Loading...
HomeMy WebLinkAbout20131199 Ver 1_USACE Correspondence_20131212Homewood, Sue From: Williams, Andrew E SAW < Andrew .E.Williams2 @usace.army.mil> Sent: Thursday, December 12, 2013 10:17 AM To: Parker, Jerry A; Mills, James M Cc: Thomson, Nicole J; Homewood, Sue; Williams, Andrew E SAW Subject: SAW - 2013 -02297 NWP 3 NCDOT Bridge #300 Guilford County (UNCLASSIFIED) Attachments: NWP3_3- 23.pdf Classification: UNCLASSIFIED Caveats: NONE Jerry and Mike, On November 14, 2013, the US Army Corps of Engineers, Wilmington District received your written notification that you intend to replace NCDOT Bridge #300 with a new bridge at the same location. The specific location where the work is planned is on SR 3355 (Layton Road) over Stinking Quarter Creek in Guilford County, North Carolina. The geographic coordinates (in decimal degrees) are 35.9206° N and - 79.5780° W. Your notification indicated that you intend to permanently impact 35 linear feet of jurisdictional stream channel and temporarily impact 0.01 acre of adjacent wetlands by hand clearing. Based on the information provided in your application, including Attachment G (Low /Minimum Impact Bridge Project Data Sheet) of the 2010 Low Impact Bridge Replacement Document, your work is authorized by Nationwide Permit (NWP) 3 for Maintenance Activities provided it is accomplished in strict accordance with the attached conditions and your submitted description. Any violation of the attached conditions or deviation from your submitted description may subject the permittee to a stop work order, a restoration order and /or appropriate legal action. Attached is a copy of the NWP 3 and the applicable permit conditions. This verification is valid until the NWP is modified, reissued, or revoked. All of the existing NWPs are scheduled to be modified, reissued, or revoked prior to March 18, 2017. It is incumbent upon you to remain informed of changes to the NWPs. We will issue a public notice when the NWPs are reissued. Furthermore, if you commence or are under contract to commence this activity before the date that the relevant nationwide permit is modified or revoked, you will have twelve (12) months from the date of the modification or revocation of the NWP to complete the activity under the present terms and conditions of this nationwide permit. The Action Identification Number for this project is SAW- 2013 - 02297. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Quality (telephone: 919 - 807 -6300) to determine Section 401 requirements. This response to your notification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals /permits. This electronic copy is your official Department of the Army Notification; no paper copy will be mailed, unless specifically requested. Please let me know if you have any questions regarding this permit or the conditions. You can call me at telephone (919) 554 -4884, ext 26 or contact me via e -mail at andrew .e.williams2 @usace.army.mil. Thank you, Andrew Williams Regulatory Project Manager U.S. Army Corps of Engineers Raleigh Regulatory Field Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 919 - 554 -4884 extension 26 Classification: UNCLASSIFIED Caveats: NONE