Loading...
HomeMy WebLinkAboutSW8060238_HISTORICAL FILE_20141209STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SWS Uto 023�f DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS It HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 20IN 12U c YYYYMMDD i NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor December 9, 2014 Mr. Andrew Sandman, Manager Maco Road Partners, LLC 7101 Creedmoor Rd, Suite 122 Raleigh, NC 27613 Subject: Permit Modification and Permit Extension State Stormwater Management Permit No. SW8 060238 Grayson Park Phase I High Density Subdivision Wet Pond Project Brunswick County Dear Mr. Sandman: John E. Skvarla, III Secretary Effective August 1, 2013 the State Stormwater program has been transferred from the Division of Water Quality (DWQ) to the Division of Energy, Mineral and Land Resources (DEMLR). All previous references to DWQ will remain in older stormwater permits issued prior to August 1, 2013 until they are modified. Please note that any updated pages or addendums to the permit will now reference DEMLR as the Division responsible for issuance of the permit. Modification: The Wilmington Regional Office received a complete, modified State Stormwater Management Permit Application for Grayson Park Phase I on November 25, 2014. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Session Law 2008-211 and Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 06238 dated December 9, 2014, for the construction, operation and maintenance of the EIMP's and built -upon area associated with the subject project. The following modifications are included and covered by this permit: 1. Pond 1: The previously permitted impervious area increased. Pond design changes were not required to accommodate the increase in impervious. This pond's data has also been corrected to clarify data previously permitted. The previous version did not specify that this pond had offsite drainage area though offsite impervious area was specified. The offsite drainage area is now shown. 2. Pond 7: This pond was added to the permit. 3. Lots: The numbers of lots and their respective impervious area per lot values have been changed. 4. Other: An amenity pond was added to the permit, Pond 8, but this pond is not permitted under State Stormwater. 5. Plan Set: The following plan sheets make up the full permitted set. Please replace Sheet SW-1 approved 12/1/11 with the version approved on 12/8/14. a. Approved 12/8/14: Cover sheet, 1-1, C-1, SD-1, SD-2, P-1, P-2, SE-1, D-1, D-3, SW- 1 b. Approved 12/1/11: SW-2, SW-3, SW-4 Permit Extension: On August 5, 2009, the Governor signed Session Law 2009-406. This law impacts any development approval issued by the Division of Energy, Mineral and Land Resources under Article 21 of Chapter 143 of the General Statutes, which is current and valid at any point between January 1, 2008, and December 31, 2010. The law extends the effective period of any stormwater permit that was set to expire during this time frame up to three (3) years from its current expiration date. On August 2, 2010, the Governor signed Session Law 2010-177, which granted an extra year for an extension of up to four (4) years. Division of Energy, Mineral, and Land Resources Land Quality Section — Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 • (910) 796-7215 / Fax: (910) 350-2004 SW8 060238 December9, 2014 This permit shall be effective from the date of issuance until September 21, 2020, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed restrictions, procedures for changing ownership, transferring the permit, and renewing the permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions, to transfer the permit, or to renew the permit, will result in future compliance problems. r If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes, and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919- 431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Kelly Johnson in the Wilmington Regional Office, at (910) 796-7215. Sincerely, i 9m Tracy Davis, P.E., Director Division of Energy, Mineral and Land Resources GDS/kpj: %Stormwater\Permits & Projects\2006\060238 HD\2014 12 permit 060238 cc: Elizabeth Nelson, PE, Cape Fear Engineering Inspector, Brunswick County Inspections Brunswick County Engineering Division of Coastal Management Wilmington Regional Office Stormwater File Page 2 of 2 r i State Stormwater Management Systems Permit No. SW8 060238 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY SUBDIVISION DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Maco Road Partners, LLC Grayson Park Phase 1 Grayson Parkway, Leland, Brunswick County FOR THE construction, operation and maintenance of five (5) wet detention ponds in compliance with the provisions of 15A NCAC 2H .1000, effective September 1, 1995 (Ponds 4, 5, and 6) and October 1, 2008 (Pond 7 and a portion of Pond 1, see Section 15), hereafter referred to as the "stormwater rules" and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Energy, Mineral and Land Resources and considered a part of this permit. This permit shall be effective from the date of issuance until September 21, 2020 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.5 on of this permit. The subdivision is permitted for the following built -upon area: (Phase 1A) Lots 1 through 59, each allowed 3,500 square feet; (Phase 1 B) Lots 58 through 95, each allowed 3,000 square feet; (Phase 1A&B) 60 multi -family units with a building footprint of 2,160 square feet each; (Phase 1 C) Lots 1 through 90 each allowed 3,000 square feet, and (Phase 1A/1B multifamily) 60 units each allowed 2,160 square feet. 3. The runoff from all built -upon area within the permitted drainage areas of this project must be directed into the permitted stormwater control system. 4. The tract will be limited to a maximum of 1,332,757 square feet of built -upon area. The wet ponds designated as pond #1, #4, #5, #6, and #7 have been designed to treat the runoff from 465,462; 221,407; 334,311; 152,842 and 158,735 square feet of Built -Upon Area, respectively. Page 3 of 10 State Stormwater Management Systems Permit No. SW8 060238 5. The following design elements have been permitted for this wet detention pond stormwater facility, and must be provided in the system at all times. a. Drainage Area, acres: Onsite, ft2 Offsite, ftZ b. Total Impervious Surfaces, ftZ Design Storm', 1.0 inches, ftZ Design Storm2, 1.5 inches, ftZ c. Pond Depth, feet d. TSS removal efficiency e. Permanent Pool Elev., FMSL f. Perm. Pool Surface Area, ftZ g. Permitted Storage Volume, ft3 h. Temporary Storage Elev., FMSL i. Controlling Orifice, "0 pipe j. Permitted Forebay Volume, ft3 k. Receiving Stream/River Basin I. Stream Index Number m. Classification of Water Body n. Max. horsepower for a fountain Pond #1 Pond #4 Pond #5 Pond #6 Pond #7 40.11 19.07 23.10 9.40 9.12 1,245,196 830,689 1,003,622 409,464 397,140 501,996 None None None None 465,462 221,407 334,311 152,842 158,735 456,462 221,407 334,311 152,842 0 9,000 0 0 0 158,735 7.5 6.0 6.0 7.0 4.0 90% 90% 90% 90% 90% 50.00 57.00 62.00 53.00 65.50 49,482 10,972 15,150 9,028 24,487 46,338 15,991 32,579 14,014 43,219 50.90 58.20 63.80 54.40 67.00 3.00 2.00 2.00 1.50 2.00 9,429 4,974 8,615 3,771 22,166 Bishop Branch / Cape Fear 18-81-7-1 C; Sw 3/4 1/8 1/6 1/8 1/3 'Impervious Area Permitted per 15A NCAC 2H .1008, effective 9/1/95 2Impervious Area Permitted per 15A NCAC 2H .1008, effective 10/1/08 II. SCHEDULE OF COMPLIANCE 1. No homeowner/lot owner/developer shall fill in, alter, or pipe any drainage feature (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. 2. The permittee is responsible for verifying that the proposed built -upon area for the entire lot does not exceed the maximum allowed by this permit. Once the lot transfer is complete, the built -upon area may not be revised without approval from the Division of Energy, Mineral and Land Resources, and responsibility for meeting the built -upon area limit is transferred to the individual property owner. 3. If an Architectural Review Board or Committee is required to review plans for compliance with the BUA limit, the plans reviewed must include all proposed built -upon area. Any approvals given by the Board do not relieve the homeowner of the responsibility to maintain compliance with the permitted BUA limit. 4. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. Page 4 of 10 State Stormwater Management Systems Permit No. SW8 060238 5. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 6. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modificatidn to the approved plans, including, but not limited to, those listed below: a. Any revision to the approved plans, regardless of size. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area. e. Further development, subdivision, acquisition, or sale of any, all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 7. The Director may determine that other revisions to the project should require a modification to the permit. 8. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 9. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 10. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 11. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 12. Permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 13. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of structures, orifice, catch basins and piping. g. Access to all components of the system must be available at all times. Page 5 of 10 State Stormwater Management Systems Permit No. SW8 060238 14. Records of maintenance activities must be kept and made available upon request to authorized personnel of DEMLR. The records will indicate the date, activity, name of person performing the work and what actions were taken. 15. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 16. Prior to the sale of any lot, the following deed restrictions must be recorded: a. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW8 060238, as issued by the Division of Energy, Mineral and Land Resources under NCAC 2H.1000. b. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the Stormwater Management Permit. C. These covenants are to run with the land and be binding on all persons and parties claiming under them. d. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Energy, Mineral and Land Resources. e. Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the Division of Energy, Mineral and Land Resources. f. The maximum built -upon area per lot for the subdivision is as follows. (Phase 1A) Lots 1 through 59, each allowed 3,500 square feet; (Phase 1B) Lots 58 through 95, each allowed 3,000 square feet; (Phase 1A&B) 60 multi -family units with a building footprint of 2,160 square feet each; (Phase 1C) Lots 1 through 90 each allowed 3,000 square feet, and (Phase 1A/1 B multifamily) 60 units each allowed 2,160 square feet. This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. g. All runoff on the lot must drain into the permitted system. This may be accomplished through providing roof drain gutters, which drain to the street, grading the lot to drain toward the street, or grading perimeter swales and directing them into the pond or street. Lots that will naturally drain into the system are not required to provide these measures. h. Built -upon area in excess of the permitted amount will require a permit modification. 17. A copy of the recorded deed restrictions must be submitted to the Division within 30 days of the date of recording the plat, and prior to selling lots. The recorded copy must contain all of the statements above, the signature of the Permittee, the deed book number and page, and the stamp/signature of the Register of Deeds. 18. Prior to transfer of the permit, the stormwater facilities will be inspected by DEMLR personnel. The facility must be in compliance with all permit conditions. Any items not in compliance must be repaired or replaced to design condition prior to the transfer. Records of maintenance activities performed to date will be required. Page 6 of 10 State Stormwater Management Systems Permit No. SW8 060238 19. Decorative spray fountains will be allowed in the stormwater treatment system, subject to the following criteria: a. The fountain must draw its water from less than 2' below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. C. The falling water from the fountain must be centered in the pond, away frorr the shoreline. d. The maximum horsepower for the fountain's pump is based on the permanent pool volume. The maximum pump horsepower for a fountain in Pond #1 is 3/4, Ponds #4 & 6 is 1/8, Pond #5 is 1/6 and Pond #7 is 1/3. III. GENERAL CONDITIONS This permit is not transferable to any person or entity except after notice to and approval by the Director. In the event there is either a desire for the facilities to change ownership, or there is a name change of the Permittee, a completed "Name/Ownership Change Form" must be submitted to the Division of Energy, Mineral and Land Resources, signed by the parties involved, along with the appropriate documentation as listed on page 2 of the form. The project must be in good standing with DEMLR. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all of the terms and conditions of this permit until such time as the Director approves the transfer request. Neither the sale of the project nor the transfer of common area to a third party constitutes legal transfer of the stormwater permit. 3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 4. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Energy, Mineral and Land Resources, in accordance with North Carolina General Statute 143- 215.6A to 143-215.6C. 5. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal), which have jurisdiction. 6. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 7. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. The Permittee grants permission to staff of the DEMLR to access the property for the purposes of inspecting the stormwater facilities during normal business hours. 9. The permittee shall notify the Division in writing of any name, ownership or mailing address changes at least 30 days prior to making such changes. Page 7 of 10 State Stormwater Management Systems Permit No. SW8 060238 10. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from- the date of the completion of construction. 11. If the use of permeable pavement is desired, this permit must be modified to add the permeable pavement conditions. 12. The permittee shall submit a permit renewal application request at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate documentation and the processing fee. Permit modified and reissued this the gth day of December 2014. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION 1 racy Davis, H.E., Director Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Page 8 of 10 State Stormwater Management Systems Permit No. SW8 060238 Grayson Park Phase 1 Stormwater Permit No. SW8 060238 Brunswick County Designer's Certification Page 1 of 2 I, , as a duly registered. in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is a part of this Certification. Noted deviations from approved plans and specifications: Signature Registration Number Date SEAL Page 9 of 10 State Stormwater Management Systems Permit No. SW8 060238 Certification Requirements: Page 2 of 2 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, a forebay, and the vegetated filter. 15. The required dimensions of the system are provided, per the approved plan. cc: NCDENR-DEMLR Regional Office Brunswick County Building Inspections Page 10 of 10 DEMLR USE ONLY D to Rgceived Fee Paid Permit Number Applicable Rules: ❑ Coastal SW -1995 ❑ Coastal SW - 2008 ❑ Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ M mt Plan: State of North Carolina Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original ® I. GENERAL INFORMATION EC E I tlsC fC 1. Project Name (subdivision, facility, or establishment name -should be consistent '- l trin26%pl specifications, letters, operation and maintenance agreements, etc.): U, 2. Location of Project (street address): Intersection of Grayson Parkway and NC Hwy 87 (Maco Road) City: Leland County: Brunswick Zip: 28451 3. Directions to project (from nearest major intersection): Traveling south on US Hwy-17, turn right onto NC Hwy-87. Travel on Hwy-87 approximately 1.3 miles. Project is on the left at the intersection of NC-87 and Grayson Parkway. 4. Latitude: 34' 12' 00" N Longitude: 78' 05' 16" W of the main entrance to the project. II. PERMIT INFORMATION 1. a. Specify whether project is (check one): []New ®Modification ❑ Renewal w/ Modificationt tRenewals with modifications also requires SWU-102 - Renewal Application Form b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit number SW8 060238 , its issue date (if known) 9/21/2006 and the status of construction: ❑Not Started ®Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DEMLR requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ❑NPDES Industrial Stormwater ®Sedimentation/Erosion Control: 74.7 ac of Disturbed Area 0404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number issue date and the type of each permit: 5. Is the project located within 5 miles of a public airport? ®No ❑Ye If yes, see S.L. 2012-200, Part Vl: http://portal.ncdenr.org/web/Ir/rules-and-regulations Fonn S WU-101 Version Oct. 31, 2013 Page 1 of 6 Ill. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc, who owns the project): Applicant/ Organization: Maco Road Partners, LLC Signing Official & Title:Andrew Sandman, Member/ Manager b. Contact information for person listed in item I a above: Street Address: 7101 Creedmoor Road, Suite 122 City: Raleigh State:NC Zip:27613 Mailing Address (if applicable): 7101 Creedmoor Road, Suite 122 City: Raleigh State:NC Zip:27613 Phone: (910 ) 845-6688 Email: asandlaw@bellsouth.net Fax: (910 ) 297-5397 c. Please check the appropriate box. The applicant listed above is: EC EBVE ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Informati itetg ,loU ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Con ta ormation, item 2a 2b below) BY' ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Signing Official & Title: b.Contact information for person listed in item 2a above: Street Address: City: State: Zip: Mailing Address (if applicable): City: State: Zip: Phone: ( ) Fax: ( ) 3. a. (Optional) Print the name and title of another contact such as the projects construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: Signing Official & b.Contact information for person listed in item 3a above: Mailing City: State: Zip: Phone: ( ) Fax: ( ) Email: 4. Local jurisdiction for building permits: Point of Phone #: FormSWU-101 Version Oct. 31,2013 Page 2of6 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Stormwater will be treated in wet detention basins. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ® Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ® Coastal SW -1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the Cape Fear River basin. 4. Total Property Area: 143.19 acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area': 143.19 acres Total project area shall be calculated to exclude the following the normal pool of im ounded strictures, the area between the banks of streams and rivers, the area below the Normal High Water (NM line or Mean High Water (MHW) line, and coastal wetlands landward from the NHW (or MHM line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or MHW) line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 21.4 % 9. How many drainage areas does the project have?5 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drains a Area _ Drains a Area _ Drainage Area _ Area _ Receiving Stream Name SEE ATTACHED -Drainage Stream Class Stream Index Number * S C Total Drainage Area (sf) On -site Drainage Area (sf) Off -site Drainage Area (sf) Pro osed Impervious Area`* s — �— Im ervious Area** total Impervious- Surface Area Drainage Area _ Drainage Area _ Drainage Area _ Drainage Area _ On -site Buildings/Lots (so On -site Streets (so On -site Parking (so On -site Sidewalks (so Other on -site (so Future (so Off -site (so Existing BUA*** (so Total (so: Stream Class and Index Number can be determined at: http.Vlportal.rtcdenr.orgfwebfwq/ps/esu/classifications Impewrvious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidealks, gravel areas, etc. Form SWU-101 Version Oct. 31, 2013 Page 3 of 6 10. Complete the following information for each drainagearea identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Area 1 (Pond 1)* Area 2 (Pond 4) Receiving Stream Name Bishop's Branch Bishop's Branch Receiving Stream Class/ Index No. C;Sw (18-87-7-1) C;Sw (18-81-7-1) Total Drainage Basin Area (sf) 1,747,192 830,689 On -Site Drainage Area (sf) 1,245,196 830,689 Off -Site Drainage Area (sf) 501,996 0 Existing Impervious* Area (sf) 17,424 0 Proposed Impervious* Area (sf) 465,462 221,407 % Impervious* Area (total) 27% 27% Impervious* Surface Area Area 1 (Pond 1) Area 2 (Pond 4) On -Site Buildings (sf) 315,180 172,620 On -Site Streets (sf) 101,495 43,124 On -Site Parking (sf) 0 0 On -Site Sidewalks (sf) 31,363 5,663 Other On -Site (sf) 0 0 Off -Site (sf) 17,424 0 Total (sf) 465,462 221,407 Basin Information Area 3 (Pond 5) Area 4 (Pond 6) Receiving Stream Name Bishop's Branch Bishop's Branch Receiving Stream Class/ Index No. C;Sw (18-87-7-1) C;Sw (18-87-7-1) Total Drainage Basin Area (sf) 1,003,622 409,464 On -Site Drainage Area (sf) 1,003,622 409,464 Off -Site Drainage Area (sf) 0 0 Existing Impervious* Area (sf) 0 0 Proposed Impervious* Area (sf) 334,310 152,842 Impervious* Area (total) 33% 37% Impervious* Surface Area Area 3 (Pond 5) Area 4 (Pond 6) On -Site Buildings (sf) 144,480 71,820 On -Site Streets (sf) 103,004 57,935 On -Site Parking (sf) 0 0 On -Site Sidewalks (sf) 20,876 23,087 Other On -Site (sf) 65,950 0 Off -Site (sf) 0 0 Total (sf) 4at3+B. 33Lt,,w 1 152,842 *NOTE: Pond k1 includes drainage area and impervious area draining through amenity Pond N2 and Pond U. �, �ti\ally CEUV1FI* a NOV 2 5 2014 Basin Information Area 5 (Pond 7) •* Receiving Stream Name Bishop's Branch Receiving Stream Class/ Index No. C; Sw (18-87-7-1) Total Drainage Basin Area (sf) 397,140 On -Site Drainage Area (sf) 397,140 Off -Site Drainage Area (sf) 0 Existing Impervious* Area (sf) 0 Proposed Impervious* Area (sf) 158,735 %Impervious* Area (total) 40% Impervious* Surface Area Area 5 (Pond 7) On -Site Buildings (sf) 108,000 On -Site Streets (sf) 28,750 On -Site Parking (sf) 0 On -Site Sidewalks (sf) 3,485 Other On -Site (sf) 18,500 Off -Site (sf) 0 Total (sf) 158,735 "NOTE: Pond #7 includes drainage area and impervious area draining through amenity pond #8. ECElvo- OCT 13 2014 'Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and which will be replaced by new B UA. 11. How was the off -site impervious area listed above determined? Provide documentation. Brunswick County GIS Aerial Photography Projects in Union County: Contact DEMLR Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements as per 15A NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http://portal.ncdenr.org/web/wq/ws/su/bmp-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Energy, Mineral and Land Resources (DEMLR). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms does. The complete application package should be submitted to the appropriate DEMLR Office. (The appropriate office may be found by locating project on the interactive online map athtW://portal.ncdenr.org/web/wq/ws/su/­maRs.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from hU://portal.ncdenr.org/web/wq/ws/su/statesw/formssddoocs. I---� 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions &Protective Covenants Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP. ' 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to http://www.envhelp.org/pages/onestopexpress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/managementfor the project. This is required in addition to the brief summary provided in the Project Information, item 1. J 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the mile radius on the map. 7. Sealed, signed and dated calculations (one copy). 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. rah EC E U 9Y FC E f. Scale. 11 g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevatio f OCT 13 20% impounded structures, the banks of streams and rivers, the MHW or NHW lin f tidal waters, and any coastal wetlands landward of the MHW or NHW lines. �BY. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of Toads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. Form SWU-101 Version Oct. 31, 2013 Page 4 of 6 n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"xll" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DEMLR to verify the SHWT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: 2158 Page No: 751 PR6J 5�sml tEo 11. For corporations and Limited liability corporations (LLC): Provide documentation from the NC Q�Q:• 4UBWtTED Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per 15A NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. hqp://www.secretary.state.nc.us/Corporations/CSearch.aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from httl2:Hl2ortal.ncdenr.org/web/ir/state-stormwater- forms does. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DEMLR, and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer: Elizabeth M Nelson, PE Consulting Firm: Cape Fear Engineering, Inc. Mailing Address: 151 Poole Road, Suite 100 City: Belville State:NC Zip: 28451 Phone: (910 ) 383-1044 Fax: (910 1 383-1045 Email:_ elizabeth.nelson@capefearengineerine.com IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or type name of person listed in Contact Information, item 2a) certify that I own the property identified in this permit application, and thus give permission to (print or hype name of person listed in Contact Information, item la) with (print or type name of organization listed in Contact Information, item la) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. RECEIVER I OCT 13 2014 BY: Form SWU-101 Version Oct. 31, 2013 Page 5 of 6 As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DEMLR Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DEMLR immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. a Notary Public for the State of do hereby certify that before me this _ day of Date: County of personally appeared and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission X. APPLICANT'S CERTIFICATION 1, (print or hjpe name of person listed in Contact Infonuntion, item la) Andreeo Sandman certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater rules under 15A NCAC 2H .1000 and any other applicable state stormwater requirements - Signature: Signature: zr V Date: 1 `, /�t.t.�rcL AA. JohnScn a Notary Public for the State of NO"&OtIYtf� , County of Y V 00�4-,-_ � , do hereby certify that N�r-C - �mO- -� personally appeared before me this Gil�- clay of,,0X-LAPm Eo r2014,and ack/i wledge the due execupon�of the application for a stormwater permit. Witness my hand and official seal,Q-C..(_r/L `%'YL S,..QV7,755iD� SEAL My commission ij-Z-1-1 ECEIVE OCT 13 2014 Form SWU-101 Version Oct. 31, 2013 Page 6 of 6 �? ' ,: J`' vl, _: �:_ General Data: Impervious, Drainage Area and Volume PROJECT NUMBER: SWO 060238 ' Reviewer: glohnson DRAINAGE BASIN: lCape Fear Current Date 9-Dec-14 Original Run Date: 6-Nov-14 DA Number 1 7 BMP Type wet Pond WO Poi No BMP In 0 No BMP In 0A No BMP In 0 No BMP In 4 No BMPIn p No BMP In p No BMP In No BMP In A Receiving Stream B.P.Brsn.P. Brancn 8ranU Stream Index maz]a to-ezat Class C:SW C;SW MemCd used to determine tonsured volume? simpb simPe Proaae Selen Reave SeIM Prone Seletl PkMe Selen Pi BoiMt PIeLe Bele{3 Reate Seletl Revu SeIM Simple Method, Design Storm, P,i in: ChNI d Proletl is Suo,i to SA - NEEDED FOR BOTH SIMPLE pun BCS SA CALCs) Simple Method, Design Storm of Old Rule, in: Enter it Pert of Pro ed is PermittM UMer an OM Rule Such as 1 Y, if not leave dank 1.0 SCS Discrete (TR-55) Method, Design Storm, Value of Post m: (Enter the Value of Pm it NonSAor P,pu, if SA) Prge Is Sidled to SA? N N Rene BNM M. Selent Ream Beled in. Sel. Plewe select efereSel. Peeve get. Pv. se. Volume That is Required, it": (Volume hcm either the Bimpe MCNNatM SCS MCOW II dZ.546 28.3{B Sim le Method Valume Summit : 42,546 20,3402008 Simple Method 8 SA tall 2008 Rule, Greater of 1.For 1 24hr re/ st OldSimple Method 8 rwnSA Rule, 1.5" Old Rule, 1.0'SCS Discrete (TR-55) Volume Summary: If m.sse usesd dndrotuptoa6 ntiwa iNthatvolumet0anOMMeMIw19MMIt Mee not make ranee b comdne (hevalume calcula0one that wit SCS Discrete (TR-55) 8 SA 2W8 Rule, Greater of 1.5"or124hr pridi SCS Discrete TR-55 8 non -SA IM22NIOUS Area Proposed Impervious (ALL IMPERVIOUS), Total, fl: 165.462 158,735 0 0 0 0 0 0 01 0 Onsite Buildings 315180 10800D Onsite Streets 101,49 28 ]50 Onsite Pai i 0 D Onsite Sidewalks 31363 3,485 Onste Other 0 18 500 Future 0 0 Ofite 17.424 0 E.ifumq 0 0 Previous -Permitted Impervious, Old Rule, e: 4W.,152 0 0 0 0 0 0 0 0 0 Orion, Buildings Onsue Streets Chatter Perkin Onsite Sidewalks Corte Other 456 462 Future Offal. Exisen Proposed Impervious, Sublet to 200811"1 Rule, flT: 9,1300 158,735 0 0 0 0 01 0 0 0 Drainage Area: Needed For Both Simple and SCS Discrete Drainage Area, Total, : 1747.192 397,140 Onsite, flT: 1,747,192 397,140 ORsite, k : 0 0 Previous) -Permitted Drainage Are6.Old Rule, fl: 1.747.192 0 0 0 0 0 0 0 0 0 Onste,f : 1,747.192 0 Offsite, k : 0 0 Proposed DA (Being Added By Arad), fl : 0 397.140 Drainage Area, Subject to Old Rule, if' 1.738,192 0 0 0 0 0 0 0 0 0 Drainage Area, Subject to New Rule. flit: 9,000 397,140 Valume Re aired: Slm la Method Data --' Volume Required, Old Rule, flit. 41,47701 01 0 0 0 0 0 0 C RVP,d � .Old Rule: 029 Volume Requirei 2W8 Rule, fta: 1,069 20,340 RvP„ d„mr„sa, 2008 Rule: (Enter 005 d no geEevebpnem BUA) 0.05 RvPod e..aew,me 2008 Rule: 0.95 0.41 Volume Required, r. flit: 1,069 20.340 0 0 0 0 0 0 0 0 Volume Required,Ma W. 0 0 0 0 0 0 0 0 0 0 Volume Calculations - Page 1/3 Wet Ponds PROJECT NUMBER: SW8 060238 Reviewer: K Johnson DRAINAGE BASIN: Ca Fear Current Date 9-De 14 Original Run Date: 6-Nov-14 DA Number 1 7 BMP Type Wet Pond Wet Pond No BMP In DA No BMP in DA No BMP In DA No BMP In DA No BMP In DA Ne BMP in DA No BMP in DA No BMP in DA Minimum Surface Area No Pond Design 39.97% %impervious Lower Impervious 30.0% Upper Impervious Changes. New BUA fits in Previously Permitted Pond. 40.0% TSS 85 or 90 : 90 Lower SA/DA 2.7 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Upper SAIDA 3.5 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #NIA SAIDA ratio 3.5 #N/A #N/A MAJ #N/A MAI #N/A #N/A #N/A PP Surface Area req, ft': 13, 990 #NIA #N/A #N/A #N/A #N/A #N/A #NIA #N/A Storage Calculations 59.00 Elevation, Bottom of Sediment excavated de th,fmsl: Elevation, Top of Sediment bottom pond/designed bottom ,fmsl: 60.00 Elevation, Bottom of shelf, fmsl: 65.00 Elevation, Permanent Pool, fmsl: 65.50 Elevation. Top of Shelf, fmsl: 66.00 Elevation, Temp. Pool, fmsl: 67.00 Area, Top of Sediment bottom pondidesigned bottom), ft2: 9,733 Area, Bottom of Shelf, W: 20,858 Area, Perm Pool, ft2: 24,487 Area, Top of Shelf, ft2: 28,327 Area, Tem .Pool, ft2: 31,703 Volume Provided(Temp Pool), DWQ Calculated, it': 0 43,219 0 0 0 0 0 0 0 0 Volume Provided (Temp Pool), Provided per Consultart, ft': 43,219 Volume Required (Temp Poop, DM Calwlared, fta: 42.546 20,340 Consultant Provided Enough Volume? Y Averse Depth Option 1 or Option 2 Enter 1 or 2? 2 Averse Depth Provided, it: 4.0 Averse Depth - OPTION 1 -, DWQ Calculated, ft: 3.59 Average Depth - OPTION 2 -, DWQ Calculated, ft: 4.00 Foreba Volume 0 87,814 0 0 0 0 0 0 0 0 Permanent Pool Volume, ft': Foreba Volume, Required, ft': 0 17.563 0 0 0 0 0 0 0 0 Foreba Volume, Provided, ft3: 22,166 Percent of Permanent Pool (18-22% is Target): 25% Drawdown Av era a Head, ft: 0.00 0.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Average Flow Q2, ft'/sec: 0.246 0.118 Average Flow Qs, ft3/sec: 0.098 0.047 Q2 Area, in 2: #DIV/01 5,123 Q, Area, in 2: #DIV/01 2.049 No. of Onfces 1 Onfice Diameter, in: 2.00 Onfice Area, in2: 0.000 3.142 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Weir enter Y or N ? Weir Height, in: Weir Length, in: Weir C: Weir L, Effective Length, ft: 0.000 -0.094 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Average Orifice Flowrate, DWO Calc (Guwc) ft3/sec: 0,000 0.072 0.000 1 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Average Onfice Flowmte, Reported (Qn,pm,d) ft3/sec: 0.040 Average Onfice Flowrate is Adequate? Y Runoff Coefficient Cc: 0.250 0.250 0.250 0.250 0.250 0.250 0.250 0.250 0.250 0.250 1 yr 24 hr rainfall depth, in: 3.80 1 yr 24 hr Intensity (1) in/hr: 0,000 0.158 0.000 0.000 0.000 0,000 0.000 0.000 0.000 0.000 1 yr 24 hr Pre -Development (0), ft'/sec: 0.361 Avg. Orifice flow<Pre Q? OK Drawdown, days: 3.26 Soils Report Data Ground Elevation at Boring in Soils Report fmsl: 66.22 Distance Ground to SHWr ear Soils Report, in: 26.04 Distance Ground to SHWr per Soils Report, ft 0.00 2A7 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0,00 SHWT Elevation, DWO Calculated, fmsl: 0.00 64.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 SHWr Elevation, Reported b Consultant, fmsl: 6445 Distance SHWr to PP, ft: Design OK if. 0<= Value <= 0.5 0.00 -1.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Permanent Pool Elevation, fmsl: 0.00 65.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Pump Max HP: N/A 1/3 N/A N/A N/A N/A NIA N/A N/A N/A 75wut umc�- AN:"^� b1 QQ ekes e('o) bQ- Bot Pond Bot Shelf PP Top Shelf TP Wet Pond #7 Basin Contour El (ft) SA (sf) Inc Vol (cf) Cum Vol (cf) 60.00 9,733 0 0 61.00 11,491 10,612 10,612 62.00 13,421 12,456 23,068 63.00 15,532 14,477 37,545 64.00 17,936 16,734 54,279 65.00 20,858 19,397 73,676 65.50 24,487 11,336 85,012 66.00 28,327 13,204 98,215 67.00 31,703 30,015 128,230 68.001 35,1711 33,4371 161,667 PP Vol: 85,012 cf TP Vol: 43,219 cf CAPEFEAR EN61N.E.ERING- 151 Poole Road, Suite 100 Belville, NC 28451 TEL (910) 383-1044 FAX (910) 383-1045 www.capefearengineering.com To: I NCDENR- Stormwater Johnson Transmittal 25, 2014 File: 820-01 C Section 3 "36" Subject: Grayson Park Stormwater Revision SW8 060238 Additional information for 1 C Section 3 ❑ As Requested ❑ For Your Files ❑ For Distribution ® For your Review / Action / Approval ❑ Sent via Mail ❑ Sent via Courier Quantity Drawing No. Description 1 Original Response Letter 1 Original Pond #1 — Calculations for additional BUA @ 1.5" 1 Copy Pond #1 — Previously permitted calculations @ 1.0" for reference 1 Original Pond #7 — Revised calculations for 1.5" 1 Copy Revised Pond #7 Wet Detention Basin Supplement 1 Copy Revised Basin Information attachment for Pond #1 3 Copies Design Plan Sheet P-2, revised (2 Full Size 24" x 36", 1 Half Size 11" x 17") REMARKS Delivery by hand. CC: File 820-01C Section 3 "36" (File 820-01 "36") NOV 2 5 2014 Cape Fear Engineering, Inc. Signed:% °nt lizabeth M. Nelson, PE Received By: Date: P1820%820-01C Section 31ADMIMSTORMWATERp014-11-25 SW TransmWaLdoc iU CAPE FEAR'"'' ENGINEERING November 25, 2014 Kelly Johnson, Environmental Engineer NCDENR, Division of Energy, Mineral, and Land Resources 127 Cardinal Drive Extension Wilmington, NC 28405 RE: Additional Information Stormwater Project No. SW8 060238 Grayson Park Phase I Brunswick County Dear Kelly, In response to your request for additional information, dated November 6, 2014, please find the following information: 1. New impervious areas are required to be treated at 1.5" a. Design Storm, Pond 1: Calculations have been revised to reflect treatment of 1.5" of runoff for the additional 9,000 SF of impervious area proposed. The permitted calculations for Pond 1 for the existing BUA at 1.0" have also been enclosed for your reference. b. Design Storm, Pond 7: Calculations have been revised for 1.5" of runoff. In addition, revised Wet Basin Supplement for Pond #7 and Revised Plan Sheet P-2 is enclosed. 2. Pond 1, Clarification: The 17,424 sf of impervious area is offsite. The error is that the original application should have listed a portion of the drainage area as offsite. Attached for your referenced is a revised and corrected drainage area supplement. Please see Sheet SW-1 that shows the drainage area, and shows the portion of offsite. 3. Plan Set: All new sheets submitted (with the exception of D-2 reduced) are to be included in the plan set, as they provide the necessary details for Section I and Pond #7. Please replace the previously permitted SW-1 with the revised SW-1 that was submitted on 10/13/14. This revised SW-1 reflects the drainage areas for all ponds, including the 2 new lots added to DAl. Please maintain previously permitted sheets SW-2, SW-3 and SW-4, as they provide the details for the existing permitted ponds. Please let me know if you need any additional information. Sincerely, EJabeth M. Nelson, PE File: 820-01 "36" 'ECEUVE NOV 2 5 2014 BY: 151 Poole Food, Suite 100 • Selviile, NC 28451 • TEL: (910)383-1044 • FAX (910)383- 1045 www. cop efeore ng in ee ring. com s WET DETENTION DA51N DATA SHEET GRAY5ON PARK - PHA5E I POND # I -ADDITIONAL BUA @ 1 .5" ADDITIONAL IMPERVIOUS AREA (Ai): BUILDING5: 9,000 5P 0.21 ACRES TOTAL: 0.21 ACRES MINIMUM REQUIRED VOLUME (SIMPLE METHOD BY TOM 5CHUELER): EXI5TING VOLUME REQUIRED @ I" = SEE PERMITTED POND #I CALC5 = 41,521 FT^3 NEW VOLUME REQUIRED @ 1 .5" = VOLUME= I .5"`Rv*AcI = VOLUME= 1.5"'0.95'0.21 = 0.02454 AC -PT I .069 PT ^ 3 TOTAL VOLUME REQUIRED = 42,590 PT^3 (2 LOT5@45005f LOT) PER PERMITTED POND # I CALC5 VOL. PROV'D = 46338 CP .................................................................................................................................. VOL. PROV'D= 46338 > 42,590 =VOL. REQ'D OK ................................................................................................................................. r \NNI" G A R p4-1// ;pQ �FEssioNq L9 /�///i?QeET H •M ������ POND# I Additional DATA 5HEET PAGE I OP I NOVEMBER2014 WET DETENTION 6A51N DATA SHEET GRAY50N PARK - PHASE I POND # I DRAINAGE AREA (Ad) = IMPERVIOUS AREA (A(): BUILDINGS: ROADS: SIDEWALKS: OFF -SITE CONTINGENCY: TOTAL: PERCENT IMPERVIOUS (1): 40.1 1 ACRES 7.03 ACRES 2.33 ACRES 0.72 ACRES 0.40 ACRES 0.00 ACRE5 10.48 ACRES I = Ad/Ai = 2G. 13% (5AY26%P) (57 5F LOT5@45005F/LOT E 23 MF @ 2 1 GO 5F/UNIT) (SIDEWALKS 4� MF DRIVEWAYS) POND# I SHALL BE 7.5 DEEP AND DESIGNED TO REMOVE 90% T55. 5A/DA= 0.7200% REQUIRED SURFACE AREA AT PERMANENT POOL: 5Aj�EQ.= 0.286792 AC. = 12580 5P SURFACE AREA PROVIDED AT PERMANENT POOL (EL.50)= 49481.7 SF ........................................................................................................................... 5A PROV'D= 49481 .GG > 12550 =5A REQ'D OK ........................................................................................................................... MINIMUM REQUIRED VOLUME (SIMPLE METHOD BY TOM 5CHUELER): Rv=0.05+0.009`(1) Rv= 0.25517 VOLUME= I "'Rv"Ad = 0.953 18 AC -FT = 41520.G I`T^3 VOLUME PROVIDED AT TEMPORARY POOL: INCREM. TOTAL EL SA (5F) VOL, (CF) VOL, (CF) 50 49482 0 0 51 53491 5148G.2 5148G.2 52 5755G 55523.4 107010 53 GIG78 59G17.2 IGGG27 Pu:—C E RVFj NOV 2 5 2014 P BY: POND#1 DATA SHEET PAGE I OF 3 APRIL, 20OG SET TEMP. POOL ELEVATION: REQ'D EL. = 50.80G44 F 5AY 50.9 VOL. PROV'D = 4G338 CF ........................................................................................................................... VOL. PROV'D= 4G337.54 > 41520.G =VOL. REQ'D OK .......................................................................................................................... FOREBAY 51ZING: PERMANENT POOL VOLUME: INCREM. TOTAL fl , SA (5F) VOL, (CF) VOL. (CF) 42.5 13344 0 0 43 14997 7085 7085 44 18375 IGGBG 23771 45 21847 20111 43883 4G 25414 23G30 G7513 47 29058 2723G 94749 48 327G3 30911 125000 49 3G527 34G45 IG0305 50 49482 43004 203309 REQ'D VOLUME = 20% TOTAL = 8777 CF CHECK FOREBAY VOLUME: INCREM. TOTAL EL,_ 5A (5F) VOL, (CF) VOL (GO 4G 1416 0 0 47 2533 197G 197G 48 3711 3122 5096 49 4951 4331 9429 PROV'D VOLUME = 9429 CF 3' DEEP FOREBAY) 4- (5A REQT METI) "EoEuVEP , NOV 2 5 2014 ........................................................................................................................... VOL. PROV'D= 9429 8777 =VOL. REQ'D OK .......................................................................................................................... POND# I DATA 5HEET PAGE 2 Of 3 AML, 2000 ORIFICE 51ZING: REQ'D DRAWDOWN TIME = 2-5 DAYS Q2= 0.240281 CF5 (FOR 2 DAY DRAWDOWN) Q5= 0.09G 1 12 CF5 (FOR 5 DAY DRAWDOWN) SELECT A 3" CIRCULAR ORIFICE, EL. 50.0' (PERM. POOL EL.) Q PROV'D= Cd'A'(2cgh)^ 1/2 Q PROV'D= 0. 137309 WHERE: Cd= 0.G A= 0.04909 51' g= 32.2 FP5/5 h= AVE. HEAD =(0.8' - (0.5)(37 1 2))/2 = 0.3375 ..................................................................... Q2> 0.137309 >Q5 OK ..................................................................... DRAWDOWN TIME: TIME = VOLUME = 3.49987 DAYS Q PROV'D POND#I DATA5HEET PAGE 3Of3 APRIL, 20OG WET DETENTION BA51N DATA SHEET DATE: 1 1/21/2014 DESIGN CALCULATIONS FOR PROJECT NO.: 520-01 GPAY50N PARK PHASE I C SECTION 3 DESIGNED BY: EMN POND #7 DRAINAGE AREA (Ad) = 397,140 SO. FT 9.12 ACRES IMPERVIOUS AREA (Ai): BUILDINGS: 108,000 5Q. PT (3G LOTS AT 3,000 5F) ROADS: 28,750 50. FT SIDEWALKS: 3,465 50. FT OTHER: 0 SO. FT RESERVE: 18,500 SO. FT TOTAL: 158.735 SO. FT PERCENT IMPERVIOUS (I) I = AcVAi = 35.57% U5E 40 % CALCULATE AVERAGE DEPTH (Davg): SEE AVERAGE DEPTH CALCULATION SPREADSHEET FOR POND #7 CALCULATE REQUIRED SURFACE AREA AT PERMANENT POOL: POND 7 SHALL HAVE AN AVERAGE DEPTH OF 4.0' AND BE DESIGNED TO REMOVE 90% T55. INTERPOLATION OF TABLE 10-4 IN NCDENK 5TOR.MWATER BMP MANUAL 0 DEPTH = 4.0' % IMP. 5A/DA 40 3.50 40 3.50 50 4.30 5A/DA= 3.50% 5A,o.= 13,900 5F. = 0.32 AC SURFACE AREA PROVIDED AT PERMANENT POOL (ELEV. G5.5) = 24,487 5F 5A PROV'D= 24,457 > 13,900 =5A REQ'D OK SORT F.R �y C\ J// y�(N E i S�`\\§ POND 7 DATA SHEET PAGE I OF 3 Pne2a 20-01l lcs�ND57om 7 - i.5 in MINIMUM REQUIRED VOLUME (SIMPLE METHOD BY TOM 5CHUELER) Rv=0.05+0.009'(I) Rv= 0.40972G VOLUME= 1 .5"'Rv'Aci = 0.4GG935 AC -FT = 20,340 FT ^ 3 VOLUME PROVIDED AT TEMPORARY POOL: NCREM. TOTAL EL SA (5F) VOL. (CF) VOL. (CF) G5.5 24,457 O O GG 25,327 13,204 13,204 G7 31,703 30,015 43,219 G6 35, 1 71 33,437 7G,G5G G9 36,723 3G,947 113,GO3 MINIMUM TEMP, POOL ELEVATION (FROM SIMPLE METHOD VOLUME): REQ'D EL.= GG.24 VOL. REQ'D = 20,340 CP TEMP. POOL ELEVATION: OUTLET EL. = G7.00 - VOL. PROV'D = 43,219 CF NOTE: 51NCE THE ELEVATION OF THE NEXT AVAILABLE OUTLET ABOVE THE NORMAL POOL 15 GREATER THAN THE MINIMUM TEMP. POOL ELEVATION, THE OUTLET ELEVATION 15 THE TEMPORARY POOL ELEVATION, VOL. PROV'D= 43,219 > 20,340 =VOL. REQ'D OK N POND 7 DATA SHEET PAGE 2 Of 3 P,WM20-01�ICSWONp \Po 7- 1,51n FOREBAY SIZING: PERMANENT POOL VOLUME INCREM. TOTAL EL. 5A (5F) VOL. (CF) VOL. (CF) 60 9,733 0 0 61 I I ,49 1 1 0, 6 12 1 0, 6 12 62 13,421 12,456 23,068 63 15,532 14,477 37,545 64 17,936 16,734 54,279 65 20,555 - 19,397 73,676 65.5 24,487 11,336 65,012 REO'D POPE DAY VOLUME = 14,735 CF CHECK POPE DAY VOLUME INCREM, TOTAL EL. 5A (5F) VOL. ICE) VOL. (CF) 60 1,566 0 O 61 2,105 1 ,836 1,836 62 2,724 2,415 4,250 63 3,427 3,076 7,326 64 4,326 3,877 1 ),202 65 5,636 4,982 16, 184 65.5 6,326 5,962 22, 1 66 PROV'D VOLUME = 22, 1 66 CF VOL. PROV'D= 22, 1 66 - 14,735 =VOL. REQ'D OK ORIFICE 51ZING: REQ'D DRAWDOWN TIME = 2-5 DAY5 NOTE: ORIFICE SIZED TO DRAWDOWN THE TEMPORARY POOL IN 2-5 DAYS 02= 0. 1 1 771 CF5 (FOR 2 DAY DRAWDOWN) Q5= 0.04708 CF5 (FOR 5 DAY DRAWDOWN) ORIFICE EL.= 65.5 (PERM. POOL EL.) TEMP. POOL EL. = 67.00 (OUTLET EL.) ORIFICE DIAMETER = 2.0 IN. Q PROV'D= Cd'A'(2gh)^ 1/2 WHERE: Cd= 0.6 A= 0.02152 5F g= 32.2 FPS/5 h= (TEMP POOL -NORMAL POOLY3 0.5 Q PROV'D= 0.07428 Q2> 0.07428 >Q5 OK DRAWDOWN TIME: TIME = VOLUME = 20340 = 3. 17 DAYS O PROV'D 0.07426 POND 7 DATA SHEET PAGE 3 OF 3 F:WM20-0)Y VONo Tw 7-1.5n ,� �e NC®ENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor November 6, 2014 Mr. Andrew Sandman, Manager Maco Road Partners, LLC 7101 Creedmoor Rd, Suite 122 Raleigh, NC 27613 Subject: Request for Additional Information Stormwater Project No. SW8 060238 Grayson Park Phase I Brunswick County Dear Mr. Sandman: John E. Skvarla, III Secretary The Wilmington Regional Office received and accepted a modified State Stormwater Management Permit Application for Grayson Park Phase I on October 13, 2014. A preliminary in-depth review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Rule Subject: All impervious area that has been previously permitted to be treated at 1.0" can continue to be treated at 1.0". Any new impervious area (9,OOOsf of Pond 1 and all of Pond 7) are required to be treated at 1.5" per 15A NCAC 2H .1008, effective October, 1, 2008 because new impervious area is not vested to the 1995 rule. tea! Design Storm, Pond 1: The 456,462sf of impervious area previously permitted is under the 1995 rule at 1.0in. The 9,OOOsf additional impervious area should be calculated under the 2008 rule at 1.5in. The total volume (V1.o=41,477cf)+(V1.5=1,069cf at "A"=9,OOOsf in the Simple Method)=42,546cf which is within the 46,388cf already available in the pond. So, there will not be any changes needed to the pond itself. But, please update the calculations to show that-42,546cf is the required volume. b. Design Storm, Pond 7: Please show the impervious area calculated at 1.5". (The required volume will be-20,340cf which is below the 43,219cf capacity of the pond.) Please also update the drawdown / orifice diameter and associated calculations if necessary. `2. Pond 1, Clarification: The application shows that there is 17,424sf of impervious area but there is no offsite drainage area to the pond (this was also in the previous permit). This appears to be in error. Was this intended Ito be "future" on the application? -13. Plan Set: Please clarify which sets will be included in a full plan set for the entire project area. Plan sheets that have been previously -permitted and are unchanged can be carried over and additional copies are not needed. Please ensure that two to -scale copies of each sheet that has not been previously permitted are submitted. Please also ensure that the drainage area map for each pond is included in the full plan set and that the two lots added to DA1 by this modification are shown. a. Received 10/13/14: i. Two Sets: Coversheet,1-1, C-1, SD-1, SD-2, P-1, P-2, SE-1, D-1, D-3 ii. One Set (large/to scale): SW-1 iii Ohe Set'(small/not-to-scale)-Coversheet, H-C=1-SD=1-SD-2-P=1-P=2-SE=1-D=1-D=2-and D-3 b. Permitted 12/1/11: SW-1, SW-2, SW-3, SW-4, Division of Energy, Mineral, and Land Resources Land Quality Section — Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 • (910) 796-7215 / Fax: (910) 350-2004 SW8 060238 November 6, 2014 Please remember that a change to one number may have a domino effect on other numbers. Please check all plans, calculations and.forms to ensure that the numbers are consistent throughout. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to December 8, 2014, or the application will be returned as incomplete. The return of a project will necessitate resubmission of all required items, including the application fee. If you need additional time to submit the information, please mail, email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 796-7215 or email me at kelly.p.johnson@ncdenr.gov. WSSincely,-ineer GDS/kpj: G:\WQ\Shared\Storrnwater\Permits & Projects\2006\060238 HD\2014 11 addinfo 060238 cc: Elizabeth Nelson; PE, Cape Fear Engineering Wilmington Regional Office Stormwater File Page 2 of 2 Ci smer, Jo From: Casmer, Jo Sent: Wednesday, October 29, 2014 12:48 PM To: 'asandlaw@bellsouth.net';'elizabeth.nelson@capefearengineering.com' Subject: Grayton Park Phase 1; Stormwater Permit SW8 060238 The Wilmington Regional Office of the Division of Energy, Mineral, and Land Resources (Stormwater Section) received the Stormwater Permit Application and $505.00 fee on October 13, zor4. Your project will be assigned to a staff member and you will be notified if additional information is needed. Please be advised that the construction of built -upon area may not commence until the Stormwater Permit is issued. Jo Casmer Administrative Assistant for DEMLR/Stormwater Section NC Department of Environment & Natural Resources Division of Environmental Assistance & Customer Service 127 Cardinal Drive Extension Wilmington, NC 28405 Phone: (910) 796-7336 Fax: (910) 350.2004 Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disdosed to third parties Project Name: Project Location: Received Date: Q� ► 'J?-0 1 y -T Accepted Date: 11 2008 Coastal of Permit: Coastal El Phase II (WiRO) EJ Universal 1988 Coastal 2 Existing Permit # (Mod or PR): (� (0 0 PE Cert on File? %: _®(% OK?) Stream Class: EISA Map nr Cinola I nt IMORWM MOffsite to SW8 Paperwork Emailed Engineer on: pplement(s) (1 original per BMP) BMP Type(s): M with correct/original signatures (1 original per BMP except LS/VFS and swoles) application with correct/original signatures ®Deed ElCorp or LLC: Sig. Auth per SoS or letter mail Address: Design Engineer 05 (within 6mo) ®Email Address: Owner Plans Sets teport with SHWT ations (signed/sealed) obvious errors nsity includes common areas, etc Restrictions, if subdivided: ned & Notarized Map Is Report Additional Information: Note to Reviewer: C'��� . etails (roads, cul-de-sacs, curbs, sidewalks, BMPs, Buildings, etc) MWetlands: Delineated or No Wetlands out (proposed BUA dimensions) Maps ®Project Boundaries Wet Pond ®Soils Report ®SHWT: PP: Cert for Master Deed Rest for Master BUA Permitted (Master): BUA Proposed (Offsite): Lot #: ®Lot# Matches Master sf sf BUA (sf) DA (sf) vermltcea rrupuaeu. ------- PP (el) SHWT (el) Depth (ft) SA (sf) CAPE FEAR ENGINEERING RECEx'-1431) 151 Poole Road, Suite 100 Belville, NC 28451 TEL (910) 383-1044 FAX (910) 383-1045 www.capefearengineering.com To: NCDENR- Stormwater Attn: Linda Lewis Transmittal 10, 2014 File: 820-01 C Section 3 "36" Subject: Grayson Park Stormwater Revision SW8 060238 Modification for 1 C Section 3 ❑ As Requested ❑ For Your Files ❑ For Distribution ® For your Review / Action / Approval ❑ Sent via Mail ❑ Sent via Courier Quantity Drawing No. Description 1 Original Check for $505 from Maco Road Partners, LLC, #2090 2 Original/Copy Executed Stormwater Permit Application SWU-101 with drainage area attachments 2 Original/Copy Executed High Density Residential Subdivision Deed Restrictions Form 1 Original Wet Detention Basin Supplement SW401 for Pond #7 1 Original Executed O&M Agreement SW401 for Pond #7 1 Original Revised SWU-102 form (page 1 of 4) for Pond #1 1 Copy Soil / SHWT Report from Needham Environmental 1 Original Stormwater Narrative and Calculations with USGS Map, Sealed 10-8-14 3 Copies Design Plans for 1C Section 3; Cover, 1-1, C-1, SD-1, SD-2, P-1, P-2, SE-1, D-1, D-3 (2 Full Size 24" x 36", 1 Half Size 11" x 17") 3 Copies Stormwater Management Plan, Sheet SW-1 (2 Full Size, 1 Reduced 11" x 17" Size) REMARKS Delivery by hand. CC: File 820-01C Section 3 "36" (File 820-01 "36") Cape Fear Engineering, Inc. Signed: — h Elizabeth M. Nelson, PE Received By: Date: P:02M2M1CSeaton 3WDMINISW MOD=4-1010 SWT2nsmi Ldoc Stormwater Design Narrative And Calculations For NCDENR Permitting Subject: Grayson Park Phase 1A, 1B & 1C Modification for SW8 060238 Brunswick County, North Carolina ;�FESSioyq.•-9 SEAL C o3050i,y Z Prepared for Maco Road Partners 7101 Creedmoor Road, Suite 122 Raleigh, NC 27613 (910) 362-1809 Date: October 8, 2014 Prepared by Cape Fear Engineering, Inc. 151 Poole Road, Suite 100 Belville, NC 28451 (910)383-1044 ECEUVE OCT 13 2014 BY: STORMWATER NARRATIVE Overview: This submittal is to modify the existing Grayson Park Phase 1 A, I and 1 C, permit number SW8 060238. The proposed project is located off Maco Road (NC Hwy 87) in Brunswick County, North Carolina. Below is a summary of the changes included in the proposed modification. The specific changes made to each individual BMP are discussed in more detail on the following pages. Two single family lots have been added in Phase I within the pond #1 drainage area. Phase 1C Section 3 which included 36 single family lots, stormwater pond #7 and amenity pond #8 has been added to the permit. The project is currently under construction. Designer's Certifications for State Stormwater Ponds 1, 4, 5, and 6 have been previously provided. This modification submittal does not make any changes to Ponds 1, 4, 5, or 6 that would require re -certification. New stormwater pond #7 will be certified upon the completion of construction. Grayson Park Phase 1A, 1B, 1C: Grayson Park is a proposed high density development. The entire project is approximately 505.4 acres and drains to the Bishops Branch (class C;SW waters, Stream Index no. 18-81-7-1), which is part of the Cape Fear River Basin. This modification includes a total project area of 143.2 acres (permit number SW8 060238). The remaining approximately 362.2 acres of the Grayson Park project will be permitted separately. Pond 1 Two new lots have been added in the previously permitted pond #1 drainage area. As a result of these two lots, the proposed impervious area has increased by 9,000 SF. No additional roads or sidewalks are required to support the additional lots. The previously permitted pond #1 calculations have been revised to show that the previously permitted pond contains enough volume and surface area to handle the added impervious without making any changed to the previously permitted pond geometry or outlet configuration. The originally approved wet -detention basin supplement has been revised to reflect the revised calculations. Pond 7 This modification adds Phase 1 C Section 3 which includes 36 single family lots and associated roads and sidewalks. Stormwater pond #7 is being added to treat runoff from the proposed Phase 1 C Section 3 development. Amenity pond 48 is being added upstream of the pond #7 forebay to collect a portion of the Phase I Section 3 drainage area; however no treatment credit is being considered from amenity pond #8. WET DETENTION BA51N DATA SHEET DATE: 101512014 DESIGN CALCULATIONS FOR PROJECT NO.: 620-01 GRAYSON PARK PHASE I C SECTION 3 DESIGNED BY: EMN POND #7 DRAINAGE AREA (Ad) = 397, 140 50. FT 9. 1 2 ACRES IMPERVIOUS AREA (Ai) BUILDINGS: 108,000 SO. FT (3G LOTS AT 3,000 5F) ROAD5: 25,750 50. FT SIDEWALKS: 3,465 SO. FT OTHER: 0 SO. FT RESERVE: 18,500 50. FT TOTAL: 158,735 SO. FT PERCENT IMPERVIOUS (1): I = Ad/A, = 35.97% U5P 40 % ' CALCULATE AVERAGE DEPTH(Davq): SEE AVERAGE DEPTH CALCULATION SPREADSHEET FOR POND #7 CALCULATE REQUIRED SURFACE AREA AT PERMANENT POOL: POND 7 SHALL HAVE AN AVERAGE DEPTH OF 4.0' AND BE DESIGNED TO REMOVE 90% T55. INTERPOLATION OF TABLE 10-4 IN NCDENR 5TORMWATEP. BMP MANUAL (a? DEPTH = 4.0' IMP. 5A/OA 40 3.50 40 3.50 50 4.30 5A/DA= 3.50% 5A,o.= 13,900 5F. = 0.32 AC SURFACE AREA PROVIDED AT PERMANENT POOL (ELEV. G5.5) = 24,457 5F 5A PROV'D= 24,487 > 13,900 =5A KEQ'D OK POND 7 DATA SHEET PAGE I Of 3 P\ 2W20-01WlcsWONPWOo 7,x� MINIMUM REQUIRED VOLUME (SIMPLE METHOD BY TOM 5CHUELER): Rv=0.05+0.00910 Rv= 0.40972G VOLUME= 1 .0-Kv'Ad = 0.31 1 292 AC -FT 13,5GO FT-3 VOLUME PROVIDED AT TEMPORARY POOL: INCFEM. TOTAL EL. 5A (5F) VOL. (CF) VOL. (CF) G5.5 24,487 0 0 GG 25,327 13,204 13,204 G7 31,703 30,015 43,213 G8 35,171 33,437 7G,G5G G9 35,723 3G,947 113,GO3 MINIMUM TEMP. POOL ELEVATION (FROM 51MPLE METHOD VOLUME): REO'D EL.= GG.01 VOL. REO'D = 13,5GO CF TEMP. POOL ELEVATION: OUTLET EL. = G7.00 VOL. PROV'D = 43,215 CF NOTE: SINCE THE ELEVATION OF THE NEXT AVAILABLE OUTLET ABOVE THE NORMAL POOL 15 GREATER THAN THE MINIMUM TEMP. POOL ELEVATION, THE OUTLET ELEVATION 15 THE TEMPORARY POOL ELEVATION. VOL. PROV'D= 43,219 > 13,5GO =VOL. REO'D OK POND 7 DATA 5HEET PAGE 2 OF 3 P.1 2M20-01Y ILMONMWor 7,6 FOREBAY 51ZING: PERMANENT POOL VOLUME INCREM. TOTAL EL. _5A (5F) VOL. CF VOL. (CF) 60 9,733 0 0 61 1 1,491 1 0,61 2 10,G12 62 13,421 12,456 23,068 63 15,532 14,477 37,545 64 1 7,936 I G,734 54,279 65 20,555 19,357 73,676 . 65.5 24,467 1 1 ,336 55,012 REO'D FOREBAY VOLUME = 14,735 CF CHECK FORE5AY VOLUME INCREM. TOTAL EL. 5A (5P) VOL. (CF) VOL. (CF) 60 1,566 O 0 61 2,105 1 ,836 1 ,836 62 2,724 2,415 4,250 63 3,427 3,076 7,326 64 4,326 3,677 1,202 65 5,638 4,362 16, 184 65.5 6,326 5,582 22, 166 PROV'D VOLUME = 22, 166 CF VOL. PROV'D= 22,1 66 - 14,735 =VOL. REQ'D OK ORIFICE SIZING: REQ'D DRAWDOWN TIME = 2-5 DAY5 NOTE: ORIFICE 517ED TO DRAWDOWN THE TEMPORARY POOL IN 2-5 DAYS Q2= 0.07847 CF5 (FOR 2 DAY DRAWDOWN) Q5= 0.03135 CF5 (FOR 5 DAY DRAWDOWN) ORIFICE EL.= 65.5 (PERM. POOL EL.) TEMP. POOL EL. = 67.00 (OUTLET EL.) ORIFICE DIAMETER = T.5 IN. Q FROV'D= CclW(2gh)- 1/2 WHERE: Cd= 0.6 A= 0.012275F g= 32.2 FF5/5 h= (TEMP POOL -NORMAL POOL)/3 = 0.5 Q PROV'D= 0.04175 Q2> 0.04175 >Q5 OK DRAWDOWN TIME: TIME = VOLUME = 1 35GO = 3.76 DAY5 Q FROV'D 0.04175 POND 7 DATA SHEET PAGE 3 OF 3 P:\9201B20-Ol�aksWOND51PorW 7,16 AVERAGE DEPTH CALCULATION DATE: 8/5/201 4 DE51GN CALCULATIONS FOR PROJECT NO.: 820-01 GRAY50N PARK PHASE I C SECTION 3 DE51GNED BY: MTH POND #7 ELEV. (FT) DEPTH (FT) SURFACE AREA AT DEPTH. (5F) INC. VOL. AT DEPTH. (CF) TOTAL VOL. AT DEPTH. (CF) AVG. DEPTH (FT) G5.5 0.00 24,457 0 0 0.00 G5 0.50 20,858 1 1 ,33G I 1 ,33G 0.4G G4 1.50 17,93G 19,397 30,733 1.2G G3 2.50 15,532 1 G,734 47,4G7 1.04 G2 3.50 13,421 14,477 G 1,944 2.53 G 1 4.50 1 1,491 1 2,45G 74,400 3.04 GO 5.50 9,733 I O,G 12 65,012 3.47 FA52W20-0I\calcs\PONDS\Pond 7.xi5 Option #2 A,,t sWf = 20,555 5F e,m .i = 24,487 5F Abut d = 9,733 5F Depth = 5.00 FT Da = 4.13 FT U5E 4.0 FT POND #7 AVG. DEPTH PAGE I OF I WEIGHTED 5C5 CURVE NUMBER DATE: 8/G/2014 DESIGN CALCULATIONS FOR PROJECT NO.: 620-01 GFAY50N PARK PHA5E I C 5ECTION 3 DE51GNED BY: MTH POND #7 501L TYPE5 HSG Area (Ar:re5) Ma, MANDARIN C 4.49 Mu, Mur"Ile D 0.32 to, Leon D 4.2G Total Area in H5G A = 0 Acres 0.0% Total Area in H5G B = 0 Acre5 0.0% Total Area in H5G C = 4.49 Acres 49.5% Total Area in H5G D = 4.58 Acres 50.5% 9.07 Acres 100.0% LAND U5E, CONDITION H.5.G 5C5 CN' PERCENT CN x IMPERVIOUS - 95.00 0% 0.00 WOOD5, GOOD C 73.00 50% 3G. I4 WOOD5, GOOD D 77.00 50% 38.88 From NC Erosion Control Manual Tables 8.03e and 8.03g 1 00% 75.02 FI:7:: WEIGHTED SCS CN = 75 P05T-DEVELOPMENT: Assume that all pervious area will be proportionally divided between Soil groups. Assume that all pervious area will be open space good condition (Grass > 75%) LAND USE, CONDITION H.5.G 5C5 CN' PERCENT CN x % IMPERVIOU5 - 98.00 41 % 40.18 OPEN SPACE, GOOD C 74.00 29.5% 21.83 OPEN SPACE, GOOD D 50.00 29.5% 23.GO From NC Erosion Control Manual Table 8.03e WEIGHTED 5C5 CN = 8G FA92W20-0I�A,5VONDSWona 7,1s 100% 85.G I POND #7 SCS CN PAGE I OF I WET DETENTION BASIN DATA SHEET GRAY50N PARK - PHASE I POND # I REV 10-08-14 FOR 2 ADDITIONAL LOTS DRAINAGE AREA (Ad) = 40. 1 1 IMPERVIOUS AREA (AI): 5P BUILDINGS: ROADS: SIDEWALKS: OFF -SITE CONTINGENCY: 315,180 101,495 3 1 ,3G3 17,424 0 EMN ACRES ACRES 7.24 (59 SF LOTS@45005F/LOT 4 23 MF @ 2 1 GO SP/UNIT) 2.33 0.72 (SIDEWALKS * MP DRIVEWAYS) 0.40 0.00 TOTAL: 4G5,4G2 I O.G9 PERCENT IMPERVIOUS (1): I = AcVAI = 2G.G4% (5A)'26%) POND# I SHALL BE 7.5' DEEP AND DESIGNED TO REMOVE 90% T55. 'NOTE: THIS POND PRE -DATES AVG DEPTH REQUIREMENTS 5A/DA= 0.73% REQUIRED SURFACE AREA AT PERMANENT POOL: 5AF,,tQ = 0.292803 AC. = 12754 51' SURFACE AREA PROVIDED AT PERMANENT POOL (EL.50)= 494(51.7 51' ........................................................................................................................... 5A PROV'D= 49481 .GG > 12754 =5A REQ'D OK .......................................................................................................................... MINIMUM REQUIRED VOLUME (SIMPLE METHOD BY TOM 5CHUELER): Rv=0.05+0.009-(I) Rv= 0.28517 VOLUME= I "'Rv"Ad = 0.953 18 AC -PT = 41520.G PT^3 VOLUME PROVIDED AT TEMPORARY POOL: 0 INCREM. TOTAL l<L SA (5P) VOL, (CP) VOL, (CP) 50 49482 0 0 51 53491 5148G.2 5148G.2 52 5755G 55523.4 107010 53 GIG76 59G17.2 IGGG27 POND# I DATA SHEET PAGE I Of 3 OCT 2014 SET TEMP. POOL ELEVATION: REQ'D EL.= 50.8OG44 f---SAY 50.9 VOL. PKOV'D = 4G338 CP :.......................................................................................................................... VOL. PROV'D= 4G337.54 > 41520.G =VOL. REQ'D OK ........................................................................................................................... FOREBAY SIZING: PERMANENT POOL VOLUME: INCREM. TOTAL F� SA (SF:) VOL,( F) VOL (CF) 42.5 .13344 0 0 43 14997 7085 7085 44 18375 1GG8G 23771 45 21847 20111 43883 4G 25414 23G30 G7513 47 29058 2723G 94749 48 327G3 30911 125GGO 49 3G527 34G45 IG0305 50 49482 43004 203309 REQ'D VOLUME = 20% TOTAL = 8777 CF CHECK FOREBAY VOLUME: 4G 47 48 49 PROV'D VOLUME = SA (SF) 1416 2533 3711 4951 INCREM. VOL (CP) 0 157G 3122 4331 TOTAL 0 197G 5055 9429 9429 CF 3' DEEP FOREBAY) e-- (5A PEW MET!) :.......................................................................................................................... VOL. PROV'D= 9429 8777 =VOL. REQ'D OK ..........................................................................................................................: POND# I DATA SHEET PAGE 2 OF 3 OCT 2014 ORIFICE 51ZING: REQ'D DRAWDOWN TIME = 2-5 DAYS 02= 0.240251 CF5 (FOR 2 DAY DRAWDOWN) Q5= 0.09G 1 12 CF5 (FOR 5 DAY DRAWDOWN) SELECT A 3" CIRCULAR ORIFICE, EL. 50.0' (PERM. POOL EL.) Q PROV'D= Cd"A"(2gh) ^ 112 Q PROV'D= 0. 137309 WHERE: Cd= O.G A= 0.04909 SF cg= 32.2 FPS/5 h= AVE. HEAD =(0.8' - (0.5)(3"/ 1 2))/2 = 0.3375 ..................................................................... Q2> 0.137309 >Q5 OK .................................................................... DRAWDOWN TIME: TIME = VOLUME = 3.49957 DAYS Q PROV'D POND# I DATA SHEET PAGE 3 OF 3 OCT 2014 ii Watershed Model Schemat �draflow Hydrographs Extension for AutoCAD®Civil 3DO2010 by Autodesk, Inc. v9.25 _POND 7 PRE P=POND 8 POST - POND 7 POST 4 - POND 8 ROUTED V5 - POND 8 AND AREA 7 6 - POND 7 ROUTED 11 10 Legend Hvd. Origin Description 1 SCS Runoff POND 7 PRE 2 SCS Runoff POND 8 POST 3 SCS Runoff POND 7 POST 4 Reservoir POND 8 ROUTED 5 Combine POND 8 AND AREA 7 6 Reservoir POND 7 ROUTED Project: P:\820\820-01\calcs\P0NDS\pond 7 routing.gpw Wednesday, Aug 6, 2014 2 Hydrograph Return Period Reflow y rac�rographs Extension for AutoCAD®Civil 3D® 2010 by Autodesk, Inc. v9.25 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff 13.41 19.20 -- 29.37 38.84 53.53 66.26 81.71 POND 7 PRE 2 SCS Runoff 10.79 14.09 19.51 24.37 31.72 37.99 45.56 POND 8 POST 3 SCS Runoff 13.93 18A9 25.20 31.47 40.96 49.07 58.83 POND 7 POST 4 Reservoir 2 1.769 2.724 4.500 7.787 15.99 24.52 33.88 POND 8 ROUTED 5 Combine 3,4 14.72 19.61 -- 27.82 35.35 48.41 65.86 86.48 POND 8 AND AREA 7 6 Reservoir 5 1.308 2.962 ---- 7.667 13.81 21.01 35.82 54.38 POND 7 ROUTED Proj. file: PA820\820-01\calcs\P0NDS\pond 7 routing.gpw Wednesday, Aug 6, 2014 Hydrograph Summary Re p9ydaflow Hydrographs Extension for AutoCAD®Civil 3D®2010 by Autodesk, Inc. v9.25 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Timeto Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 13.41 2 730 52,585 --- -- POND 7 PRE 2 SCS Runoff 10.79 2 724 32,410 -- POND 8 POST 3 SCS Runoff 13.93 2 724 41,856 POND 7 POST 4 Reservoir 1.769 2 752 32,301 2 67.04 15,524 POND 8 ROUTED 5 Combine 14.72 2 724 74,157 3,4 -- -- POND 8 AND AREA 7 6 Reservoir 1.308 2 930 43,868 5 67.07 45,689 POND 7 ROUTED P:\820\820-01\ca1cs\P0NDS\pond 7 routin .Q§oAurn Period: 1 Year Wednesday, Aug 6, 2014 Hydrograph Report 4 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25 Hyd. No. 1 POND 7 PRE Hydrograph type = SCS Runoff Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 9.120 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 3.83 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 14.00 12.00 10.00 : I1 . 11 4.00 2.00 POND 7 PRE Hyd. No. 1 — 1 Year Wednesday, Aug 6, 2014 = 13.41 cfs = 730 min = 52,585 cuft = 75 = Oft = 10.00 min = Type III = 484 Q (cfs) 14.00 12.00 10.00 4.00 2.00 0.00 —�� 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 1 5 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3139)2010 by Autodesk, Inc. v9.25 Wednesday, Aug 6, 2014 Hyd. No. 2 POND 8 POST Hydrograph type = SCS Runoff Peak discharge = 10.79 cfs Storm frequency = 1 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 32,410 cuft Drainage area = 3.980 ac Curve number = 86 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.83 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Q (cfs 12.00 10.00 : M -me al 4.00 Mill POND 8 POST Hyd. No. 2 -- 1 Year Q (cfs) 12.00 10.00 M 4.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 2 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25 Hyd. No. 3 POND 7 POST Hydrograph type = SCS Runoff Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 5.140 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 3.83 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 14.00 12.00 10.00 M . 11 4.00 f'A11I111 POND 7 POST Hyd. No. 3 -- 1 Year Wednesday, Aug 6, 2014 = 13.93 cfs = 724 min = 41,856 cuft = 86 = Oft = 5.00 min = Type III = 484 Q (cfs) 14.00 12.00 10.00 M . 1� 4.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 3 7 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D®2010 by Autodesk, Inc. v9.25 Wednesday, Aug 6, 2014 Hyd. No. 4 POND 8 ROUTED Hydrograph type = Reservoir Peak discharge = 1.769 cfs Storm frequency = 1 yrs Time to peak = 752 min Time interval = 2 min Hyd. volume = 32,301 cuft Inflow hyd. No. = 2 - POND 8 POST Max. Elevation = 67.04 ft Reservoir name = POND 8 Max. Storage = 15,524 cuft Storage Indication method used. Q (cfs) 12.00 10.00 . m 4.00 2.00 0.00 0 240 Hyd No. 4 POND 8 ROUTED Hyd. No. 4 -- 1 Year 480 720 960 — Hyd No. 2 1200 1440 1680 1920 2160 j_=0 Total storage used = 15,524 cult Q (cfs) 12.00 10.00 IXIIIII] 4.00 2.00 ---4- 0.00 2400 Time (min) Pond Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3DO 2010 by Autodesk, Inc. v9.25 Wednesday, Aug 6, 2014 Pond No. 2 - POND 8 Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 66.50 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cult) 0.00 66.50 27,252 0 0 0.50 67.00 29,255 14,127 14,127 1.50 68.00 33,307 31,281 45,408 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrtRsr] [A] [B] [C] [D] Rise (in) = 24.00 0.00 0.00 0.00 Crest Len (ft) = 16.00 40.00 0.00 0.00 Span (in) = 24.00 0.00 0.00 0.00 Crest El. (ft) = 66.50 67.50 0.00 0.00 No. Barrels = 10 0 0 0 Weir Coeff. = 3.330.00 2.60 3.33 3.33 Invert El. (ft) = 66.50 0.00 0.00 0.00 Weir Type = 1 Broad - - Length (ft) = 321.00 0.00 0.00 0.00 Multistage = Yes No No No Slope (%) = 0.39 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0 (by Contour) Multistage = n/a No No No TW Elev. (ft) = 0.00 Note, CuNeWordice outtlo are analyzed under inlet (ic) and outlet (m) control. Weir risers checked for onfce conditions (ic) and submergence (s). Stage / Storage I Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cts cfs cfs cfs cfs cis cfs cts cfs cis cfs 0.00 0 66.50 0.00 - 0.00 0.00 - - - - 0.000 0.05 1,413 66.55 0.02 is - - - 0.00 s 0.00 - - 0.018 0.10 2,825 66.60 0.07 is - 0.00 0.00 - - - - 0.065 0.15 4,238 66.65 0A 5 is - - - 0.00 0.00 - - 0.149 0.20 5,651 66.70 0.25 is - - - 0.00 0.00 - - - - 0.250 0.25 7,063 66.75 0.41 is - - - 0.00 0.00 -- - - - 0.409 0.30 8,476 66.80 0.56 is - - - 0.00 0.00 - - 0.562 0.35 9,889 66.85 0.75 is - - - 0.00 0.00 - - - - 0.745 0.40 11,301 66.90 1.01 is - - - 0.00 0.00 - - 1.006 0.45 12,714 66.95 1.21 is - - - 0.00 0.00 - - - - 1.212 0.50 14,127 67.00 1.50 is - - - 0.00 0.00 - 1.498 0.60 17,255 67.10 2.10 is - 0.00 0.00 --- - - - 2.104 0.70 20,383 67.20 2.82 is - - - 0.00 0.00 - 2.824 0.80 23,511 67.30 3.65 is - 0.00 0.00 - - - - 3.649 0.90 26,639 67.40 4.47 is - - - 0.00 0.00 - 4.467 1.00 29,767 67.50 5.35 is - - - 0.00 0.00 - - 5.348 1.10 32,895 67.60 6.39 is - -- - 0.00 3.29 -- -- -- - 9.680 1.20 36,023 67.70 7.36 is - - - 0.00 9.30 - - - - 16.66 1.30 39,152 67.80 8.46 is - - - 0.00 17.09 - 25.55 1.40 42,280 67.90 9.55 is - -- - 0.00 26.31 -- -- -- - 35.86 1.50 45,408 68.00 10.60 is - - - 0.00 36.77 - 47.37 E Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25 Wednesday, Aug 6, 2014 Hyd. No. 5 POND 8 AND AREA 7 Hydrograph type = Combine Peak discharge = 14.72 cfs Storm frequency = 1 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 74,157 cuft Inflow hyds. = 3, 4 Contrib. drain. area = 5.140 ac POND 8 AND AREA 7 Q (cfs) Hyd. No. 5 -- 1 Year Q (cfs) 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 5 —Hyd No. 3 —Hyd No. 4 Hydrograph Report 10 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25 Wednesday, Aug 6, 2014 Hyd. No. 6 POND 7 ROUTED Hydrograph type = Reservoir Peak discharge = 1.308 cfs Storm frequency = 1 yrs Time to peak = 930 min Time interval = 2 min Hyd. volume = 43,868 cuft Inflow hyd. No. = 5 - POND 8 AND AREA 7 Max. Elevation = 67.07 ft Reservoir name = POND 7 Max. Storage = 45,689 cuft Storage Indication method used Q (cfs) Hyd. No. 6 -- 1 Year Q (cfs) 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) — Hyd No. 6 — Hyd No. 5 jJ]= Total storage used = 45,689 cult Pond Report 11 Hydraflow Hydrographs Extension for AutoCAD® Civil 3DO 2010 by Autodesk, Inc. v9.25 Wednesday, Aug 6, 2014 Pond No. 1 - POND 7 Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 65.50 ft Stage / Storage Table Stage (ft) Elevation (ft) 0.00 65.50 0.50 66.00 1.50 67.00 2.50 68.00 3.50 69.00 Contour area (sgft) 24,487 28,327 31,703 35,171 38,723 Incr. Storage (cult) 0 13,204 30,015 33,437 36,947 Total storage (cult) 0 13,204 43,219 76,656 113,603 Culvert / Orifice Structures [A] [B] [C] Rise (in) = 24.00 1.50 0.00 Span (in) = 24.00 1.50 0.00 No. Barrels = 10 10 0 Invert El. (ft) = 65.50 65.50 0.00 Length (ft) = 53.00 1.00 0.00 Slope (%) = 2.32 0.50 0.00 N-Value = .013 .013 .013 Orifice Coeff. = 0.60 0.60 0.60 Multistage = n/a Yes No [PrfRsr] 0.00 0.00 0 0.00 0.00 n/a n/a 0.60 No Weir Structures [A] [B] Crest Len (ft) = 16.00 30.00 Crest El. (ft) = 67.00 68.00 WeirCoeff. = 3.330.00 2.60 Weir Type = 1 Broad Multistage = Yes No Exfl.(iNhr) = 0 (by Contour) TW Elev. (ft) = 0.00 [C] [D] 0.00 0.00 0.00 0.00 3.33 3.33 - - No No Note. Culvervonfice outtlows are analyzed under inlet (ic) and cutlet (oc) cantrol. Weir risers checked for onfioe conditions lic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total It cult ft cis cfs cfs cfs cis cfs cfs cis cfs cfs cis 0.00 0 65.50 0.00 0.00 - - 0.00 0.00 - - - - 0.000 0.05 1,320 65.55 0.00 is 0.00 is - - 0.00 0.00 - 0.004 0.10 2,641 65.60 0.01 is 0.01 is - - 0.00 0.00 - - - - 0.011 0.15 3,961 65.65 0.02 is 0.02 is - - 0.00 0.00 - - - - 0.017 0.20 5,281 65.70 0.02 is 0.02 is - - 0.00 0.00 - - - - 0.022 0.25 6,602 65.75 0.03 is 0.03 is - - 0.00 0.00 - - - - 0.026 0.30 7,922 65.80 0.03 is 0.03 is - - 0.00 0.00 -- - - - 0.029 0.35 9,242 65.85 0.03 is 0.03 is - - 0.00 0.00 -- -- -- - 0.031 0.40 10,563 65.90 0.04 is 0.03 is - - 0.00 0.00 -- - 0.034 0.45 11,883 65.95 0.04 is 0.04 is - - 0.00 0.00 -- -- --- -- 0.036 0.50 13,204 66.00 0.04 is 0.04 is - -- 0.00 0.00 -- - -- -- 0.038 0.60 16,205 66.10 0.04 is 0.04 is -- - 0.00 0.00 -- - -- - 0.043 0.70 19,207 66.20 0.05 is 0.05 is - -- 0.00 0.00 - - 0.046 0.80 22,208 66.30 0.06 is 0.05 is -- - 0.00 0.00 - - - - 0.050 0.90 25,210 66.40 0.06 is 0.05 is - - 0.00 0.00 - - -- -- 0.053 1.00 28,211 66.50 0.06 is 0.06 is - - 0.00 0.00 - - - - 0.056 1.10 31,213 66.60 0.06 is 0.06 is - - 0.00 0.00 - 0.059 1.20 34,214 66.70 0.06 is 0.06 is - - 0.00 0.00 - - - - 0.062 1.30 37,216 66.80 0.06 is 0.06 is - - 0.00 0.00 - - - - 0.065 1.40 40,217 66.90 0.07 is 0.07 is - - 0.00 0.00 - - - - 0.067 1.50 43,219 67.00 0.07 is 0.07 is - - 0.00 0.00 - - - - 0.070 1.60 46,562 67.10 1.75 is 0.06 is - - 1.68 0.00 - - - - 1.746 1.70 49,906 67.20 4.87 is 0.05 is - - 4.77 0.00 - - 4.817 1.80 53,250 67.30 8.80 is 0.04 is - - 8.75 0.00 - - - - 8.795 1.90 56,593 67.40 12.20 is 0.03 is - - 12.17 s 0.00 - - - - 12.20 2.00 59,937 67.50 13.92 is 0.02 is - - 13.90 s 0.00 - - - - 13.92 2.10 63,281 67.60 15.05 is 0.02 is - - 15.03 s 0.00 - - 15.05 2.20 66,624 67.70 15.98 is 0.02 is - - 15.95 s 0.00 - 15.97 2.30 69,968 67.80 16.81 is 0.02 is - - 16.79 s 0.00 - - - - 16.81 2.40 73,312 67.90 17.57 is 0.01 is - - 17.54 s 0.00 - - 17.55 2.50 76,656 68.00 18.27 is 0.01 is - - 18.24 s 0.00 - - - - 18.25 2.60 80,350 68.10 18.92 is 0.01 is - - 18.89 s 2.47 - - - - 21.37 2.70 84,045 68.20 19.55 is 0.01 is - - 19.54 s 6.98 - - 26.53 2.80 87,740 68.30 20.15 is 0.01 is - - 20.14 s 12.82 - 32.96 2.90 91,434 68.40 20.73 is 0.01 is 20.72 s 19.73 - - 40.46 3.00 95,129 68.50 21.29 is 0.01 is - - 21.27 s 27.58 - - 48.85 Continues on next page... 12 POND 7 Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cis cfs cfs cfs cfs 3.10 98,824 68.60 21.83 is 0.01 is - - 21.80 s 36.25 - - 58.06 3.20 102,518 68.70 22.36 is 0.01 is - - 22.34 s 45.68 --- -- -- - 68.03 3.30 106,213 68.80 22.87 is 0.01 is - - 22.80 s 55.81 - - - - 78.62 3.40 109,908 68.90 23.37 is 0.01 is - - 23.29 s 66.60 - - - - 89.89 3.50 113,603 69.00 23.86 is 0.01 is - - 23.79 s 78.00 - - - - 101.80 ..End 13 Hydrograph Summary Re p9yldaflow Hydrographs Extension for AutoCAD®Civil 3082010 by Autodesk, Inc. v9.25 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 38.84 2 728 148,905 --- ---- --- POND 7 PRE 2 SCS Runoff 24.37 2 724 75,805 --- --- -- POND 8 POST 3 SCS Runoff 31.47 2 724 97,898 --- --- --- POND 7 POST 4 Reservoir 7.787 2 740 75,687 2 67.56 31,528 POND 8 ROUTED 5 Combine 35.35 2 724 173,585 3,4 -- -- POND 8 AND AREA 7 6 Reservoir 13.81 2 748 142,934 5 67.49 59,728 POND 7 ROUTED P:\820\820-01\calcs\P0NDS\pond 7 routin .§OMurn Period: 10 Year Wednesday, Aug 6, 2014 14 Hydrograph Report Hydraflow Hydrographs E#ension for AutoCAD® Civil MV 2010 by Autodesk, Inc. v9.25 Wednesday, Aug 6, 2014 Hyd. No. 1 POND 7 PRE Hydrograph type = SCS Runoff Peak discharge = 38.84 cfs Storm frequency = 10 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 148,905 cuft Drainage area = 9.120 ac Curve number = 75 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 7.24 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Q (cfs) 40.00 30.00 10.00 0.00 0 120 240 Hyd No. 1 POND 7 PRE Hyd. No. 1 -- 10 Year 360 480 600 720 840 Q (cfs) 40.00 30.00 20.00 10.00 960 1080 1200 1320 1440 1560 Time (min) 1 Hydrograph Report 15 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25 Wednesday, Aug 6, 2014 Hyd. No. 2 POND 8 POST Hydrograph type = SCS Runoff Peak discharge = 24.37 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 75,805 cuft Drainage area = 3.980 ac Curve number = 86 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.24 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 POND 8 POST Q (cfs) Q (cfs) Hyd. No. 2 -- 10 Year 28.00 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Time (min) Hyd No. 2 ill Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3DO2010 by Autodesk, Inc. v9.25 Wednesday, Aug 6, 2014 Hyd. No. 3 POND 7 POST Hydrograph type = SCS Runoff Peak discharge = 31.47 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 97,898 cuft Drainage area = 5.140 ac Curve number = 86 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.24 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Q (cfs 35.00 25.00 0AIIIIIII 15.00 10.00 5.00 Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 1 1 1 10.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Time (min) — Hyd No. 3 ' 17 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3DV 2010 by Autodesk, Inc. v9.25 Wednesday, Aug 6, 2014 Hyd. No. 4 POND 8 ROUTED Hydrograph type = Reservoir Peak discharge = 7.787 cfs Storm frequency = 10 yrs Time to peak = 740 min Time interval = 2 min Hyd. volume = 75,687 cuft Inflow hyd. No. = 2 - POND 8 POST Max. Elevation = 67.56 ft Reservoir name = POND 8 Max. Storage = 31,528 cuft Storage Indication method used POND 8 ROUTED Q (cfs) Q (Cfs) Hyd. No. 4 -- 10 Year 28.00 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0 240 480 720 960 1200 1440 1680 1920 Time (min) Hyd No. 4 — Hyd No. 2 ® Total storage used = 31,528 cult Hydrograph Report 18 Hydraflow Hydrographs Extension for AutoCADV Civil 3D® 2010 by Autodesk, Inc. v9.25 Wednesday, Aug 6, 2014 Hyd. No. 5 POND 8 AND AREA 7 Hydrograph type = Combine Peak discharge = 35.35 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 173,585 cuft Inflow hyds. = 3, 4 Contrib. drain. area = 5.140 ac 1O]il!Zs1_1L, I9Z1N=F_`A Q (cfs) Q (cfs) Hyd. No. 5 -- 10 Year 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 MID 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 5 —Hyd No. 3 —Hyd No. 4 Hydrograph Report 19 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25 Hyd. No. 6 POND 7 ROUTED Hydrograph type = Reservoir Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 5 - POND 8 AND AREA 7 Max. Elevation Reservoir name = POND 7 Max. Storage Storage indication method used. Q (cfs 40.00 30.00 rto ie 10.00 0 Wednesday, Aug 6, 2014 = 13.81 cfs = 748 min = 142,934 cuft = 67.49 ft = 59,728 cuft POND 7 ROUTED Hyd. No. 6 -- 10 Year Q (cfs) 40.00 30.00 20.00 10.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 1680 Time (min) — Hyd No. 6 — Hyd No. 5 []1= Total storage used = 59,728 cult 20 Hydrograph Summary Re p Aydaflow Hydrographs Extension for AutoCAD® Civil 3DO 2010 by Autodesk, Inc. v9.25 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 81.71 2 728 319,753 -- --- -- POND 7 PRE 2 SCS Runoff 45.56 2 724 147,317 -- POND 8 POST 3 SCS Runoff 58.83 2 724 190,254 POND 7 POST 4 Reservoir 33.88 2 728 147,192 2 67.88 41,680 POND 8 ROUTED 5 Combine 86.48 2 724 337,446 3,4 -- POND 8 AND AREA 7 6 Reservoir 54.38 2 732 306,533 5 68.56 97,347 POND 7 ROUTED P:\820\820-01\ca1cs\P0NDS\pond 7 routin .&Aurn Period: 100 Year Wednesday, Aug 6, 2014 21 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD8 Civil 3D0 2010 by Autodesk, Inc. v9.25 Wednesday, Aug 6, 2014 Hyd. No. 1 POND 7 PRE Hydrograph type = SCS Runoff Peak discharge = 81.71 cfs Storm frequency = 100 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 319,753 cuft Drainage area = 9.120 ac Curve number = 75 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 12.64 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 POND 7 PRE Hyd. No. 1 -- 100 Year Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 i--r--,• 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 1 Hydrograph Report 22 Hydraflow Hydrographs Extension for AutoCAD® Civil 3DO2010 by Autodesk, Inc. v9.25 Hyd. No. 2 POND 8 POST Hydrograph type = SCS Runoff Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 3.980 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 12.64 in Distribution Storm duration = 24 hrs Shape factor POND 8 POST Wednesday, Aug 6, 2014 = 45.56 cfs = 724 min = 147,317 cuft = 86 = Oft = 5.00 min = Type III = 484 Q (cfs) Q (cfs) Hyd. No. 2 -- 100 Year 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Time (min) — Hyd No. 2 23 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25 Wednesday, Aug 6, 2014 Hyd. No. 3 POND 7 POST Hydrograph type = SCS Runoff Peak discharge = 58.83 cfs Storm frequency = 100 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 190,254 cuft Drainage area = 5.140 ac Curve number = 86 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 12.64 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 POND 7 POST Q (cfs) Hyd. No. 3 — 100 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 .00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Time (min) Hyd No. 3 Hydrograph Report 24 Hydraflow Hydrographs Extension for AutoGAD® Civil 3D® 2010 by Autodesk, Inc. v9.25 Hyd. No. 4 POND 8 ROUTED Hydrograph type = Reservoir Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 2 - POND 8 POST Max. Elevation Reservoir name = POND 8 Max. Storage Storage Indication method used. � Ed:loxl;X11111lji417 Wednesday, Aug 6, 2014 = 33.88 cfs = 728 min = 147,192 cult = 67.88 ft = 41,680 cuft Q (cfs) Hyd. No. 4 -- 100 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 4 — Hyd No. 2 FFFf-FI7 Total storage used = 41,680 cult • 25 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25 Wednesday, Aug 6, 2014 Hyd. No. 5 POND 8 AND AREA 7 Hydrograph type = Combine Peak discharge = 86.48 cfs Storm frequency = 100 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 337,446 cuft Inflow hyds. = 3, 4 Contrib. drain. area = 5.140 ac Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 POND 8 AND AREA 7 Hyd. No. 5 -- 100 Year Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 z.- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 5 —Hyd No. 3 —Hyd No. 4 Time (min) i. Hydrograph Report 26 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D®2010 by Autodesk, Inc. v9.25 Wednesday, Aug 6, 2014 Hyd. No. 6 POND 7 ROUTED Hydrograph type = Reservoir Peak discharge = 54.38 cfs Storm frequency = 100 yrs Time to peak = 732 min Time interval = 2 min Hyd. volume = 306,533 cuft Inflow hyd. No. = 5 - POND 8 AND AREA 7 Max. Elevation = 68.56 ft Reservoir name = POND 7 Max. Storage = 97,347 cuft Storage Indication method used Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 POND 7 ROUTED Hyd. No. 6 -- 100 Year Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 ' ' ' ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 6 —Hyd No. 5 ®]_p Total storage used = 97,347 tuft ",4Y Hydraflow Rainfall Report 27 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D®2010 by Autodesk, Inc. v9.25 Wednesday, Aug 6, 2014 Return Intensity -Duration -Frequency Equation Coefficients (FHA) Period (yrs) B D E (NIA) 1 81.8155 12.8000 0.8927 --- 2 89.6877 12.6000 0.8707 -- 3 0.0000 0.0000 0.0000 -- 5 98.3564 12.9000 0.8409 10 98.4972 12.6000 0.8087 -- 25 86.1743 11A000 0.7415 -- 50 81.3332 10.4000 0.7034 - 100 74.7444 9.3000 0.6599 -- File name: ILM PER 8.03.9.IDF Intensity = B / (Tc + D)AE Return Intensity Values (in/hr) Period (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60 1 6.26 5.02 4.20 3.63 3.20 2.86 2.59 2.37 2.19 2.03 1.90 1.78 2 7.38 5.94 4.99 4.32 3.81 3.42 3.10 2.85 2.63 2.45 2.29 2.15 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 8.70 7.07 5.99 5.21 4.63 4.17 3.80 3.50 3.24 3.02 2.83 2.67 10 9.69 7.91 6.73 5.88 5.24 4.74 4.33 4.00 3.71 3.47 3.26 3.08 25 10.98 8.98 7.67 6.74 6.03 5.48 5.03 4.66 4.35 4.08 3.85 3.65 50 11.88 9.75 8.36 7.37 6.62 6.03 5.55 5.16 4.83 4.54 4.30 4.08 100 12.92 10.60 9.11 8.05 7.25 6.63 6.13 5.71 5.36 5.05 4.79 4.56 Tc = time in minutes. Values may exceed 60. Preein file name I \Civil\CALCS\StormwaterULM SCS PER 8.03.35.oco Stone Rainfall Precipitation Table (in) Distribution 1-yr 2-yr 3-yr S-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 3.83 4.66 0.00 6.02 7.24 9.10 10.70 12.64 SCS 6-Hr 0.00 3.38 0.00 0.00 5.20 6.49 0.00 8.93 Huff -1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hydraflow Table of Contents P:\820\820-01\ca1cs\P0NDS\pond 7 routing.gpw Hydraflow Hydrographs Extension for AutoCAD® Civil 3DO 2010 by Autodesk, Inc. v9.25 Wednesday, Aug 6, 2014 Watershed Model Schematic................................................................................ 1 Hydrograph Return Period Recap........................................................................ 2 1 -Year SummaryReport................................................................................................................... 3 HydrographReports............................................................................................................. 4 Hydrograph No. 1, SCS Runoff, POND 7 PRE.................................................................. 4 Hydrograph No. 2, SCS Runoff, POND 8 POST................................................................ 5 Hydrograph No. 3, SCS Runoff, POND 7 POST................................................................ 6 Hydrograph No. 4, Reservoir, POND 8 ROUTED.............................................................. 7 PondReport - POND 8.................................................................................................. 8 Hydrograph No. 5, Combine, POND 8 AND AREA 7......................................................... 9 Hydrograph No. 6, Reservoir, POND 7 ROUTED............................................................ 10 PondReport - POND 7................................................................................................ 11 10 - Year SummaryReoort................................................................................................................. 13 HydrographReports........................................................................................................... 14 Hydrograph No. 1, SCS Runoff, POND 7 PRE................................................................ 14 Hydrograph No. 2, SCS Runoff, POND 8 POST.............................................................. 15 Hydrograph No. 3, SCS Runoff, POND 7 POST.............................................................. 16 Hydrograph No. 4, Reservoir, POND 8 ROUTED............................................................ 17 Hydrograph No. 5, Combine, POND 8 AND AREA 7....................................................... 18 Hydrograph No. 6, Reservoir, POND 7 ROUTED............................................................ 19 100 - Year SummaryReport................................................................................................................. 20 HydrographReports........................................................................................................... 21 Hydrograph No. 1, SCS Runoff, POND 7 PRE................................................................ 21 Hydrograph No. 2, SCS Runoff, POND 8 POST.............................................................. 22 Hydrograph No. 3, SCS Runoff, POND 7 POST.............................................................. 23 Hydrograph No. 4, Reservoir, POND 8 ROUTED............................................................ 24 Hydrograph No. 5, Combine, POND 8 AND AREA 7....................................................... 25 Hydrograph No. 6, Reservoir, POND 7 ROUTED............................................................ 26 OFReport............................................................................................................. 27 , Needham Environmental Inc. Robert N. Needham, PWS 9100 Charlesto%me Rd. SE Winnabow, NC 28479 Office/Fax (910)371-6082 needhambud@ec.rr.com Perry Davis Cape Fear Engineering 151 Poole Road, Suite 100 Leland, NC 28451 Tom Gulley, NCLSS#t256 P.O. Box 960 Wilmington, NC 28402 Office/Fax (910)795-0319 tgulley@gmail.com May 16, 2014 RE: Preliminary Seasonal High Water Table Determination for Grayson Park, Area 5, Brunswick County, North Carolina. Dear Perry: On May 12, 2014, I made a site visit to the above -mentioned property, located near Ramble Drive. The purpose of this site visit was to evaluate predetermined areas within the proposed project to determine the estimated seasonal high water table. The information gathered should help you with your preliminary design and layout of any storm water treatment devices. Attached a Bore Hole Location map which shows the approximate location of the test areas. The soils encountered on this site were in the Mandarin and Leon Soil Series. The seasonal high water table was determined based on redox depletions and concentrations, with the exception of the Leon Soil Series, which the seasonal high water table was assumed to be slightly above the Bh or spodic horizon. Detailed soil profile descriptions were performed at locations X1 through X4 and are available upon request. The table below is a summary of the estimated seasonal high water tables at each location. Boring Location Seasonal High Water Table (in) X1 10" X2 26" X3 32" X4 14" If you have any questions or concerns, please contact me at (910)795-0319, (910)297-1282, or by e-mail at tgullevOgmail.com. Sincerely, E(CEU E �_ I OCT 13 2014 J. Tom Gulley, Jr. B el North Carolina Soil Scientist ff 1256 t wwnti Qow.- t cos.S' cDS.I4 4C-L_ - -". 31 54(WT— l+ ii \ lE N M.M 7:N,N... :71-:�I-I� ` I - :' W...: I /I ♦ y ♦ o I — `1 .Yaa : On1a) I 1 / / I / / I 1 � i ji ..a v N ••• a � I I 1 1 I I : iNm 1 1 II 1 I t .'° as•yls• •�i ti .r' a ti:•eiA.i :sw � su r \ ------------ It s \ l � �'� •/1i—ten , i �° �' -- '4�\ � `� 1 _ _ ------------ P:�820\820-01C Section 3\CALCS\BORE CALCS\820-01C-S3wdc(DCCOPY051214).dwg, 5/19/2014 1112:14 AM, 1:100 AY& ��b.� 1 5-12-14 bore stk 100,165434.480000,2273188.330000,70.500000,mag 1000,165236.960000,2273186.800000,0.000000,bore 1001,165252.010000,2272858.220000,0.000000,bore 1002,165659.410000,2272548.350000,0.000000,bore 1003,165742.790000,2272392.340000,0.000000,bore._- 1004,165236.591960,2273187.020128,' 67.683709,PT1000� 1005,165251.951190,2272858.237242,'67.880787,PT1001 1006,165659.367115,2272548.386716,66.224088,PT1002' 1007,165741.885090,2272392.751655,65.143077,PT1003 Page 1 ro \ ' AREA i I ' I - REA 2i� r = AREA 6 `AR` EA3'11 I I li �N, LEGEND X# Bore Hole Location - Bore hole placed next to wooden stakes located by Cape Fear Engineering. Grayson Park Brunswick County, NC Needham Environmental, Inc. Environmental Consultants Wilmington, NC May 2014 Bore Hole Location Map CA201410104833 SOSID: 0784319 Date Filed: 4/11/2014 8:19:00 AM Eli FM hll a ne ars a LIMITED LIABILITY COMPANY ANNUAL RE North Carolina Secretary of State 0CA2014 101 04833 NAME OF LIMITED LIABILITY COMPANY: Maco Road Partners, LLC SECRETARY OF STATE ID NUMBER: 0784319 STATE OF FORMATION: NC Fii Ones Use OYy REPORT FOR THE YEAR: 2014 SECTION A: REGISTERED AGENTS INFORMATION Changes 1. NAME OF REGISTERED AGENT: Andrew K. Sandman 2. SIGNATURE OF THE NEW REGISTERED AGENT: 3. REGISTERED OFFICE STREET ADDRESS & COUNTY 7101 Creedmoor Road, Suite 122.. _ __ Raleigh, NC 27613 Wake SECTION B: PRINCIPAL OFFICE INFORMATION 1. DESCRIPTION OF NATURE OF BUSINESS: Development SIGNATURE CONSTITUTES CONSENT TO THE APPOINTMENT 4. REGISTERED OFFICE MAILING ADDRESS 7101 Creedmoor Road, Suite 122. Raleigh, NC 27613 2. PRINCIPAL OFFICE PHONE NUMBER: (919) 845-6688 3. PRINCIPAL OFFICE EMAIL: 4. PRINCIPAL OFFICE STREET ADDRESS & COUNTY 5. PRINCIPAL OFFICE MAILING ADDRESS 7101 Creedmoor Road; Suite 122 7101 Creedmoor Road, Suite 122 Raleigh, NC 27613 Wake Raleigh, NC 27613 SECTION C: COMPANY OFFICIALS/ORGANIZERS (Enter additional Company Officials/Organizers in Section E.) NAME: Andrew Sandman NAME: TITLE: Manager/Member ADDRESS: 7101 Creedmoor Road Suite 122 Raleigh, NC 27613 TITLE: ADDRESS: NAME: TITLE: ADDRESS: SECTION D: CERTIFICATION OF ANNUAL REPORT, Section D must be completed in its entirety by a person/business entity. L%v:� yl h V SIGNATURE ��— DATE Form must be signed by Com any OlficallOryanizer Isted under Section C of this farm. Andrew K Sandman Manager/Member Pnnt ar Type Name of Company OlfidaltOrganizc TITLE SUBMIT THIS ANNUAL REPORT WITH THE REQUIRED FILING FEE OF$200 tlhllWl'ul�ll'OI IIII"I�� MAIL TO: Secretary of State, Corporebuns DMsion, Post Office Box 29525, Rsleigh, NC 27626-0525 1111 II.WII