Town of Louisburg
110 West Nash Street
Louisburg, NC 27549-2526
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Coleen H. Sullins, Director
Division of Water Quality
July 25, 2007
DWQ Project # 04-1818, Ver. 2
Franklin County
Subject Property: Town of Louisburg - 2004 Sewer Improvements
Ut to Tar River [030301, 28-(24.7), WSV, NSW]
REQUEST FOR MORE INFORMATION
Dear Sir or Madam:
On Jure 2~; 2007, the Division of Water Quality (DWQ) received your application dated Apri130, 2007
to permanently impact 0.018 acres of 404/wetland, temporarily impact 0.71 acres of 404/wetland,
permanently impact 80 linear feet of perennial stream, and permanently impact 3,600 square feet (ft2) of
Zone 1 of the Tar-Pamlico River basin protected riparian buffers and 4,000 square feet (ftZ) of Zone 2 of
the Tar-Pamlico River basin protected riparian buffers, to construct sewer line improvements at the site.
On July 20, 2007, the DWQ received additional information from you, however, the DWQ has
determined that your application remains incomplete and/or provided inaccurate information as discussed
below. The DWQ will require additional information in order to process your application to impact
protected wetland, streams and/or buffers on the subject property. Therefore, unless we receive the
additional information requested below, we will have to move toward denial of your application as
required by 15A NCAC 2H .0506 and 2B .0233(8) and will place this project on hold as incomplete until
we receive this additional information. Please provide the following information so that we may continue
to review your project.
Additional Information Requested:
1. You indicated in your correspondence dated July 20, 2007, and received by the DWQ on July 20,
2007, that impacts for the project have been reduced. Please submit updated impact tables from
your Pre-Construction Notification application.
As previously requested, DWQ's rules require that we certify that the project will not result in
"cumulative impacts, based on past or reasonably anticipated future impacts, that cause or will
cause a violation of downstream water quality standards" NCAC 2H .0506(b)(4), and therefore,
we requested a qualitative secondary and indirect cumulative impact analysis be performed and
submitted to the DWQ. Alternatively, one way to address this concern is to have the Town of
Louisburg commit to requiring on-site stormwater management measures (such as level
spreaders, bioretention or constructed wetlands) for the additional development when those
parcels are developed. However, the Division is open to other approaches that would give us
the assurance that downstream water quality would be protected from the cumulative impacts of
this project.
Noe Carolina
~tura!!y
401 Oversight/Express Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone: 919-733-1786 /FAX 919-733-6893 /Internet: http://h2o.enr.state.nc.us/ncwetlands
An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper
Town of Louisburg
Page 2 of 2
July 25, 2007
Please submit this information within 30 calendar days of the date of this letter. If we do not receive this
requested information within 30 calendar days of the date of this letter, your project will be withdrawn
and you will need to reapply with a new application and a new fee.
This letter only addresses the application review and does not authorize any impacts to wetlands, waters
or protected buffers. Please be aware that any impacts requested within your application are not
authorized (at this time) by the DWQ. Please call Ms. Cyndi Karoly or Mr. Ian McMillan at 919-733-
1786 if you have any questions regarding or would like to set up a meeting to discus,~his matter.
Since ly,
Cyndi Karoly, Supervisor
401 Oversight/Express Review Permits Unit
CBK/~m~_
cc: Sean McLean, EarthTech, 701 Corporate Center Drive, Suite 475, Raleigh, NC 27607
Mike Horan, DWQ Raleigh Regional Office
USACE Raleigh Regulatory Field Office
File Copy
Central Files
Filename: 041818 Ver2TOLouisburg2004SewerImprovements(Franklin~n_Hold2