HomeMy WebLinkAboutNCC192684_NOT Supporting Documents (2)_20211202ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRIAN WRENN
Director
NORTH CAROLINA
Environmental Quality
January 7, 2021
LETTER OF APPROVAL WITH MODIFICATION
Walbridge Southeast LLC
ATTN: Mr. Chris Morgan
8514 McAlpine Park Drive, Ste 130
Charlotte, NC 28211
Tennoca Construction Company
ATTN: Mr. Michael Bedell
PO Box 2379
Candler, NC 28715
RE: Project Name: Project Ranger - Site Construction
Acres Approved: 66.35
Project ID: BUNCO-2020-006
County: Buncombe
City: Limestone
Address: NC 191
River Basin: French Broad
Stream Classification: B and C
Submitted By: Mr. William R. Buie, P.E.
Date Originally Received by LQS: October 17, 2019
Date Received by LQS: December 9, 2020
PIan Type: Industrial
Dear Mr. Morgan and Mr. Bedell,
This office has reviewed the subject erosion and sedimentation control plan and hereby
issues this Letter of Approval with Modification. The modification is attached. This plan
approval shall expire three (3) years following the date of approval, if no land -disturbing
activity has been undertaken, as is required by Title 15A NCAC 413 .0129. Should the plan
not perform adequately, a revised plan will be required (G.S. 113A-54.1) (b).
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the
NCGO10000 Construction General Permit. After the form is reviewed and found to be
D � North Carolina Department of Environmental Quality ] Division of Energy, Mineral and Land Resources
Asheville Regional Office 12090 U.S. Highway 70 ] Swannanoa, North Carolina 28778
N6RTrl CARCI NA Capart828.296.4500
mento!Fnvlmnme U 7oatly
Letter of Approval with Modification
Walbridge Southeast, LLC
ATTN: Mr. Chris Morgan
Tennoca Construction Company
ATTN: Mr. Michael Bedell
January 7, 2021
Page 2 of 3
complete, you will receive a link with payment instructions for the $100 annual permit fee.
After the fee is received, you will receive the COC via email. You MUST obtain the COC prior
to commencement of any land disturbing activity. The eNOI form may be accessed at
deq.nc.gov/NCG01. Please direct questions about the eNOI form to Annette Lucas at
Annette.lucas@ncdenr.gov or Paul Clark at Paul.cIark@ncdenr.gov. If the owner/operator
of this project changes in the future, the new responsible party is required to apply for
his/her own COC.
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation
be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance -oriented,
requiring protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control
plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of
1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions
to the plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and
State water quality laws, regulations, and rules. In addition, local city or county ordinances
or rules may also apply to this land -disturbing activity. This approval does not supersede
any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility Form, which you provided. This permit allows for a land -
disturbance, as called for on the application plan, not to exceed the approved
acres. Exceeding the acreage will be a violation of this permit and would require a revised
plan and additional application fee. You are requested to file an amended form if there is any
change in the information included on the form.
Letter of Approval with Modification
Walbridge Southeast, LLC
ATTN: Mr. Chris Morgan
Tennoca Construction Company
ATTN: Mr. Michael Bedell
January 7, 2021
Page 3 of 3
Your cooperation is appreciated.
S' er
Mi ha Smith
Ass tant Regional Engineer
Division of Energy, Mineral, and Land Resources
Enclosures: Certificate of Approval
NPDES NCG01 Fact Sheet
Modification
ec: Mr. William R. Buie, P.E. wbuie@wgla.com
cc: Regional Office file
MODIFICATION REQUIRED FOR APPROVAL
Project Name: Project Ranger - Site Construction
Project ID: BUNCO-2020-006
County: Buncombe
For final plan approval on or before Tuesday,,February 2. 20211 please provide to this
office the requested documents listed below.
Please provide a signed property owner's authorization for each of the financially
responsible parties listed on the Financial Responsibility/Ownership Form (FRO) stating
that the financially responsible company 1) may submit a draft erosion and sediment control
plan and 2) may conduct the land disturbing activity. {G.S. 113A-54 (1)1,
Ref: G.S. 113A-54.1 through G.S. 113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NCG 010000 NPDES for Construction Activities
C)
n� n a moo y
fD d w 04
C C
CD
P Owe
Mowed
C° owe P,l, r-f Pei
C° r° IrD y
n
Z.
Met
� : rCD
° y [
CD
C C. a' MCD
r n
rD
v ° �
� � � -CD
�,
(�tme�d �d
n O Q �
MO.' G �+
IMMA��
CD wow
how. ri
n
fD
OnEd
fD
�yy�
0 W
CD
CD C Z ~
vfD
fa