Loading...
HomeMy WebLinkAbout201211025 Ver 1_Modifications_20131211Homewood, Sue From: Braquet, Stephanie Sent: Thursday, December 12, 2013 10:41 AM To: Thomas, John T JR SAW (John.T.Thomas.JR @usace.army.mil); Homewood, Sue Cc: Euliss, Amy; Jones, Matthew W Subject: FW: Message from KMBT_C360 Attachments: Message from KMBT_C360 Attached please find an updated copy of the Attachment G for Low Impact Bridge Replacement project BD -5109F (Jackson Hill Road). It was updated to reflect the added impacts which fall below 40 feet, we wanted to make you aware of this change. Thanks - - - -- Original Message---- - From: noreply @ncdot.gov [mailto:noreply @ncdot.gov] Sent: Thursday, December 12, 2013 6:30 AM To: Braquet, Stephanie Subject: Message from KMBT_C360 Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. Priority TIP NO BD-5109F WBS 45355A:6 coup !y Davidson Bridge Number 280282 Description Replace Bridge over Cabin Greek on on SR 2533 Jackson Hill Rd.) Basin Yadkin Classification WS-1V Stream SIN 12-127(2� Type Inland Size (width & depth) 36'x 2' TYPO I Span: Timber Deck/Steel Beams; Timber Substructure Existing Structure Size 50.5'x 20' Suff. Rating 39 Proposed Structure Type 2 Span: Cared Slab; Concrete Substructure Size (1engthxMdth out-out) 80'X301 USAGE Impacts (LF) 38 LF (permanent due to rip rap bank stabilization at Bent 1); 12 LF Stream qempana!y due to turbidity curtain) NCDWQ Impacts (LF) 38 LF (permanent due to rip rap bank stabilization at Bent 1); 12 LF (temporary due to turbidity curtain) USACE Impacts (AC) 0,03 Wetlands Non 404 impacts (AC) 0.03' LAMA Impacts (AC) NIA NC DWQ Buffers Impacts (SD None Buffer Application Required (YIN) No NC DWQ StormWater Permit Required (YIN) No Habitat (y1n) No T&E Species Present No Bio Conclusion NE Moratorium Type (per WRG) None Dates Native/Hatchery No Trout Waters Trout Species Present No Trout Conditions JYJNJ No WRC Reviewer Marla Chambers CAMA AECs NIA Essential Fish Habitat !n No Nay. Opeolng No USCG Permit No Historic Properties No Archaeological Resources No Tribal Lands No Resources No 6(f) [LWCFJ Resources No Wild and Scenic River No Forest Service Lands No TVA Area No TEMA Buyout No FEMA Flood Study Yes - MOA USTs Haz Mats No Relocatees No Location LAT N 35.5850 LONG W 80. 1449 Permanent stream impacts are due to rip rap bank stabilization that was needed. Once construction began it was apparent that the new Bent 1 piles would be very near the streambank. The rip rap bank stabilization was needed to prevent future widening of the stream due to the streambank being weakened at the pile locations and to Project Comments correct the past erosion of the streambank. Wetland impacts are caused by building a driveway to provide access for the property owner at Station -L- 13+75, 501 to 751 left. The existing driveway is right at the end of the existing bridge. Once the new bridge was lenghtened the driveway had to be shifted. Construction of the driveway will be completed to minimize the impacts to the wetland. (Updated 12112113 to reflect the permanent stream impacts) Completed b) ZV/ -�)