Loading...
HomeMy WebLinkAboutSW7071211_COMPLIANCE_20110512STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW O 1 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATEll YYYYM M D D NC®ENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director May 12, 2011 Mr. Raju Uppalapati, Managing Member R&E Developments, LLC 821 Ocean Trail, Suite 4 Corolla, NC 27927 Dee Freeman Secretary Subject: NOTICE OF INSPECTION Permit No. SW7071211 Bank of Commonwealth, Kitty Hawk Dare County Dear Mr. Uppalapati: On April 8, 2011, Mr. Samir Dumpor of the Washington Regional Office of the Division of Water Quality (DWQ) inspected the Bank of Commonwealth development in Kitty Hawk, Dare County to determine compliance with Stormwater Management Permit Number SW707121 I, which was issued on December 28, 2007. DWO site inspection revealed that the hroiect is in substantial compliance with the approved hermit, however file review revealed that, as of today, the Engineer's Certification was not received. (see attached Compliance Inspection Report) Please be reminded that Section 11 (Schedule of Compliance) of the Stormwater Permit SW7071211, item 6, states the following: "Upon completion of construction and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications,.....". Please submit the required information as requested above by June 13, 2011. If additional time is needed to complete these items, please submit a written request giving reasons by this date. Please be advised that you are required to comply with the terms, conditions and limitations of your Stormwater Management Permit under Title 15A North Carolina Administrative Code 2H .1003 and North Carolina General Statute 143-214.7, including operation and maintenance of your permitted stormwater system. Please be advised that violations of your Stormwater Management Permit may be subject to the assessment of civil penalties of up to $25,000 per day per violation. If you have any questions please contact me at the Washington Regional Office, telephone number (252) 946-6481. Sincerely, Samir Dumpor Environmental Engineer cc: 1, WaRO Files North Carolina Division of Water Quality Internet: w nc ateraualitv.oro 943 Washington Square Mall Phone: 252-946-6481 Washington, INC 27889 FAX 252-946-9215 An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper NorthCarolina Naturally Compliance Inspection Report Permit: SW7071211 County: Dare Region: Washington Effective: 12/28/07 Expiration: 12/28/17 Owner: R & E Developments LLC Project: Bank of Commonwealth - Kitty Hawk - Express 3732 N Croatan Hwy Contact Person: Eric Avery Title: Directions to Project: Property on southwest corner of US 158 and First Flight Run, Kitty Hawk Type of Project: State Stormwater - HD - Infiltration Drain Areas: 1 - (Kitty Hawk Bay) (03-01-56 ) ( SC) 2 - (Kitty Hawk Bay) (03-01-56) (SC) On -Site Representative(s): Related Permits: r` Inspection Date: 04/0812011 Entry Time: 11:00 AM Primary Inspector: Samir Dumpor Secondary Inspector(s): Reason for Inspection: Routine Permit Inspection Type: State Stormwater Facility Status: ® Compliant Q Not Compliant Question Areas: State Stormwater (See attachment summary) Kitty Hawk NC 27949 Phone:252-453-3600 Exit Time: 12:00 AM Phone:252-948-3960 Inspection Type: Compliance Evaluation Page 1 Permit: SW7071211 Owner - Project: R & E Developments LLC .'�. Inspection Date: 04/08/2011 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Inspection conducted on April 8, 2011 by Samir Dumpor od Washington Regional Office Site was found to be in very good condition as far as Stormwater permit compliance. File review revealed that Engineers Certification is not submitted. File Review Yes No NA NE Is the permit active? ■ ❑ ❑ ❑ Signed copy of the Engineers certification is in the file? ❑ ■ ❑ ❑ Signed copy of the Operation & Maintenance Agreement is in the file? ■ ❑ ❑ ❑ Copy of the recorded deed restrictions is in the file? ❑ ❑ ■ ❑ Comment: Engineers Certification not submitted Built Upon Area Yes No NA NE Is the site BUA constructed as per the permit and approval plans? 0 ❑ ❑ ❑ Is the drainage area as per the permit and approved plans? ■ ❑ ❑ ❑ Is the BUA (as permitted) graded such that the runoff drains to the system? IN ❑ ❑ ❑ Comment: SW Measures Yes No NA NE Are the SW measures constructed as per the approved plans? ■ ❑ ❑ ❑ Are the inlets located per the approved plans? ■ ❑ ❑ ❑ Are the outlet structures located per the approved plans? ■ ❑ ❑ ❑ Comment: Operation and Maintenance Yes No NA NE Are the SW measures being maintained and operated as per the permit requirements? ■ ❑ ❑ ❑ Are the SW BMP inspection and maintenance records complete and available for review or provided to DWQ ■ ❑ ❑ ❑ upon request? Comment: Other Permit Conditions Yes No NA NE Is the site compliant with other conditions of the permit? ■ ❑ ❑ ❑ Comment: Other WQ Issues Yes No NA NE Is the site compliant with other water quality issues as noted during the inspection? ■ ❑ ❑ ❑ Comment Page: 2