Loading...
HomeMy WebLinkAboutNCC192684_NOT Supporting Documents (2)_20211202ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Director NORTH CAROLINA Environmental Quality January 7, 2021 LETTER OF APPROVAL WITH MODIFICATION Walbridge Southeast LLC ATTN: Mr. Chris Morgan 8514 McAlpine Park Drive, Ste 130 Charlotte, NC 28211 Tennoca Construction Company ATTN: Mr. Michael Bedell PO Box 2379 Candler, NC 28715 RE: Project Name: Project Ranger - Site Construction Acres Approved: 66.35 Project ID: BUNCO-2020-006 County: Buncombe City: Limestone Address: NC 191 River Basin: French Broad Stream Classification: B and C Submitted By: Mr. William R. Buie, P.E. Date Originally Received by LQS: October 17, 2019 Date Received by LQS: December 9, 2020 PIan Type: Industrial Dear Mr. Morgan and Mr. Bedell, This office has reviewed the subject erosion and sedimentation control plan and hereby issues this Letter of Approval with Modification. The modification is attached. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 413 .0129. Should the plan not perform adequately, a revised plan will be required (G.S. 113A-54.1) (b). As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be D � North Carolina Department of Environmental Quality ] Division of Energy, Mineral and Land Resources Asheville Regional Office 12090 U.S. Highway 70 ] Swannanoa, North Carolina 28778 N6RTrl CARCI NA Capart828.296.4500 mento!Fnvlmnme U 7oatly Letter of Approval with Modification Walbridge Southeast, LLC ATTN: Mr. Chris Morgan Tennoca Construction Company ATTN: Mr. Michael Bedell January 7, 2021 Page 2 of 3 complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is received, you will receive the COC via email. You MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.cIark@ncdenr.gov. If the owner/operator of this project changes in the future, the new responsible party is required to apply for his/her own COC. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land - disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. Letter of Approval with Modification Walbridge Southeast, LLC ATTN: Mr. Chris Morgan Tennoca Construction Company ATTN: Mr. Michael Bedell January 7, 2021 Page 3 of 3 Your cooperation is appreciated. S' er Mi ha Smith Ass tant Regional Engineer Division of Energy, Mineral, and Land Resources Enclosures: Certificate of Approval NPDES NCG01 Fact Sheet Modification ec: Mr. William R. Buie, P.E. wbuie@wgla.com cc: Regional Office file MODIFICATION REQUIRED FOR APPROVAL Project Name: Project Ranger - Site Construction Project ID: BUNCO-2020-006 County: Buncombe For final plan approval on or before Tuesday,,February 2. 20211 please provide to this office the requested documents listed below. Please provide a signed property owner's authorization for each of the financially responsible parties listed on the Financial Responsibility/Ownership Form (FRO) stating that the financially responsible company 1) may submit a draft erosion and sediment control plan and 2) may conduct the land disturbing activity. {G.S. 113A-54 (1)1, Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities C) n� n a moo y fD d w 04 C C CD P Owe Mowed C° owe P,l, r-f Pei C° r° IrD y n Z. Met � : rCD ° y [ CD C C. a' MCD r n rD v ° � � � � -CD �, (�tme�d �d n O Q � MO.' G �+ IMMA�� CD wow how. ri n fD OnEd fD �yy� 0 W CD CD C Z ~ vfD fa