t-- Compliance Inspection Report
IPenn it: SW761090� Effective: 08/04/11 Expiration: 08/04/25
Project: ,Shoreside Center-Walmart-Kitty Hawk Store # 2000-0�
/ Owner: Peachtree Shoreside LLC
CCounty: _Dare 7 Adress: 5400 N Croalan Hwy
Region: Washington
City/State/Zip: Kitty Hawk NC 27949
Contact Person: Thomas W Wheeler Title: Phone: 770-476-4801
Directions to Project:
North on US Hwy 158, the main site entrance is approx 1,100 feet west from the intersection of US Hwy 158 and Ocean Blvd
Type of Project: Stale Stormwater - HD - Infiltration
Drain Areas: 1 - (Kitty Hawk Bay) (03-01-56 ) (SC)
2 - (Kitty Hawk Bay) (03-01-56 ) ( SC)
On -Site Representative(s):
Related Permits:
Inspection Date: 07/31/201!
_. —__. — _-- J
Primary Inspector: William J Moore
Secondary Inspector(s):
State Stormwater - HD - Detention Pond
EntryTime: 10:00AM
Reason for Inspection: Routine
Permit Inspection Type: State Stormwater
Facility Status: IN Compliant ❑ Not Compliant
Question Areas:
■ State Stormwater
(See attachment summary)
Exit Tlme: 10:30AM
Phone: 252-946-6481 Ext.264
Inspection Type: Transfer Renewal
PE C- t-t -0-/, y
2rZ/ 207,,40 ZS
Ga/IrV¢ e.,5 r'A :79 -0 4�-/ter. A e
page: 1
Permit: SW7910903 Owner • Project Peachtree Shoreslde LLC
Inspection Date: 07/31/2015 Inspection Type Transfer Renewal Reason for Visit-. Routine
Inspection Summary:
site inspection 07/31/2015 at existing Walmart site in Kitty Hawk. BUA & SW measures appear to be constructed
according to plans. O&M good; no apparent problems.
Built Upon Area Yes No NA NE
Is the site BUA constructed as per the permit and approval plans? M ❑ ❑ ❑
Is the drainage area as per the permit and approved plans? 0 ❑ ❑ ❑
Is the BUA (as permitted) graded such that the runoff drains to the system? 0 ❑ ❑ ❑
Comment:
SW Measures Yes No NA NE
Are the SW measures constructed as per the approved plans? 0 ❑ ❑ ❑
Are the inlets located per the approved plans? E ❑ ❑ ❑
Are the outlet structures located per the approved plans? E ❑ ❑ ❑
Comment:
Operation and Maintenance Yes No NA NE
Are the SW measures being maintained and operated as per the permit requirements? 0 ❑ ❑ ❑
Are the SW BMP inspection and maintenance records complete and available for review or provided to ❑ ❑ ❑
DWO upon request?
Comment:
page: 2
(1
StiO 5/ �`�. C.� �._�Iliy"�iblG�✓� '• i^� Al !"'^-'/—
712
Z9 3 57
3. 7,v - <. �o
1
6Z
Ho- VP
(/¢c 1. v N� —!h 04)15 � 217-3/0q A�4 At,,
IT
✓
:1
�' 1
P
r'
r!
16
•i,
r
777
Ir
�
+(.
r
a
7,j
C
LA
✓`
yti
i/
`4
i
'ti.
j