TO POND SOUTH = 1.83AC 4. BYPASS TO SOUTH = 3.1 5AC d ----- — N -- GRAPHIC SCALE: , ,* o y t ;*. a• so• +oo' Aso' zoo' p. } `q1� o 1 jr r"r �iiSt J E II Y�rt Y • rYYzT J _�{• .a _.� x � r v d -` ee.... ^,-a d 7a... .+ .—1 .�+ 3i d a d ,•��V//3 a �j , . CJ DISTURBED AREA = 6.70 ACRES 2.4 ..................., . IrvGRAPHIC SCALE: o' so• ioo• Isa' zoo' ILL J 1 + �.. j •SY (* Yei i�M'L } �� w m�a{l� 4...J •iJG._ i� J I jai + . J . � t +� IP 31II 99. _ �F + 3 'i .y hj J tl dI� �.�.1 ........ L. p� d �•E J• J . + + \J . e • l J i Hoggard-Eure Associates, P.C. ' 901 PortCentre Parkway, Suite 5 Portsmouth, VA 23704 Fri Sep 14 08:26:01 2007 1 -PROJECT: MACC\CALCULATIONS-DESIGN ANALYSIS\STORM SEWER - POND\SWM POND - 2.pro ---------------------------------------------------------------------------- HYDROLOGIC REPORT - SUMMARY OF PEAK FLOW RATES BASIN: POND NORTH ID: POND NORTH PREDEVELOPMENT AREA 6.46 ' AVERAGE BASIN SLOPE 0.00 HYDRAULIC LENGTH = 0.00 TIME OF CONCENTRATION = 20.90 CURVE NUMBER = 0.30 'BASIN DEVELOPMENT AREA = 1.79 AVERAGE BASIN SLOPE = 0.00 HYDRAULIC LENGTH = 0.00 ' TIME OF CONCENTRATION = 13.00 BASIN CURVE NUMBER = 0.59 BYPASS ' AREA 3.98 AVERAGE BASIN SLOPE 0.00 HYDRAULIC LENGTH = 0.00 ' TIME OF CONCENTRATION BASIN CURVE NUMBER 15.00 0.41 Frequency Pre -developed By-pass area Developed Allowable peak (years) Peak Q (cfs) Peak Q (cfs) Peak Q (cfs) Peak Q (cfs) -------- 2 6.6 -------------- 6.5 4.3 --- 0.1 10 8.8 8.5 5.8 0.3 100 12.0 11.8 8.2 0.2 1 I 1 i 1 11 1 1 1 Y 1 Hoggard-Eure Associates, P.C. 901 PortCentre Parkway, Suite 5 Portsmouth, VA 23704 Fri Sep 14 08:26:35 2007 PROJECT: MACC\CALCULATIONS-DESIGN ANALYSIS\STORM SEWER - POND\SWM POND - 2.pro -------------------------------------------------------------------------------- HYDROLOGIC REPORT FOR POND NORTH SUMMARY OF PEAK FLOW RATES . FREQ PRE -DEVELOPED POST -DEVELOP POND ROUTED FLOW FLOW ELEVATION STORAGE OUTFLOW (yr) (c.f.s.) (c.f.s.) (ft.) (cu.ft.) (c.f.$) 2 6.62 4.33 14.75 7125.1 0.33 10 8.82 5.81 14.94 9144.7 0.76 100 12.03 8.21 15.13 11199.4 1.28 11 L [J I 1 11 Hoggard-Eure Associates, P.C. 901 PortCentre Parkway, Suite 5 Portsmouth, VA 23704 Fri Sep 14 09:39:32 2007 I PROJECT_ MACC\CALCULATIONS-DESIGN ANALYSIS\STORM SEWER - POND\SWM POND - 2.pro ----------------------------------------------------------------------- HYDROLOGIC REPORT - POND DEPTH VS STORAGE PROVIDED POND: POND NORTH ELEV DEPTH AREA VOLUME SUMVOL feet feet sq.ft. cu.ft. cu.ft. ----------------------------------------------------------------------- 14.0 8070.0 0.0 (Perminant Pool) ' 0.5 4534.5 14.5 10068.0 4534.5 (Temporary Pool) 0.5 5154.0 15.0 10548.0 9688.5 0.5 5485.8 15.5 11395.0 15174.3 0.5 6058.0 16.0 12837.0 21232.3 1 u 1 1 1 1 I I I 1 Hoggard-Eure Associates, P.C. 901 PortCentre Parkway, Suite 5 Portsmouth, VA 23704 Fri Sep 14 08:26:18 2007 PROJECT: MACC\CALCULATIONS-DESIGN ANALYSIS\STORM SEWER - POND\SWM POND - 2.pro -------------------------------------------------------------------------------- HYDROLOGIC REPORT - POND OUTPUT DEVICES POND: POND NORTH 1=CIRCULAR ORIFICE INVERT 14.0000 C 0.5000 D 0.0830 if (H < D) Q = 3.0 * D * (H ** 1.5) if (H >= D) Q = C * A * SQRT(64.4 * (H - RAD) 2=CIRCULAR ORIFICE INVERT 14.5000 C 0.5000 D 0.8300 if (H < D) Q = 3.0 * D * (H ** 1.5) if (H >= D) Q = C * A * SQRT(64.4 * (H - HAD) 3=TRAPEZODIDAL BROAD CRESTED WEIR INVERT 15.4000 W 5.0000 A 45.0000 Q = 4.8 * (H ** 1.5) * (0.667 * W + 0.533 * H * TAN(A) 1 11 I 1 I 1 11 1 1 1 [1 0 I r� Hoggard-Sure Associates, P.C. 901 PortCentre Parkway, Suite 5 Portsmouth, VA 23704 Fri Sep 14 08:29:03 2007 1 PROJECT: MACC\CALCULATIONS-DESIGN ANALYSIS\STORM SEWER - POND\SWM POND - 2.pro ---------------------------------------------------------------------------- HYDROLOGIC REPORT - SUMMARY OF PEAK FLOW RATES BASIN: AIRCRAFT FIRE RESCUE - SOUTH ID: POND SOUTH PREDEVELOPMENT AREA 4.29 1 AVERAGE BASIN SLOPE 0.00 HYDRAULIC LENGTH = 0.00 TIME OF CONCENTRATION = 12.40 BASIN CURVE NUMBER = 0.30 DEVELOPMENT AREA = 1.83 AVERAGE BASIN SLOPE = 0.00 HYDRAULIC LENGTH = 0.00 TIME OF CONCENTRATION = 13.92 BASIN CURVE NUMBER = 0.52 BYPASS 1 AREA 3.15 AVERAGE BASIN SLOPE 0.00 HYDRAULIC LENGTH = 0.00 TIME OF CONCENTRATION BASIN CURVE NUMBER 12.40 0.31 Frequency Pre -developed By-pass area Developed Allowable peak (years) Peak Q (cfs) Peak Q (cfs) Peak Q (cfs) Peak Q (cfs) 10 7.3 5.5 5.1 1.8 100 10.2 7.7 7.2 2.5 I CJ I C 1 Hoggard-Eure Associates, P.C. 901 PortCentre Parkway, Suite 5 Portsmouth, VA 23704 Fri Sep 14 08:29:32 2007 PROJECT: MACC\CALCULATIONS-DESIGN ANALYSIS\STORM SEWER - POND\SWM POND - 2.pro -------------------------------------------------------------------------------- HYDROLOGIC REPORT FOR AIRCRAFT FIRE RESCUE - SOUTH SUMMARY OF PEAK FLOW RATES ' FREQ PRE -DEVELOPED POST -DEVELOP POND ROUTED FLOW FLOW ELEVATION STORAGE OUTFLOW (yr) (c.f.s.) (c.f.s.) (ft.) (cu.ft.) (c.f.$) ---2-_------_5-43----_-----3-90--_-------19 75-_--_---6050.8 0.40 10 7.30 5.06 14.94 7824.3 0.88 100 10.20 7.17 15.11 9535.9 1.46 1 1 1 1 CJ I Y Hoggard-Eure Associates, P.C. 901 PortCentre Parkway, Suite 5 Portsmouth, VA 23704 Fri Sep 14 08:29:46 2007 PROJECT: MACC\CALCULATIONS-DESIGN ANALYSIS\STORM SEWER - POND\SWM POND - 2.pro --------- -------------------------- --------------- ------ ----------- ----- -------- „ HYDROLOGIC REPORT - POND DEPTH VS STORAGE PROVIDED POND: AIRCRAFT FIRE RESCUE - SOUTH ELEV DEPTH AREA VOLUME SUMVOL feet feet sq.ft. cu.ft. cu.ft. 14.0 -- ----- --------------------------------------------------- 6352.0 0.0 (Perminent Pool) 0.5 3587.5 14.5 7998.0 3587.5 (Temporary Pool) 1.2 11637.6 15.7 11398.0 15225.1 1 [] 1 1 I Hoggard-Eure Associates, P.C. 901 PortCentre Parkway, Suite 5 Portsmouth, VA 23704 Fri Sep 14 08:29:17 2007 PROJECT: MACC\CALCULATIONS-DESIGN ANALYSIS\STORM SEWER - POND\SWM POND - 2.pro HYDROLOGIC REPORT - POND OUTPUT DEVICES ' POND: AIRCRAFT FIRE RESCUE - SOUTH 1=CIRCULAR ORIFICE INVERT 14.0000 C 0.5000 D 0.0630 ' if (H < D) Q = 3.0 * D * (H ** 1.5) if (H >= D) Q = C * A * SQRT(64.4 * (H - RAD) 2=CIRCULAR ORIFICE INVERT 14.5000 C 0.5000 D 1.0000 if (H < D) Q = 3.0 * D * (H ** 1.5) if (H >= D) Q = C * A * SQRT(64.4 * (H - RAD) 3=TRAPEZODIDAL BROAD CRESTED WEIR INVERT 15.4000 W 10.0000 A 45.0000 ' Q = 4.8 * (H ** 1.5) * (0.667 * w + 0.533 * H * TAN(A) 1 1 1 1 1 1 I I i i 1 1 I 1 1 1 I 1 I 1 2.7 TEMPORARY SEDIMENT TRAP SIZING File: 2724.02.06 Project: Aircraft Fire Rescue Location: Camp Lejeune, NC Design: JWF Date: 7/4/2007 Revision: North TEMPORARY SEDIMENT BASIN DRAINAGE AREA = 5.77 Acres 4.98 Acres DISTURBED AREA = 1.79 Acres 1.83 Acres OFFSITE DISTURBED AREA = 0.00 Acres 0.00 Acres TOTAL DISTURBED AREA = 1.79 Acres 1.83 Acres VOLUME REQUIRED = 6444 Cubic Feet 6588 Cubic Feet VOLUME PROVIDED = 8642 Cubic Feet 7006 Cubic Feet BOTTOM ELEV. = 13.50 Feet 13.00 Feet TOP OF EMBANKMENT = 15.70 Feet 16.00 Feet TRAP DEPTH = 2.20 Feet 3.00 Feet SIDE SLOPE = 3:1 MAX 3:1 MAX TEMPORARY SEDIMENT TRAP @ North Pond ELEV FT CHANGE IN ELEV. AREA SF VOL. CF SUM VOL. CF 13.5 7695 0 0.5 4083 14 8638 4083 0.5 4558 14.5 9596 8642 1 9596 15 10553 13679 0.5 5578 15.5 11760 19257 TEMPORARY SEDIMENT TRAP @ South Pond ELEV FT CHANGE IN ELEV. AREA SF VOL. CF SUM VOL. CF 13 1715 0 1 2374 14 3032 2374 0.5 1710 14.5 3809 4084 0.5 2099 15 4586 6183 0.7 5595 15.7 11401 11778 2.8 Wet Detention Pond Sizing Calculations North Pond Drainage Area(D.A.)= 1.79 Acres ('7 '7) Impervious Area = O.f6A.cres 9 Impervious, (I) = 47.9 % Use a 3.0 foot deep pond, with 90% TSS Therefore, SA/DA= 5.6 & (From Table 3.3-3) ' MINIMUM REQUIRED SURFACE AREA AT PERMANENT POOL (PP): = SA/DA x Drainage Area= 4361 SF MINIMUM REQUIRED VOLUME Rv _ .05 + .009(I)= 0.48 ' VOLUME _ (1"/12") X R, X D.A. X 43560 = 3124 CUBIC FEET ' SURFACE AREA (S. A.) PROVIDED AT PP : = 9070 SF(>Required S.A.)@ Elev. = 14,00 ft ' M F2 SET ELEVATION OF TEMPORARY POOL (TP): REQ. VOL./S.A. PROVIDED @ PP = 0.39 FEET ' THEREFORE USE 050 FEET ' TP ELEV. = 14.500 FEET SURFACE AREA AT TEMPORARY POOL ELEVATION: = L x W = 10068 SQUARE FEET ' VOLUME PROVIDED = (S.A. PROVIDED(PP) + S.A. @ TP ELEV.)/2 x (TP ELEV. - PP ELEV) (B21+B33)/2 X (E- G21) _ t MPS 4� ,35 CUBIC FEET (> REQUIRED VOL., OKAY) FOREHAY VOLUME: ' BOTTOM OF POND ELEVATION AND SURFACE AREA: 6.0 FT - 1690 SF = PERMANENT POOL VOLUME = 24859 CUBIC FEET ' FOREBAY VOLUME REQUIRED= .2(VOL. OF PP)= 4972 CUBIC FEET FOREBAY VOLUME PROVIDED= 5195.25 CUBIC FEET 20. 95 ' ORIFICE SIZING: Qi = REQ. VOL./172600 = 0.026 CPS (FLOWRATE REQUIRED FOR A 2 DAY DRAWDOWN Q5 = REQ. V0L./432000 = 0.010 CPS (FLOWRATE REQUIRED FOR A 5 DAY DRAWDOWN ' CHOOSE A 0.75" CIRCULAR ORIFICE, AVERAGE HEAD = (0.50'-(1/2)(0.75"/l2))/2 1 ORIFICE W/ AVERAGE HEAD = 0.229 FEET AREA = 3.14R' ' AREA = 0.0055 SF Q=Co(A2gh)112 Q= 0.026 CFS (0.0I0</=.026</=.026) ' USE ONE (1) - ONE INCH (111) DIAMETER PVC I 2.8 Wet Detention Pond Sizing Calculations South Pond Drainage Area(D.A. )= i.'o;i Acres (76)6D3 K'1 Impervious Area = 0.65 Acres 8 Impervious, (I) = 37.2 8 C Use a 3 foot deep pond, with 90% TSS Therefore, SA/DA= 4_5 6 (From Table 3.3-3) MINIMUM REQUIRED SURFACE AREA AT PERMANENT POOL (PP): = SA/DA x Drainage Area= 3582 SF MINIMUM REQUIRED VOLUME Rv= .05 + .009(I)= 0.38 VOLUME _ (i"/12") X Ry X D.A. X 43560 2553 CUBIC FEET SURFACE AREA (S.A.) PROVIDED AT PP = 6352 SF(>Required S.A.)@ Elev. = 14.00 ft 1 SET ELEVATION OF TEMPORARY POOL (TP): REQ. VOL./S.A. PROVIDED @ PP = 0.40 FEET THEREFORE USE 0.50 FEET ' TP ELEV. = 14.500 FEET 1 SURFACE AREA AT TEMPORARY POOL ELEVATION: = L x W 7998 SQUARE FEET VOLUME PROVIDED = (S.A. PROVIDED(PP) + S.A. @ TP ELEV.)/2 x (TP ELEV. - PP ELEV) (B21+B33)/2-X (B29 - G21) = 3588 CUBIC FEET (> REQUIRED VOL., OKAY) FOREBAY VOLUME: t BOTTOM OF POND ELEVATION AND SURFACE AREA: 7 FT - 555 Se = PERMANENT POOL VOLUME = 19144 CUBIC FEET FOREBAY VOLUME REQUIRED= .2(VOL. OF PP)= 3829 CUBIC FEET ' FOREBAY VOLUME PROVIDED= 4515.25 CUBIC FEET 23.6% 1 ORIFICE SIZING: Qi = REQ. VOL./172600 = 0.021 CFS (FLOWRATE REQUIRED FOR A 2 DAY DRAWDOWN Q, = REQ. VOL./432000 = 0.008 CFS (FLOWRATE REQUIRED FOR A 5 DAY DRAWDOWN ' CHOOSE A 0.75" CIRCULAR ORIFICE, AVERAGE HEAD = (1.00'-(l/2)(0.75"/I2))/2 0.75 ORIFICE W/ AVERAGE HEAD = 0,234 FEET AREA = 3.34R' AREA = 0.0031 SF Q=Cp(A2gh)1/2 Q= 0.019 CFS (.006</=. 019</=. 021) ' USE ONE (1) - THREE QUARTER INCH (3/411) DIAMETER PVC 1 1 t 1 1 2.9 Wet Detention Pond Volume Calculations NORTH POND ELEVATION AREA VOLUME SUM VOL 8 1690 0 BOTTOM 1 2047 9 2404 2047 1 2790 10 3175 4837 1 3589 11 4002 8425 1 4444 12 4886 12869 1 5357 13 5827 18226 0.5 3037 AVE DEPTH 3.08 13.5 6319 21262 0.5 3597 / 14 8070J 24859 ✓ PERM POOL 0.5 4535 14.5 10068 29394 TEMP POOL 4535 NORTH POND FOREBAY ELEVATION AREA VOLUME SUM VOL 10 0 0 0 0 10 785 0 BOTTOM 1 961 11 1136 961 1 1344 12 1551 2304 1 1791 13 2031 4095 0.5 1100 13.5 2370 5195 FOREBAY VOL 1 1 1 1 t 1 1 1 t 2.9 SOUTH POND Wet Detention Pond Volume Calculations ELEVATION AREA VOLUME SUM VOL 7 555 0 BOTTOM 1 809 8 1062 809 1 1344 9 1626 2153 1 1936 10 2246 4089 1 2585 11 2923 6673 1 3290 12 3656 9963 1 4051 AVE DEPTH 3.01 13 4446 14014 0.5 2327 13.5 4862 16341 0.5 2804 14 6352 19144 PERM POOL 0.5 3588 3588 14.5 7998 22732 TEMP POOL 1.2 11638 15.7 11396 34369 SOUTH POND FOREBAY ELEVATION AREA VOLUME SUM VOL 10 0 0 0 0 10 648 0 BOTTOM 1 809 11 969 809 1 1162 12 1355 1971 1 1580 13 1805 3551 0.5 963 13.5 2054 4515 PERM POOL SECTION O1 56 10 EROSION AND SEDIMENT CONTROL 03/03 PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only. ASTM INTERNATIONAL (ASTM) ASTM D 3787 (2001) Bursting Strength of Textiles - Constant -Rate -of -Traverse (CRT), Ball Burst Test ASTM D 4533 (1991; R 1996) Trapezoid Tearing Strength of Geotextiles ASTM D 4632 (1991; R 1996) Grab Breaking Load and Elongation of Geotextiles NORTH CAROLINA SEDIMENT CONTROL COMMISSION (NCSCC) NCSCC ESCM (1993) Erosion and Sediment Control Planning and Design Manual 1.2 DESCRIPTION OF WORK The work includes the provision of temporary and permanent erosion control measures to prevent the pollution of air, water, and land within the project limits and in areas outside the project limits where work is accomplished in conjunction with the project. 1.3 SUBMITTALS Submit the following in accordance with Section 01330, "Submittal Procedures:" SD-01 Preconstruction Submittals Construction Sequence Schedule; G Erosion Control Plan; G SD-03 Product Data Sediment Fence Dust Suppressors Page 1 Filter Fabric 1.4 CONSTRUCTION SEQUENCE SCHEDULE Submit a Contractor furnished construction work sequence schedule, with the erosion control plan. The work schedule shall coordinate the timing of land 1 disturbing activities with the provision of erosion control measures to reduce on site erosion and off site sedimentation. Installation of temporary erosion control features shall be coordinated with the ' construction of permanent erosion control features to assure effective and continuous control of erosion and pollution. 1.5 STATE APPROVED PLAN The erosion control plan indicated has been approved by the State. No additional State review and approval of the erosion control plan is - required, unless the Contractor desires to modify the erosion control plan indicated. Should the Contractor desire to modify the State approved plan, a resubmittal to the State, including the State's approval is required prior to the start of construction. The contractor shall be responsible for any additional costs and time incurred as a result of the resubmittal of the previously approved erosion control plan. The contractor shall anticipate a minimum 45 day review period by the State. Provide and maintain erosion control measures in accordance with NCSCC ESCM, and as specified herein. PART 2 PRODUCTS ' 2.1 SEDIMENT FENCE 2.1.1 State Standard Sediment Fence ' NCSCC ESCM Standard 6.62, sediment fence (maximum height of 18 inches). 2.2 CONSTRUCTION ENTRANCE 2.2.1 State Standard Construction Entrance ' 2.2.1.1 Aggregate NCSCC ESCM, Standard 6.06. ' 2.2.1.2 Filter Fabric A woven or nonwoven polypropylene, nylon, or polyester containing ' stabilizers and/or inhibitors to make the fabric resistant to deterioration from ultraviolet, and with the following properties: a. Minimum grab tensile strength (IF 25 #1/ASTM D 4632) 180 pounds b. Minimum Puncture (TF 25 #4/ASTM D 3787) 75 psi in the weakest direction ' C. Apparent Opening Size 40-80 (U.S. Sieve Size) d. Minimum Trapezoidal tear strength (TF 25 #2/ASTM D 4533) 50 pounds 1 Page 2 �1 2.3 DUST SUPPRESSORS Calcium chloride, or other standard manufacturer's spray on adhesives ' designed for dust suppression. 2.4 TEMPORARY SEEDING 2.4.1 State Standard Temporary Seeding ' Provide seed, lime, and fertilizer in accordance with NCSCC ESCM, Standard 6.10. PART 3 EXECUTION ' 3.1 CONSTRUCTION SEQUENCE SCHEDULE Stabilize areas for construction access immediately with gravel. Install principal sediment basins and traps before any major site grading takes place. Provide additional sediment traps, sediment fences, and filter barriers as grading progresses. Provide protection around existing ' drainage structures, and inlet and outlet protection at the ends of new drainage systems. Stabilize graded and disturbed areas immediately after grading. Permanent stabilization shall be provided immediately on areas that have been final graded. Temporary seeding and mulching shall be provided on disturbed areas as specified in the paragraph entitled "Temporary Seeding." Installation of temporary erosion control features shall be coordinated with the construction of permanent erosion control features to assure effective and continuous control of erosion and sediment deposition. Remove temporary erosion control measures at the end of construction and provide permanent seeding. ' 3.2 AND SEDIMENT FENCES Install posts at the spacing indicated, and at an angle between 2 degrees and 20 degrees towards the potential silt load area. Sediment fence height shall be approximately 18-24 inches. Do not attach filter fabric to existing trees. Secure filter fabric to the post using staples, tie wire, or hog rings. Imbed the filter fabric into the ground as indicated. Splice filter fabric at support pole using a 6 inch overlap and securely seal. 3.3 CONSTRUCTION ENTRANCE Provide as indicated, a minimum of 6 inches thick, at points of vehicular ingress and egress on the construction site. Construction entrances shall be cleared and grubbed, and then excavated a minimum of 3 inches prior to placement of the filter fabric and aggregate. The aggregate shall be placed in a manner that will prevent damage and movement of the fabric. Place fabric in one piece, where possible. Overlap fabric joints a minimum of 12 inches. 3.4 DUST SUPPRESSORS 'I Immediately dampen the surface before calcium chloride application. Apply dust suppressors on unsurfaced base, subbase and other unsurfaced travel ways. Apply calcium chloride at the rate of 1.0 to 1.25 pounds per square 'I yard of surface for pellets for the initial application. For subsequent 11 Page 3 applications of calcium chloride, application rates may be approximately 75 percent of initial application rates. Do not apply when raining or the ' moisture conditions exceed that required for proper application. Apply other dust suppressors in accordance with manufacturers instructions. Protect treated surfaces from traffic for a minimum of 2 hours after treatment. Repeat application of dust suppressors as required to control 1 dust emissions. 3.5 TEMPORARY SEEDING t 3.5.1 Time Restrictions Within 48 hours after attaining the grading increment specified herein, provide seed, fertilizer, mulch and water on graded areas when any of the following conditions occur: a. Grading operations stop for an anticipated duration of 30 days or more. b. When it is impossible or impractical to bring an area to finish ® grade so that permanent seeding operations can be performed without serious disturbance from additional grading. C. Grading operations for a specific area are completed and the seeding seasons specified for permanent seeding in Section 32 92 19 SEEDING is more than 30 days away. d. When an immediate cover is required to minimize erosion, or when erosion has occurred. e. Provide on erosion control devices constructed using soil materials. 3.5.2 Seeding Requirements 3.5.2.1 State Standard Seeding Requirements Provide seed, lime, and fertilizer in accordance with NCSCC ESCM, Standard 6.10. 3.6 MAINTENANCE AND INSPECTION Inspect erosion control devices after each rainfall and daily during pro longed rainfall. Remove sediment deposits after each rainfall or when sediment reaches approximately one-half the barrier height. Immediately repair damaged erosion control devices and damaged areas around and underneath the devices. Maintain erosion control devices to assure continued performance of their intended function. Modify the erosion control plan as required to control problem areas noticed after each inspection. Modifications shall be approved by the Contracting Officer. 3.7 CLEAN UP At the completion of the job, or when directed or approved by the Contracting Officer, temporary erosion control devices shall be removed. Erosion control devices and areas immediately adjacent to the device shall be filled (where applicable), shaped to drain and to blend into the Page 4 surrounding contours, and provided with permanent seeding. Erosion control devices may remain in place after job completion when approved by the Contracting officer. -- End of Section -- Page 5 SECTION O1 57 19.00 20 TEMPORARY ENVIRONMENTAL CONTROLS 07/06 PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only. U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA) EPA 832-R-92-005 (1992) Storm Water Management for Construction Activities Developing Pollution Preventions and Plans and Best Management Practices U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA) 29 CFR 1910.120 Hazardous Waste Operations and Emergency Response 40 CFR 112 Oil Pollution Prevention 40 CFR 122.26 Storm Water Discharges (Applicable to State NPDES Programs, see section 123.25) 40 CFR 241 Guidelines for Disposal of Solid Waste 40 CFR 243 Guidelines for the Storage and Collection of Residential, Commercial, and Institutional Solid Waste 40 CFR 258 Subtitle D Landfill Requirements 40 CFR 260 Hazardous Waste Management System: General 40 CFR 261 Identification and Listing of Hazardous Waste 40 CFR 262 Standards Applicable to Generators of Hazardous Waste 40 CFR 263 Standards Applicable to Transporters of Hazardous Waste 40 CFR 264 Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities 40 CFR 265 Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities Page 1 for the Management of Specific 40 CFR 266 Standards Hazardous Wastes and Specific Types of Hazardous Waste Management Facilities 40 CFR 268 Land Disposal Restrictions j� 40 CFR 270 EPA Administered Permit Programs: The Hazardous Waste Permit Program 40 CFR 271 Requirements for Authorization of State Hazardous Waste Programs 40 CFR 272 Approved State Hazardous Waste Management Programs 40 CFR 273 Standards For Universal Waste Management 40 CFR 279 Standards for the Management of Used Oil 40 CFR 280 Technical Standards and Corrective Action Requirements for Owners and Operators of Underground Storage Tanks (UST) 40 CFR 300 National Oil and Hazardous Substances Pollution Contingency Plan 40 CFR 355 Emergency Planning and Notification 40 CFR 372-SUBPART D Specific Toxic Chemical Listings 49 CFR 171 General Information, Regulations, and Definitions 49 CFR 172 Hazardous Materials Table, Special Provisions, Hazardous Materials Communications, Emergency Response Information, and Training Requirements 49 CFR 173 Shippers - General Requirements for Shipments and Packaging 49 CFR 178 Specifications for Packaging 1.2 DEFINITIONS ' 1.2.1 Sediment Soil and other debris that have eroded and have been transported by runoff ' water or wind. 1.2.2 Solid Waste Garbage, refuse, debris, sludge, or other discharged material, including ' solid, liquid, semisolid, or contained gaseous materials resulting from domestic, industrial, commercial, mining, or agricultural operations. Types of solid waste typically generated at construction sites may include: ' ' Page 2 I I a. Green waste: The vegetative matter from landscaping, land clearing and grubbing, including, but not limited to, grass, bushes, scrubs, small trees and saplings, tree stumps and plant roots. Marketable trees, grasses and plants that are indicated to I_ remain, be re -located, or be re -used are not included. b. Surplus soil: Existing soil that is in excess of what is required for this work, including aggregates intended, but not used, for on -site mixing of concrete, mortars and paving. Contaminated soil meeting the definition of hazardous material or hazardous waste is Bnot included. I e. Scrap metal: Scrap and excess ferrous and non-ferrous metals such as reinforcing steel, structural shapes, pipe and wire that are I recovered or collected and disposed of as scrap. Scrap metal meeting the definition of hazardous material or hazardous waste is not included. i f. Paint cans: Metal cans that are empty of paints, solvents, B thinners and adhesives. If permitted by the paint can label, a thin dry film may remain in the can. g. Recyclablea: Materials, equipment and assemblies such as doors, windows, door and window frames, plumbing fixtures, glazing and mirrors that are recovered and sold as recyclable. Metal meeting the definition of lead contaminated or lead based paint contaminated may be included as recyclable if sold to a scrap metal company. Paint cans may be included as recyclable if sold to a scrap metal company. h. Hazardous Waste: By definition, to be a hazardous waste a material must first meet the definition of a solid waste. I Hazardous waste and hazardous debris are special cases of solid t waste. They have additional regulatory controls and must be handled separately. They are thus defined separately in this document. I ' Material not regulated as solid waste are: nuclear source or byproduct materials regulated under the Federal Atomic Energy Act of 1954 as amended; suspended or dissolved materials in domestic sewage effluent or irrigation return flows, or other regulated point source discharges; regulated air emissions; and fluids or wastes associated with natural gas or crude oil exploration or I production. 1 . 1.2.3 Hazardous Debris As defined in Solid Waste paragraph, debris that contains listed hazardous waste (either on the debris surface, or in its interstices, such as pore structure) per 40 CFR 261; or debris that exhibits a characteristic of hazardous waste per 40 CFR 261. ' 1.2.4 Chemical Wastes This includes salts, acids, alkalizes, herbicides, pesticides, and organic Page 3 1 chemicals. 1.2.5 Garbage Refuse and scraps resulting from preparation, cooking, dispensing, and consumption of food. 1.2.6 Hazardous Waste Any discarded material, liquid, solid, or gas, which meets the definition of hazardous material or is designated hazardous waste by the Environmental Protection Agency or State Hazardous Control Authority as defined in 40 CFR 260, 40 CFR 261, 40 CFR 262, 40 CFR 263, 40 CFR 264, 40 CFR 265, 40 CFR 266, 40 CFR 268, 40 CFR 270, 40 CFR 271, 40 CFR 272, 40 CFR 273, 40 CFR 279, and 40 CFR 280. 1.2.7 Hazardous Materials Hazardous materials as defined in 49 CFR 171 and listed in 49 CFR 172. i 1 Hazardous material is any material that: a. Is regulated as a hazardous material per 49 CFR 173, or b. Requires a Material Safety Data Sheet (MSDS) per 29 CFR 1910.120, or C. During end use, treatment, handling, packaging, storage, transpiration, or disposal meets or has components that meet or have potential to meet the definition of a hazardous waste as defined by 40 CFR 261 Subparts A, B, C, or D. Designation of a material by this definition, when separately regulated or controlled by other instructions or directives, does not eliminate the need for adherence to that hazard -specific guidance which takes precedence over this instruction for "control" purposes. Such material include ammunition, weapons, explosive actuated devices, propellants, pyrotechnics, chemical and biological warfare materials, medical and pharmaceutical supplies, medical waste and infectious materials, bulk fuels, radioactive materials, and other materials such as asbestos, mercury, and polychlorinated biphenyls (PCBs). Nonetheless, the exposure may occur incident to manufacture, storage, use and demilitarization of these items. 1.2.8 Waste Hazardous Material (WHM) Any waste material which because of its quantity, concentration, or physical, chemical, or infectious characteristics may pose a substantial hazard to human health or the environment and which has been so designated. Used oil not containing any hazardous waste, as defined above, falls under this definition. 1.2.9 Oily Waste Those materials which are, or were, mixed with used oil and have become separated from that used oil. Oily wastes also means materials, including wastewaters, centrifuge solids, filter residues or sludges, bottom sediments, tank bottoms, and sorbents which have come into contact with and 11 Page 4 have been contaminated by, used oil and may be appropriately tested and discarded in a manner which is in compliance with other State and local requirements. This definition includes materials such as oily rags, "kitty litter" sorbent clay and organic sorbent material. These materials may be land filled provided that: a: It is not prohibited in other State regulations or local ordinances b. The amount generated is "de minimus" (a small amount) C. It is the result of minor leaks or spills resulting from normal process operations d. All free -flowing oil has been removed to the practical extent possible Large quantities of this material, generated as a result of a major spill or in lieu of proper maintenance of the processing equipment, are a solid waste. As a solid waste, a hazardous waste determination must be performed prior to disposal. As this can be an expensive process, it is recommended that this type of waste be minimized through good housekeeping practices and employee education. 1.2.10 Regulated Waste Those solid waste that have specific additional Federal, state, or local controls for handling, storage, or disposal. 1.2.11 Class I Ozone Depleting Substance (ODS) Class I ODS is defined in Section 602(a) of The Clean Air Act and includes the following chemicals: chlorofluorocarbon-11 (CFC-11) chlorofluorocarbon-12 (CFC-12) chlorofluorocarbon-13 (CFC-13) chlorofluorocarbon-111 (CFC-111) chlorofluorocarbon-112 (CFC-112) chlorofluorocarbon-113 (CFC-113) chlorofluorocarbon-114 (CFC-114) chlorofluorocarbon-115 (CFC-115) chlorofluorocarbon-211 (CFC-211) chlorofluorocarbon-212 (CFC-212) 1.3 SUBMITTALS chlorofluorocarbon-213 (CFC-213) chlorofluorocarbon-214 (CFC-214) chlorofluorocarbon-215 (CFC-215) chlorofluorocarbon-216 (CFC-216) chlorofluorocarbon-217 (CFC-217) halon-1211 halon-1301 halon-2402 carbon tetrachloride methyl chloroform Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for Contractor Quality Control approval. The following shall be submitted in accordance with Section O1 33 00 SUBMITTAL PROCEDURES: SD-01 Preconstruction Submittals ?reconstruction Survey; G Page 5 r r I t Environmental Protection Plan; G Storm Water Pollution Prevention Plan; G Storm Water Notice of Intent (for NPDES coverage under the general permit for construction activities); G SD-06 Test Reports Laboratory Analysis Erosion and Sediment Control Inspection. Reports Storm Water Inspection Reports for General Permit SD-11 Closeout Submittals Some of the records listed below are also required as part of other submittals. For the "Records" submittal, maintain on -site a separate three-ring Environmental Records binder and submit at the completion of the project. Make separate parts to the binder corresponding to each of the applicable sub items listed below. i Waste Determination Documentation Disposal Documentation for Hazardous and Regulated Waste Contractor 40 CFR Employee Training Records Solid Waste Management Report Contractor Hazardous Material Inventory Log; G i Hazardous Waste/Debris Management 1.4 ENVIRONMENTAL PROTECTION REQUIREMENTS i ' Provide and maintain, during the life of the contract, environmental protection as defined. Plan for and provide environmental protective i measures to control pollution that develops during normal construction practice. Plan for and provide environmental protective measures required to correct conditions that develop during the construction of permanent or temporary environmental features associated with the project. Comply with Federal, State, and local regulations pertaining to the environment, including water, air, solid waste, hazardous waste and substances, oily Page 6 iI , I' substances, and noise pollution. 1.5 QUALITY ASSURANCE 1.5.1 Preconstruction Survey I ' Perform a Preconstruction Survey of the project site with the Contracting Officer, and take photographs showing existing environmental conditions in and adjacent to the site. Submit a report for the record. ' 1.5.2 Environmental Brief Attend an environmental brief to be included in the preconstruction ' meeting. Provide the following information: types, quantities, and use of hazardous materials that will be brought onto the activity; types and quantities of wastes/wastewater that may be generated during the contract. Discuss the results of the Preconstruction Survey at this time. ' Prior to initiating any work on site, meet with the Contracting Officer and activity environmental staff to discuss the proposed Environmental ' Protection Plan. Develop a mutual understanding relative to the details of environmental protection, including measures for protecting natural resources, required reports, required permits, permit requirements, and I other measures to be taken. 1.5.3 Contractor 40 CFR Employee Training Records ' Prepare and maintain employee training records throughout the term of the contract meeting applicable 40 CFR requirements. Submit these training records to the Contracting Officer at the conclusion of the project; unless I otherwise directed. 1 PART 2 PRODUCTS Not used. PART 3 EXECUTION i ' 3.1 ENVIRONMENTAL PROTECTION PLAN Prior to initiating any work on site, the Contractor will meet with the Contracting Officer to discuss the proposed Environmental Protection Plan ' and develop a mutual understanding relative to the details of environmental protection, including measures for protecting natural resources, required reports, and other measures to be taken. The Environmental Protection Plan ' will be submitted in the following format and will, at a minimum, address the following elements: a. Description of the Environmental Protection Plan (1) General overview and purpose 1I(2) General site information �I b. Protection of Natural Resources 'I Page 7 t(1) Land resources ' (2) Tree protection . (3) Replacement of damaged landscape features ' (4) Temporary construction (5) Stream crossings I d. Storm Water Management and Control ' (1) Ground cover (2) Erodible soils (3) Temporary measures I (a) Mechanical retardation and control of runoff (b) Vegetation and mulch e. Protection of the Environment from Waste Derived from Contractor Operations I (1) Control and disposal of solid and sanitary waste (2) Control and disposal of hazardous waste (Hazardous Waste Management Section) This item will consist of the management procedures for all hazardous waste to be generated. The elements of those procedures will coincide with the Activity Hazardous Waste Management Plan. A copy of the Activity Hazardous Waste Management Plan will be provided by the Contracting Officer. As a minimum, include the following: be to ensure a written waste (a) Procedures to employed determination is made for appropriate wastes which are to be generated; (b) Sampling/analysis plan; (c) Methods of hazardous waste accumulation/storage (i.e., in tanks and/or containers); (d) Management procedures for storage, labeling, ' transportation, and disposal of waste (treatment of waste is not allowed unless specifically noted); ' (e) Management procedures and regulatory documentation Page 8 ensuring disposal of hazardous waste complies with Land Disposal Restrictions (40 CFR 268); (f) Management procedures for recyclable hazardous materials such as lead -acid batteries, used oil, and the like; (g) Used oil management procedures in accordance with 40 CFR 279; (h) Pollution prevention\hazardous waste minimization procedures; (i) Plans for the disposal of hazardous waste by permitted facilities; (j) Procedures to be employed to ensure all required employee training records are maintained. f. Prevention of Releases to the Environment (1) Procedures to orevent releases to the environment (2) Notifications in the event of a release to the environment g. Regulatory Notification and Permits (1) List what notifications and permit applications must be made. Include copies of all applicable, environmental permits. 3.1.1 Environmental Protection Plan Review Fourteen days after the environmental protection meeting, submit the proposed Environmental Protection Plan for further discussion, review, and approval. Commencement of work will not begin until the environmental protection plan has been approved. 3.1.2 Licenses and Permits [Obtain licenses and permits pursuant to the "Permits and Responsibilities" FAR Clause.] The following permits will be obtained by the Contracting Officer: [a. ] [b. ] For permits obtained by the Contracting Officer, whether or not required by the permit, the Contractor is responsible for conforming to all permit requirements and performing all quality control inspections of the work in progress, and to submit notifications and certifications to the applicable regulatory agency via the Contracting Officer. [No permits will be obtained by the Contracting Officer. Where required by the State regulatory authority, the inspections and certifications will be provided through the services of a Professional Page 9 i Engineer (PE), registered in the State where the work is being performed. [Where a PE is not required, the individual must be otherwise qualified by ' other current State licensure, specific training and prior experience (minimum 5 years). ]As a part of the quality control plan, which is required to be submitted for approval by the quality control section, provide a sub item containing the name, appropriate professional registration or licence number, address, and telephone number of the professionals or other qualified persons who will be performing the inspections and certifications for each permit.] 1 ' 3.2 PROTECTION OF NATURAL RESOURCES Preserve the natural resources within the project boundaries and outside t the limits of permanent work. Restore to an equivalent or improved condition upon completion of work. Confine construction activities to within the limits of the work indicated or specified. i Except in areas to be cleared, do not remove, cut, deface, injure, or ' destroy trees or shrubs without the Contracting Officer's permission. Do not fasten or attach ropes, cables, or guys to existing nearby trees for anchorages unless authorized by the Contracting Officer. Where such use of attached ropes, cables, or guys is authorized, the Contractor will be responsible for any resultant damage. Protect existing trees which are to remain and which may be injured, bruised, defaced, or otherwise damaged by construction operations. Remove displaced rocks from uncleared areas. By approved excavation, remove trees with 30 percent or more of their root systems destroyed. Remove trees and i other landscape features scarred or damaged by equipment operations, and ' replace with equivalent, undamaged trees and landscape features. Obtain Contracting Officer's approval before replacement. The Contracting officer's approval is required before any equipment will be ' permitted to ford live streams. In areas where frequent crossings are required, install temporary culverts or bridges. Obtain Contracting i Officer's approval prior to installation. Remove temporary culverts or ' bridges upon completion of work, and repair the area to its original condition. tl 3.2.1 Erosion and Sediment Control Measures 3.2.1.1 Burnoff 'I Burnoff of the ground cover is not permitted. 3.2.1.2 Protection of Erodible Soils 'I Immediately finish the earthwork brought to a final grade, as indicated or specified. Immediately protect the side slopes and back slopes upon completion of rough grading. Plan and conduct earthwork to minimize the 'I duration of exposure of unprotected soils. - 3.2.1.3 Temporary Protection of Erodible Soils Use the following methods to prevent erosion and control sedimentation: I; Page 10 a. Mechanical Retardation and Control of Runoff (1) Mechanically retard and control the rate of runoff from the construction site. This includes construction of diversion ditches, benches, berms, and use of silt fences and straw bales to retard and divert runoff to protected drainage courses. b. Sediment Basins (2) Install, inspect, and maintain best management practices (BMPs) as required by the general permit. Prepare BMP Inspection Reports as required by the general permit. If required by the permit, include those inspection reports. C. Vegetation and Mulch (1) Provide temporary protection on sides and back slopes as soon as rough grading is completed or sufficient soil is exposed to require erosion protection. Protect slopes by accelerated growth of permanent vegetation, temporary vegetation, mulching, or netting. Stabilize slopes by.hydroseeding, anchoring mulch in place, covering with anchored netting, sodding, or such combination of these and other methods necessary for effective erosion control. (2) Seeding: Provide new seeding where ground is disturbed. Include topsoil or nutriment during the seeding operation necessary to establish a suitable stand of grass. The seeding operation will be as specified in Section32 92 19 3.2.2 Erosion, Sediment and Stormwater Control Submit "Erosion and Sediment Control Reports" (E&S) (form provided at the pre -construction conference) and "Stormwater Inspections for General Permit NCGO10000 - Land Disturbing Activities" (form provided at http://h2o.enr.state.nc.us/su/?DF_Files/SW_General_Permits/NCGOI_Inspect_log.pdf) to the Contracting Officer once every 7 days and within 29 hours of a storm event that produces 0.5 inch or more of rain. Comply with NCGO10000, North Carolina Permit to Discharge Storm Water under the National Pollutant Discharge Elimination System. The existing permit may be obtained from: http://h20.enr.state.nc.us/su/PDF_Files/SW_General_Permits/NCGO1_Inspect_log.pdf. 3.2.2.1 Storm Water Notice of Intent for Construction Activities The Contractor shall submit a Storm Water Notice of Intent (for NPDES coverage under the general permit for construction activities) and a Storm Water Pollution Prevention Plan (SWPPP) for the project to the Contracting Officer prior and gain approval prior to the commencement of work. The SWPPP will meet the requirements of the State of North Carolina general permit for storm water discharges from construction sites. Submit the SWPPP along with any required Notice of Intents, Notice of Termination, and appropriate permit fees, via the Contracting Officer, to the appropriate Page 11 State agency for approval, a minimum of 14 calendar days prior to the start of any land disturbing activities. The Contractor shall maintain an approved copy of the SWPPP at the construction on -site office, and continually update as regulations require, to reflect current site conditions. (1) The SWPPP shall: a. Identify potential sources of pollution which may be reasonably expected to affect the quality of storm water discharge from the site. b. Describe and ensure implementation of practices which will be used to reduce the pollutants in storm water discharge from the site. C. Ensure compliance with terms of the State of North Carolina general permit for storm water discharge. d. Select applicable best management practices from EPA 832-R-92-005. e. Include a completed copy of the Registration Statement, BMP Inspection Report Template and Notice of Termination except for the effective date. f. Storm Water Pollution Prevention Measures and Notice of Intent 40 CFR 122.26, EPA 832-R-92-005. Provide a "Storm Water Pollution Prevention Plan" (SWPPP) for the project. The SWPPP will meet the requirements of the State of North Carolina general permit for storm water discharges from construction sites. Submit the SWPPP along with any required Notice of Intents, Notice of Termination, and appropriate permit fees, via the Contracting officer, to the appropriate State agency for approval, a minimum of 14 calendar days prior to the start of construction. A copy of the approved SWPPP will be kept at the construction on -site office, and continually updated as regulations require to reflect current site conditions. 3.3 SOLID WASTE MANAGEMENT PLAN and PERMIT Provide to the contracting officer written notification of the quantity of solid waste/debris that is anticipated to be generated by construction. Include in the report the locations where various types of waste will be disposed or recycled. Include letters of acceptance or as applicable, submit one copy of a State permit or license showing such agency's approval of the disposal plan before transporting wastes off Government property. �i 3.3.1 Solid Waste management Report 11 Page 12 Monthly, submit a solid waste disposal report to the Contracting Officer. For each waste, the report will state the classification (using the definitions provided in this section), amount, location, and name of the business receiving the solid waste. Include copies of the waste handling facilities' weight tickets, receipts, bills of sale, and other sales documentation. In lieu of sales documentation, the Contractor may submit a statement indicating the disposal location for the solid waste which is signed by an officer of the Contractor firm authorized to legally obligate or bind the firm. The sales documentation or Contractor certification will include the receiver's tax identification number and business, EPA or State registration number, along with the receiver's delivery and business addresses and telephone numbers. For each solid waste retained by the Contractor for his own use, the Contractor will submit on the solid waste disposal report the information previously described in this paragraph. Prices paid or received will not be reported to the Contracting Officer unless required by other provisions or specifications of this Contract or public law. 3.3.2 Control and Disposal of Solid Wastes Pick up solid wastes, and place in covered containers which are regularly -� emptied. Do not prepare or cook food on the project site. Prevent contamination of the site or other areas when handling and disposing of wastes. At project completion, leave the areas clean. Recycling is encouraged and can be coordinated with the Contracting Officer and the activity recycling coordinator. Remove all solid waste (including non -hazardous debris) from Government property and dispose off -site at an approved landfill. Solid waste disposal off -site must comply with most stringent local, State, and Federal requirements including 40 CFR 241, 40 CFR 243, and 40 CFR 258. 3.4 WASTE DETERMINATION DOCUMENTATION Complete a Waste Determination form (provided at the pre -construction conference) for all contractor derived wastes to be generated. Base the waste determination upon either a constituent listing from the manufacturer used in conjunction with consideration of the process by which the waste was generated, EPA approved analytical data, or laboratory analysis (Material Safety Data Sheets (MSDS) by themselves are not adequate). Attach all support documentation to the Waste Determination form. As a minimum, a Waste Determination form must be provided for the following wastes (this listing is not all inclusive): oil and latex based painting and caulking products, solvents, adhesives, aerosols, petroleum products, and all containers of the original materials. 3.4.1 Contractor Hazardous Material Inventory Log tSubmit the Contractor Hazardous Material Inventory Log (found at: http://www.wbd2.org/ccb/NAVGRAPH/015"5n.pdf), which provides information required by (EPCRA Sections 312 and 313) along with corresponding Material Safety Data Sheets (MSDS) to the Contracting Officer at the start and at the end of construction (30 days from final acceptance), and update no later than January 31 of each calendar year during the life of the e contract. Documentation for any spills/releases, environmental reports or off -site transfers may be requested by the Contracting officer. 3.4.2 Laboratory Analysis Page 13 Submit a copy of a Laboratory Analysis of solid waste and debris with the potential of becoming classified as a hazardous waste (i.e., abrasive/sand blasting debris, etc.). Waste stream determinations are required at the point of generation and must sufficiently document whether the waste will be a solid waste, hazardous waste, or Resource Conservation and Recovery Act (RCRA) exempt waste. Determinations must use EPA approved methods and provide written rational for whether the waste is classified as hazardous or non -hazardous. The Contractor will bear the cost of the waste stream determinations, and the Contracting Officer reserves the right to request waste stream determinations on questionable waste streams. 3.5 CONTRACTOR HAZARDOUS MATERIAL INVENTORY LOG Submit the "Contractor Hazardous Material Inventory Log"(found at: http://www lantdiv navfac navy mil/pls/lantdiv/docs/FOLDER/EICO/UFGS/GRA ), which provides information required by (EPCRA Sections 312 and 113) along with corresponding Material Safety Data Sheets (MSDS) to the Contracting Officer at the start and at the end of construction (30 days from final acceptance), and update no later than January 31 of each calendar year during the life of the contract. Documentation for any spills/releases, environmental reports or off -site transfers may be requested by the Contracting Officer. 3.5.1 Disposal Documentation for Hazardous and Regulated Waste Manifest, pack, ship and dispose of hazardous or toxic waste and universal waste that is generated as a result of construction in accordance with the generating facilities generator status under the Recourse Conservation and Recovery Act. Contact the Contracting Officer for the facility RCRA identification number that is to be used on each manifest. Submit a copy of the applicable EPA [and State] permit(s), manifest(s), or license(s) for transportation, treatment, storage, and disposal of hazardous and regulated waste by permitted facilities. Hazardous or toxic waste manifest must be reviewed, signed, and approved by the Navy before the Contractor may ship waste. To obtain specific disposal instructions the Contractor must coordinate with the Activity environmental office at t3.6 POLLUTION PREVENTION/HAZARDOUS WASTE MINIMIZATION minimize the use of hazardous materials and the generation of hazardous waste. Include procedures for pollution prevention/ hazardous waste minimization in the Hazardous Waste Management Section of the Environmental Protection Plan. Consult with the activity Environmental Office for suggestions and to obtain a copy of the installation's pollution prevention/hazardous waste minimization plan for reference material when preparing this part of the plan. If no written plan exists, obtain information by contacting the Contracting Officer. Describe the types of the hazardous materials expected to be used in the construction when requesting information. 3.7 WHM/HW MATERIALS PROHIBITION No waste hazardous material or hazardous waste shall be disposed of on government property. No hazardous material shall be brought onto ' government property that does not directly relate to requirements for the performance of this contract. The government is not responsible for Page 14 disposal of Contractor's waste material brought on the job site and not required in the performance of this contract. The intent of this provision is to dispose of that waste identified as waste hazardous material/hazardous waste as defined herein that was generated as part of this contract and existed within the boundary of the Contract limits and not brought in from offsite by the Contractor. Incidental materials used to support the contract including, but not limited to aerosol cans, waste paint, cleaning solvents, contaminated brushes, rags, clothing, etc. are the responsibility of the Contractor. The list is illustrative rather than inclusive. The Contractor is not authorized to discharge any materials to sanitary sewer, storm drain, or to the river or conduct waste treatment or disposal on government property without written approval of the Contracting Officer . ' 3.8 HAZARDOUS MATERIAL CONTROL Include hazardous material control procedures in the Safety Plan. Address procedures and proper handling of hazardous materials, including the appropriate transportation requirements. Submit a MSDS and estimated quantities to be used for each hazardous material to the Contracting j Officer prior to bringing the material on base. Typical materials requiring MSDS and quantity reporting include, but are not limited to, oil and latex based painting and caulking products, solvents, adhesives, aerosol, and petroleum products. At the end of the project, provide the Contracting Officer with the maximum quantity of each material that was present at the site at any one time, the dates the material was present, the amount of each material that was used during the project, and how the material was used. Ensure that hazardous materials are utilized in a manner that will minimize the amount of hazardous waste that is generated. Ensure that all containers of hazardous materials have NFPA labels or their equivalent. Keep copies of the MSDS for hazardous materials on site at all times and provide them to the Contracting Officer at the end of the project. Certify that all hazardous materials removed from the site are hazardous materials and do not meet the definition of hazardous waste per 40 CFR 261. 3.9 PETROLEUM PRODUCTS ' Conduct the fueling and lubricating of equipment and motor vehicles in a manner that protects against spills and evaporation. Manage all used oil generated on site in accordance with 40 CFR 279. Determine if any used oil generated while on -site exhibits a characteristic of hazardous waste. Used oil containing 1000 parts per million of solvents will be considered a hazardous waste and disposed of at Contractor's expense. Used oil mixed with a hazardous waste will also be considered a hazardous waste. 3.9.1 Oily and Hazardous Substances Prevent oil or hazardous substances from entering the ground, drainage areas, or navigable waters. In accordance with 40 CFR 112, surround all temporary fuel oil or petroleum storage tanks with a temporary berm or containment of sufficient size and strength to contain the contents of the tanks, plus 10 percent freeboard for precipitation. The berm will be impervious to oil for 72 hours and be constructed so that any discharge. will not permeate, drain, infiltrate, or otherwise escape before cleanup occurs. 3.10 FUEL TANKS tPage 15 Petroleum products and lubricants required to sustain up to 30 days of construction activity may be kept on site. Storage and refilling practices shall comply with 40 CFR Part 112. Secondary containment shall be provided and be no less than 110 percent of the tank volume plus five inches of free -board. If a secondary berm is used for containment then the berm shall be impervious to oil for 72 hours and be constructed so that any discharge will not permeate, drain, infiltrate, or otherwise escape before cleanup occurs. Drips pans are required and the tanks must be covered during inclement weather. 3.11 RELEASES/SPILLS OF OIL AND HAZARDOUS SUBSTANCES Exercise due diligence to prevent, contain, and respond to spills of hazardous material, hazardous substances, hazardous waste, sewage, regulated gas, petroleum, lubrication oil, and other substances regulated by environmental law. Maintain spill cleanup equipment and materials at the work site. In the event of a spill, take prompt, effective action to stop, contain, curtail, or otherwise limit the amount, duration, and severity of the spill/release. In the event of any releases of oil and hazardous substances, chemicals, or gases; immediately (within 15 minutes) notify the Base or Activity Fire Department, the activity's Command Duty Officer, and the Contracting Officer. If the contractor's response is inadequate, the Navy may respond. If this should occur, the contractor will be required to reimburse the government for spill response assistance and analysis. The Contractor is responsible for verbal and written notifications as required by the federal 40 CFR 355, State, local regulations and Navy Instructions. Spill response will be in accordance with 40 CFR 300 and applicable State and local regulations. Contain and clean up these spills without cost to the Government. If Government assistance is requested or required, the Contractor will reimburse the Government for such assistance. Provide copies of the written notification and documentation that a verbal notification was made within 20 days. Maintain spill cleanup equipment and materials at the work site. Clean up all hazardous and non -hazardous (WHM) waste spills. The Contractor shall reimburse the government for all material, equipment, and clothing generated during any spill cleanup. The Contractor shall reimburse the government for all costs incurred including sample analysis materials, equipment, and labor if the government must initiate its own spill cleanup procedures, for Contractor responsible spills, when: a. The Contractor has not begun spill cleanup procedure within one hour of spill discovery/occurrence, or b. If, in the government's judgment, the Contractor's spill cleanup is not adequately abating life threatening situation and/or is a threat to any body of water or environmentally sensitive areas. 3.12 CONTROL AND DISPOSAL OF HAZARDOUS WASTES 3.12.1 Hazardous Waste/Debris Management 1 ' Page 16 Identify all construction activities which will generate hazardous waste/debris. Provide a documented waste determination for all resultant waste streams. Hazardous waste/debris will be identified, labeled, handled, stored, and disposed of in accordance with all Federal, State, and local regulations including 40 CFR 261, 40 CFR 262, 40 CFR 263, 40 CFR 264, 40 CFR 265, 40 CFR 266, and 40 CFR 268. Hazardous waste will also be managed in accordance with the approved Hazardous Waste Management Section of the Environmental Protection Plan. Store hazardous wastes in approved containers in accordance with 49 CFR 173 and 49 CFR 178. Hazardous waste generated within the confines of Government facilities will be identified as being generated by the Government. Prior to removal of any hazardous waste from Government property, all hazardous waste manifests must be signed by activity personnel from the Station Environmental Office. No hazardous waste will be brought onto Government property. Provide to the Contracting Officer a copy of waste determination documentation for any solid waste streams that have any potential to be hazardous waste or contain any chemical constituents listed in 40 CFR 372-SUBPART D. For hazardous wastes spills, verbally notify the Contracting Officer immediately. 3.12.1.1 Regulated Waste Storage/Satellite Accumulation/90 Day Storage Areas If the work requires the temporary storage/collection of regulated or hazardous wastes, the Contractor will request the establishment of a Regulated Waste Storage Area, a Satellite Accumulation Area, or a 90 Day Storage Area at the point of generation. The Contractor must submit a request in writing to the Contracting Officer providing the following information: Contract Number Haz/Waste or Regulated Waste POC Type of Waste Emergency POC Location of the Site: (Attach Site Plan to the Request) Attach a waste determination form. this request. 3.13 DUST CONTROL Contractor Phone Number Source of Waste Phone Number Allow ten working days for processing Keep dust down at all times, including during nonworking periods. Sprinkle or treat, with dust suppressants, the soil at the site, haul roads, and other areas disturbed by operations. Dry power brooming will not be permitted. Instead, use vacuuming, wet mopping, wet sweeping, or wet power brooming. Air blowing will be permitted only for cleaning nonparticulate debris such as steel reinforcing bars. Only wet cutting will be permitted for cutting concrete blocks, concrete, and bituminous concrete. Do not unnecessarily shake bags of cement, concrete mortar, or plaster. 3.13.1 Dirt and Dust Control Plan Page 17 Submit truck and material haul routes along with a plan for controlling dirt, debris, and dust on base roadways. As a minimum, identify in the plan the subcontractor and equipment for cleaning along the haul route and measures to reduce dirt, dust, and debris from roadways. 3.11 NOISE Make the maximum use of low -noise emission products, as certified by the EPA. Blasting or use of explosives will not be permitted without written permission from the Contracting Officer, and then only during the designated times. 1 3.11 REMOVAL FROM CAMP LEJEUNE, NC Remove and dispose of rubbish and debris from Government property. a. Provide 24-hour advance written notice to the Contracting Office of Contractor's intention to dispose of off base. b. Disposal at sites or landfills not holding a valid State of North Carolina permit is specifically prohibited. The prohibition also applies to sites where a permit may have been applied for but not yet obtained. ' C. Off -base disposal of construction debris outside the parameters of this.paragraph at site without State permits and/or not in accordance with regulatory requirements will require the t Contractor at his own expense to remove, transport and relocate the debris to a State approved site. The Contractor will also be required to pay any fines, penalties, or fees related to the ' illegal disposal of construction debris d. Metals will not be accepted at the Base Sanitary Landfill. Materials which may be deposited in the landfill include: 1 CATEGORY CONSTRUCTION DEBRIS DISPOSAL - BASE SANITARY LANDFILL EXAMPLE/GENERAL INFORMATION FOR DEPOSIT IN THE LANDFILL Mixed Debris The following materials may be placed in the landfill in a location designated by the ' landfill operator. These items may be mixed together. Sheetrock - plaster - glass (broken) 1 Non asbestos insulation - (fiberglass and mineral wool will be bagged). ' Packing paper, styrofoam, and pasteboard boxes Non -asbestos roofing materials such as shingles built-up and shingle roofing. Painted wood such as doors, windows, siding, and ' trim. Plastic/fiberglass such as pipe, electrical boxes, cover plates, etc. Ceramic and vinyl flooring or tile - ceiling 'I 'I Page 18 r 1 CATEGORY CONSTRUCTION DEBRIS DISPOSAL - BASE SANITARY LANDFILL EXAMPLE/GENERAL INFORMATION FOR DEPOSIT IN THE LANDFILL tile. ' Masonry and Concrete Deliver concrete, block, brick, mortar to the landfill separate from any other items, and place in a location designated by the landfill operator. Reinforcement wire and rebar will be removed flush with exposed surfaces. Nonrecyclable Cardboard Breakdown corrugated cardboard boxes and deliver to the Base Recycling Center located at Building 913. If Base personnel rejects the cardboard, take cardboard to the landfill. Nonrecyclable Wall Pallets Deliver usable pallets to the .Base Recycling Center located at Building 913. If base personnel rejects the pallets, take pallets to the landfill. _1 Treated Wood Deliver treated wood, and such as piling and power poles, to the landfill separated from any other items, and place in locations as designated by the landfill operator. Untreated/Unpainted Wood Deliver lumber, trees, stumps, limbs, tops, and shrubs to the landfill separated from any other ' items, and place in locations as designated by landfill operator. Organic Matter Deliver leaves, pine straw, grass clippings to the landfill separated from any other items, and place in locations as designated by landfill operator. No bags or containers are allowed. ' Fiberglass Tanks Clean tanks before delivery to landfill. 550 gallons or less Asphalt Pavement Remove pavement from Government property and deliver to an asphalt -recycling establishment. Provide a record of the total tons of asphalt recycled and the corporate name and location of the recycling establishment receiving the removed asphalt. Weigh each and every Separate each category of construction debris at vehicle delivering debris the construction site and deliver separately to the landfill. Weigh each and every Place each category of construction debris in vehicle delivering debris the landfill at the location designated by the landfill operator. Page 19 CATEGORY CONSTRUCTION DEBRIS DISPOSAL - BASE SANITARY LANDFILL EXAMPLE/GENERAL INFORMATION FOR DEPOSIT IN THE LANDFILL Metals Metals will not be accepted at the landfill. Remove metals from each and every category before delivery to the landfill. (Example: Remove hardware from doors and windows Dispose of metal construction debris at Defense Reutilization Maintenance Office (DRMO) Building TC-861, Camp Geiger. Aluminum, brass, copper, lead, other metal, electrical wiring, cable (cut in 3 foot or less sections) -- End of Section -- Page 20 IJ 7 I SECTION 31 23 00.00 20 EXCAVATION AND FILL 04/06 1 PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only. AMERICAN WATER WORKS ASSOCIATION(AWWA) AWWA C600 (2005) Installation of Ductile -Iron Water Mains and Their Appurtenances ASTM INTERNATIONAL (ASTM) ASTM C 136 (2005) Sieve Analysis of Fine and Coarse Aggregates ASTM C 33 (2003) Concrete Aggregates ASTM D 1140 (2000) Amount of Material in Soils Finer than the No. 200. (75-micrometer) Sieve ASTM D 1556 (2000) Density and Unit Weight of Soil in Place by the Sand -Cone Method ASTM D 1557 (2002el) Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/cu. ft. (2,700 kN-m/cu.m.)) ASTM D 2216 (2005) Laboratory Determination of Water (Moisture) Content of Soil and Rock by Mass ASTM D 2321 (2005) Underground Installation of Thermoplastic Pipe for Sewers and Other Gravity -Flow Applications ASTM D 2487 (2000) Soils for Engineering Purposes (Unified Soil Classification System) ASTM D 2922 (2004) Density of Soil and Soil -Aggregate in Place by Nuclear Methods (Shallow Depth) ASTM D 3017 (2004) Water Content of Soil and Rock in Place by Nuclear Methods (Shallow Depth) ASTM D 4318 (2000) Liquid Limit, Plastic Limit, and Plasticity Index of Soils ASTM D 698 (2000ael) Laboratory Compaction Page 1 Characteristics of Soil Using Standard Effort (12,400 ft-lbf/cu. ft. (600 kN-m/cu. m.)) U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA) EPA 530/F-93/004 EPA 600/4-79/020 1.2 DEFINITIONS 1.2.1 Capillary Water Barrier (1993; Rev 0; Updates I, II, IIA, IIB, and III) Test Methods for Evaluating Solid Waste (Vol IA, IS, IC, and II) (SW-846) (1983) Methods for Chemical Analysis of Water and Wastes A layer of clean, poorly graded crushed rock, stone, or natural sand or gravel having a high porosity which is placed beneath a building slab with or without a vapor barrier to cut off the capillary flow of pore water to the area immediately below a slab. 1.2.2 Degree of Compaction Degree of compaction is expressed as a percentage of the maximum density obtained by the test procedure presented in ASTM D 698, for general soil types, abbreviated as percent laboratory maximum density. ■ 1.2.3 Hard Materials ' Weathered rock, dense consolidated deposits, or conglomerate materials which are not included in the definition of "rock" but which usually require the use of heavy excavation equipment, ripper teeth, or jack hammers for removal. 1.2.4 Rock Solid homogeneous interlocking crystalline material with firmly cemented, laminated, or foliated masses or conglomerate deposits, neither of which can be removed without systematic drilling and blasting, drilling and the use of expansion jacks or feather wedges, or the use of backhoe-mounted ' pneumatic hole punchers or rock breakers; also large boulders, buried masonry, or concrete other than pavement exceeding 1 cubic yard in volume. Removal of hard material will not be considered rock excavation because of intermittent drilling and blasting that is performed merely to increase production. 1.3 SUBMITTALS �I Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES: 'I SD-01 Preconstruction Submittals ,I IIPage 2 Dewatering work plan Submit 15 days prior to starting work. SD-06 Test Reports Borrow Site Testing; G Fill and backfill test Select material test Porous fill test for capillary water barrier Density tests Moisture Content Tests Copies of all laboratory and field test reports within 24 hours of the completion of the test. 1.4 DELIVERY, STORAGE, AND HANDLING Perform in a manner to prevent contamination or segregation of materials. 1.5 CRITERIA FOR BIDDING Base bids on the following criteria: a. Surface elevations are as indicated. b. Pipes or other artificial obstructions, except those indicated, will not be encountered. C. Ground water elevations indicated by the boring log were those existing at the time subsurface investigations were made and do not necessarily represent ground water elevation at the time of construction. e. Material character is indicated by the boring logs. g. Borrow material Suitable backfill and bedding material in the quantities required are not available at the project site. h. Blasting will not be permitted. Remove material in an approved manner. 1.6 REQUIREMENTS FOR OFF SITE SOIL Page 3 Soils brought in from off site for use as backfill shall be tested for TPH, BTEX and full TCLP including ignitability, corresivity and reactivity. Backfill shall contain less than 100 parts per million (ppm) of total petroleum hydrocarbons (TPH) and less than 10 ppm of the sum of Benzene, Toluene, Ethyl Benzene, and Xylene (BTEX) and shall not fail the TCPL test.. TPH concentrations shall be determined by using EPA 600/4-79/020 Method 418.1. BTEX concentrations shall be determined by using EPA 530/F-93/004 Method 5030/8020. TCLP shall be performed in accordance with EPA 530/F-93/004 Method 1311. Provide Borrow Site Testing for TPH, 1 BTEX and TCLP from a composite sample of material from the borrow site, with at least one test from each borrow site. Material shall not be brought on site until tests have been approved by the Contracting Officer. 1.7 QUALITY ASSURANCE i 1.7.1 Dewatering Work Plan ' Submit procedures for accomplishing dewatering work. i 1.7.2 Utilities Movement of construction machinery and equipment over pipes and utilities during construction shall be at the Contractor's risk. Excavation made with power -driven equipment is not permitted within two feet of known Government -owned utility or subsurface construction. For work immediately adjacent to or for excavations exposing a utility or other buried obstruction, excavate by hand. Start hand excavation on each side of the indicated obstruction and continue until the obstruction is uncovered or until clearance for the new grade is assured. Support uncovered lines or other existing work affected by the contract excavation until approval for backfill is granted by the Contracting Officer. Report damage to utility lines or subsurface construction immediately to the Contracting Officer. PART 2 PRODUCTS 2.1 SOIL MATERIALS i 2.1.1 Satisfactory Materials Any materials classified by ASTM D 2487 as GW, GP, GM, GP -GM, GW-GM, GC, GP -GC, GM -GC, SW, SP, SM, SW -SC, SP-SM, SP-SC, free of debris, roots, 11 wood, scrap material, vegetation, refuse, soft unsound particles, and li frozen, deleterious, or objectionable materials. Unless specified otherwise, the maximum particle diameter shall be one-half the lift thickness at the intended location. 'I 2.1.2 Unsatisfactory Materials t Materials which do not comply with the requirements for satisfactory materials. Unsatisfactory materials also include man-made fills, trash, refuse, or backfills from previous construction. Unsatisfactory material also includes material classified as satisfactory which contains root and 'I other organic matter, frozen material, and stones larger than 3 inches. J The Contracting Officer shall be notified of any contaminated materials. 2.1.3 Cohesionless and Cohesive Materials 11. 11 Page 4 Cohesionless materials include materials classified in ASTM D 2487 as GW, GP, SW, and SP. Cohesive materials include materials classified as GC, SC, ML, CL, MH, and CH. Materials classified as GM, GP -GM, GW-GM, SW-SM, SP-SM, and SM shall be identified as cohesionless only when the fines are nonplastic (plasticity index equals zero). Materials classified as GM and SM will be identified as cohesive only when the fines have a plasticity index greater than zero. 2.1.4 Common Fill ' Approved, unclassified soil material with the characteristics required to compact to the soil density specified for the intended location. ' 2.1.5 Backfill and Fill Material ASTM D 2487, classification GW, GP, GM, GC, SW, SP, SM, SC with a maximum 1 ASTM D 4318 liquid limit of 35, maximum ASTM D 4318 plasticity index of 12, and a maximum of 25 percent by weight passing ASTM D 1140, No. 200 sieve. 2.1.6 Select Material Provide materials classified as GW, GP, SW, SP, by ASTM D 2487 where indicated. The liquid limit of such material shall not exceed 35 percent when tested in accordance with ASTM D 4318. The plasticity index shall not be greater than 12 percent when tested in accordance with ASTM D 4318, and not more than 35 percent by weight shall be finer than No. 200 sieve when tested in accordance with ASTM D 1140. 2.1.7 Topsoil Provide as specified in Section 32 92 19SEEDING. 2.2 POROUS FILL FOR CAPILLARY WATER BARRIER ASTM C 33 fine aggregate grading with a maximum of 3 percent by weight passing ASTM D 1140, No. 200 sieve, or 1-1/2 inches and no more than 2 percent by weight passing the No. 4 size sieve or coarse aggregate Size 57, 67, or 77 and conforming to the general soil material requirements specified in paragraph entitled "Satisfactory Materials." 2.3 UTILITY BEDDING MATERIAL Except as specified otherwise in the individual piping section, provide bedding for buried piping in accordance with AWWA C600, Type 4, except as specified herein. Backfill to top of pipe shall be compacted to 95 percent of ASTM D 698 maximum density. Plastic piping shall have bedding to spring line of pipe. Provide ASTM D 2321 materials as follows: a. Class I: Angular, 0.25 to 1.5.inches, graded stone, including a number of fill materials that have regional significance such as coral, slag, cinders, crushed stone, and crushed shells. b. Class II: Coarse sands and gravels with maximum particle size of Page 5 1.5 inches, including various graded sands and gravels containing small percentages of fines, generally granular and noncohesive, either wet or dry. Soil Types GW, GP, SW, and SP are included in this class as specified in ASTM D 2487. 2.3.1 Gravel Clean, coarsely graded natural gravel, crushed stone or a combination thereof having a classification of GW GP in accordance with ASTM D 2487 for bedding Maximum particle size shall not exceed 3 inches. 2.4 BORROW Obtain borrow materials required in excess of those furnished from excavations -from sources outside of Government property. 2.5 BURIED WARNING AND IDENTIFICATION TAPE Polyethylene plastic warning tape manufactured specifically for warning and identification of buried utility lines. Provide tape on rolls, 3 inch minimum width, color coded as specified below for the intended utility with warning and identification imprinted in bold black letters continuously over the entire tape length. Warning and identification to read, "CAUTION, BURIED (intended service) LINE BELOW" or similar warding. Color and printing shall be permanent, unaffected by moisture or soil. Warning Tape Color Codes Yellow: Electric Yellow: Gas, Oil; Dangerous Materials Orange: Telephone and Other Communications Blue: Water Systems Green: Sewer Systems 2.5.1 Warning Tape for Metallic Piping Acid and alkali -resistant polyethylene plastic tape conforming to the width, color, and printing requirements specified above. Minimum thickness of tape shall be 0.003 inch. Tape shall have a minimum strength of 1500 psi lengthwise, and 1250 psi crosswise, with a maximum 350 percent elongation. 2.5.2 Detectable Warning Tape for Non -Metallic Piping Polyethylene plastic tape conforming to the width, color, and printing requirements specified above. Minimum thickness of the tape shall be 0.004 inch. Tape shall have a minimum strength of 1500 psi lengthwise and 1250 psi crosswise. Tape shall be manufactured with integral wires, foil backing, or other means of enabling detection by a metal detector when tape is buried up to 3 feet deep. Encase metallic element of the tape in a protective jacket or provide with other means of corrosion protection. 2.6 DETECTION WIRE FOR NON-METALLIC PIPING Detection wire shall be insulated single strand, solid copper with a Page 6 minimum of 12 AWG. PART 3 EXECUTION 3.1 PROTECTION 3.1.1 Drainage and Dewatering Provide for the collection and disposal of surface and subsurface water encountered during construction. 3.1.1.1 Drainage So that construction operations progress successfully, completely drain construction site during periods of construction to keep soil materials sufficiently dry. The Contractor shall establish/construct storm drainage features (ponds/basins) at the earliest stages of site development, and throughout construction grade the construction area to provide positive surface water runoff away from the construction activity and/or provide temporary ditches, swales, and other drainage features and equipment as required to maintain dry soils, prevent erosion and undermining of foundations. When unsuitable working platforms for equipment operation and unsuitable soil support for subsequent construction features develop, remove unsuitable material and provide new soil material as specified herein. It is the responsibility of the Contractor to assess the soil and ground water conditions presented by the plans and specifications and to employ necessary measures to permit construction to proceed. Excavated slopes and backfill surfaces shall be protected to prevent erosion and sloughing. Excavation shall be performed so that the site, the area immediately surrounding the site, and the area affecting operations at, the site shall be continually and effectively drained. 3.1.1.2 Dewatering Groundwater flowing toward or into excavations shall be controlled to prevent sloughing of excavation slopes and walls, boils, uplift and heave in the excavation and to eliminate interference with orderly progress of construction. French drains, sumps, ditches or trenches will not be permitted within 3 feet of the foundation of any structure, except with specific written approval, and after specific contractual provisions for restoration of the foundation area have been made. Control measures shall be taken by the time the excavation reaches the water level in order to maintain the integrity of the in situ material. While the excavation is open, the water level shall be maintained continuously, at least 1 feet below the working level. Operate dewatering system continuously until construction work below existing water levels is complete. Submit performance records weekly. 'I 3.1.2 Underground Utilities 1 Location of the existing utilities indicated is approximate. The ,l Contractor shall physically verify the location and elevation of the existing utilities indicated prior to starting construction. The Contractor shall contact the Public Works Department for assistance in locating existing utilities. ' j Page 7 I 1 3.1.3 Machinery and Equipment 1 Movement of construction machinery and equipment over pipes during construction shall be at the Contractor's risk. Repair, or remove and provide new pipe for existing or newly installed pipe that has been 1 displaced or damaged. 3.2 SURFACE PREPARATION 1 3.2.1 Clearing and Grubbing Unless indicated otherwise, remove trees, stumps, logs, shrubs, brush and 1 vegetation and other items that would interfere with construction operations within the clearing limits. Remove stumps entirely. Grub out matted roots and roots over 2 inches in diameter to at least 18 inches below existing surface. 1 3.2.2 Stripping 1 Strip suitable soil from the site where excavation or grading is indicated and stockpile separately from other excavated material. Material unsuitable for use as topsoil shall be stockpiled and used for backfilling. Locate topsoil so that the material can be used readily for the finished 1 grading. Where sufficient existing topsoil conforming to the material requirements is not available on site, provide borrow materials suitable for use as topsoil. Protect topsoil and keep in segregated piles until 1 needed. 3.2.3 Unsuitable Material 1 Remove vegetation, debris, decayed vegetable matter, sod, mulch, and rubbish underneath paved areas or concrete slabs. 3.3 EXCAVATION 1 Excavate to contours, elevation, and dimensions indicated. Reuse excavated materials that meet the specified requirements for the material type 1 required at the intended location. Keep excavations free from water. Excavate soil disturbed or weakened by Contractor's operations, soils softened or made unsuitable for subsequent construction due to exposure to weather. Excavations below indicated depths will not be permitted except 1 to remove unsatisfactory material. Unsatisfactory material encountered below the grades shown shall be removed as directed. Refill with select material and compact to 95 percent of ASTM D 698 maximum density. Unless 1 specified otherwise, refill excavations cut below indicated depth with satisfactory material and compact to 95 percent of ASTM D 698 maximum density. Satisfactory material removed below the depths indicated, without specific direction of the Contracting Officer, shall be replaced with 1 satisfactory materials to the indicated excavation grade; except as specified for spread footings. Determination of elevations and measurements of approved overdepth excavation of unsatisfactory material below grades indicated shall be done under the direction of the Contracting Officer. 3.3.1 Structures With Spread Footings lEnsure that footing subgrades have been inspected and approved by the 1 Page 8 I ' Contracting Officer prior to concrete placement. Fill over excavations with concrete during foundation placement. 3.3.2 Pipe Trenches Excavate to the dimension indicated. Grade bottom of trenches to provide uniform support for each section of pipe after pipe bedding placement. Tamp if necessary to provide a firm pipe bed. Recesses shall be excavated to accommodate bells and joints so that pipe will be uniformly supported for the entire length. Rock, where encountered, shall be excavated to a depth of at least 6 inches below the bottom of the pipe. 3.3.3 Excavated Materials Satisfactory excavated material required for fill or backfill shall be placed in the proper section of the permanent work required or shall be ' separately stockpiled if it cannot be readily placed. Satisfactory material in excess of that required for the permanent work and all unsatisfactory material shall be disposed of as specified in Paragraph "DISPOSITION OF ' SURPLUS MATERIAL." 3.3.4 Final Grade of Surfaces to Support Concrete Excavation to final grade shall not be made until just before concrete is to be placed. Only excavation methods that will leave the foundation rock in a solid and unshattered condition shall be used. Approximately level surfaces shall be roughened, and sloped surfaces shall be cut as indicated into rough steps or benches to provide a satisfactory bond. Shales shall be protected from slaking and all surfaces shall be protected from erosion resulting from ponding or flow of water. ' 3.4 SUBGRADE PREPARATION Unsatisfactory material in surfaces to receive fill or in excavated areas shall be removed and replaced with satisfactory materials as directed by the Contracting Officer. The surface shall be scarified to a depth of 6 inches before the fill is started. Sloped surfaces steeper than 1 vertical ' to 4 horizontal shall be plowed,. stepped, benched, or broken up so that the fill material will bond with the existing material. When subgrades are less than the specified density, the ground surface shall be broken up to a minimum depth of 6 inches, pulverized, and compacted to the specified 'I density. When the subgrade is part fill and part excavation or natural ground, the excavated or natural ground portion shall be scarified to a depth of 12 inches and compacted as specified for the adjacent fill. Material shall not be placed on surfaces that are muddy, frozen, or contain 'I frost. Compaction shall be accomplished by sheepsfoot rollers, pneumatic -tired rollers, steel -wheeled rollers, or other approved equipment well suited to the soil being compacted. Material shall be moistened or aerated as necessary to provide the moisture content that will readily facilitate obtaining the specified compaction with the equipment used. Minimum subgrade density shall be as specified herein. �1 3.4.1 Proof Rolling Proof rolling shall be done on an exposed subgrade free of surface water 'I (wet conditions resulting from rainfall) which would promote degradation of an otherwise acceptable subgrade. After stripping, proof roll the existing subgrade of the building and pavements with six passes of a 15 ton, ' Page 9 ' pneumatic -tired roller. Operate the truck in a systematic manner to ensure the number of passes over all areas, and at speeds between 2 112 to 3 1/2 miles per hour. When proof rolling under buildings, the building subgrade shall be considered to extend 5 feet beyond the building lines, and one-half of the passes made with the roller shall be in a direction perpendicular to the other passes. Notify the Contracting Officer a minimum of 3 days prior to proof rolling. Proof rolling shall be performed in the presence of the Contracting Officer. Putting or pumping of material shall be undercut as directed by the Contracting Officerand replaced with ' select material. 3.5 FILLING AND BACKFILLING - 1 Fill and backfill to contours, elevations, and dimensions indicated. Compact each lift before placing overlaying lift. 3.5.1 Common Fill Placement Provide for general site . Use satisfactory materials. Place in 6 inch ' lifts. Compact areas not accessible to rollers or compactors with mechanical hand tampers. Aerate material excessively moistened by rain to a satisfactory moisture content. Finish to a smooth surface by blading, rolling with a smooth roller, or both. ' 3.5.2 Backfill and Fill Material Placement ' Provide for paved areas and under concrete slabs, except where select material is provided. Place in 6 inch lifts. Do not place over wet or frozen areas. Place backfill material adjacent to structures as the structural elements are completed and accepted. Backfill against concrete only when approved. Place and compact material to avoid loading upon or ,j against the structure. 3.5.3 Select Material Placement tlProvide under structures not pile supported. Place in 6 inch lifts. Do not place over wet or frozen areas. Backfill adjacent to structures shall 'I be placed as structural elements are completed and accepted. Backfill against concrete only when approved. Place and compact material to avoid loading upon or against structure. 'I 3.5.4 Backfill and Fill Material Placement Over Pipes and at Walls Backfilling shall not begin until construction below finish grade has been approved, underground utilities systems have been inspected, tested and approved, forms removed, and the excavation cleaned of trash and debris. Backfill shall be brought to indicated finish grade and shall include backfill for outside oil water seperators. Where pipe is coated or wrapped 'I for protection against corrosion, the backfill material up to an elevation 2 feet above sewer lines and 1 foot above other utility lines shall be free from stones larger than 1 inch in any dimension. Heavy equipment for spreading and compacting backfill shall not be operated closer to foundation or retaining walls than a distance equal to the height of backfill above the top of footing; the area remaining shall be compacted in layers not more than 4 inches in compacted thickness with power -driven ' hand tampers suitable for the material being compacted. Backfill shall be placed carefully around pipes or tanks to avoid damage to coatings, wrappings, or tanks. Backfill shall not be placed against foundation walls l Page 10 I prior to 7 days after completion of the walls. As far as practicable, ' backfill shall be brought up evenly on each side of the wall and sloped to drain away from the wall. 3.5.5 Porous Fill Placement . Provide under floor and area -way slabs on a compacted subgrade. Place in 4 inch lifts with a minimum of two passes of a hand -operated plate -type vibratory compactor. 3.5.6 Trench Backfilling ' Backfill as rapidly as construction, testing, and acceptance of work permits. Place and compact backfill under structures and paved areas in 6 inch lifts to top of trench and in6 inch lifts to one foot over pipe outside structures and paved areas. ' 3.6 BORROW Where satisfactory materials are not available in sufficient quantity from required excavations, approved borrow materials shall be obtained as specified herein. ' 3.7 BURIED WARNING AND IDENTIFICATION TAPE Provide buried utility lines with utility identification tape. Bury tape 12 inches below finished grade; under pavements and slabs, bury tape 6 ' inches below top of subgrade. 3.8 BURIED DETECTION WIRE ' Bury detection wire directly above non-metallic piping at a distance not to exceed 12 inches above the top of pipe. The wire shall extend continuously and unbroken, from manhole to manhole. The ends of the wire shall terminate inside the manholes at each end of the pipe, with a minimum of 3 feet of wire, coiled, remaining accessible in each manhole. The wire shall remain insulated over it's entire length. The wire shall enter manholes ' between the top of the corbel and the frame, and extend up through the chimney seal between the frame and the chimney seal. For force mains, the wire shall terminate in the valve pit at the pump station end of the pipe. ' 3.9 COMPACTION Determine in -place density of existing subgrade; if required density exists, no compaction of existing subgrade will be required. Density requirements specified herein are for cohesionless materials. When cohesive materials are encountered or used, density requirements may be reduced by 5 percent. . 3.9.1 General Site Compact underneath areas designated for vegetation and areas outside the 5 'I foot line of the paved area or structure to 85 percent of ASTM D 698. 3.9.2. Structures, Spread Footings, and Concrete Slabs Compact top 12 inches of subgrades to 95 percent of ASTM D 698. Compact ' I Page 11 common fill fill and backfill material and select material to 95 percent of ASTM D 698. 3.9.3 Adjacent Area ' Compact areas within 5 feet of structures to 90 percent of ASTM D 698. 3.9.4 Paved Areas ' Compact top 12 inches of subgrades to 95 percent of ASTM D 698. Compact .fill and backfill materials to 95 percent of ASTM D 698. 3.10 FINISH OPERATIONS 3.10.1 Grading Finish grades as indicated within one -tenth of one foot. Grade areas to drain water away from structures. Maintain areas free of trash and debris. For existing grades that will remain but which were disturbed by Contractor's operations, grade as directed. 3.10.2 Topsoil and Seed Provide as specified in Section 32 92 19 SEEDING. 3.10.3 Protection of Surfaces Protect newly backfilled, graded, and topsoiled areas from traffic, erosion, and settlements that may occur. Repair or reestablish damaged grades, elevations, or slopes. 3.11 DISPOSITION OF SURPLUS MATERIAL Remove from Government property surplus or other soil material not required or suitable for filling or backfilling, and brush, refuse, stumps, roots, and timber. 3.12 FIELD QUALITY CONTROL 3.12.1 Sampling Take the number and size of samples required to perform the following tests. ' 3.12.2 Testing Perform one of each of the following tests for each material used. Provide additional tests for each source change. 3.12.2.1 Fill and Backfill Material Testing � Test fill and backfill material in accordance with ASTM C 136 for conformance to ASTM D 2487 gradation limits; ASTM D 1140 for material finer than the No. 200 sieve; ASTM D 4318 for liquid limit and for plastic limit; 'I ASTM D 698 or ASTM D 1557 for moisture density relations, as applicable. 11 Page 12 3.12.2.2 Select Material Testing Test select material in accordance with ASTM C 136 for conformance to ASTM D 2487 gradation limits; ASTM D 1140 for material finer than the No. 200 sieve; ASTM D 698 or ASTM D 1557 for moisture density relations, as applicable. 3.12.2.3 Porous Fill Testing Test porous fill in accordance with ASTM C 136 for conformance to gradation specified in ASTM C 33. 3.12.2.4 Density Tests Test density in accordance with ASTM D 1556, or ASTM D 2922 and ASTM D 3017. When ASTM D 2922 and ASTM D 3017 density tests are used, verify density test results by performing an ASTM D 1556 density test at a location already ASTM D 2922 and ASTM D 3017 tested as specified 'herein. Perform an ASTM D 1556 density test at the start of the job, and for every 10 ASTM D 2922 and ASTM D 3017 density tests thereafter. Test each lift at randomly selected locations every 2500 square feet of existing grade in fills for structures and concrete slabs, and every 2500 square feet for other fill areas and every 2500 square feet of subgrade in cut. Include density test results in daily report. a. Bedding and backfill in trenches: One test per 50 linear feet in each lift. 3.12.2.5 Moisture Content Tests In the stockpile, excavation or borrow areas, a minimum of two tests per day per type of material or source of materials being placed is required during stable weather conditions. During unstable weather, tests shall be made as dictated by local conditions and approved moisture content shall be tested in accordance with ASTM D 2216. Include moisture content test results in daily report. -- End of Section -- Page 13 1 b I ' SECTION 32 92 19 SEEDING 10/06 PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only. ASTM INTERNATIONAL (ASTM) 1 ASTM C 602 (1995a; R 2001) Agricultural Liming Materials ASTM D 4427 (1992; R 2002el) Peat Samples by ' Laboratory Testing ASTM D 4972 (2001) pH of Soils U.S. DEPARTMENT OF AGRICULTURE (USDA) AMS Seed Act (1940; R 1988; R 1998) Federal Seed Act I ' DOA SSIR 42 (1996) Soil Survey Investigation Report No. 42, Soil Survey Laboratory Methods Manual, Version 3.0 I 1.2 DEFINITIONS I 1.2.1 Stand of Turf The contractor shall guarantee a full stand of grass over the entire disturbed area. If necessary the contractor will wet down the areas to assist in seed germination or aid in growth in times of excessively dry weather. a stand of grass will be considered acceptable when the entire stand of grass is at least four inches high and has achieved at least 95% coverage of disturbed area. Reseeding will be required by the contractor as necessary to obtain the specified stand of grass. 1.3 RELATED REQUIREMENTS Section 31 23 00.00 20 EXCAVATION AND FILL 1 1.4 SUBMITTALS Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for Contractor Quality Control approval. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES: 1 SD-03 Product Data I Page 1 fll Wood cellulose fiber mulch Fertilizer Include physical characteristics, and recommendations. SD-06 Test Reports Topsoil composition tests (reports and recommendations). SD-07 Certificates State certification and approval for seed SD-08 Manufacturer's Instructions 1.5 DELIVERY, STORAGE, AND HANDLING 1.5.1 Delivery 1.5.1.1 Seed Protection Protect from drying out and from contamination during delivery, on -site storage, and handling. 1.5.1.2 Fertilizer Gypsum Sulfur Iron and Lime Delivery Deliver to the site in original, unopened containers bearing manufacturer's chemical analysis, name, trade name, trademark, and indication of conformance to state and federal laws. Instead of containers, fertilizer gypsum sulphur iron and lime may be furnished in bulk with certificate indicating the above information. 1.5.2 Storage 1.5.2.1 Seed, Fertilizer Gypsum Sulfur Iron and Lime Storage Store in cool, dry locations away from contaminants. 1.5.2.2 Topsoil Prior to stockpiling topsoil, treat growing vegetation with application of appropriate specified non -selective herbicide. Clear and grub existing vegetation three to four weeks prior to stockpiling topsoil. 1.5.2.3 Handling Do not drop or dump materials from vehicles. 1.6 TIME RESTRICTIONS AND PLANTING CONDITIONS 1.6.1 Restrictions Do not plant when the ground is frozen, snow covered, muddy, or when air Page 2 temperature exceeds 90 degrees Fahrenheit. 1.7 TIME LIMITATIONS 1.7.1 Seed Apply seed within twenty four hours after seed bed preparation. PART 2 PRODUCTS 2.1 SEED 2.1.1 Classification Provide State -certified seed of the latest season's crop delivered in original sealed packages, bearing producer's guaranteed analysis for percentages of mixtures, purity, germination, weedseed content, and inert material. Label in conformance with AMS Seed Act and applicable state seed laws. Wet, moldy, or otherwise damaged seed will be rejected. Field mixes will be acceptable when field mix is performed on site in the presence of the Contracting Officer. 2.1.2 Planting Dates See construction drawings for temporary and perminent seeding dates. 2.2 TOPSOIL 2.2.1 On -Site Topsoil Surface soil stripped and stockpiled on site and modified as necessary to meet the requirements specified for topsoil in paragraph entitled "Composition." When available topsoil shall be existing surface soil stripped and stockpiled on -site in accordance with Section 31 23 00.00 20 EXCAVATION AND FILL. 2.2.2 Off -Site Topsoil Conform to requirements specified in paragraph entitled "Composition." Additional topsoil shall be furnished by the Contractor. 2.2.3 Composition Containing from 5 to 10 percent organic matter as determined by the topsoil composition tests of the Organic Carbon, 6A, Chemical Analysis Method described in DOA SSIR 42. Maximum particle size, 3/4 inch, with maximum 3 percent retained on 1/4 inch screen. The pH shall be tested in accordance with ASTM D 4972. Topsoil shall be free of sticks, stones, roots, and other debris and objectionable materials. Other components shall conform to the following limits: Silt 7 to 17 percent Clay 4 to 12 percent Sand 20-35 percent pH 5.5 to 7.0 soluble Salts 600 ppm maximum Page 3 2.3 SOIL CONDITIONERS Add conditioners to topsoil as required to bring into compliance with "composition" standard for topsoil as specified herein. 2.3.1 Lime Commercial grade limestone containing a calcium carbonate equivalent (C.C.E.) as specified in ASTM C 602 of not less than 94 percent. 2.3.2 Aluminum Sulfate Commercial grade. 2.3.3 Sulfur 100 percent elemental 2.3.4 Iron 100 percent elemental 2.3.5 Peat Natural product of peat moss derived from a freshwater site and conforming to ASTM D 4427. Shred and granulate peat to pass a 1/2 inch mesh screen and condition in storage pile for minimum 6 months after excavation. 2.3.6 Sand Clean and free of materials harmful to plants. 2.3.7 Perlite Horticultural grade. 2.3.8 Composted Derivatives Ground bark, nitrolized sawdust, humus or other green wood waste material free of stones, sticks, and soil stabilized with nitrogen and having the following properties: 2.3.8.1 Particle Size Minimum percent by weight passing: No. 4 mesh screen 95 No. 8 mesh screen 80 2.3.8.2 Nitrogen Content Minimum percent based on dry weight: Fir Sawdust 0.7 Fir or Pine Bark 1.0 Page 4 2.3.9 Gypsum Coarsely ground gypsum comprised of calcium sulfate dihydrate 61 percent, calcium 22 percent, sulfur 17 percent; minimum 96 percent passing through 20 mesh screen, 100 percent passing thru 16 mesh screen. 2.3.10 Calcined Clay Calcined clay shall be granular particles produced from montmorillonite clay calcined to a minimum temperature of 1200 degrees F. Gradation: A minimum 90 percent shall pass a No. 8 sieve; a minimum 99 percent shall be retained on a No. 60 sieve; and a maximum 2 percent shall pass a No. 100 sieve. Bulk density: A maximum 40 pounds per cubic foot. 2.4 FERTILIZER 2.4.1 Granular Fertilizer organic Synthetic, granular controlled release fertilizer containing the following minimum percentages, by weight, of plant food nutrients: 10 percent available nitrogen 20 percent available phosphorus 20 percent available potassium 2.4.2 Hydroseeding Fertilizer Controlled release fertilizer, to use with hydroseeding and composed of pills coated with plastic resin to provide a continuous release of nutrients for at least 6 months and containing the following minimum percentages, by weight, of plant food nutrients. 10 percent available nitrogen 20 percent available phosphorus 20 percent available potassium 1 2.5 MULCH Mulch shall be free from noxious weeds, mold, and other deleterious materials. 2.5.1 Straw Stalks from oats, wheat, rye, barley, or rice. Furnish in air-dry condition and of proper consistency for placing with commercial mulch blowing equipment. Straw shall contrain no fertile seed. 2.5.3 Wood Cellulose Fiber Mulch Use recovered materials of either paper -based (100 percent) or wood -based (100 percent) hydraulic mulch. Processed to contain no growth or germination -inhibiting factors and dyed an appropriate color to facilitate visual metering of materials application. Composition on air-dry weight ' Page 5 i i basis: 9 to 15 percent moisture, pH range from 5.5 to 8.2 . Use with hydraulic application of grass seed and fertilizer. 2.6 WATER I Source of water shall be approved by Contracting Officer and of suitable quality for irrigation, containing no elements toxic to plant life. PART 3 EXECUTION t3.1 PREPARATION 3.1.1 EXTENT OF WORK Provide soil preparation (including soil conditioners as required), fertilizing, seeding, and surface topdressing of all newly graded finished earth surfaces, unless indicated otherwise, and at all areas inside or outside the limits of construction that are disturbed by the Contractor's operations. 3.1.1.1 Topsoil Provide 4 inches of off -site topsoil, on -site topsoil orexisting soilto I meet indicated finish grade. After areas have been brought to indicated finish grade, incorporate fertilizer pH adjusters soil conditioners into soil a minimum depth of 4 inches by disking, harrowing, tilling or other method approved by the Contracting Officer. Remove debris and stones larger than 3/4 inch in any dimension remaining on the surface after finish 1 grading. Correct irregularities in finish surfaces to eliminate depressions. Protect finished topsoil areas from damage by vehicular or pedestrian traffic. I 3.2 SEEDING I. 3.2.1 Seed Application Seasons and Conditions ' Immediately before seeding, restore soil to proper grade. Do not seed when ground is muddy frozen snow covered or in an unsatisfactory condition for seeding. If special conditions exist that may warrant a variance in the ' above seeding dates or conditions, submit a written request to the Contracting Officer stating the special conditions and proposed variance. Apply seed within twenty four hours after seedbed preparation. Sow seed by approved sowing equipment. Sow one-half the seed in one direction, and sow IIremainder at right angles to the first sowing. 3.2.2 Seed Application Method Seeding method shall be broadcasted and drop seedingor hydroseeding. 3.2.2.1 Broadcast and Drop Seeding Seed shall be uniformly broadcast at the rate as indicated on the construction drawings.. Use broadcast or drop seeders. Sow one-half the seed in one direction, and sow remainder at right angles to the first t sowing. Cover seed uniformly to a maximum depth of 1/4 inch in clay soils and 1/2 inch in sandy soils by means of spike -tooth harrow, cultipacker, raking or other approved devices. Page 6 1� 3.2.2.3 Hydroseeding First, mix water and fiber. Wood cellulose fiber, paper fiber, or recycled paper shall be applied as part of the hydroseeding operation. Fiber shall be added at 1,000 pounds, dry weight, per acre. Then add and mix seed and fertilizer to produce a homogeneous slurry. Seed shall be mixed to ensure broadcasting at the rate as indicated on the construction drawings. When hydraulically sprayed on the ground, material shall form a blotter like cover impregnated uniformly with grass seed. Spread with one application with no second application of mulch. 3.2.3 Mulching 3.2.3.1 Hay or Straw Mulch Straw mulch shall be applied at a rate which will insure approximatelly 75% coverage of the seeded area. The straw and sown seed will be lightly disced into the bed to give it further resistence to blowing and washing. Straw mulch shall be spread uniformly at the rate of 2 tons per acre. Mulch shall be spread by hand, blower -type mulch spreader, or other approved method. Mulching shall be started on the windward side of relatively flat areas or on the upper part of steep slopes, and continued uniformly until the area is covered. The mulch shall not be bunched or clumped. Sunlight shall not be completely excluded from penetrating to the ground surface. All areas installed with seed shall be mulched on the same day as the seeding. Mulch shall be anchored immediately following spreading. ' 3.2.3.3 Asphalt Adhesive Tackifier Asphalt adhesive tackifier shall be sprayed at a rate between 10 to 13 ' gallons per 1000 square feet. Sunlight shall not be completely excluded from penetrating to the ground surface. 3.2.3.5 Asphalt Adhesive Coated Mulch Straw mulch may be spread simultaneously with asphalt adhesive applied at a rate between 10 to 13 gallons per 1000 square feet, using power mulch equipment which shall be equipped with suitable asphalt pump and nozzle. The adhesive -coated mulch shall be applied evenly over the surface. Sunlight shall not be completely excluded from penetrating to the ground surface. 'I 3.2.4 Rolling Immediately after seeding, firm entire area except for slopes in excess of 3 to 1 with a roller not exceeding 90 pounds for each foot of roller width. If seeding is performed with cultipacker-type seeder or by hydroseeding, rolling may be eliminated. ' 3.2.6 Watering Start watering areas seeded as required by temperature and wind conditions. Apply water at a rate sufficient to insure thorough wetting fl of soil to a depth of 2 inches without run off. During the germination process, seed is to be kept actively growing and not allowed to dry out. 11 Page 7 11 3.3 PROTECTION OF TURF AREAS Immediately after turfing, protect area against traffic and other use. 3.5 RESTORATION Restore to original condition existing turf areas which have been damaged during turf installation operations at the Contractor's expense. Keep clean at all times at least one paved pedestrian access route and one paved vehicular access route to each building. Clean other paving when work in adjacent areas is complete. -- End of Section -- Page 8 11 ' REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING ANALYSIS AIRCRAFT FIRE RESCUE FACILITY - SEED 1 PROJECT MCAS NEW RIVER JACKSONVILLE, NORTH CAROLINA i i i PREPARED FOR: MR. CHRIS COOK VIRTEXCO CORPORATION 2909 BRUNSWICK AVENUE ' NEW BERN, NORTH CAROLINA 28562-2601 ECS CAROLINAS, LLP PROJECT NO.: 22.12700 JANUARY 15, 2007 I 1 I i 1 1 DRAFT January 15, 2007 Mr. Chris Cook ' Virtexco Corporation 2909 Brunswick Avenue New Bern, North Carolina 28562-2601 ' Re: Report of Subsurface Exploration and Geotechnical Engineering Evaluation Aircraft Fire Rescue Facility - Seed 1 Project MCAS New River 1 Jacksonville, North Carolina ECS Project No.: 22.12700 Dear Mr. Cook: As authorized by your acceptance of our proposal number 9235R, dated December 20, 2006, ' ECS Carolinas, LLP has completed a subsurface exploration for the subject project. This report presents the results of the field exploration; laboratory testing and engineering analysis, along with our recommendations for design of geotechnical related items. ' We appreciate the opportunity to be of service to you during the design phase of this project and look forward to our continued involvement during the construction phase. If you have any questions concerning the information and recommendations presented in this report, please ' contact us at (910) 686-9114 for further assistance. Respectfully submitted, ECS CAROLINAS, LLP 1 Winslow E. Goins, E.I. Project Manager 11 11 I Walid M. Sobh, P.E. Principal Engineer North Carolina License No. 22983 11 11 11 I' REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL EN ANALYSIS AIRCRAFT FIRE RESCUE FACILITY - SEED 1 PROJECT MCAS NEW RIVER JACKSONVILLE, NORTH CAROLINA PREPARED FOR: MR. CHRIS COOK VIRTEXCO CORPORATION 2909 BRUNSWICK AVENUE NEW BERN, NORTH CAROLINA 28562-2601 PREPARED BY: ECS CAROLINAS, LLP 7211 OGDEN BUSINESS PARK SUITE 201 JACKSONVILLE , NORTH CAROLINA 28411 ECS CAROLINAS, LLP PROJECT NO.: 22.12700 WALID M. SOBH, P.E. NC LICENSE NO.22983 JANUARY 15, 2007 11 !1 TABLE OF CONTENTS 1.0 EXECUTIVE SUMMARY..................................................................................................................I 2.0 PROJECT OVERVIEW......................................................................................................................2 1 2.1 Project Information............................................................................................................................2 2.2 Scope of Work...................................................................................................................................2 2.3 Purpose of Exploration......................................................................................................................2 1 3.0 EXPLORATION PROCEDURES.......................................................................................................3 3.1 Subsurface Exploration Procedures...................................................................................................3 3.1.1 Soil Borings...............................................................................................................................3 1 3.1.2 Hand Auger Borings and Infiltration Tests...............................................................................3 3.2 Laboratory Testing Program..............................................................................................................4 1 4.0 EXPLORATION RESULTS ................................................................................................................5 4.1 Site Conditions..................................................................................................................................5 4.2 Regional Geology..............................................................................................................................5 4.3 Soil Conditions..................................................................................................................................5 4.4 Groundwater Conditions.......................................................................................................6 1 4.5 Laboratory Test Results........................................................................................................6 4.6 Infiltration Test Results ........................................................................................................7 5.0 ANALYSIS AND RECOMMENDATIONS.......................................................................................8 5.1 Subgrade Preparation.........................................................................................................................8 5.2 Engineered Fill Placement ............... :...................................... ........................................................... 9 1 5.3 Foundations Design.........................................................................................................................10 5.4 Floor Slab Design............................................................................................................................11 5.5 Pavement Design Considerations....................................................................................................11 5.6 Site Drainage...................................................................................................................................12 1 5.7 Construction Considerations...........................................................................................................13 1 6.0 CLOSING............................................................................................................................................14 APPENDICES 1 APPENDIX A-FrcuREs APPENDIX B-SPT BORING LOGS AND SOIL CLASSIFICATION SYSTEM, DESCRIPTION, AND TERMINOLOGY APPENDIX C-LABROTORY TEST RESULTS APPENDIX D-HAND AUGER BORING LOGS AND INFILTRATION TEST RESULTS APPENDIX &GENERAL CONDITIONS APPENDIX F-PROCEDURES REGARDING FIELD LAGS, LABORATORY DATA SHEETS AND SAMPLES 1 Report of Subsurface Exploration and Geotechnical Engineering Analysis Aircraft Fire Rescue Facility MCAS New River Jacksonville, North Carolina ECS Project No.: 22,12700 1.0 EXECUTIVE SUMMARY This report contains the results of our subsurface exploration and geotechnical engineering analysis for the proposed site located off of Curtis Road at the MCAS New River in Jacksonville, North Carolina. At the time of our field exploration, the site is mostly clear. The site is relatively level We understand that fire station building along with associated drive ways and parking will be built on the proposed site. Project site grading and structural information was not available at the time this proposal was prepared. No appreciable organic topsoil was reported by the drillers at the borings locations. Beneath the surface to an approximate depth of 12 feet, the test borings typically encountered intermittent layers of loose to medium dense silty, clayey and clean sands (SM, SC, SP) and soft to stiff sandy clays and clays(CL, CH). From 12 feet to approximate termination depths of 40 to 50 feet, the test borings typically encountered intermittent layers of loose to dense silty and clean sands (SM, SP). In summary, the proposed single family structures can be supported on conventional shallow foundations provided that the structures are one to two stories. For foundations designed and constructed in accordance with the recommendations provided in this report, a net allowable soil bearing pressures of 2,000 pounds per square foot (psi) is recommended for use in proportioning shallow foundations. We request the opportunity to review our foundation recommendations and make any necessary changes once structural loads and site design grades are determined. Specific information regarding the subsurface exploration procedures used, the site and subsurface conditions at the time of our exploration, and our conclusions and recommendations concerning the geotechnical design and construction aspects of the project are discussed in detail in the subsequent sections of this report. Please note this Executive Summary is an important part of this report and should be considered a "summary" only. The subsequent sections of this report constitute our findings, conclusions, and recommendations in their entirety. Prepared By: Reviewed By: Winslow E. Goins, E.I. Walid M. Sobh, P.E. Project Manager Principal Engineer Report of Subsurface Exploration and Gootechnical Engineering Analysis Aircraft Fire Rescue Facility WAS New River Jacksonville, North Carolina ECS Project No.: 22,12700 2.0 PROJECT OVERVIEW 2.1 Project Information Our understanding of the proposed development is based upon our discussions with representatives of Virtexco Corporation and a review of the site plan provided to ECS by Virtexco Corporation The proposed site is located off of Curtis Road at the MCAS New River in Jacksonville, North Carolina. At the time of our field exploration, the site is mostly clear. The site is relatively level We understand that fire station building along with associated drive ways and parldng will be built on the proposed site. Proj ect site grading and structural information was not available at the time this proposal was prepared. 2.2 Scone of Worlc The conclusions and recommendations contained in this report are based on the results of: Y five soil test borings, • one infiltration test, • visual examination of the samples obtained during our field exploration, • the results of select laboratory index and engineering properties testing, • engineering analyses of the field and laboratory findings with respect to the provided project information. 23 Purposes of Exploration The purpose of this exploration program was to determine the soil and groundwater conditions at the site and to develop engineering recommendations to assist in the design and construction of the proposed project. We accomplished these objectives by: • performing a site reconnaissance to evaluate the existing site conditions, • drilling test borings to explore the subsurface soil and groundwater conditions, • performing an infiltration test to determine the infiltration rate of subsurface soil, • performing laboratory tests on selected representative soil samples from the borings to evaluate pertinent engineering properties; and • analyzing the field and laboratory data to develop appropriate geotechnical engineering design and construction recommendations. 2 Report of Subsurface Exploration and Geotechnical Engineering Analysis Aircraft Fire Rescue Facility MCAS New River Jacksonville, North Carolina ECS Project No.: 22.12700 3.0 EXPLORATION PROCEDURES 3.1 Subsurface Exploration Procedures 3.1.1 Soil Test Borings The field logs and soil samples were provided to ECS. We understand that the five soil test borings drilled on the site were performed using a truck -mounted drill rig utilizing various cutting bits to advance the boreholes. Mud rotary drilling was utilized to advance the borings. Representative soil samples were obtained by means of the split -barrel sampling procedure in general conformance with ASTM D-1586. In this procedure, a 2-inch O.D., split -barrel sampler is driven into the soil a distance of 18 inches by a 140-pound hammer falling 30 inches. The number of blows required to drive the sampler through a 12- inch interval is termed the Standard Penetration Test (SPT) value and is indicated for each sample on the boring logs in Appendix B. The SPT value can be used as a qualitative indication of the in -place relative density of cohesionless soils. In a less reliable way, it also indicates the consistency of cohesive soils. This indication is qualitative, since many factors can affect the standard penetration resistance value (i.e., differences between drill crews, drill rigs, drilling procedures, and hammer -rod -sampler assemblies) and prevent a direct correlation between SPT resistance value, or N-Value, and the consistency or relative density of the tested soil. Split -spoon samples were obtained at approximately 2.5-foot intervals within the upper 10 feet and at approximately 5-foot intervals thereafter. The approximate locations of -the 'soil test borings are indicated on the Boring Location Plan in Appendix A of this report. The drilling crew maintained a field log of the soils encountered in the borings. After recovery, each sample was removed from the sampler and visually classified. Representative portions of each soil sample were then sealed in air -tight containers and brought to our laboratory in Wilmington, North Carolina for visual examination and formal classification by a geotechnical engineer in general accordance with the Unified Soil Classification System guidelines. 3.1.2 Hand Auger Borings and Infiltration Test On December 21, 2006, one hand auger boring was performed on the site. The purpose of the hand auger boring was to stratify the subsurface soils and estimate the infiltration rate of the subsurface soils. We evaluated the subsurface soil and ground water conditions by drilling one hand auger boring to a depth of approximately 4 feet below the existing ground surface at the approximate location indicated on the Boring Location Plan in Appendix A of this report. We visually classified the subsurface soils on site. An infiltration test was then performed adjacent to the hand auger boring location. The results are provided in Section 4.6 and in Appendix D. Report of Subsurface Exploration and Geotechnical Engineering Analysis Aircraft Fire Rescue Facility MCAS New River Jacksonville, North Carolina ECS Project No.: 22.12700 3.2 Laboratory Testing Program Representative soil samples obtained during our field exploration were selected and tested in our laboratory to check field classifications and to determine pertinent engineering properties. The laboratory testing program included: • visual classifications of soil according to ASTM D 2487; index property testing included natural moisture content determinations (ASTM D 2216), standard Proctor (ASTM D 686), California Bearing Ratio (CBR) (ASTM D 1883) and grain size analyses (ASTM D 1140). bulls samples were obtained from the area around locations CBR-I, CBR-2 and CBR-3. The bulk samples consisted of samples taken at various depths using a shovel and hollow flight augers with the drill rig. All data obtained from the laboratory tests are included on the Laboratory Testing Summary and in Appendix C of this report. The soil samples collected for this investigation will be retained at our laboratory for a period of sixty (60) days, after which they will be discarded unless other instructions are received as to their disposition. Report of Subsurface Exploration and Geotechnical Engineering Analysis . Aircraft Fire Rescue Facility MCAS New River Jacksonville, North Carolina ECS Project No.: 22.12700 4.0 EXPLORATION RESULTS 4.1 Site Conditions The proposed site is located off of Curtis Road at the MCAS New River in Jacksonville, North Carolina. At the time of our field exploration, the site is mostly clear. The site is relatively level. It is bordered to the north by a concrete runway. It is bordered to the south and west by a ditch. It is bordered to the east by the New River. 4.2 ReQional Geolo �v The site is located in the Coastal Plain Physiographic Province of North Carolina. The Coastal Plain is composed of seven terraces, each representing a former level of the Atlantic Ocean. Soils in this area generally consist of sedimentary materials transported from other areas by the ocean or rivers. These deposits vary in thickness from a thin veneer along the western edge of the region to more than 10,000 feet near the coast. The sedimentary deposits of the Coastal Plain rest upon consolidated rocks similar to those underlying the Piedmont and Mountain Physiographic Provinces. In general, shallow unconfined groundwater movement within the overlying soils is largely controlled by topographic gradients. Recharge occurs primarily by infiltration along higher elevations and typically discharges into streams or other surface water bodies. The elevation of the shallow water table is transient and can vary greatly with seasonal fluctuations in precipitation. 4.3 Soil Conditions Soil Test Borings: No appreciable organic topsoil was reported by the drillers at the borings locations. Beneath the surface to an approximate depth of 12 feet, the test borings typically encountered intermittent layers of loose to medium dense silty, clayey and clean sands (SM, SC, SP) and soft to stiff sandy clays and clays(CL, CH). Standard penetration test resistances (N-values) in these soils generally ranged from 4 to 18 blows per foot (bpf). From 12 feet to approximate termination depths of 40 to 50 feet, the test borings typically encountered ' intermittent layers of loose to dense silty and clean sands (SM, SP). Standard penetration test resistances (N-values) in these soils generally ranged from 6 to 36 bpf. The descriptions provided in this section are a general summary of the subsurface conditions encountered within the test borings. The Test Boring Records in Appendix B contain detailed information recorded at each of the boring locations and represent the geotechnical engineer's interpretation of the data based on visual examination of the soil samples obtained during the field exploration. The stratification lines on the Test Boring Records represent approximate boundaries between material types and the actual transition between strata is expected to be gradual. L i Report of Subsurface Exploration and Geotwhnical Engineering Analysis Aircraft Fire Rescue Facility MCAS New River Jacksonville, North Carolina ECS Project No.: 22.12700 4.4 Groundwater Conditions Groundwater observations were made after the completion of the drilling operations all boring locations. Furthermore, visual observations of the samples retrieved during drilling exploration were also used in evaluating the groundwater conditions. The groundwater depths were observed to range from 0.6 to 4.4 feet below the existing grade after completion of the borings. The highest groundwater observations are normally encountered in the late winter and early spring, and our current groundwater observations are expected to be near or representative of the seasonal maximum water table. Variations in the location of the long-term water table may occur as a result of changes in precipitation, evaporation, surface water runoff, and other factors not immediately apparent at the time of this exploration. If long term water levels are crucial to the development of this site, it would be prudent to verify water levels with the use of perforated pipes or piezometers. The relatively shallow groundwater conditions encountered within the boreholes are expected to impact utility excavations, foundation installation, and subgrade preparation and mass grading activities. However, this will depend on final site design grades. Consequently, the diversion of surface water should be expected in order to successfully complete site grading activities. 4.5 Laboratory Test Results Index and engineering properties tests were performed on select samples of the sample soils encountered within the test borings. In summary, the tested samples had in -situ moisture contents ranging from about 22.0 to 38.5 percent. The Atterberg limits analyses of the tested samples indicated liquid limits ranging from 36 to 72, plastic limits ranging from 12 to 21 and plasticity indices ranging from 17 to 51. i t The maximum dry density of the bulk samples are 113.0, UNKNOWN, and UNKNOWN pounds per cubic foot (pcf) with optimum moisture contents of 11.5, UNKNOWN, and UNKNOWN percent as detemuned by the standard Proctor method (ASTM D 698) California Bearing Ratio (CBR) values of 19.5, UNKNOWN, and UNKNOWN were obtained for the soaked samples that were compacted to 100 percent of the soils maximum dry density. ' Specific laboratory test results are provided in the Laboratory Testing Summary and in Appendix C of this report. i i i t 6 Report of Subsurface Exploration and Geotechnical Engineering Analysis Aircraft Fire Rescue Facility WAS New River Jacksonville, North Carolina ECS Project No.: 22.12700 4.6 Infiltration Test Results Our field classifications indicate that the subsurface soils at the infiltration test location consisted of brown silty fine to medium sand, tan fine to medium sand and orange gray clay. Ground water was encountered at a depth of 36 inches below present site grades. Infiltration test I-1 was performed at a depth of approximately 12 inches below existing grade and indicated an infiltration rate of 3.2 inches per hour. Please see the site sketch in Appendix A for the infiltration test location. Based on observations in the hand auger borings, it is our opinion that the seasonal high ground water level at the test location is approximately 17 inches below existing grade. Report of Subsurface Exploration and Gectechnical Engineering Analysis Aircraft Fire Rescue Facility MCAS New River Jacksonville, North Carolina ECS Project No.: 22.12700 5.0 ANALYSIS AND The recommendations provided in this report are based upon our understanding of the proposed construction, the information provided to us during this study and our past experience with similar conditions. Should any of the information provided to us be changed prior to final design, ECS should be notified to review these recommendations and make appropriate revisions, if necessary. 5.1 Subarade Preaaration The first step in preparing the site for the proposed construction should be to remove all vegetation, rootmat, topsoil, deleterious materials, and any other soft or unsuitable materials from the existing ground surface. These operations should extend at least 10 feet, where possible, beyond the planned limits of the proposed building and pavements. After proper clearing, stripping grubbing, and prior to fill placement, foundation, slab, or pavement construction, the exposed subgrade soils should be carefully evaluated by an experienced geotechnical engineer to identify any localized unstable or otherwise unsuitable materials. Aber evaluating the exposed soils, loose and yielding areas should be identified by proofrolling the exposed subgrades, if site and subsurface conditions allow, with an approved piece of equipment, such as a loaded dump truck, having a single -axle weight of at least 10 tons. Any soft or unsuitable materials identified during prooftolling operations should be either repaired in -place or removed and replaced with an approved backfill placed and compacted in accordance with recommendations of this report. Depending on final site design grades, undercutting should be anticipated in the proposed building area due to the presence of loose/soft soils and moisture sensitive soils in the upper five feet of the existing subgrade. These areas will be identified during proofrolling operations. Undercutting should also be anticipated in the footing areas and should be verified following foundation excavations. If plastic clay (CI) is encountered below the footing, we recommend that the clay be over -excavated by at least two feet below the footing and approved back fill material should be placed in the footing to provide a two foot separation between the bottom of footing and the plastic clay layer. Site subgrade conditions will be significantly influenced by weather conditions. Subgrades that are evaluated after periods of rainfall will not respond as well to proofroling as subgrades that are evaluated after periods of more favorable weather. We strongly recommend that rubber tire equipment not be used if subgrade conditions exhibit elevated moisture conditions. The contractor should use tracked equipment to minimize the degradation of marginally stable subgrade. The preparation of fill subgrades, as well as proposed building subgrades, should be observed on a full- time basis by a representative of ECS. These observations should be performed by an. experienced geotechnical engineer, or his representative, to ensure that all unsuitable materials have been removed and that the prepared subgrade is suitable for support of the proposed construction and/or fills. Report of Subsurface Exploration and Geotechnical Engineering Analysis Aircraft Fire Rescue Facility MCAS New River ' Jacksonville, North Carolina ECS Project No.: 22.12700 5.2 Endneered Fill Placement ' Following the removal of deleterious surface and subsurface materials, and after achieving a stable subgrade, engineered fills can be placed and compacted to achieve the desired site grades. All fill for ' support of the proposed construction and for backfill of utility lines within expanded building and pavement limits should consist of an approved material, free of organic matter and debris and cobbles greater than 3 inches, and have a Liquid Limit (LL) and Plasticity Index (Pl) less than 40 and 20, ' respectively. We also recommend that all fills within structural areas have a standard Proctor (ASTM D 698) maximum dry density of at least 110 pounds per cubic foot (pef). Unsuitable fill materials include topsoil, organic materials (OH, OL), and high plasticity clays and silts i' (CH, MED. All such materials removed during grading operations should be either stockpiled for later use in landscape fills, or placed in approved on or off -site disposal areas. Existing soils containing significant amounts of organic matter will not be suitable for re -use as engineered fill. As such, the organic content of the near surface cultivated soils should be evaluated to determine if some of these soils will be suitable for reuse as engineered fill. Natural fine -gained soils classified as clays or silts (CL, ML) with LL and PI greater than 40 and 20, respectively, should be evaluated by the geotechnical engineer at the time of construction to determine their suitability for use as engineered fill. Prior to the commencement of fill operations and/or utilization of any off -site borrow materials, the contractor should provide representative samples of the proposed fill soils to the geotechnical engineer. The geotechnical engineer can determine the material's suitability for use as an engineered fill and 1 develop moisture -density relationships in accordance with the recommendations provided herein. Samples should be provided to the geotechnical engineer at least 3 to 5 days prior to their use in the field to allow for the appropriate laboratory testing to be performed. Fill materials placed within the building and pavement areas should be placed in lifts not exceeding 8 inches in loose lift thickness and moisture conditioned to within their working range of optimum moisture content. The fills should then be compacted to a minimum of 95 percent of the soil's standard Proctor (ASTM D 698) maximum dry density to within 12 inches below finished subgade. The upper 12 inches of fills placed beneath structural development should be compacted to 98 percent of the soil's standard Proctor maximum dry density. The typical working range of optimum moisture for the natural Coastal Plain soils at the site is expected to be within approximately 3 percent of the optimum moisture content. Care should also be taken to provide a smooth, gently sloping ground surface at the end of each day's earthwork activities to help reduce the potential for ponding and absorption of surface water. ' Grade controls should also be maintained throughout the filling operations. All filling operations should be observed on a full-time basis by a qualified representative of ECS to determine that the required degrees of compaction are being achieved. We recommend that a minimum of one compaction test per 2,000-square-foot area be performed for each lift of controlled fill. The elevation and location of the tests should be clearly identified at the time of fill placement. Areas which fail to achieve the required degree of compaction should be re -worked until the specified degree of compaction is achieved. Failing test areas may require moisture adjustments or other suitable remedial activities in order to achieve the required compaction. it I' Report of Subsurface Exploration and Geotechnicat Engineering Analysis Aircraft Fire Rescue Facility MCAS New River Jacksonville, North Carolina ECS Project No.: 22.12700 Fill materials should not be placed on frozen, frost -heaved, and/or soils which have been recently subjected to precipitation. All wet or frozen soils should be removed prior to the continuation of site grading and fill placement. Borrow fill materials, if required, should not contain excessively wet or frozen materials at the time of placement. Additionally, if grading operations occur during the winter months, all frost -heaved soils should be removed prior to placement of engineered fill, granular sub -base materials, foundation or slab concrete, and asphalt pavement materials. If problems are encountered during the site grading operations, or if the actual site conditions differ from those encountered during our subsurface exploration, the geotechnical engineer should be notified immediately. i 1 5.3 Foundation Desisn Provided the subgrade preparation and earthwork operations are completed in strict accordance with the recommendations of this report, the proposed construction can be supported an conventional shallow foundations bearing on approved natural materials and/or properly compacted U. We recommended a net allowable design soil bearing pressure of 2,000 psf for proportioning continuous and isolated column footings. To reduce the possibility of foundation bearing failure and excessive settlement due to local shear or "punching" failures, we recommend that continuous footings have a minimum width of 18 inches and that isolated column footings have a minimum lateral dimension of 30 inches. Furthermore, i all footings should bear at a depth to provide adequate frost cover protection. For this region, we recommend the bearing elevation be a minimum depth of 12 inches below the finished exterior grade or in accordance with the local building code requirements. We request the opportunity to review our foundation recommendations and make any necessary changes once structural loads and site design grades are determined. The net allowable soil bearing pressure refers to that pressure which may be transmitted to the foundation bearing soils in excess of the final minimum surrounding overburden pressure. The final footing elevation should be evaluated by ECS personnel to verify that the bearing soils are capable of supporting the recommended net allowable bearing pressure and suitable for foundation construction. These evaluations should include visual observations, hand rod probing, and dynamic cone penetrometer 1 (ASTM STP 399) testing, or other methods deemed appropriate by the geotechnical engineer at the time of construction, in each column footing excavation and at intervals not greater than 30 feet in continuous footing excavations. If plastic clay is encountered below the footing, we recommend the clay be over - excavated by a depth of at least two feet below the footing and approved back fill material should be placed in the footing to provide a two foot separation between the bottom of footing and the plastic clay layer. C r 10 I� Report of Subsurface Exploration and Geotechnical Engineering Analysis Aircraft Fire Rescue Facility MCAS New River Jacksonville, North Carolina ECS Project No.: 22.12700 The settlement of a structure is a function of the compressibility of the bearing materials, bearing i pressure, actual structural loads, fill depths, and the bearing elevation of footings with respect to the final ground surface elevation. Estimates of settlement for foundations bearing on engineered or non - engineered fills are strongly dependent on the quality of fill placed. Factors which may affect the quality of fill include maximum loose lift thickness of the fills placed and the amount of compactive effort placed on each lift. Provided the recommendations outlined in this report are strictly adhered to, we expect that total settlements for the proposed construction are expected to be in the range of 1 inch or less, while the differential settlement will be approximately''/z of the anticipated total settlement. This evaluation is based on our engineering experience and assumed structural loadings for this type of structure, and is intended to aid the structural engineer with his design. i ' 5.4 Floor Slab Design Provide a suitable subgrade will be prepared as recommended herein, ground level slabs can be designed as slabs -on -grade. Our findings indicate that a modulus of subgrade reaction (ks) of 100 pci is appropriate for design provided that upper 18 inches of the slab subgrade soils have been uniformly compacted to at least 98 percent of their standard Proctor maximum dry density. i ' We recommend that all slabs -on -grade be isolated from the foundations so that potential differential settlement of the structure will not induce shear stresses in the floor slab. Also, to minimize the crack width of any shrinkage cracks that may develop near the surface of the slab, wire mesh reinforcement ' may be included in the slab design. The mesh should be located in the top third of the slab to be effective. We also recommend that all slabs -on -grade be underlain by a minimum of 6 inches of open graded aggregate to help prevent the capillary rise of subsurface moisture from adversely affecting the slab. If floor covering such as tile or carpet will be utilized for interior finishes, a polyethylene vapor barrier may be used beneath the floor slab for moisture control considerations. 5.5 Pavement Design Considerations ' For the design and construction of exterior pavements, the subgrades should be prepared in strict accordance with the recommendations in the "Subgrade Preparation" and "Engineered Fill Placement" sections of this report. An important consideration with the design and construction of pavements is ' surface and subsurface drainage. Where standing water develops, either on the pavement surface or within the base course layer, softening of the subgrade and other problems related to the deterioration of the pavement can be expected. Furthermore, good drainage should minimize the possibility of the subgrade materials becoming saturated during the normal service period of the pavement. In the parking and drive areas, a California Bearing Ratio (CBR) of UNKNOWN could be used for pavement design for on -site soil compacted to 100% of the maximum dry density determined in accordance with ASTM Specification D-698, standard Proctor method under saturated conditions. 11 t i ' Report of Subsurface Exploration and Geotechnical Engineering Analysis Aircraft Fire Rescue Facility MCAS New River Jacksonville, North Carolina ECS Project No.: 22.12700 Base on the CBR value, 2 inches of surface SF9.5 mix overlying six inches of compacted crushed stone in the light pedestrian type vehicle areas and 1.5 inches of surface SF9.5 mix over 2.5 inches of I19.0 mix ' overlying eight inches of compacted crushed stone in the main heavily traveled drive areas, in truck delivery and dumpster areas. In lieu of compacted crushed stone for heavily traveled drive areas, 5 inches of B25.0 mix can be used. For heavy vehicle drive ways and parking, we recommend a rigid (concrete) pavement consisting of an i eight inch thick, mesh reinforced concrete slab supported on four inches of ABC stone. The concrete ' should have a minimum flexural strength of 650 psi at 28 days and should be provided with proper and adequatejoints. i Regardless of the section and type of construction utilized, saturation of the subgrade materials and asphalt pavement areas results in a softening of the subgrade material and shortened life span for the pavement. Therefore, we recommend that both the surface and subsurface materials for the pavement be properly graded to enhance surface and subgrade drainage. By quickly removing surface and subsurface ' water, softening of the subgrade can be reduced and the performance of the parking area can be improved. Site preparation for the parking areas should be similar to that for the building area including stripping, proofrolling, and the placement of compacted structural fill. Please note that large, front -loading trash dumpsters frequently impose concentrated front -wheel loads on pavements during loading. This type of loading typically results in rutting of bituminous pavements and ultimately pavement failures and costly repairs. Consequently, we recommend the use of an eight inch thick, mesh reinforced concrete slab that extends the entire length of the truck. Concrete pavements should be properly jointed and reinforced as needed to help reduce the potential for cracking and to permit proper load transfer. 5.6 Site Drainaee i Positive drainage should be provided around the perimeter of the structure to minimise the potential for moisture infiltration into the foundation and slab subgrade soils. We recommend that landscaped areas adjacent to these structures be sloped away from the construction and maintain a fall of at least 6 inches t for the first 10 feet outward from the structures. The parking lots, sidewalks, and any other paved areas should also be sloped to divert surface water away from the proposed building. 1 The proper diversion of surface water during site grading and construction will help reduce the potential for delays associated with periods of inclement weather. The proper diversion of surface water is especially critical since portions of the site soils are expected to be moisture sensitive. Based upon our past experience, the use of "crowning" large areas of exposed soils should be useful to help divert surface water from the prepared subgrades. Please note that the need for construction dewatering should be determined at the time of construction. If t grading operations are performed during the wet seasons (i.e. fall and winter) the use of gravity flow ditches may be necessary to divert precipitation and surface water away from the construction areas. 1 12 i 1 i Report of Subsurface Exploration and Geotechnical Engineering Analysis Aircraft Fire Rescue Facility MCAS New River Jacksonville, North Carolina ECS Project No.: 22.12700 5.7 Construction Considerations Exposure to the environment may weaken the soils at the foundation bearing elevation if the foundation excavations remain exposed during periods of inclement weather. Therefore, foundation concrete should be placed the same day that proper excavation is achieved and the design bearing pressure verified. If the bearing soils are softened by surface water absorption or exposure to the environment, the softened soils must be removed from the foundation excavation bottom immediately prior to placement of concrete. If the excavation must remain open overnight, or if inclement weather becomes imminent while the bearing soils are exposed, we recommend that a 1 to 3 inch thick "mud -mat" of "lean" concrete be placed over the exposed bearing soils before the placement of reinforcing steel. t It is imperative to maintain good site drainage during earthwork operations to help maintain the integrity of the surface soils. The surface of the site should be kept properly graded to enhance drainage of surface water away from the proposed construction areas during the earthwork phase of this project. We recommend that surface drainage be diverted away from the proposed building and pavements areas without significantly interrupting its flow. Other practices would involve sealing the exposed soils daily with a smooth -drum roller at the end of the day's work to reduce the potential for infiltration of surface water into the exposed soils. The key to minimizing disturbance problems with the soils is to have proper control of the earthwork operations. Specifically, it should be the earthwork contractor's responsibility to maintain the site soils within a workable moisture content range to obtain the required in -place density and maintain a stable sabgrade. Scarifying and drying operations should be included in the contractor's price and not be considered an extra to the contract. In addition, construction equipment cannot be permitted to randomly ran across the site, especially. once the desired final grades have been established. Construction equipment should be limited to designated lanes and areas, especially during wet periods to minimize disturbance of the site subgrades. It will likely be necessary to utilize tracked equipment during grading operations particularly if the subgrade soils exhibit elevated moisture conditions. 1 1 13 11 ,t Report of Subsurface Exploration and Geotechnical Engineering Analysis Aircraft Fire Rescue Facility WAS New River Jacksonville, North Carolina ECS Project No.: 22.12700 6.0 CLOSING Our geotechnical evaluation of the site has been based on our understanding of the site, the project information provided to us, and the data obtained during our exploration. The general subsurface conditions utilized in our evaluations have been based on interpolation of subsurface data between the borings. If the project information provided to us is changed, please contact us so that our recommendations can be reviewed and appropriate revisions provided, if necessary. The discovery of ' any site or subsurface conditions during construction which deviate from the data outlined in this exploration should be reported to us for our evaluation. The assessment of site environmental conditions for the presence of pollutants in the soil and groundwater of the site was beyond the scope of this geotechnical exploration. 1 14 APPENDIX B SPT BORING LOGS AND SOIL CLASSIFICATION SYSTEM, DESCRIPTION AND TERMINOLOGY M r Unified Soil Classification System (ASTM Designation D-2487) Major Division Group Symbol Typical Names Classification Criteria E GW Well -graded gravels and gravel- o C. = D6s/D10 Greater than 4 ° „ sand mixtures, little or no fines c C== (D30)1/(DtcxDbo) Between 1 and 3 oz GP Poorly graded gavels and gravel- Not meeting both criteria for GW o o sand mixtures, little or no fines v o m 3 "A" 01.5 GM Silty gravels, gavel -sand -silt o Atterberg limits plot below line or c mixtures C7 0 .°g plasticity index less than 4 GC Clayey gavels, gavel -sand -clay 'o m Atterberg limits plot above "A" line mixtures .44 ° and plasticity index greater than 7 SW Well -graded sands and gravelly '� o C„= D60"'la Greater than 6 ° sands, little or no fines .b N N o C=— (1)30)2/(DtoxD61) Between 1 and 3 zSP Poorly graded sands and gravelly z W z Not meeting both criteria far SW N sands, little or no lines U 4 \ o n =, = Atterberg limits plot below "A" line or 9 SM Silty sands, sand -silt mixtures y plasticity index less than 4 ° +u = Atterberg limits plot above "A" line ' SC Clayey sands, sand -clay mixtures and plasticity index Beater than 7 ML Inorganic silts, very fine sands, *oi° u-avcmpl.�.n. a sma ofu.®an mMb.'kO fi v rock flour, silty or clayey fine foramwd was (cmp'vcnllY dctamwnl). A51M-m98'!. sands U'a "yy CL Inorganic clays of low to medium A plasticity, gravelly clays, sandy s m o, a clays, silty clays, lean clays n z w h OL Organic silts and organic silty � clays of low plasticity m >m MH Inorganic silts, micaceous or diatomaceous fine sands or silts, a elastic silts „ � � � CH Inorganic clays of high plasticitry, d h fat clays OH Organic clays of medium to high plasticity 1.4 T w m m m m w 1.110 uomo UMIT, u Plasticity chart for the classification of fine-grained soils. Tests made on fraction finer than No. 40 sieve Highly organic soils Pt Peat, muck and other highly Fibrous organic matter, will organic soils char, bum, or glow MAY 2006 UNIF EID SOIL. CLASSIFICATION SYSTEM Reference Notes for Boring Logs I. Drilling and Sampling Symbols: SS - Split Spoon Sampler RB -Rock Bit Drilling ST - Shelby Tube Sampler BS - Bulk Sample of Cuttings RC - Rock Core: NX, BX, AX PA - Power Auger (no sample) PM - Pressuremeter HSA - Hollow Stem Auger DC - Dutch Cone Penetrometer WS - Wash Sample Standard Penetration (Blows/Ft) refers to the blows per foot of a 140 lb. hammer falling 30 inches on a 2 inch O.D. split spoon sampler, as specified in ASTM D-1586. The blow count is commonly referred to as the N-value. H. Correlation of Penetration Resistances to Soil Properties: Relative Densitv-Sands, Silts Consistency of Cohesive Soils SPT-N Relative Density N-Values Consistency 0-4 Very Loose 0-2 Very Soft 5 -10 Loose 3-4 Soft 11 - 30 Medium Dense 5-8 Firm 31 - 50 Dense 9-15 Stiff 51 or more Very Dense 16-30 Very Stiff 31-50 Hard 51 or more. Very Hard III. Unified Soil Classification Symbols: GP - Poorly Graded Gravel ML - Low Plasticity Silts GW - Well Graded Gravel ME - High Plasticity Silts GM - Silty Gravel CL - Low Plasticity Clays GC - Clayey Gravels CH - High Plasticity Clays SP - Poorly Graded Sands OL - Low Plasticity Organics SW - Well Graded Sands OH - High Plasticity Organics SM - Silty Sands CLrML - Dual Classification SC - Clayey Sands (Typical) IV. Water Level Measurement Symbols: WL - Water Level BCR - Before Casing Removal WS - While Sampling ACR - After Casing Removal WD - While Drilling WCI - Wet Cave In DCI - Dry Cave In The water levels are those water levels actually measured in the borehole at the times indicated by the symbol. The measurements are relatively reliable when angering, without adding fluids, in a granular soil. In clays and plastic silts, the accurate determination of water levels may require several days for the water level to stabilize. In such cases, additional methods of measurement are generally applied. The elevations indicated on the boring logs should be considered approximate and were not determined using accepted surveying techniques. i t I 1 1 I I I I I t I I I i 1 CLIENT Virtexco Corporation JOB # BORING SHEET 22-12700 B-1 1 of 2 ILP PROJECT NAME ARCHITECT —ENGINEER LLP Aircraft Fire Rescue Facility SITE LOCATION Jacksonville, North Carolina CMZ@ M y�G� 1 2 3 4 6+ STIC RATER LIQUID m S CONTENT X IDET R —�--- —A S gDAI1TT DE4IGNAITON 8 RECOVERY ROD%— — — REC.Xz ® STANDARD PENITRTION 10 20 R� 90 AO 50+ w � � DESCRIPTION OF MATERIAL ENGLISH UNITS% BOTTOM OF CASING LOSS OF CRiCUTATIONit SURFACE ELEQATION Soft to Firm, Brownish Gray, CLAY, (CL) .022.0 04: (2-2-2) >E — 1 SS 18 18 21 38 2 SS 18 18 8 (2-4-4) 5 6 (2-24) 3 SS 18 18 Medium Dense, Brown to Gray, 4 SS 18 18 Fine to Medium SAND, (SP) 18 (4-1-11) i 5 SS 18118 15 21 6 SS 18 18 20 22 (S-10-I2) 7 SS 18 18 25 Loose, Light Gray, Clayey Fire to Medium Cemented SAND, (SC) 8 SS 18 16 :, .'_ (L-1 I) i 30 ------------ —=— ------- — CONTINUED ON NEXT PAGE. THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES IN -SITU THE TRANSITION MAY BE GRADUAL Yin, 4' 1 " 4S OR ® BORING STARTED 01 /1 0/07 71"BCR) TRL(ACR) BORING COMPLETED 0 1 1 O O7 CAVE IN DEPTH • Y'nL RIG CME 45 FOMUN MW nRmuNG I�THGn Mud Rotary CLIENT Virtexco Corporation SOB # BORIIQG $ SHEET 22-12700 B-1 2 OF 2 Cam" PROJECT NAME ARCHITECT —ENGINEER LLP CAR® Aircraft Fire Rescue Facility SITE LOCATION Jacksonville, North Carolina CALI�tAT1 SEIMSPROURM I B S 4 6+ PLASTIC WATER LIQUID LUU X CONTIM % LDUT % x o z w EE F DESCRIPTION OF 11ATERIAL BUTTON OF CASING L099 OF CIRa20X-40X-60X—BOX-100%SURFACE z 0 ROCK QUALITY DESIGNATION & RECOVERY ROD%— — — REC.% ® STANDARD MaNRAT[ON BI.OWs/rr. Ia B0 sa 40 6O+ ELEVATION Ane Loosa, Light Gray, Clayey Fto Medium Cemented SAND Medium Dense, Light Gray, Fine to Medium Cemented SAND, (SP) SS 9 18 18 3 Medium Dense to Dense, Gray, Fine to Medium SAND, (SP) SS 10 18 18 40 11 18 SS 11z"ie"2a) .38 SS 4 12 18 18 (e'Ns a) 36 SS 50 END OF BORING ® 50.0' 55 60 r__j — — THE STRATIFICATION LINES REPRESENT THE APPROXINATE BOUNDARY LINES BETVEEN SDIL TYPES IN -SITU THE TRANSITION MAY HE GRADUAL :WL 4.' 1 " Ws OR ® BORING STARTED 01 / 10/07 T"CR) TV4ACR) BORING COIPLEM 01 10 07 cAvE RN DEPTH o 3WL RIG CME 45 FORnM MW DRNLUNG wMOD Mud Rotary CLIENT JOB SHEET Virtexco Corporation 22-12700 B-2 1 all 2 Cam'" PROJECT NAME ARCHITECT -ENGINEER LLP Aircraft Fire Rescue Facility CAROL�NAS SPTE LOCATION r.*+"wED PENLT40MEM TONS/FT Jacksonville, North Carolina 1 2 B 4 5+ STIC WATER LIQUID M z CONTENT s tnaT x x n DESCRIPTION OF MATERIAL ENGLISH UNITS JE!ROCK QDAIITY DffiGNATION !t RECOVERY dRQDX— OF CASING D-- LOSS OF CIRCULVION io020%-40X-60X--80%—i00% J! — — REC.XBOTTOM Ea, SURFACE ELEVATION® STANDARD PENETRATION H� y7 16 20 o AO 50+ 0 Soft to Firm, Brownish Gray, CLAY, (CL) 1 SS 18 18 4: (2-z-z) 2 SS 18 18 8 (z+4) 5 3 SS 18 18 8 (2+4) 23.0 4 SS 18 I8 5 (2-2-3) :x----�' 1 12 36 Medium Dense, Brown to Gray, Fine to Medium SAND, (SP) 5 SS IS I8 17 (s-E e) 15 6 SS 18 )8 24 (ID-11-13) 20 7 SS 18 18 24 (Io-tz-iz) 25 Medium Dense, Gray to Light Gray, Clayey Fine to Medium 8 SS 18 18 SAND, and Cemented Sand, (SC) 14 (7-2-I2) CONTINUED ON NEXT PAGE. THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SML TYPES IN -SITU THE TRANSITION MAY BE GRADUAL 711, 4'5" WS OR ® BORING STARTED 01 /10/07 TWL(BCR) YWL(ACR) BORING COMPLETED 01 1 0 07 CAVE IN DEm O AWL RIG CME 45 POP"" MW DRILLING 1IETHOD Mud Rotary . i C Cl CLTENT Virtexco Corporation JOB 0 BORING # SHEET 22-12700 1 B-2 2 OF 2 PROJECT NAME ARCHITECT —ENGINEER LLP Aircraft Fire Rescue Facility CAR® SITE IACATION Jacksonville, North Carolina CAUBRATED ENE eO� 1 2 B 4 5+ PLASTIC HATER UQUED LJ1m % CONTENT X UNIT % x—--------- V A ROCK QUALITY DEMGNATION a RECOVERY RQD%— — — REC.X 2OX-4O%-6OYf —80%-1 O0% iTON ® STANDARD BUMS/Fr. 10 20 so 40 50+ a o z a _ DESCRIPTION OF MATERIAL ENGLISH UNITS BOTTOM OF CASING @�— LOSS OF CIRCULATION too z EJ E� SURFACE W—EVATION _ 3 Medium Dense, Gray to Light Gray, Clayey Fine to Medium SAND, and Cemented Sand, (SC) Medium Dense, Light Gray, Fine 9 SS 18 18 to Medium Cemented SAND, (SP) 19 (17-10-9) 3 Medium Dense to Dense, Gray, Silty Fine to Medium SAND, With 10 SS 18 18 Cemented Sand, (SM) 20 CBLID-10) 4 ;(iriri¢) 34 11 SS 18 18 4 Dense, Gray, Silty SAND, (SM) ;(7-14-iH) 33: 12 SS 18 18 50 END OF BORING ® 50.0' 55 60 — — THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES IN -SITU THE TRANSITION MAYBE GRADUAL VWL 4' 5" RB OR ® BORING STARTED 01 / 10/07 THL(BCR) TWVACR) BORING COHPMMM 01 1 0 07 CAVE IN DEPTH O YVL a1G CME 45 FOREIIAN MW DRRLING METHOD Mud Rotary i 1 1 1 1 1 C7VIrt Virtexco Corporation NAME Aircraft Fire Rescue Facility ]O2 2 BORING $ SHEET 22-12700 B-3 1 OF 2 ARCHITECT -ENGINEER liftin t C LLIP CAROLINAS SITE LOCATION Jacksonville, North Carolina -0- CALIBRATED PENMOYETER I 2 ��3 4 6+ PLASTIC RATER IIg001 LIM z CONTENT S I"IT % x ROCK QUALITY DESIGNATION & RECOVERY R00X— — — REC.X 20%-40%-60%-80%--100% ® STANDARD PENETRATION BLOWS. 10 20 SO 40 90+ a z w $ _ a DESCRIPTION OF MATERIAL ENGId9H UNITS BOT1'OY OF CA9BiG �P-- fA99 OF CIRCULATION t00 z s SURFACE ELEVATION 0 1 15 20 25 Loose, Brown, Silty Fine to Medium SAND, (SM) 7 (r*3) Q x---- 17:2 10 (s=4-s) 9 (a rs) 19 C=B-tt) 14 (s 7-T) 19 (e B t0) CONTINUED ON NEXT PAGE. 18 18 Firm to Stiff, Brown and Gray, CLAY, (CL)5 $2SS 18 18 18 18 4 SS 18 i8 Medium Dense to Loose, Brownish Gray to Gray, Fine to Medium SAND, (SP) 5 SS 18 18 6 SS 1S 18 7 SS 18 IS THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETVEEN SOIL TYPES IN -SIN THE TRANSITION MAY BE GRADUAL Y*L 3' 1 0" WS.OR ® BOEING ETA= 01 /1 0/07 T1rL(BCR) ORL(ACR) BORING COMPLETED 01 1 O 07 CAPE IN DEPTH • RIG CME 45 rOSm N MW DROI.ING WETROD Mud Rotary CLIENT Virtexco Corporation JOB # BORDNG g SKEET 22-12700 1 B-3 2 OF 2 ®� � PROJECT NAME ARCHITECT -ENGINEER LLP Aircraft Fire Rescue Facility GAROLINAS SITE LOCATION -o- CdLIBRA ID PEMIONEFEB Jacksonville, North Carolina 1 2 s 4 5+ PLAB'NC WATER LIQUID I11IT X CONTENT X LLOT X ROM QUALITY DESIGNATION k BECOVERY DESCRIPTION OF MATERIAL ENGI.ISB UNITS z BOTTOM OF CASING D— LOSS OF CIRCULATION 100 RODX— — — REC.X 20X-40X-60X—e0X-100 a � � z � � k ATION ® ���,I, STANDARD BLOWS/FT. SURFACE ELEVATION 10 RO s0 40 50+ 3 Medium Dense to Loose, Brownish Gray to Gray, Fine to Medium SAND, (Sp) Medium Dense, Light Gray, Silty 9 SS 18 is Fine to Medium Cemented SAND, 29 ( 11-15) '. 3 (SM) 23:(e 10-13) SO SS 18 18 40 END OF BORING @ 40.0' 4 50 55 60 — — THE STRAMCATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES IN -SITU THE TRANSITION MAY BE GRADUAL vm, 3' 10" xS OR ® BORING srAmm 01 /10/07 _ YIRL(BCR) TWgACR) BORING CONPLBTED O 1 1 O 07 CAVE IN DEPTB O IgNL RIG CME 45 FOR"m MW DRIIIIIG MEIROD Mud Rotary CLIENT JOB # BORING # slim Virtexco Corporation 22-12700 1 8-4 1 OF 2 PROJECT NAME ARCHITECT —ENGINEER Aircraft Fire Rescue Facility SITE LOCATION ::d --o- ALI Jacksonville. North Carolina I B PL&MC NATM LIQUID UNIT z CONTENT S I= x o DESCRIPTION OF v4TOTAL ENGIISH �T� ROCK QUALITY DESIGNATION k RECOVERY Lw Ioo RODX— — — REC.X z F BOTTOM OF CASING �— LOSS OF CIRCULATION 20X-40X-60X-80X-100X— a g� SURFACE ELEVATION ® MANDA"DP RATION S Io 20 sG 4a 50+ O Loose, Brown, Silty Fine to Medium SAND, (SM) 1 SS 18 18 Soft to Firm, Brownish Gray, 2 SS 18 18 CLAY, (CL) 4. (2-2-2) 38.E 5 Z —=--- 0 3 SS 18 18 8 (3-3-5) 1 1 4 1SS1181181 Medium Dense to Loose, Brownish Gray to Gray, Fine to Medium 5 SS 18 18 SAND, (SP) 7 6 1SS1181181 7 ISS118118 8 ISSIIBIIB 20 (e s II) CONTINUED ON NEXT PAGE. THE STRATIFICATIN LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SAIL TYPES IN -SITU THE TRANSITION MAY BE GRAWAL YvL 4'2" WS OR ® BORING ETARTKD 01 /10/07 TWL(BCR) geL(ACR) BORING COMPLETED 01 10 07 CAVE IN DKPTB o jrw RIG CME 45 FOREMAN MW DRRJJNG METBOD Mud Rotary CLIENT Virtexco Corporation JOB A BORING ;R I Sm r 22-12700 B-4 2 OF 2 PROJECT NAME ARCHITECT —ENGINEER LLP Aircraft Fire Rescue Facility SITE LOCATION Jacksonville, North Carolina P.A7RATED SONB/FT. PEN.FTRBOMMER t z 8 4 6+ PIASTtC RATER UQUID LBO X CONTENT z IDDT z o QUALITY DESIGNATION 8 R6CDY6c Y RQDX— — — REC.% 20X-40%-60%--80%-100%URFACE ® sTANn LOWS/FT •*pox to 20 so 40 60+ ESCRIPTION OF MATERIAL ENGLISH UNITSROCB OTTOM OF CASING �— LASS OF CIRCULATION 100 z ELEVATION Medium Dense to Loose, Brownish Gray to Gray, Fine to MediumSAND, (SP) Dense, Light Gray, Silty Fine jX to Medium Cemented SAND, (SM) (2irt6-r) 31 Medium Dense, Gray to Medium Cemented SAND; (SP) 24 (S-to-ti) 11 SS 18 i8 4 Medium Dense, Gray, Fine to Medium SAND, (SP) 12 SS 18 i8 28 (ttaa-ts) 50 END OF BORING ® 50.0' 55 60 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SET. TYPES IN -SITU TW TRANSITION MAY BE GRADUAL jVL 4'2" fig OR ® BORING STARTED 01 /10/07 _ TVQBCR) 7199ACR) BORING COMPLETED 01 10 07 CAVE IN DEPTH O TWL RIG CME 45 FOREMAN MW DRILZING METHOD Mud Rotary CLIENT Virtexco Corporation JOB # SHEET 22-12700 B-5 1 OF 1 PROJECT NAME ARCHITECT -ENGINEER LLP Aircraft Fire Rescue Facility . SITE LOCATION -0- OALIDftAT1NgP) RBOYEI'Eii Jacksonville, North Carolina 1 2 3 4 s+ PLASTIC RATER LIQUID 1110 % CONTENT X U RT X a c z DESCRIPTION OF MATERIAL ENGLISH UNITS m o BOTTOM OF CASING D- LOSS OF CIRCULATION 100 z ROC% QUALM DESIGNATION k RECOVERY R00X— — — REC.X 20X-40X-60Xr-80%f 00X ® "^'aT>•-a�PENETRA'ffON 10 20 30 A0 SO+ '� SURFACE ELEVATION 0 Stiff to Firm, Dark Brown to Brownish Gray, CLAY, (CL) SS 18 18 10 (4t4) 1 SS 18 18 7 (3-43) 2 5 SS 18 18 7 (3-374) 3 Medium Dense, Brownish Gray, 4 SS 18 18 Clayey SAND, (SC) 12 i3 4 s) 1 END OF BORING ® 10.0' 15 20 25 30 — — THE STRATIFICATIoN LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES IN -SITU THE TRANSITION MAY BE GRADUAL 7RL 0'6" RS OR ® BORING STARTED 01 /1 0/07 ZWL(BCR) TRL(ACR) BORING COMPLETED 01 1 O 07 GVE IN DEPTH 0 �JVL RIG CME 45 FOREMAN MW DRILLING METHOD Mud Rotary APPENDIX C LABORATORY TEST RESULTS i0- ®- ri �- lllii t•- �- �- _- �- �- i•- �- �I- �- llll�- �- �- � Project Number: 113—io..r M.Ma. 22 - 12700 Aircraft Fire Rescue Facility ECS Carolinas, LLP Wilmington, North Carolina Laboratory Testing Summary Project Engineer: wEG Principal Engineer: wMS Date: January 15, 2007 Summary By: wEG w_� ���■wll.�lls���� Summary Key: SA = See Attached S = Standard Proctor M= Modified Proctor OC = Organic Content Hyd = Hydrometer Con = Consolidation DS = Direct Shear GS = Specific Gravity UCS = Unconfined Compression Soil UCR = Unconfined Compression Rock LS = Lime Stabilization CS = Cement Staibilizatlon c�.aa®a_eu�w� ASTM D4318 Atterberg Limits Data and Calculation Sheet ECS CAROLINAS, LLP 7211 Ogden Busisness Park Wilmington, North Carolina 28411 Suite 201 (916) 686-9114 (910) 686-9666 Fax Job name Aimreft Fire Rescue Facility Date 01/15/2007 Jab# 22-12700 Performedby AB Bating #; Sample # B-1, 8-1 IDepth 1.0-2.5 Description of 440 Material Brownish Gay CLAY Natural water content 22.0 % Plnctir. Limir Tam # 27 Taieweight 41.04 Tare+ Wet Soil 48.7 Tam+DrySail 47.39 A�1u'Yc'a':t5i Weigbt of waterai�4315FKT-i+y�a1`As,iT,Li, Weight of dry soil Water content i ^�i 20+6 x �� 1 fh ':{„y+ 1 "'"ia+:!'S': 21 Llnnid Limit Natural Moisture k 0 38.61 3I.65 <= Plastic Limit Tam# 26 101 R-7 Tam weight 24.59 23.61 16.91 Tam+Wet Soil 32.67 33.69 24.37 Tam+Dry Soil 30.49 31.44 22.19 Numberofblows 28 21 16 Weight of water 75%�79•2� ETY'� �is`.;'-^�. Weight of dry soil iVO59 t7. i+.; =.,71, 837F FA -Us ct :.`ri e'ti" ':'•.� Water content Water content at 25 blows 37.8 %' � Liquid Limit Flow Chart Plasticity Chart 100 60 90 eo so = CH o OH ]0 6 40 60 d ° U 50 D 30 b 40 P� 30 —y" 20 I - • 20 MH o OH to 1s _ 0. a • ML OL 10 25 100 a 20 40 60 a0 100 120 Fumbm ofDmps Liquid Limit('il.i Liquid Limit 38 Natural water content 22.0 Plastic Limit 21 Classification of 440 Sieve Material CL Plasticity Index 17 ECS CAROLINAS, LLP 7211 Ogden Busisness Park Wilmington, North Carolina 28411 Suite 201 (910) 686-9114 (910)686-9666 Fax ASTM D4318 Atterberg Limits Data and Calculation Sheet Job name Aircraft Fue Rescue Facility Date 01/15/2007 Job # 22.12700 Performed by AB Boring#; Sample# B-2, S-4 IDepth 8.5-10.0 Description of -"0 Material Brownish Gmy CLAY Natural water content 23.0% Plastic Limit Tare# Rz Tom weight 45.17 Tam +Wet Soil 50.48 Tare +Dry Soil 49.9 :%;;,t ''>•i,�, . Weight of water i'o.:.. SS°1 -•,:• to S", •v:�rstOU u�L� r,. %�:ed�'.11i: >�t �.�b11 G;i•.. Weight of dry soil j`'s� 4 73 sa33,'�:`'� �` t: n @k u , q, § T..F '•:1 Water content 12 Liquid Limit Natural Moisture k Lh 0 31.24 25.4 29 % I<= Plastic Limit Tare# Pi x 26 Tam weight 29.27 16.82 45.71 Tare + Wet Soil 35.78 24.51 52.78 Tom +Dry Soil M 17 22.41 50.75 Numberofblows 35 20 16 Weight of water UTEGUIT" s 1r•=^n I'llt .. k"4..(F. gn x';." Weight of dry soil - ..':i;>4 9; . n5 '$u'. 3 Al L`�" 5 04 0 11:11: Water content '::'3 •2,ti°ji :?IiC463r c,:':P Water content at 25 blows 36A A' .'C-.2n�'.'.. ':`•:�i:�ai ;o>%' Flow Chart 100 9a fl0 � t0 'e 60 ° 50 bb 40 3 30 20 to 9M 0 10 25 100 Nivobco[Ihep� Liquid limit Plasticity Chart 60 s0 = CH or OH 40 D 30 V v a y 20 o tMH OH ML CL 0 0 20 40 60 60 too 120 Ligwdl3 t(LL) Liquid Limit 36 Natural water content 23.0 Plastic limit 12 Classification of-#40 Sieve Material CL Plasticity Index 24 LLP ��a.rfs®o_ae�vaa� ASTM DA318 Atterberg Limits Data and Calculation Sheet ECS CAROLINAS, LLP 7211 Ogden Busisness Park Wilmington, North Carolina 28411 Suite 201 (910) 686-9114 (910)686-9666 Fax Sob name lAitcraft Fire Rescue Facility Date 01/15/2007 Job # 22-12700 Performed by AB Boring #; Sample # B-3, 5-2 D th 3.5-5.0 Description of -#40 Material Brawn CLAY Natural water content 1 36.9 pindir Limit Tare# C pro;.'! --ipt Tare weight 16.91i.'ir: Tare +wet Soil 23.4 Tare+Dry Soil 22.48'a:x�=xe L Weight of water w=1`ttb 4i %1i� :`Nf Weight soilL,...' Kb dry ,/•:_:. �`" F 1. -.{• i_. .`„f.. tl:a.—•: ,-b'� .� sxS�'%,.. Water comen[ 43:;i'•.16 S ':'!ili'.`'4a,42+d h ai'.+�.v'�w i'! 17 I,innid limit Natural Moisture k 0 29.42 21.49 36..* o— Plastic Limit T=# 212 1 201 210 Tare weight 14.61 37.47 14.63 Tara+Wet Soil 21.88 46.73 22.6 Tare+Dry Soil 19.75 43.84 20.03 Number of blows 28 20 15 Wei tofwater x;=: 2[3 i.-^�`::s"�'69 1'"^i::5`eId4rn". Weight of dry soil `,;:F"Sfl'4': :k. ' ' 4`L:3.7.:i`.Wi . .5 4 "s Water content 1, fy;l 1 J 76e W y. d2-,V6 1t7 Water content at 25 blows 42.9 % Lkli Liquid Limit Flow Chart Pinsticity Chart t00 fi0 � 90 00 50 = CH or OH 70 40 e 60 7 ° 50 U 40 5 30 • II 30 a 20 20 MH o OH 10 ID _ a o ML OL ' 10 25 100 0 20 40 60 80 too 120 N�bQafL*uPs L4WdL t(LL) Liquid Limit 43 Natural water content 36.9 PI¢sac Limit 17 Classification of-#40 Sieve Material CL PlasticiTy Index 26 11 ter— F• f� • �. r ' F 1 l "T ASTM D4318 Atterberg Limits Data and Calculation Sheet ECS CAROLINAS, LLP 7211 Ogden Busisness Park Wilmington, North Carolina 28411 Suite 201 (910) 6S6-9114 (910)686-9666 Fax Job name Aircraft Fim Rescue Facility Date 01/15/2007 Job # 22-12700 Performed by AB Boring#;Sam le# B-4,S-2 IDeptbL 3.5-5.0 Description of-#40 Material Brownish Gay CLAY Natural water content 38.5 % Plastic Limit Tare# 11 Tareweight 42.17 Tam+wet Boil 47.09 's'ii sn4ir:"'13e Tare+Dry Soil 46.25 Weight ofwater Weight of dry soil Water content 21 Liauid Limit Tam # 1 88 207 23 Tam weight 42.25 26.8 45.17 Tam+Wet Soil 48.83 34.65 51.91 Tate +Dry Soil 46.2 31.38 48.98 Number ofblows 35 26 16 Weight of water.=2:63"'t:i.:i Weight of dry soil "?.wl"-.355,' a' u^ ie439'"":a' W5.91 a 1 Water content ",'�i ::"!y, Water content at 25 blows 72.0% IPU i ai-U.1.. 10--E'^.::x7: Natural Moisture k IL 0 12.95 11 4.35 <= Plastic Limit < Liquid Limit Flow Chart Plasticity Chart 103 60 90 80 50 ."OH � 70 = 00 e 40 d 50 30 40 n it 30 a 20 20 ]o a tMHo OH 0 10 ]00 0 ML OL 25 0 20 40 60 g0 100 120 Nrmbrs ofDmps ligwdi.imit(LL) Liquid Limit 72 Natural water content 38.5 Plastic Limit 21 Classification of-#40 Sieve Material CH Plasticity Index 51 CBR Penetration ASTM D-1883 500 450 400 350 300 ..6 a : 250 0 0 200 150 100 50 0 0.000 0.050 0.100 0.150 0.200 0.250 0.300 Penetration (inch) 0.350 Sample No.: 3 Street: 0 Description: Brown Fine to Medium Sand Station No.: 0 Classification: SP Remark: Maximum Dry Density (pcf) 113.0 CBR 3 Opt. Moisture Content % 11.5 11 Corrected CBR @ 0.1" 19.5 Natural Moisture Content 4.0 Corrected CBR @ 0.2" 24.0 Liquid Limit LL Plastic Limit PL Dry Density as Molded 112.6 Plasticity Index PI Molded Moisture Content 11.5 Liquidity Index (LI) Percent of Maximum DensitY 99.8 Percent Retained 3/4" Sieve I Moisture Content +(- 0.0 Percent Retained No. 4 Sieve Percent % Swell 0.0 Percent Passin No.200 Sieve Project: Aircraft Fire Rescue Facility ECS CAROLINAS, LLC. Project No.: 22-12700 Wilmington, North Carolina Date. January 15, 2007 California Bearing Ratio Curves APPENDIX D HAND AUGER BORING LOGS AND INFILTRATION TEST RESULTS I 1 Infiltration Evaluation 1 Aircraft Fire Rescue Facility MCAS New River Jacksonville, North Carolina 1 ECS Project No. 22.12700 January 15, 2007 11 Location Depth Soil Description 1 I-1 0-12" Brown Silty SAND w/ gravel 12"-17" Tan Fine SAND II17"-48" Orange Gray CLAY Seasonal High Water Table was estimated to be at 17 inches below the existing grade elevation. Infiltration Rate: 0.05 inches per minute (3.2 inches per hour) ' Test was conducted at 12 inches below existing grade elevation Ground water was encountered at 36 inches below the existing grade elevation. 1 1 1 1 1 1 1 1 General Conditions The analysis, conclusions, and recommendations submitted in this report are based on the investigation previously outlined and the data collected at the points shown on the attached location plan. This report doe's not reflect specific variations that may occur between test locations. The borings were located where site conditions permitted and where it is believed representative conditions occur, but the full nature and extent of variations between borings and of subsurface conditions not encountered by any boring may not become evident until the course of construction. If variations become evident at any time before or during the course of construction, it will be necessary to make a re-evaluation of the conclusions and recommendations of this report and further exploration, observation, and/or testing may be required. This report has been prepared in accordance with generally accepted soil and foundation engineering practices and makes no other warranties, either expressed or implied, as to the professional advice under the terms of our agreement and included in this report. The recommendations contained herein are made with the understanding that the contract documents between the owner and foundation or earthwork contractor or between the owner and the general contractor and the caisson, foundation, excavating and earthwork subcontractors, if any, shall require that the contractor certify that all work in connection with foundations, piles, caissons, compacted fills and other elements of the foundation or other support components are in place at the locations, with proper dimensions and plumb, as shown on the plans and specifications for the project. Further, it is understood the contract documents will specify that the contractor will, upon becoming aware of apparent or latent subsurface conditions differing from those disclosed by the original soil investigation work, promptly notify the owner, both verbally to permit immediate verification of the change, and in writing, as to the nature and extent of the differing conditions and that no claim by the contractor for any conditions differing from those anticipated in the plans and specifications and disclosed by the soil studies will be allowed under the contract unless the contractor has so notified the owner both verbally and in writing, as required above, of such changed conditions. The owner will, in turn, promptly notify this firm of the existence of such unanticipated conditions and will authorize such further investigation as may be required to properly evaluate these conditions. Further, it is understood that any specific recommendations made in this report as to on -site construction t review by this fine will be authorized and funds and facilities for such review will be provided at the times recommended if we are to be held responsible for the design recommendations. 1 L 1 1 APPENDIX F REGARDING FIELD LOGS, LABORATORY DATA SHEETS AND SAMPLES Procedures Regarding Field Logs. Laboratory Data Sheets and Samples In the process of obtaining and testing samples and preparing this report, procedures are followed that represent reasonable and accepted practice in the field of soil and foundation engineering. Specifically, field logs are prepared during performance of the drilling and sampling operations which are intended to portray essentially field occurrences, sampling locations, and other information. Samples obtained in the field are frequently subjected to additional testing and reclassification in the laboratory by more experienced soil engineers, and differences between the field logs and the final logs exist. The engineer preparing the report reviews the field and laboratory logs, classifications and test data, and his judgment in interpreting this data, may make further changes. Samples are taken in the field, some of which are later subjected to laboratory tests; are retained in our laboratory for sixty (60) days and are then discarded unless special disposition is requested by our client. Samples retained over a long period of time, even if sealed in jars, are subject to moisture loss which changes the apparent strength of cohesive soil generally increasing the strength from what was originally encountered in the field. Since they are then no longer representative of the moisture conditions initially encountered, an inspection of these samples should recognize this factor. It is common practice in the soil and foundation engineering profession that field logs and laboratory data sheets not be included in engineering reports because they do not represent the engineer's final opinions as to appropriate descriptions for conditions encountered in the exploration and testing work On the other hand, we are aware that perhaps certain contractors submitting bids or proposals on work may have an interest in studying these documents before submitting a bid or proposal. For this reason, the field logs will be retained in our office for inspection by all contractors submitting a bid or proposal. We would welcome the opportunity to explain any changes that have been and typically are made in the preparation of our final reports, to the contractor or subcontractors, before the firm submits the bid or proposal, and to describe how the information was obtained to the extent the contractor or subcontractor wishes. Results of the laboratory tests are generally shown on the boring logs or described in the extent of the report, as appropriate. The descriptive terms and symbols used on the logs are described on the attached sheet, entitled General Notes. m m m m m m m m m m m m m m m m m m m = = m m m = = m m = m m m = m m m = m 7 r ' 41 s Pt i y } LT , _ `• � � �._.—way `" ` '� LM 't• 7" �1,�"'!'j t sR• l i • M �• • PACAS h APIl y 414,.Ilk ate ► ,,�• t` I ..�.. .��,y� (' 'q � ��—.,wry r' '� "'• f '�v !�', � q'4. '� ��. ' � � � �' ` a _tea` � •f va Y� s F Y J Y ,aj r �' SPY" t, :, i 4•y. � :k � +'x 1 •�Yt ��. —{— T. a, l�ai brut � i f..' F Y 4f-y�+.i4 a Y !v.,l, � . lC., s a ! ice' r '^. ry !r IT a ' _ — .. - .;: Fri � ' •+'i''" t ' e� -s vim ='s..r•+�—�- } .71�i trt 4 4 k{TO y'yYt cap- lNi e — I C 11 E CI F C 11 0 u I 1 0 1 C r] I 1 0 0 C 0 H L' EN >ggard-Sure lkssociatesP... EEM SURVEYORS PUNNER9 757A84-9670 - Fax: 757-484.7498 - 901 Podentro Parkway, Suite 5 DENR-DWQ Stormwater Unit Archdale Building 12tR Floor, Room 1209E 512 N. Salisbury St. Raleigh, NC 27604 ATTN: Mr. Paul Bartlett, P.E. Re: Aircraft Fire Rescue Facility Marine Corps Base Camp Lejeune, North Carolina Our File No. 2724.02.06 Project ID: Onslo-2008-017 Dear Mr. Bartlett: (Pov f4 Portsmouth, Yroinia 23704 C7--% 9/1 O/O -7' r`(!,,/- 44w-77 � V . September 14, 2007 `(-Tkx Hoggard / Eure Associates, P.C. respectfully requests review of the above mentioned project. The enclosed submittal package includes the Stormwater management Report. The following have been enclosed: 1. One (1) Original "Stormwater Management Permit Application Form", two (2) copies 2. One (1) Original "Wet Detention Basin Supplement" — North Pond, two (2) copies 2. One (1) Original "Wet Detention Basin Supplement" — South Pond, two (2) copies 4. Two (2) copies of Stormwater Management Report, includes Calculations & Specifications. 5. Three (3) Full Size sets of the civil construction plans. The plans and specifications submitted for your review reflect the contract documents that will be utilized for construction after permit approval. Please contact me if any questions or comments arise during your review. I will be able to visit your office or speak to you by telephone if necessary to help with your review. Very truly yours, EAR SSOCIATES, P.C. W. Farrell, P.E. 255 115 - et :( `ram `re ✓5ecl; Ow— Ile (,,/I - t 1• --�l�j F.; dAl Aee L &W ICI. �- ( )'„mil ti�, `-«C (-�� i_.['"i� �_/�• / ��� _1-1 � �3 �Jre SS y� DIVISION OF WATER QUALITY S[,J� (v�2✓ INFILTRATION SYSTEM INVESTIGATION Complete and email this form to Vincent.Lewis@ncmail.net. if there are more than 7 areas to be tested, attach a second sheet. Q Ve n4," Ca Scheduled Site Visit Date and Time �,� 0/�L� IIl U �/ 1,3 Z )u,) 9h�� Project Name: � P-671 Aircraft Fire Rescue tCounty: Onslbw Street Address: Curtis Road MCAS New River Directions from the nearest intersection of two major roads: 2350' South of Intersection of Curtis Road and Lonastaff Street. Latitude: 340 42' 30" N Longitude: 770 26' 2.95" W >1 acre being disturbed? ®YES [:]NO CAMA Major required? ❑YES ®NO Consultant Name: James Farrell Phone: 757-484-9670 G<orie Afet -t" Consultant Firm Name: Hoggard-Eure Associates, PC N S Bore Number 1a 2a 3 1 4 5 6 7 a Existing Ground Elevation 15.4 15.8 b Proposed Bottom Elevation 14.0 14.0 c Subtract a — b 1.4 1.8 d Add 2 ft. Min. Bore Depth) 3.4 3.8 z e Hardpan Depth? f Infiltration Rate OK? Actual Elev. Of SHWT It '' h Max. lowest bottom elev. Comments: Borings designated with "a" to differentiate from existing borings. Required Attachments 1. Legible vicinity map. 2. Compete Soils Report. 3. PDF formatted site plan with the boring locations to be tested. Site plans should be emailed or hand -delivered only. Illegible faxed maps will not be accepted. All proposed infiltration areas and existing, active utility lines located Kithin the proposed basin/trench must be marked and flagged. If these areas are not flagged, the Soils Scientist reserves the right to decline to do the investigation. If the proposed infiltration system will be located in an area of existing pavement and there is no open area nearby, equipment capable of breaking through the impervious layer must be provided. The soils investigation does not take the place of a soils report prepared by an appropriate professional. The Soils Scientist will only verify the soil conditions that are reported in the Soils Report, and make a determination as to the suitability of the site to meet the infiltration design requirements under NCAC 2H.1000, and assumes no liability should the system fail. n E C E 1 V E S:\WQS\STORMWATER\FORMS\infiltration site visit.for Illllllllulllllllll y Sal is T D en 14J Iet'4de r4et,y AUG 0 8 2007 ' DWQ PHOJ 9 6-cIv ry-c lyare'Lr Vr4ek C.10 ),rL �.-7,9 72,8d Sh(.i A S4 ivi 44 " t •. iT i I— ' I].0 i •�.�' .' 1 1'.. i...`1 ) IS.G �'• �rnrwyrr---Y= —P — S ,� 4£G i6.lfi I6le fill •YEL. r / •>5 •Y , 'L °) a_ ) e ulL'n=qis trax I]Prd r ,xs � L'3' I T Ifi9] YIWS'-ISA19.1'I p Zti •°`�^. C CBP E 11S]ICH� M S I ].II 69] 169 N4.-ISLY Il9• �T - (' �� g) �� I]II 1I19 BBI � IS IS C 161 wvrme . 5 PW-1)50 ° O \ )•6 rl]lyq °' ,r° CL.-51]r B-1 6 1i9 Iwt ]A f )S _� 17M IlGplp • Y-I)f°i PSQ�I]EO / • .r - II.IS •eQ w1iEP � I)6] I�R-IwCO \p IYO �` ) I 4➢AWM - 11 ).95 \ ; .hr _. 3' - „ IS• ���) . F x cBP_] d mAti'1e'u c?LX io° ., i« iin mu'-Ifim E 17 17. 17 •e :: urv.-lemi I � y — '� 1]'� JI • 169J IB ] 101 I)A IS I]� G IESw �\ e 6SJ � • AB_3 AB-• .S W!.-LL49 • � � 1 IBA • • .:. I x \ 4 16A Ifi ISW B15N 16 `> IS.I Vs� • kl .::. CBP LCUINM] • 690 �� fi a (/-QI CM-2 / YYIM I -I * Y6llMrpx iEst LCUrpN �] 1i/ / � r� .. �54 OP 14 �fi-s P9PWL LCGSi4'P1 u. L. _ \ —\ swm Poxo I ) \ r 15 I SIMICME LP I I°Y 4.W o-a ap vx. I.ro �' ' gIL Ise t5. E✓/E C E 8 V E W AUG 0 8 2007 D PROD n DWQ Re: P-671 Aircraft Fire Rescue Facility Subject: Re: P-671 Aircraft Fire Rescue Facility From: Jim Farrell <jim@hoggard-eure.com> Date: Thu, 09 Aug 2007 12:06:29 -0400 To: Janet Russell <Janet.Russell@ncmail.net> September 10 is acceptable :Thanks for your help. jim Janet Russell wrote: _*P-671 Aircraft Fire Rescue Facility*_ August 8, 2007 Gentlemen: The subject project has been scheduled for an Express Stormwater Submittal meeting with Paul Bartlett in Raleigh on _*September 10, 2007 at 1:00 PM. *_ Paul will be in contact with you to give you directions to his office. Paul's telephone number is 919 733-5083 ext. 235. Please respond within 2 business days to confirm and reserve this date and time. The infiltration information related to the proposed dry detention basin has been forwarded to Vince Lewis, Soil Scientist. Vince may contact you directly about the project. If you have questions, please do not hesitate to call me or email me, 910 796-7421. Thanks, Janet Russell Express Permitting James W. Farrell, PE Project Manager Hoggard-Eure Associates, PC 901 Port Centre Parkway, Suite 5 Portsmouth VA 23704 ph: 757.484.9670 fax: 757.484.7498 j_im@hoggard-eure.Com 1 of 1 8/9/2007 1:19 PM aboutblank P-671 Aircraft Fire Rescue Facility August 8, 2007 Jim: In follow-up to our telephone conversation of this date, the Express Permitting Group is in receipt of the Request for Express Permit Review for stormwater. Linda Lewis, our chief engineer, has requested that you submit an infiltration sheet with the supporting information. That sheet is attached. Please take note of the information that should be submitted with that infiltration sheet. You may submit that by email to my address. Also, in the Express Program, the project application and the check should be brought in at the time of the project submittal meeting. The Express Request and preliminary information is all we want prior to the submittal meeting. The applicant is copied on all correspondence and should attend the submittal meeting. Once we receive the infiltration information, the submittal meeting will be scheduled. Thanks, Janet Russell Express Permitting 1 of 1 8/8/2007 9:12 AM 0 o. Hoggard-Eure _AssociatesP.-. ENGINEERS SURV On PUNNERS AUG 0 j 2007 .Sra�' �7'Idr'j2 757-484-9670 - Fax: 757-484.7498 - 901 Porttentre Parkway, Suite 5 • Portsmouth, 9irainia 23704 August 6, 2007 North Carolina Department of Environment and Natural Resources Wilmington Region 127 Cardinal Drive Extension Wilmington, North Carolina 28405 ATTN: Mr. Cameron Weaver Re: Aircraft Fire Rescue Facility Marine Corps Base Camp Lejeune, North Carolina Our File No. 2724.02.06 Project ID: Onslo-2008-017 Dear Mr. Weaver: Hoggard I Eure Associates, P.C. respectfully requests review of the above mentioned project. The enclosed submittal package includes the Stormwater management Report. The following have been enclosed: 1. Request for Express Permit Review, 1-Original, 1- Copy 2. Stormwater Express Questionnaire, 1-Original, 1- Copy 2. Permit Application Processing Fee: - Previously submitted with Project ID: Onslo-2008-017 4. Two (2) copies of Stormwater management Report, includes Specifications. 5. Two (2) - 11 x 17 sets of the civil construction plans. The plans and specifications submitted for your review reflect the contract documents that will be utilized for construction after permit approval. Please contact me if any questions or comments arise during your review. I will be able to visit your office or speak to you by telephone if necessary to help with your review. Ve truly yours O GAR URE ASSOCIATES C. Ci-� am s W. Farrell, P.E. ©kWice �/1 -017 �� IP ol- (;, D't �✓ r Q �� ` - Reviewer NCDENR ke,t.o- ito l dose-/9/t � North Carolina Department of Environment V*t rt9Y�3wm 1-7 P"A . Submit q — IC) O 127 Cardinal Drive Extension, Wilmington, NC 28405 (9 0) 796-7215 FAX 10)350-200, Time o_ Request for Express Permit Review Confirm 3—Cj—O i FILL-IN all information below and CHECK required Permit(s). FAX to Express Coordinator along with a detailed narrative and vicinity map of the project location. Projects must be submitted by 5:00 pm the day before the review date, unless prior arrangements are made. 4PPLICANT Name/Title: Mr. Carl Baker Deputy Public Works Division Company United States Marine Corps Camp Leieune Address: 1005 Michael Street City: Camp Leleune Zip 28547 County ONSLOW Phone 910-451-2213 Fax 910-451-2927 Email carl.h.baker usmc.mil PROJECT Name' P-671 Aircraft Fire Rescue_ Facility ' County ONSLOW PROJECT DRAINS TO' New River (Stream name) in the White Oak RIVER BASIN ENGINEER/CONSULTANT INFORMATION: Name James Farrell PE Company_Hoogard-Eure Associates PC Address 901 Portcenter Parkway Suite 5 City Portsmouth State VA Zip 23704 Phone 757-484-9670 Fax 757-484-7498 Email iim(a�hoggard-eure.com State or National Environmental Policy Act (SEPA or NEPA) — EA or EIS Required? ❑Yes ®No -------------------------------------------------------------------------------------------------------------------------------------------------- ❑STREAM ORIGIN DETERMINATION # of Stream calls Stream Name Z STORMWATER- ,❑ Low Density ;Z High Density -Detention Pond ❑ High Density - Other (check all that -apply) ❑ Low Density -Curb & Gutter ❑ High Density -Infiltration B Off -site Wetlands MUST be addressed below Plan Revision ----------------------------------------------------------------------------------------------------------------------------------------------------------------------- ❑ COASTAL ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information MANAGEMENT ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront LAND, QUALITY _ ® Erosion and Sedimentation Control Plan with 6.7 acres to be disturbed ------------------------------------------------------------------------------------------------------------------------------------------------------------------------- WETLANDS (401) Wetlands on Property ? ❑ Yes ® No Isolated Wetlands on Property? ❑ Yes ® No (Check all that apply) Wetlands will be impacted? ❑ Yes ® No Wetland impacts: 0.0 acre(s) Wetlands delineation has been completed? ❑ Yes ® No ❑ Buffers impacted: Acre(s) PLEASE SEE ATTACHED FORM DD1391, PAGE 4 SACOE Approval of Delineation completed? ❑ Yes ® No 404 Application in Process w/USACOE? ❑ Yes ® No / Permit recv'd from USACOE❑Yes ❑ No 401 Application Required? ❑ Yes ® No If Yes, ❑ Regular ❑ Express ----------------------------------------------------------------------------------------------------------------------------------------------------------------------- Additional fees, not to exceed 50% of the original Express Review permit application fee may be charged for subsequent reviews due to the insufficiency of the permit application. Total Fee:$ Stormwater $ Date Received CAMA $ pECEIVEr LQS $ AUG 0 7 2007 L 401 $ GnP;ed b L.r�r+-ol or` 6-8-0-1-DWO Pao4 a . Project Name P-671 Aircraft Fire Rescue Facility Stormwater Express Questionnaire (6/15/2007) What is the applicant's full legal name? US Marine Corps Camp Leieune I] If a corporation, LLC or Partnership is involved, what is that name?, If it's an LLC, is it ❑ manager -managed or ❑ member -managed? What is the applicant's title within the corporation, LLC or partnership? Will an agent (someone other than the applicant) be signing the application? Yes No If Yes, what is the agent's name and title? Mr. Carl Baker Deputy Public Works Division ❑Please note the application signature requirements are listed in NCAC 2H.1003 (e). In summary, only the sole proprietor of a sole proprietorship, the designated manager, member - manager, president or vice president of a corporation or LLC, the general partner of a partnership, or a ranking official of a municipality may sign permit applications and supplements. The signature of the engineer or other agent can be accepted only if accompanied by a signed letter of authorization from one of the aforementioned individuals. Corporations, LLC's and Partnerships must be registered with the NC Secretary of State's Office, and be active. Please note that spelling, capitalization, and punctuation are extremely important. Please provide the entity name exactly as on file with the NC Secretary of State. Z Where is the project located? County ONSLOW Nearest Town/City MCAS New River (Attach a detailed vicinity map with both local street names and SR, NC, US or Interstate highway numbers, plus other relevant information such as town or city names, directions to, etc. Show the nearest intersection of two major roads on the vicinity map. A major road is any 1, 2 or 3 digit NC, US or interstate highway.) If the project is located in Brunswick, Onslow or New Hanover Counties, NPDES Phase 11 Post - Construction rules will apply. 3. What is the name of the receiving stream? NEW RIVER What River Basin is it located in? WHITE OAK What is the classification of the receiving stream? For SA or SR waters, a separate scaled topographic map will be required. The project must be accurately located on the map and the % mile radius from the property corner closest to the SA or SR receiving stream must be drawn on the map. 4. If the project is high density, what type of stormwater management BMP's are being proposed? (check all that apply) Wet Detention Infiltration Trench Infiltration Basin Sand Filter Bio-retention Wetlands e Alternative Offsite Dry Detention Other How many separate BMP's are being proposed? 1 2 3 4 5 6 7 8 9 10 11 12 Other 5. Is there offsite runoff from the adjacent properties or public right-of-way that will drain into any of the proposed BMP's on the project and is not being diverted? ❑ Yes ® No 6. Is an access road across other property required to access the project? ❑ Yes ®No 7. Is there any existing development or pre-1988 existing BUA located on the pro erty? (Please provide documentation & delineate and identify on the plans.) � Yes ® No 8. For high density projects, has all of the proposed BUA been collected? ® Yes ❑ No (If not, attach a separate explanation sheet) 9. Will the project involve the subdivision and sale of property? ❑ Yes ® No Page 1 of 2 Project Name P-671 Aircraft Fire Rescue Facility Is the subdivision ❑ residential or ❑ commercial? How many lots are proposed? N/A (Deed restrictions are required for all residential, commercial, low density or high density sub- divisions. Specific language for the various types of subdivisions is available from DENR.) 10. Have the wetlands been delineated? ❑ Yes ® No (All projects require either a signed wetlands delineation map or a wetlands report to be submitted with the application. Only a trained professional may provide information regarding the presence or absence of wetlands.) Please see attached Government Form DD1391 stating no wetlands on site. 11. Are wet detention ponds or other engineered controls proposed to be located adjacent wetlands? El Yes ® No (If, yes, a physical means to prevent the dewatering of the wetland must be provided, or the SHWT must be provided to demonstrate that the permanent pool of the BMP is above the SHWT and will not dewater the wetlands over time. Where possible, all BMP's and swales should outlet into back the wetland (with level spreaders). 12. For infiltration projects, has a site visit been completed with the DENR soils scientist to verify the soil type, water table and infiltration rate provided in the soils report? ❑ Yes ® No If yes, what was the date of the site visit? Include a copy of the consultant's soil report with the application. 13. Does the project propose Level Spreaders at the outlet of all engineered controls and swales prior to entering surface waters or wetlands? ❑ Yes ® No (The purpose of the level spreader is to reduce the energy of the incoming runoff and to promote diffuse sheet flow to prevent erosion and scour into the receiving waters or wetlands.) 14. Is this project a modification to an existing permit, part of a larger subdivision, or is it a lot that will be treated in a BMP under a previously issued permit? ❑ Yes ® No If yes, what is the name of the permitted facility? What is the permit number of the permitted facility? Is the permitted facility in compliance with its permit? Yes No Have the deed restrictions been recorded? Yes No Have the deed restrictions been submitted? Yes No Has the Designer's Certification been submitted? Yes No 15. Do the plans reflect all information as listed in 15A NCAC 2H.1003 (g)? ® Yes ❑ No 16. Have all of the design requirements of each proposed BMP been met? ® Yes ❑ No (If not, attach a separate explanation sheet. Please note that the Express program is not set up to handle any type of deviation from the standard design.) 17. For each BMP in all high density projects, and low density curb outlet swale proJtects, has a drainage area delineation map been provided? Yes ❑ No 18. Any revisions made to the application as a result of this review may cause changes to the other documentation. Plans, calculations, application, and supplements should be reviewed for any necessary changes. For example, changing the orifice size will require a modification to the calculations, the pond details on the plans, and page 1 of the supplement. Page 2 of 2