ROY COOPER
Governor
DIONNE DELLI-GATTI
Secretary
BRIAN WRENN NORTH CAROLINA
D"Mr Emironmenta/ Quality
June 24, 2021
Emmerdale, LLC
Attn: Keith Walker, Manager
100 Emmerdale Way
Jacksonville, NC 28516
Subject: Permit Renewal
State Stormwater Management Permit No. SW8 060650
Emmerdale Apartments
Onslow County
Dear Mr. Walker
The Wilmington Regional Office received a complete 8 year Stormwater Management Permit Renewal Application for
the subject project on June 17, 2021. The Division is hereby notifying you that permit SW8 060650 has been renewed
on June 24, 2021 and shall be effective until July 17, 2028. For your records, please find enclosed a renewed, updated,
and re -issued permit and a copy of the renewal application. Please keep this permit on file at all times. Please note that
the renewed, updated, and re -issued permit does not impose new or different terms; it merely restates some of the
previous terms to provide you with a better understanding of your obligations under the permit.
The renewal and reissuance of this stormwater permit does not imply that the site is currently in compliance with the
terms and conditions of this state stormwater permit. The plans originally approved on July 17, 2006 and most recently
modified on November 24, 2014, will remain in full force and effect in accordance with the regulations set forth in
Title 15A NCAC 2H.1000.
This permit is subject to the conditions and limitations as specified therein. Please pay special attention to the
conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed
restrictions, procedures for changes of ownership, transferring the permit, and renewing the permit. Failure to establish
an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions,
to transfer the permit, or to renew the permit, will result in future compliance problems.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an
adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written
petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the OAH within
thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a
filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or
via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit
shall be final and binding.
If you have any questions, need additional copies of the permit or approved plans, please contact Ashley Smith in the
Wilmington Regional Office, at (910) 796-7215 or ashleym.smith@ncdenr.gov.
Sincerely, , (� ()
C)TUt�C
.3�Brian Wrenn, Director
Division of Energy, Mineral and Land Resources
Enclosures: Attachment C — Permitting History
Renewal Application Documents
DES/arcs: %Stormwater\Permits & Projects\2006\060650 HD\2021 06 permit 060650
cc: NCDEQ-DEMLR Wilmington Regional Office
Hoerrrp D rm QZ North Carolina Department of Environmental Quality I Division of Energy. Mineral and Land Resources
./ Wilmington Regional Office 1127 Cardinal Drive Extension I Wilnungum. North Carolina 28405
910.796.7215
State Stormwater Management Systems
Permit No. SW8 060650
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL AND LAND RESOURCES
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as
amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
Emmerdale, LLC
Emmerdale Apartments
Carolina Forest Blvd, Jacksonville, Onslow County
FOR THE
construction, operation and maintenance of two (2) wet detention pond(s) in compliance with the
provisions of 15A NCAC 2H .1000 and Session Law 2008-211, as applicable, (hereafter referred to as
the "stormwater rules') the approved stormwater management plans and specifications and other
supporting data as attached and on file with and approved by the Division of Energy, Mineral and
Land Resources (the "Division" or "DEMLR") and considered an enforceable part of this permit.
This permit shall be effective from the date of issuance until July 17, 2028, and shall be subject to the
following specified conditions and limitations:
I. DESIGN STANDARDS
This permit is effective only with respect to the nature and volume of stormwater described in
the application and other supporting data.
2. This stormwater system has been approved for the management of stormwater runoff as
described in Section 1.6 of this permit. The runoff from all built -upon area within the permitted
drainage areas of this project must be directed into the permitted stormwater control systems.
The stormwater controls labeled Pond 1 and Pond 2 have been designed to handle the runoff
from 59,141 and 73,768 square feet of built -upon area, respectively.
3. The maximum built -upon area allowed for the entire project is 132.909 square feet.
4. The drainage areas will be limited to the amounts of built -upon area indicated in Sections 1.2
and 1.6 of this permit, and per approved plans. There is no allocation of future built -upon area
for this development.
A vegetated filter strip is not required for this pond as it has been designed for a 90% total
suspended solids removal efficiency.
Page 1 of 5
State Stormwater Management Systems
Permit No. SW8 060650
6. The following design criteria have been provided in the wet detention pond and must be
maintained at design condition:
Design Criteria
Pond 1
Pond 2
a. Drainage Area, acres:
Onsite, subject to 1995 Rules, ft2:
Onsite, subject to SL 2008-211, ft2:
Offsite, ft2:
2.09
91,040
0
None
2.40
102,366
2,394
None
b. Total Impervious Surfaces, ft2:
Onsite, subject to 1995 Rules, ft2:
Onsite, subject to SL 2008-211, ft2:
Offsite, ft2:
59,141
59,141
0
None
73,768
72,438
1,330
None
c. Design Storm, inches:
1995 Rules, ft2:
SL 2008-211, ft2:
1.0
n/a
1.0
1.5
d. Pond Depth, ft:
5.0
5.0
e. TSS removal efficiency, W
90
90
f. Permanent Pool Elev, FMSL:
42.5
44.0
g. Perm. Pool Surface Area, ft2:
4,508
5,569
h. Permitted Temporary Storage Volume, ft3:
4,997
6,034
i. Temporary Storage Elev., FMSL:
43.49
44.99
j. Controlling Orifice, "0 e:
1.0
1.0
k. Permanent Pool Volume, ft3:
7,522
13,659
k. Forebay Volume, ft3:
1,585
2,828
I. Maximum Fountain Horsepower:
n/a
n/a
m. Receiving Stream/River Basin:
UT Half Moon Creek /
White Oak
n. Stream Index Number:
19-6
o. Classification of Water Body:
C, NSW
II. SCHEDULE OF COMPLIANCE
1. The stormwater management system shall be constructed in its entirety, vegetated and
operational for its intended use prior to the construction of any built -upon surface.
2. During construction, erosion shall be kept to a minimum and any eroded areas of the system
will be repaired immediately.
3. The permittee shall at all times provide the operation and maintenance necessary to assure
that all components of the permitted stormwater system function at design condition. The
approved Operation and Maintenance Agreement is incorporated by reference into this permit
and must be followed in its entirety and maintenance must occur at the scheduled intervals.
4. Records of maintenance activities must be kept and made available upon request to
authorized personnel of the Division. The records will indicate the date, activity, name of
person performing the work and what actions were taken.
5. Decorative spray fountains will not be allowed in the stormwater treatment systems, as the
permanent pool volumes of both ponds are less than 30,000 cubic feet
7. The facilities shall be constructed, operated and maintained in accordance with the provisions
of this permit, the approved plans and specifications, and the supporting documents attached
to this permit and on file with the Division.
Page 2 of 5
State Stormwater Management Systems
Permit No. SW8 060650
8. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to
operation of this permitted facility, the permittee shall cause a certification from an appropriate
designer for the system installed to be submitted, certifying that the permitted facility has been
installed in accordance with this permit, the approved plans and specifications, and other
supporting documentation. Any deviations from the approved plans and specifications must
be noted on the Certification. A modification may be required for those deviations.
9. If the stormwater system is used as an Erosion Control device, it must be restored to design
condition prior to operation as a stormwater treatment device, and prior to occupancy of the
facility.
10. All stormwater collection and treatment systems must be located in either public rights -of -way,
dedicated common areas or recorded easements. The final plats for the project will be
recorded showing all such rights -of -way, common areas and easements, in accordance with
the approved plans. Access to the stormwater facilities for inspection and maintenance shall
be maintained via appropriate recorded easements at all times.
11. Prior to transfer of the permit, a file review and site inspection will be conducted by Division
personnel to ensure the permit conditions have been met and that the project and the on -site
stormwater system complies with the permit conditions. Any items not in compliance must be
repaired, replaced restored, or resolved prior to the transfer. Records of maintenance activities
performed to date may be requested.
12. The Director may notify the permittee when the permitted site does not meet one or more of
the minimum requirements of the permit. Within the time frame specified in the notice, the
permittee shall submit a written time schedule to the Director for modifying the site to meet
minimum requirements. The permittee shall provide copies of revised plans and certification in
writing to the Director that the changes have been made.
13. No person or entity, including the permittee, shall alter any component shown in the approved
plans and specifications. Prior to the construction of any modification to the approved plans,
the permittee shall submit to the Director, and shall have received approval for modified plans,
specifications, and calculations including, but not limited to, those listed below. For changes to
the project or SCM that impact the certifications, a new or updated certification(s), as
applicable, will be required and a copy must be submitted to the appropriate DEQ regional
office upon completion of the modification.
a. Any modification to the approved plans and specifications, regardless of size including
the SCM(s), BUA, details, etc.
b. Redesign or addition to the approved amount of BUA or to the drainage area.
C. Further development, subdivision, acquisition, lease or sale of any, all or part of the
project and/or property area as reported in the approved plans and specifications.
d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any
component of the approved SCM(s), the stormwater collection system and/or
vegetative conveyance shown on the approved plan.
e. The construction of any allocated future BUA.
f. The construction of any permeable pavement, #57 stone area, public trails, or
landscaping material to be considered a permeable surface that were not included in
the approved plans and specifications.
g. Other modifications as determined by the Director.
III. GENERAL CONDITIONS
Any individual or entity found to be in noncompliance with the provisions of a stormwater
management permit or the requirements of the stormwater rules is subject to enforcement
procedures as set forth in NCGS 143 Article 21.
Page 3 of 5
State Stormwater Management Systems
Permit No. SW8 060650
2. The issuance of this permit does not preclude the permittee from complying with and obtaining
any other permits or approvals that are required for this development to take place, as
required by any statutes, rules, regulations, or ordinances, which may be imposed by any
other Local, State or Federal government agency having jurisdiction. Any activities undertaken
at this site that cause a water quality violation or undertaken prior to receipt of the necessary
permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to
enforcement procedures pursuant to NCGS 143-215.6.
3. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective
actions. This includes actions required by this Division and the stormwater rules such as the
construction of additional or replacement on -site stormwater systems. These additional or
replacement measures shall receive a permit from the Division prior to construction.
4. Permit Transfer: This permit is not transferable to any person or entity except after notice to
and approval by the Director. The permittee shall submit a completed and signed "Permit
Transfer Application Form" (available on the Division website) accompanied by the required
fee and supporting documentation as listed on the form, to the Division at least 60 days prior
to any one or more of the following events:
a. The sale or conveyance of the project area in whole or in part, except in the case of an
individual lot sale that is made subject to the recorded deed restrictions and protective
covenants;
b. Dissolution of the partnership, corporate, or LLC entity, subject to NCGS 55-14-05 or
NCGS 57D-6-07 and 08;
C. Bankruptcy;
d. Foreclosure, subject to the requirements of Session Law 2013-121;
5. Current Permittee Name or Address Changes: The permittee shall submit a completed
"Permit Information Update Application Form" (available on the Division website) to the
Division within 30 days to making any one or more of the following changes:
a. A name change of the current permittee;
b. A name change of the project;
G. A mailing address change of the permittee;
The permittee is responsible for compliance with all terms and conditions of this permit until
the Division approves the transfer request. Neither the sale of the project, in whole or in part,
nor the conveyance of common area to a third party constitutes an approved transfer of the
permit.
The permittee grants Division Staff permission to enter the property during normal business
hours to inspect all components of the permitted project.
8. The permit issued shall continue in force and effect until the permittee files a request with the
Division for a permit modification, transfer, renewal, or rescission, however, these actions do
not stay any permit conditions.
9. Approved plans, application documents, supplements, calculations, operation and
maintenance agreement, and specifications for this project are incorporated by reference and
are enforceable parts of the permit. A copy of this permit, application, supplements, operation
and maintenance agreement, and approved plans and specifications shall be maintained on
file by the permittee.
10. Unless specified elsewhere, permanent seeding requirements for the on -site stormwater
system must follow the guidelines established in the North Carolina Erosion and Sediment
Control Planning and Design Manual.
11, The issuance of this permit does not prohibit the Director from reopening and modifying the
permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the
laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al.
12. A permit renewal request must be submitted at least 180 days prior to the expiration date of
this permit. The renewal request must include the appropriate application, documentation and
the processing fee as outlined in Title 15A NCAC 02H.1045(3).
Page 4 of 5
State Stormwater Management Systems
Permit No. SW6 060650
Permit renewed, updated and reissued this the 24th day of June 2021.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
C � �au
�nan Director erectorr
\
Division of Energy, Mineral and Land Resources
By Authority of the Environmental Management Commission
Page 5 of 5
Attachment C - Permitting History
Emmerdale Apartments
Permit No. SW8 060650
Approval
Date
Permit
Action
BIMS
Version
Description of the Changes
7/17/2006
Original
Approval
1.0
The addition of on -site built -
upon area associated with the
driveway and sidewalk
1 1/24/2014
Modification
1.1
connection to the adjacent
property, Wellington Grove
(SW8 120110), and draining
to Pond 2.
6/24/2021
Renewal
2.0
DEMLR USE ONLY
Date Rece' ed
Fee Paid
Permit Number
NC DEQ Division of Energy, Mineral and Land Resources I
1¢ RECEIVED
STATE STORMWATER:
PERMIT RENEWAL APPLICATION FORM f JUN 17 2021
NCUEQ
In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permltl-1 aT?sal RO
prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781)
Section 60.(c). This application form is for permit renewals only.
A. PROJECT INFORMATION
1. State Stormwater Permit Number: SW8 060650
2. Project name: Emmerdale Apartments
3. Project street address: I00 Emmerdale Way
City: J
28546
County: Onslow ZIP :
4. What, if any, changes have been made to the project as permitted?
If the project has changed from the original approved plans, please complete SWU-101 fora Major
Modification or Minor Modification Application form available at https://deg.nc.gov/about/divisions/energy-
m i n e ra I -I a nd-resources/e neMy-m i n e ra I -I a nd-rules/stormwater-p rog ra m/post-construction.
B. PERMITTEE INFORMATION
If changes to the permittee or project name have been made, please complete either the Permit Update form
or the Permit Transfer form available at: https://deg.nc.gov/about/divisions/energv-mineral-land-
resources/energv-mineral-land-rules/stormwater-program/post-construction. State Stormwater Permits do not
automatically transfer with the sale of the property.
1. Current Permit Holder's Company Name/Organization: Emmerdale, LLC
2. Signing Official's Name: Keith Walker
3. Signing Official's Title: Manger
4. Mailing Address: 100 Emmerdale Way
City: Jacksonville State: NC ZIP:
28516
5. Street Address: 100 Emmerdale Way
City: Jacksonville State: NC ZIP
28516
6. Phone: (910) 346-1397 Email: hanna(a)remnantmgt.com
JUN 11 2021
Stormwater Permit Renewal Form Page 1 of 3 BY.�11, 2018
C. SUBMITTAL REQUIREMENTS
Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR
Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQW/ORW). Only applications packages that
include all required items listed below will be accepted and reviewed.
Initial each item below to indicate that the required information is provided in the application package:
1. A permit application processing fee of $505.00 payable to NCDEQ.
2. One original signed hard copy and one electronic copy of this completed form. The signing official
named on this application to represent the current permittee must meet one of the following:
a. Corporation — a principle executive officer of at least the level of vice-president;
b. Limited Liability Company (LLC) — a manager or company official as those terms are defined
in G.S. 57D "North Carolina Limited Liability Company Act;"
c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee;
d. Partnership or limited partnership — the general partner;
e. Sole proprietor; or
f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the
signature of another entity.
U, 3. One hard copy and one electronic copy of recorded documents required by the original permit that
N' N have not yet been received by DEMLR, including: deed restrictions, protective covenants,
1 T condominium/planned community declaration and easements. If the project has been built, include
documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If
the project has not been built, include a signed agreement that the final recorded deed restrictions
and protective covenants will be submitted at a later date.
4. O&M Agreements, Please select one:
f I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to
keep this on file with the permit; or
❑ I do not have a copy of the current recorded O&M Agreement for all SCMs and am
requesting a copy be sent to me. I agree to keep this on file with the permit.
IZ 5. Designer Certifications, Please select one:
�f A copy of the certification(s) confirming that the project was built in accordance with the
approved plans have been previously provided to the Division; or
Q A copy of the certification(s) confirming that the project was built in accordance with the
approved plans are enclosed; or
❑ The project has not yet been built.
Gv�
6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a
signed, sealed, and dated letter from a licensed professional stating that the SCMs have been
inspected, and that they have been built and maintained in accordance with the permit.
rCtn 7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC):
Provide one hard copy and one electronic copy of documentation from the NC Secretary of State,
or other official documentation, which supports the titles and positions held by the persons listed in
Section C.2 per 15A NCAC 2H. 1043(3)(b).
https://www.sosnc.gov/online services/search/bv title/ Business Registration
ZZ -�
JUN 17 2011
BY:_
Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018
D. PERM,IITTTEE'S CERTIFICATION
I, the person legally responsible for the permit, certify that I have
a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am
responsible for the performance of the maintenance procedures, and the site has been and will be maintained
according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs
or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the
project, SCMs, or ownership. All information provided on this permit renewal application is, to the best of my
knowledge, corrrect an complete.
j
Signature: I ` G--� Date: S— / �— ok, I
NOT
that I
this the
County of
a Notary Public for the State of
do hereby certify
personally appeared before me
day of LIM , 20?-(_, and acknowledge the due
execution of the forgoing instrument. Witness my hand and official seal,
(Notary Seal) HANNA HADLEY
Notary Public
North Carolina
Notary Signature: (( yy�� Cumberland County
My commission expires "l' CJIJ
JUN 17 2021
Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018
0
A complete stormwater mr
supplement for each basin,
structure details.
I. PROJECT
Project Name: Emmerdale
Contaet PerSon: David KNM
For projects with multiple 1
elevations
Basin Bottom Elevation
Permanent Pool Elevation
Temporary Pool Elevation
areas
Permanent Pool Surface
Drainage Area
Impervious Area
voltames
Permanent Pool Volume
Temporary Pool Volume
Forebay Volume
Other parameters
SAJDA t
Diameter of Orifice
Design Rainfall
Design TSS Removal a
Fonn SWU-102 Rev 399
Permit No.;�w6 0(Oa(o5o
• (to be provided by DWO)
State of North Carolina
of Environment and Natural Resources
Division of Water Quality
MANAGEMENT PERMIT APPLICATION FORM
DETENTION BASIN SUPPLEMENT
This farm may be phowcopied for use as an original
ent plan submittal includes an application form, a wet detention basin
calculations, and plans and specifications showing all basin and outlet
PE, CMW Cwn Ea& "^"&PA Phone Number: (910 1 325-0006
as, specify
which basin
this worksheet applies to: 1
37.50
&
(floor of the basin)
42.50
ft.
(elevation of the orifice)
4149
$•
(elevation of the discharge structure overflow)
4,508
sq. ft.
(water surface area at the orifice elevation)
2.09
ac.
(on -site and off -site drainage to the basin)
1.36
ac.
(on -site and off -site drainage to the basin)
7,522cu ft. (combined volume Df main basin andforebay)
4,997 ` cu. ft (volume detained above the permanent pool)
1,585 ' cu. ft (approximately 10%of total volume)
4.75
1-00 in.
1v r in.
90 rya
(surface area to drainage area ratio from DWQ table)
(1 to S day temporary pool draw -down required)
(minimaim 85% required)
Page i of 4
2. If this application is
existing permit oui
3. Specify the type of 1
_Low Density
4. Additional Project Rcqui.
_CAMA Major X
Information on required
1-877-623-6748.
IU. PROJECT
L In the space provided be
(one to two pages) desc
Stormwater will be collected
submitted as the result of a renewal or modification tc an existing permit, list the
N/A and its issue date (if know[[)
(check one):
High Density _Redevelop —General Permit _Other
menu (check applicable blanks):
edimentation /Erosion Control _404/401 Permit "_NPDES Stormwater
permits can be obtained by contacting the Customer Service Center at
, summarize how stormwater will be treated. Also attach a detailed narrative
ig stormwater management for the project.
treated in two Wet Detention Basins
2. Stormwater runoff from this project drains to the White Oak River basin.
3. Total Project Area: 843 acres 1 4. Project Built Upon Area: 35.81
5. How many drainage area , does the project have? 2
6. Complete the following information for each drainage area. If there are more than two drainage areas in the
project, attach an additional sheet with the information for each area provided in the same format as below.
o#»3tttrot�u- zlia'�
Receiving Stream Name
UT Half Moon Creek
UT Half Moon Creek
Receiving Stream Class
C;NSW
C;NSW
Drainage Area
91,040 sf
102,366 sf
Existing Impervious* Area
I
-0-
Proposed Impervious*Area
59,141 sf
72,438 sf
%Impervious* Area (total)
65.0%
70.8%
ME NO MON
�14,603
'�
On-site Buildings
sf
27,060 sf
On -site Streets
.
-0
0
On -site Parking
34,978 sf
37,423 sf
Sidewalks
Oher
!
6,560 sf
7,955 sf
Other o
on
3,000 sf
_0-
site
Total: 59,141 sf (1.36 ac)
Total: 72,438 sf (1.66 ac)
. ,,yc, vww ui eu is uetinea as me outtl upon area including, Ina not limited to, buildings, roads, parking areas,
sidewalks, gravel areas, erc.
Form S WU-101 Version 3.991 Page 2 of 4
7. How was the off -site impzrvious area listed above derived? NIA
IV. DEED
AND PROTECTIVE COVENANTS
The following italicized deel restrictions and protective covenants are required to be recorded for all
subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table
listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment.
1. The following covenants are intended to ensure ongoing compliance with state stormwater management permit number
NIA as issued by the Division of Water Quality. These covenants may not be
changed or deleted without the consent of the State.
2. No more than NIA I square feet of any lot shall be covered by structures or impervious materials. .
Impervious materials include asphalt gravel, concrete, brick stone, slate or similar material but do not include wood
decking or the water surfaces of swimming pools.
3. Swales shall not be filled in, piped, or altered except as neeessaty to provide driveway crossings.
f. Built-ttpon area in excess of the permitted amount requires a state stormwater management permit modification prior to
construction
3. All permitted runoff from outparcels or future development shall be directed into the permitted stormwater control
system. These connections to the stormwater control system shall be performed in a manner that maintains the integrity
and petformmnce of the sysrJm as permitted.
By your signature below, you certify that the recorded deed restrictions and protective covenants for this project
shall include all the applicable items required above, that the covenants will be binding on all parties and persons
claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted
without concurrence from the State, and that they will be recorded prior to the sale of any lot.
V. SUPPLEMENT FORMS
The applicable state stormwa I r-management permit supplement form(s) listed below must be submitted for each
BMP specified for this project( Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status
and availability of these forms.
Form SWU-102
Wet Der
Form SWU-103
Infiltrati
Form SWU-104
Low Dei
Form SWU-105
Curb Ou
Form SWU-106
Off -Site
Form SWU-107
Undergr
Form SWU-108
Neuse R
Form SWU-109
mot:
Form SWU-101 Version 3.99
lion Basin Supplement
Basin Supplement
.ty Supplement
;t System Supplement
tstem Supplement
ad Infiltration Trench Supplement
:r Basin Supplement
Best Management Practice Supplement
Page 3 of 4
VI. SUBbIITTAL
Ouly complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ).
A complete package includes all of the items Listed below. The complete application package should be
submitted to the appropriate DWQ Regional Office,
1. Please indicate that you hi ve provided the following required information by initialing in the space provided
next to each item.
Initials
• Original and one copy of the S tormwater Management Permit Application Form
• One copy of the applicable Supplement Form(s) for each BMP
• Permit application processing fee of $420 (payable to NCDENR)
• Detailed narrative description of stormwater treatmentimanagement
Two copies of plans and specifications, including:
- DevelopmanUProject name
- Engineer and firm
-Legend
- North arrow
- Scale
- Revision number & date
- Mean high water line
- Dimensioned propertvrproject boundary
- Location map with named streets or NCSR numbers
- Original contours, proposed contours, spot elevations, finished floor elevations
- Details of roads. drainage features, collection systems, and stormwater control measures
- Wetlands delineated, or a note on plans that none exist
- Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations
- Drainage areas delineated
- Vegetated Buffers (where required) .
VII. AGENT A
If you wish to designate authority to another individual or firm so that they may provide information on your
behalf, please complete this section.
Designated agent (individual or firm): _CrYstal Coast Engineering, PA
Mailing Address:3817-3 Freedom Way
City: Hubert State: NC Z P� 28539
i
Phone:[ _910 t 325-0006 Fact( 910 1 325-0060
1
VIM APPLICANT'S
1, (print or type name ofperson
certify that the information i
that the project will be coast
and protective c yerts wil
NCAC 21- /
r
LLC
fisted in General Information, item 2) Kei th GT27`kPr t Praci runt f,���.1 s.C% .�d6
eluded on this permit application form is, to the best of my knowledge,'cotrect ai7d
acted in conformance with the approved plans, that the required deed restrictions
be recorded, and that the proposed project complies with the requirements f 15A
Date:
President
Form SVU-101 Version 3.99 I Page 4 of 4
0
Permit No. ',�w9 d(000050
(to be provided by DWO)
State of North Carolina
Department of Environment and Natural Resources
Division of Water Quality
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
WET DETENTION BASIN SUPPLEMENT
This form mar be photocopied for use as an original
DWQ Stormwater Management Plan Review:
A complete stormwater management plan submittal includes an application form, a wet detention basin
supplement for each basin, design calculations, and plans and specifications showing all basin and outlet
structure details.
1. PROJECT INFORMATION
Project Name: Emmerdale Apartments
Contact Person: David K. Newsom, PE, Crystal Coast Engineering, PA Phone Number: ( 910 ) 325-0006
For projects with multiple basins, specify which basin this worksheet applies to: 1
elevations
Basin Bottom Elevation 37.50 ft. (floor of the basin)
Permanent Pool Elevation 42.50 ft. (elevation of the orifice)
Temporary Pool Elevation 43.49 ft. (elevation of the discharge structure overflow)
r
areas
Permanent Pool Surface Area ✓ 4,508 sq. ft. (water surface area at the orifice elevation)
Drainage Area 2.09 ac. (on -site and off=site drainage to the basin)
Impervious Area 1.36 ac. (on -site and of -site drainage to the basin)
volumes
Permanent Pool Volume 7,522 cu. ft. (combined volume of main basin andforebay)
Temporary Pool Volume 4,997 cu. ft. (volume detained above the permanent pool)
Forebay Volume 1,585 ' cu. ft. (approximately 20% of total volume)
Other parameters
SAIDA t 4.75 (surface area to drainage area ratio from DWQ table)
Diameter of Orifice 1.00 in. (2 to 5 day temporary pool draiv-do ivn required)
Design Rainfall V in.
Design TSS Removal 2 90 % (minimum 85% required)
Form SWU-M Rev 3.99 Page I of
, Footnotes:
I W hen using the Division SA/DA tables, the con ect SA/DA ratio for permanent pool sizing should be computed based upon the
actual impervious % and permanent pool depth. Linear interpolation should be employed to determine the correct value for non-
standard table entries.
2 In the 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide
90% "I'SS removal. The NCDENR BMP manual provides design tables for both 35% TSS removal and 90% TSS removal.
II. REQUIRED ITEMS CHECKLIST
The following checklist outlines design requirements per the Stormwater Best Management Practices Manual
(N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code
Section: 15 A NCAC 2H .1008.
Initial in the space provided to indicate the following design requirements have been met and supporting
documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit
Application Form, the agent may initial below. If a requirement has not been met, attach justification.
Applicants Initials
b&(l
a. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet).
b. The forebay volume is approximately equal to 20% of the basin volume.
c. The temporary pool controls runoff from the design storm event.
d. The temporary pool draws down in 2 to 5 days.
e. if required, a 30-foot vegetative filter is provided at the outlet (include non -erosive flow
calculations)
f. The basin length to width ratio is greater than 3:1.
g. The basin side slopes above the permanent pool are no steeper than 3:1.
It. A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail).
i. Vegetative cover above the permanent pool elevation is specified.
j. A trash rack or similar device is provided for both the overflow and orifice.
k. A recorded drainage easement is provided for each basin including access to nearest right-
of-way.
1. If the basin is used for sediment and erosion control during construction, clean out of the
/ basin is specified prior to use as a wet detention basin.
in. A mecliamign is specified which will drain the basin for maintenance or an emergency.
I)
Ill. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT
The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the
vegetated filter if one is provided.
This system (check one) 0 doesX/does not incorporate a vegetated filter at the outlet.
This system (check one) 0 does 0 does not incorporate pretreatment other than a forebay.
Form SW U-102 Rev 3.99 Page 2 of 4
Maintenance activities shall be performed as follows:
After every significant runoff producing rainfall event and at least monthly:
a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation,
vegetated cover, and general condition.
b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within
2 to 5 days as designed.
Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative
cover to maintain a maximum height of six inches, and remove trash as needed.
Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain
proper functioning.
Remove accumulated sediment from the wet detention basin system semi-annually or when depth is
reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of
in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e.
stockpiling near a wet detention basin or stream, etc.).
The measuring device used to determine the sediment elevation shall be such that it will give an accurate
depth reading and not readily penetrate into accumulated sediments.
When the permanent pool depth reads 3.75 feet in the main pond, the sediment shall be removed.
When the permanent pool depth reads 3.75 feet in the forebay, the sediment shall be removed.
BASIN DIAGRAM
(fill in lite blankv)
Permanent Pool Elevation 42.50
Sediment Removal El. 38.75 75 o
f37.
--—_—Sediment Removal Elevation 38.75
Bottom Elevation 50 /o ----
Bottom Elevation 37.50
FOREBAY MAIN POND
5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These
plants shall be encouraged to grow along the vegetated shelf and forebay berm.
6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through
the emergency drain shall be minimized to the maximum extent practical.
Form SW U-102 Rev 3.99 Page 3 of 4
7. ' All components of the wet detention basin system shall be maintained in good working order.
I acknowledge and agree by my signature below that I am responsible for the performance of the seven
maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any
changes to the system or responsible party.
Print
Title: President, &ilnerdak-LLC
Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a
resident of the subdivision has been named the president.
1, � / , a Notary Public for the State of nit-4-%1 earall'" ,
County of f)S 6L) do hereby certify that Xe l -A �)b / ker
personally appeared before me this / d— day of May — —, and acknowledge the due
execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal,
\�qtn u n un�n
Y BIZ
:
l.`�A�BLIC .:�•
SEAL
My commission expires
Form S W U-102 Rev 3.99 Page 4 of 4
Permit No. S w g 060650
(to be provided by DWQ)
State of North Carolina
Department of Environment and Natural Resources
Division of Water Quality
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
WET DETENTION BASIN SUPPLEMENT
This form mar be photocopied for use as an original
DWQ Stormwater Management Plan Review:
A complete stormwater management plan submittal includes an application form, a wet detention basin
supplement for each basin, design calculations, and plans and specifications showing all basin and outlet
structure details.
1. PROJECT INFORMATION
Project Name: Emmerdale, LLC
Contact Person: David K. Newsom, PE, Crystal Coast Engineering, PA Phone Number: ( 910 ) 325-0006
For projects with multiple basins, specify which basin this worksheet applies to: 2
elevations
Basin Bottom Elevation 39.00 ✓ ft. (floor of the basin)
Permanent Pool Elevation 44.00 ft. (elevation of the orifice)
Temporary Pool Elevation 44.99 v ft. (elevation of the discharge structure overflow)
areas
Permanent Pool Surface Area 5,569 ✓ sq. ft. (water surface area at the orifice elevation)
Drainage Area 2.35 ac. (on -site and off -site drainage to the basin)
Impervious Area 1.66 ac. (on -site and of drainage to the basin)
volumes
Permanent Pool Volume 13,659 cu. ft. (combined volume of main basin andforebay)
Temporary Pool Volume 6,034 / cu. ft. (volume detained above the permanent pool)
Forebay Volume 2,828 ✓ cu. ft. (approximately 20% of total volume)
Other parameters
S.41DA r 5.01 (surface area to drainage area ratio from DTVQ table)
Diameter of Orifice 1.00 in. (2 to 5 day temporary pool draly-dolvn required)
Design Rainfall 1" in.
Design TSS Removal 2 90 % (minimum 85% required)
FonnSWU-102 Rev3.99
Page I of 4
Footnotes:
1 When using the Division S,LDA
actual impervious % and permat
standard table entries.
2 In the 20 coastal counties, the ter
90% TSS removal. The NCDEl,
II. REQUIRED ITEMS
The following checklist of
(N.C. Department of Envi
Section: 15 A NCAC 2H .1
as, the correct SA,'DA ratio for permanent pool sizing should be computed based upon the
pool depth. Linear interpolation should be employed to determine the correct value for non-
-ement for a vegetative filter maybe waived if the wet detention basin is designed to provide
BNIP manual provides design tables for both 35% TSS removal and 90% TSS removal.
CKLIST
design requirements per the Stormwater Best Management Practices Manual
at, Health and Natural Resources, February 1999) and Administrative Code
Initial in the space provided to indicate the following design requirements have been met and supporting
documentation is attached. Ifithe applicant has designated an agent in the Stormwater Management Permit
Application Form, the agent may initial below. If a requirement has not been met, attach justification.
Applicants Initials
a. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet).
b. The forebay volume is approximately equal to 20% of the basin volume.
c. The temporary pool controls runoff from the design storm event.
d. The temporary pool draws down in 2 to 5 days
e. If required, a 30-foot vegetative filter is provided at the outlet (include non -erosive flow
f. The basin length to width ratio is greater than 3:1.
g. The basin'side slopes above the permanent pool.are no steeper than 3:1.
h. A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail).
i. Vegetative cover above the permanent pool elevation is specified.
j. A trash rac
k. A recorde
of -way.
1. If the basi
basin is s
in. A mechai
III. WET DETENTION
The wet detention basin
vegetated filter if one is
This system (check one) 0 d,
This system (check one) 0 d
Farm SW U-102 Rev 3.99
or similar device is provided for both the overflow and orifice.
drainage easement is provided for each basin including access to nearest right -
is used for sediment and erosion control during construction, clean out of the
prior to use as a wet detention basin.
is specified which will drain the basin for maintenance or an emergency.
OPERATION AND MAINTENANCE AGREEMENT
is defined as the wet detention basin, pretreatment including forebays and the
does not incorporate a vegetated filter at the outlet.
not incorporate pretreatment other than a forebay.
Page 2 of 4 NJ
JUN 17 2021 '
Maintenance activities shall
I. After every significant
a. Inspect the wet dete
vegetated cover, and
b. Check and clear the
2 to 5 days as desil
2. Repair eroded areas
cover to maintain a
3. Inspect and repair the
proper functioning.
as follows:
producing rainfall event and at least monthly:
basin system for sediment accumulation, erosion, trash accumulation,
:al condition.
of any obstructions such that drawdown of the temporary pool occurs within
;ly, re -seed as necessary to maintain good vegetative cover, mow vegetative
height of six inches, and remove trash as needed.
system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain
4.. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is
reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of
in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e.
stockpiling near a wet detention basin or stream, etc.).
The measuring device
depth reading and not
When the permanent pool
When the permanent pool
Sediment Removal El. 40.25
Bottom Elevation 39.00
FOREBAY
5• Remove cattails and other
plants shall be encouraged
If the basin must be draint
the emergency drain shall
to determine the sediment elevation shall be such that it will give an accurate
y penetrate into accumulated sediments.
reads 3.75 feet in the main pond, the sediment shall be removed.
reads 3.75 feet in the forebay, the sediment shall be removed.
BASIN DIAGRAM
(fill in the blanlu)
Permanent Pool Elevation 44.00
\ _ _ Sediment Removal Elevation 40.25
Bottom Elevation 39.00
MAIN POND
ligenous wetland plants when they cover 50% of the basin surface. These
grow along the vegetated shelf and forebay berm.
for an emergency or to perform maintenance, the flushing of sediment through
e minimized to the maximum extent practical.
Form SWU-102 Rev 3.99 1 Page 3 of 4
7. All components of thewe t detention basin system shall be maintained in good working order.
I acknowledge and agree by my signature below that I am responsible for the performance of the seven
maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any
changes to the system or respuasible parry.
Print name:
Street Beaufort. NC
Note: The legally rmponseble parry should not he a homeowners association unless more than 50% of the lots have been mid and a
resident of the subdivision lias been named the presid=L
County of (tMfc L.tJ
personally appeared before mi
execution of the forgoing wet
My commission
a Notary Public for the State of %d— %
_ do hereby certify that LEf� 14, r
this � day of -2L& , and acknowledge the due
letention basin maintenance requirements. Witness my hand and official seal,
FomISWU-102 Rev3.99 Page of4
Permit No. J W 5 OGO(650
(to be provided by DWO)
State of North Carolina
of Environment and Natural Resources
Division of Water Quality
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
WET DETENTION BASIN SUPPLEMENT
iThisform mqv be photocopied for use as an original
DWO Stormwater Management Plan Review:
A complete stormwater management plan submittal includes an application form, a wet detention basin
supplement for each basin dsign calculations, and plans and specifications showing all basin and outlet
structure details.
I. PROJECT
Project Name: Emmerdal
Contact Person: Da id x. No
For projects with multiple
elevations
Basin Bottom Elevation
Permanent Pool Elevation
Temporary Pool Elevation
areas
Permanent Pool Surface
Drainage Area
Impervious Area
volumes
Permanent Pool Volume
Temporary Pool Volume
Forebay Volume
Other parameters
S.4/DA t
Diameter of Orifice
Design Rainfall
Design TSS Removal z
Fonn SWU-102 Rev 3.99
CrysW Coal[ En&eedn&PA Phone Number: ( 910 ) 325-0006
specify which basin this worksheet applies to: 2
39.00 ft. (floor of the basin)
44.00 ft. (elevation of the orifice)
44.99 v ft. (elevation of the discharge structure overflow)
,569 sq. ft. (water surface area at the orifice elevation)
2.35 ac. (on -site and off -site drainage to the basin)
1.66 ac. (on -site and off -site drainage to the basin)
13,659 cu. ft. (combined volume of main basin andforebay)
6,034 cu. ft. (volume detained above the permanent pool)
2,828 ✓ cu. ft. (approximately 20% of total volume)
5.01 (surface area to drainage area ratio from DYVO table)
1.00 in. (2 to S day temporary pool draw -down required)
1" in.
90 % (minimum 85% required) •%�
Page i of 9k ✓v�r �, �4t
Foomotes:
I w"aen using the Division 5AIDA
actual impervious % and perms
standard table carries.
2 In the 20 coastal counties, the rer
9W. TSS removal. The NCDV
11. REQUIRED ITEMS
The following checklist c
(N.C. Department of Env
Section:15 A NCAC 2R .
es, the correct S,vDA ratio for pemtanent pool sizing should be computed based upon the
pool depth Linear interpolation should be employed to determine the correct value fur non-
t for a vegetative filter may be waived if the wet detention basin is designed to provide
manual provides desigm tables for both 35% TSS removal and 90% TSS removal.
design requirements per the Stormwater Best Management Practices Manual
nt, Health and Natural Resources, February 1999) and Administrative Code
Initial in the space provided to indicate the following design requirements have been met and supporting
documentation is attached. Ifithe applicant has designated an agent in the Stormwater Management Permit
Application Form, the agent may initial below. If a requirement has not been met, attach justification.
Applicants Initials
p411_/ a. The
b. The
c. The
d. The
e. If re
f. The basin
g. The basin
h. A submet
j. A trash r
k. A retort
of -way.
1. If the be
basin is
m. A meth
PL✓t1/P
M. WET DETENTION
The wet detention basin
vegetated filter if one is
This system (check one) 0
This system (check one) 0
:nt pool depth is between 3 and 6 feet (required minimum of 3 feet).
volume is approximately equal to 20% of the basin volume,
ry pool controls runoff from the design storm event.
pool draws down in 2 to 5 days.
a 30-foot vegetative filter is provided at the outlet (include non -erosive flow
to width ratio is greater than 3:1.
ride slopes above the permanent pool -are no steeper than 3:1.
ed and vegetated perimeter shelf with a slope of 6:1 or less (show detail).
cover above the permanent pool elevation is specified.
t or similar device is provided for both the overflow and orifice.
drainage easement is provided for each basin including access to nearest right -
is used for sediment and erosion control during construction, clean out of the
prior to use as a wet detention basin.
is specified which will drain the basin for maintenance or an emergency.
OPERATION AND MAINTENANCE AGREEMENT
is defined as the wet detention basin, pretreatment including forebays and the
does not incorporate a vegetated filter at the outlet.
does not incorporate pretreatment other than a forebay.
Form SwIJ-102 Rev 3.99 i Page 2 of 4
Maintenance activities shall be
1. After every significant
Inspect the wet dete
vegetated cover, and
b. Check and clear the orifi
2 to 5 days as designed.
2. Repair eroded areas
cover to maintain a
3. Inspect and repair the
proper functioning.
as follows:
producing rainfall event and at least monthly:
basin system for sediment accumulation, erosion, trash accumulation,
-ai condition.
of any obstructions such that drawdowm of the temporary pool occurs within
fly, re -seed as necessary to maintain good vegetative cover, mow vegetative
height of six inches, and remove trash as needed.
system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain
4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is
reduced to 75% of the origiinal design depth (see diagram below). Removed sediment shall be disposed of
in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e.
stockpiling near a wet detention basin or stream, etc.).
The measuring device
depth reading and not
When the permanent pool
When the permanent pool
Sediment Removal El. 38.75
Bottom Elevation 37.50
FOREBAY
5. Remove cattails and other
plants shall be encouraged
6. If the basin must be draint
the emergency drain shall
Form SwU-102 Rev 3.99
to determine the sediment elevation shall be such that it will give an accurate
ly penetrate into accumulated sediments.
reads 3.75 feet in the main pond, the sediment shall be removed.
th reads 3.75 feet in the forebay, the sediment shall be removed.
BASIN DIAGRAM
(fill in the blank:)
\ Permanent Pool Elevation 42.50
\Sediment Removal Elevation 38.75 _79//
______________ _
Bottom Elevation 37.50
MAIN POND
ligenous wetland plants when they cover 50% of the basin surface. These
grow along the vegetated shelf and forebay berm.
for an emergency or to perform maintenance, the flushing of sediment through
minimized to the maximum extent practical.
Page 3 of 4
1. All components of the wef detention basin system shall be maintained in good working order.
I acknowledge and agree by my signature below that I am responsible for the performance of the seven
maintenance procedures listedlabove. I agree to notify DWQ of any problems with the system or ptior to any
changes to the system or responsible party.
Print name:
Title: President tl FmnerdakUC
Address: 315 Turner Street
Phone: (252j 1<�24 r ,
NC 28516
Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a
resident of the subdivision h!as been named the president
County of f 0S, la A�i
personally appeared before m,
execution of the forgoing wet
'c.j1Y BU4o, /
'NOTgR Ln
A�gLI
My commission
Form SW`U-102 Rev 3.99
a Notary Public for the State
�� of�%><-�l ea areO11Ji'!
LJ
do hereby certify that Ke (�Yl cy % k1pr
this _/-)- day ofMa y � and acknowledge the due
letention basin maintenance requirements. Witness my hand and official seal,
Page 4 of 4
Permit No. SW QOQ(050
State of North Carolina Ito be prmvldod by DWD)
Department of Environment and Natural Resources
Division of Water Quality
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
WET DETENTION BASIN SUPPLEMENT
This form may be pholocopiedfor use as au original
DWO Stormwater Mana ement Plan Review:
A complete stormwater management plan submittal includes an application form, a wet detention basin
supplement for each basin, design calculations, and plans and specifications showing all basin and outlet
structure details.
I. PROJECT INFORMATION
Project Name: Emmardale, LLC
Contact Person: DRYW K Newsom PE, Qvsto Coeat p ;,F PA Phone Number: L910 l 325-0006
For projects with multiple basins, specify which basin this worksheet applies to: 2
elevations
Basin Bottom Elevation 39.00 ✓ fl
Permanent Pool Elevation 44.00 ft.
Temporary Pool Elevation 44.99 ft.
areas
Permanent Pool Surface Area 5,569 ✓ sq. fh
Drainage Area 2c35 2,t}Q ac.
Impervious Area
volumes
Permanent Pool Volume
Temporary Pool Volume
Forebay Volume
Other parameters
SAIDA i
Diameter of Orifice
Design Rainfall
Design TSS Removal z
Conn SWU-102 Rev 3.99
I'm ac.
13,659 cu fi.
6,034 : eu. ft
2,829 CU. ft.
(floor of the basin)
(elevation of the orifice)
(elevation of the discharge structure overflow)
(water surface area at the ortfice elevation)
(on -sire and off -site drainage to the basin)
(on -site and off -site drainage to the basin)
(combined volume ofmain basin andforehay)
(volume detained above the permanent pool)
(approximately 20% of total volume)
I I (surface area to drainage area ratio from DWQ table)
1.00 i11, (2 to 5 day temporary pool draw -down required)
90 % (minimum 85% required) C3 E U V F
OCT 072014
Vega I cf4 ;i l
Y;
YiJ'rC.: V6L'1] ()LJ� `-{J��LI��Nr 1�(i/S') �� NCY✓ Si)/�l�C� St�t 1=�511�1
Footnotes:
I when using the Division SA/DA tables, the correct SA/DA ratio for pemnanent pool sizing should be computed based upon the
actual impervious % and permanent poot depth. Linear interpolation should be employed to determine the correct value for non-
standard table entries.
2 In the 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide
90%'1SS removal. The NCDENR BM P manual provides design tables for both 85% TSS removal and 90% TSS removal.
11. REQUIRED ITEMS CHECKLIST
The following checklist outlines design requirements per the Stormwater Best Management Practices Manual
(N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code
Section: 15 A NCAC 2H .1008.
Initial in the space provided to indicate the following design requirements have been met and supporting
documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit
Application Form, the agent may initial below. If a requirement has not been met, attach justification.
Applicants Initials
nlOZ a. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet).
P,c4l b. The forebay volume is approximately equal to 20% of the basin volume.
11_-_)1t41 c. The temporary pool controls runoff from the design storm event.
d. The temporary pool draws down in 2 to 5 days.
e. If required, a 30-foot vegetative filter is provided at the outlet (include non -erosive flow
calculations)
f. The basin length to width ratio is greater than 3:1.
g. The basin side slopes above the permanent pool are no steeper than 3:1.
h. A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail).
i. Vegetative cover above the permanent pool elevation is specified.
j. A trash rack or similar device is provided for both the overflow and orifice.
k. A recorded drainage easement is provided for each basin including access to nearest right-
of-way.
NIV 1. If the basin is used for sediment and erosion control during construction, clean out of the
basin is specified prior to use as a wet detention basin.
/� m. A mechanism is specified which will drain the basin for maintenance or an emergency.
AIV?1/%
III. VET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT
The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the
vegetated filter if one is provided.
This system (check one) 0 does es not incorporate a vegetated filter at the outlet.
This system (check one) 0 does/0 does not incorporate pretreatment other than a forebay.
FormSWU-102 Rev3.99 Page 2of4
Maintenance activities shall be performed as follows:
After every significant runoff producing rainfall event and at least monthly:
a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation,
vegetated cover, and general condition.
b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within
2 to 5 days as designed.
Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative
cover to maintain a maximum height of six inches, and remove trash as needed.
Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain
proper functioning.
4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is
reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of
in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e.
stockpiling near a wet detention basin or stream, etc.).
The measuring device used to determine the sediment elevation shall be such that it will give an accurate
depth reading and not readily penetrate into accumulated sediments.
When the permanent pool depth reads 3.75 feet in the main pond, the sediment shall be removed.
When the permanent pool depth reads 3.75 feet in the forebay, the sediment shall be removed.
BASIN DIAGRAM
(fill in the blankc)
Permanent Pool Elevation 44.00
Sediment Removal El. 40.25
-------- Sediment Removal Elevation 40.25 75
Bottom Elevation 39.00 5% ------------------------
Bottom Elevation 39.00 25
FOREBAY MAIN POND
Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These
plants shall be encouraged to grow along the vegetated shelf and forebay berm.
If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through
the emergency drain shall be minimized to the maximum extent practical.
Form SW U-102 Rev 3.99 Page 3 of 4
7; • All components of the wet detention basin system shall be maintained in good working order.
I acknowledge and agree by my signature below that I am responsible for the performance of the seven
maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any
changes to the system or responsible party.
Print name:
Title: President . &merdale LLC
Address: 315 Turner Street Beaufort, NC 28516
Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a
resident of the subdivision has been named the president.
1, 3AL, a Notary Public for the State of461.% /t,. lei d h�
County of btJ , do hereby certify that (( )G I ko, r
personally appeared before me this � day of lX (, , and acknowledge the due
execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal,
�tttw\; u f fill,,
I ly Buz
�(JOrgRy�'�-
;Z p
=tn U13LIC .
My commission expires
Form S W U-102 Rev 3.99 Page 4 of 4
_1 5711:48a CrystafCoastEngineering 9107325-0060 p.2
� ff
ENGINEERS CERTIFICATION
June 21, 2007
J. Wayne Munden, P.E,
Technical Services Branch
Public Water Suoo1N Section
N.C. Department c
Division ofEnviro
1634 Mail Service
Raleigh, N.C. 276
Re: Emmerdale
TRACKING
Peas ID: 04-
Dear Mr. Munden:
I, David IC New
Carolina, having
hereby state that, t
observation of the
substantial comnli
NC 18148
License Number
cc: UTILITY
Environmental and Natural Resources
nental Health
# 06-01600
a, as a duly registered Professional Engineer in the State of North
en authorized to observe periodically the construction of the project
nents, for the permittee, City of Jacksonville, owner of said project,
the best of my abilities, due care and diligence was used in the
onstruction such that the construction was observed to be built within
ace e permit and the approved pl,M�,and specifications.
� A CARC)
G3 / : QP 9�•. -
�`� P SEAL -
&r Date 18148 -
zr
bp4�
JUN 17 2021
»,W
Emmerdale Apartments
Stormwater Permit No. SW8 060650
Onslow County
Designer's Certification
State Stormwater Manageme ystems
J Permit No. 8 060650
Page 1 of 2
j /j/z,.� v, , as a duly registeredRnrZ3555-,&g4L
in the State of North Carolina, having been authorized to observe (periodically/ weekly/
full time) the construction of the project,
ii i ..c i _ it ..� u. � ,� ✓i r
'.-
for E420j�/ • (Project Owner) hereby state that, to the
best of my abilities, due care and diligence was used in the observation of the project
construction such that the construction was observed to be built within substantial
compliance and intent of the approved plans and specifications.
The checklist of items on page 2 of this form is included in the Certificatipti::...,,•
Noted deviations from approved plans and specification: 4' ,, ..
= 4 r?\ `
4
SEAL''•,, ,,,.,,,,,,,,'
eZ
Signature
Registration Number
Date
✓U/v I I 1010
Page 6 of 7
State Stormwater Management Systems
Permit No. SW8 060650
Page 2 of 2
Certification Requirements:
%2j,1.
The drainage area to the system contains approximately the permitted
acreage.
The drainage area to the system contains no more than the permitted
amount of built -upon area.
;YW 3.
All the built -upon area associated with the project is graded such that the
runoff drains to the system.
All roof drains are located such that the runoff is directed into the system.
,D%bt�,5.
The outleUbypass structure elevations are per the approved plan.
Z/66.
The outlet structure is located per the approved plans.
&U✓7.
Trash rack is provided on the outlet/bypass structure.
/
All slopes are grassed with permanent vegetation.C/_ece✓iy� j l�raflef/l/g
r,) i9.
Vegetated slopes are no steeper than 3:1.
/f1�10.
The inlets are located per the approved plans and do not cause short-
circuiting of the system.
,,Prt4111.
The permitted amounts of surface area and/or volume have been
provided.
Q/vl12. Required drawdown devices are correctly sized per the approved plans.
47/4/13. All required design depths are provided
�14. All required parts of the system are provided, such as a vegetated shelf,
and a forebay.
IDV15. The required system dimensions are provided per the approved plans.
cc: NCDENR-DWQ Regional Office
Mike Morris, Onslow County Building Inspections
PrT ���E �rivn� �q Cyr 'iYr !`i,17 9,d
Page 7 of 7
3817-3 Freedom Way f4
Hubert, N.C. 28539 �9
Tel: (910) 325-0006 i
Fax: (910) 325-0060
I
7b: NCDENR
Division of Water Quality
127 Cardinal Dr Ext
Wilmington, NC 28405
ift Emmerdale Apartments
Permit No. SW8 060650
From: David K. Newsom, P.E. /ads
Date: June ll, 2010
❑ Urgent ❑ For Review ❑ Please Comment ❑ Please Reply ❑ Please Recycle
Attached:
One (1) original Pond Certification for the above referenced project.
Comments:
xC: Mr. John Pieroe, P.L.S. (w/enclosure)
File