December 5, 2013
Cherri Smith
NC Division of Water Quality
401 Wetlands WQ Certification Unit
1650 Mail Service Center
Raleigh, North Carolina 27699 -1650
Re: Yates Mill Estates
DWQ Project 13 -0891
Raleigh, North Carolina
Dear Ms. Smith:
Thank you for speaking with me today and your help with this proposed resident
subdivision. We are submitting the additional information regarding the proposed riparian buff,
impacts associated with the road crossing and utility line crossings.
Attached are the following items for your files and review.
• Revised PCN page 6 (buffer impacts).
• Engineering exhibit: Figure 4- Impact Map For Septic Line
If you should have questions or require additional clarification please feel free to contact me
749 -8259 or email: lay(cD_kellerenviron mental. com.
Sincerely,
Keller Environmental, LLC
Jay Keller DEC ' 9 2013
Principal
Cc: Rex Frazier
John Teel- Stewart - Proctor Engineering /Surveying
6 Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below If yes, then individually list all buffer impacts
below If any impacts require mitigation, then you MUST fill out Section D of this form
6a
® Neuse ❑ Tar - Pamlico ❑ Other
Project is in which protected basin?
❑ Catawba ❑ Randleman
6b
6c
6d
6e
6f
6g
Buffer impact
number —
Reason
Buffer
Zone 1 impact
Zone 2 impact
Permanent (P)
for impact
Stream name
mitigation
(square feet)
(square feet)
or Temporary
required?
(T)
61 ®P ❑ T
Coss ng
UT to Swift Creek
® Nos
5,453
3,225
Utility
❑ Yes
B2 ® P [:IT
Line
UT to Swift Creek
® No
3,695
2,484
Crossings
B3 ❑ PEI T
El Yes
❑ No
6h Total buffer impacts
9,148
5,709
61 Comments There are 3 proposed septic line impacts at the rear of Lots 14 -16 The total of those 3 crossings are listed in
B2 above Please refer to the attached "Impact Map For Septic Line" for details Permanent grass will be established at the
conclusion of the installations and maintained Shrubs and trees will not be allowed to re- establish to prevent root damage to
the lines
D. Impact Justification and Mitigation
1 Avoidance and Minimization
1a Specifically describe measures taken to avoid or minimize the proposed impacts in designing project
The road crossing was strategically located near an existing crossing It's perpendicular alignment will minimize impacts to the
stream and riparian buffers
1 b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques
The existing dirt road will be utilized during construction then removed and the stream restored when the permanent road is
ready
2 Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a Does the project require Compensatory Mitigation for
❑ Yes ® No
impacts to Waters of the U S or Waters of the State?
2b If yes, mitigation is required by (check all that apply)
❑ DWQ ❑ Corps
❑ Mitigation bank
2c If yes, which mitigation option will be used for this
El Payment to in -lieu fee program
project?
❑ Permittee Responsible Mitigation
3 Complete if Using a Mitigation Bank
3a Name of Mitigation Bank
3b Credits Purchased (attach receipt and letter)
Type
Quantity
Page 6 of 10
PCN Form — Version 1 3 December 10, 2008 Version
_ \ \ \ `\ I I \ ` 1 `
�O �`�I\\ R \Y I, l \1 \ \ \/ \ \\ \� \I 11,\ LOT 1'6-___ \\ I\
NE �\ STR M
IMC�A,C 1`
10 `NT M?PbR,AkY
ON TR�CTjON
\ \ 11 kAS IMENTj
II 1 3 ff1 S�wk I I I I I
\\ \ I l l ONE! 1
1 \ I1 I �., i I /
l l l l l l hcIF�1 ARIAN
! 6Ur.
I' iii j i l i I F�R
I �
q �
j�''1 SEIIr�E j / lit ! �\ �� 'ZONE 12
TEf�IPORARIY !! ,/ / / �I I, IPA R4ANLOT /15/ /
2( ( 1 ! FER , ,
r 1 1 j f M�AC�AI�� !!! l I
I l 0 IITEM�ORAR/Y ,' ! �!
I ! EASLMEN I I J ! '
l I! I I I
i/7
/ 1208' wATk S LY
/ I / W TER HE 01JF�ER
F�OMJ IOP �00 BANK i
0� IE�ACH ;SID IE j
_i/iTEM0ORARY ,
/ S1�RE
/1y Pn
IMPACT AREA #1 FOR SEPTIC LINE
S1 — LINEAR FEET OF STREAM IMPACT 10 LF
INTERIOR BUFFER AREA (ZONE 1) 1,223 SF
J�MEXTERIOR BUFFER AREA (ZONE 2) 816 SF
IMPACT AREA #2 FOR SEPTIC LINE
S2 — LINEAR FEET OF STREAM IMPACT 10 LF
INTERIOR BUFFER AREA (ZONE 1) 1,263 SF
EXTERIOR BUFFER AREA (ZONE 2) 862 SF
YAM MR1 ESTATES
WAU COURIY, N=M CUKIM
MACT MAP FOR SEP'ITC LINE
STEW1ART-PROCTOR
sp Design Consultants
319 Chapanoke Road
Raleigh, North Carolina 27603
Phone (919) 779 -1855 Fax (919) 779 -1661
' r
., S WE
LIN� i i I I I I I I i0T114 i t
I
1 I' -I
TEM�PORA\ R\ 1\
NST�RUCTIO
SMEN \T
IMPACT AREA #3 FOR SEPTIC LINE
S3 — LINEAR FEET OF STREAM IMPACT 10 LF
INTERIOR BUFFER AREA (ZONE 1) 1,209 SF
EXTERIOR BUFFER AREA (ZONE 2) 806 SF
TOTAL IMPACT AREA FOR SEPTIC LINE
TOTAL LINEAR FEET OF STREAM IMPACT 30 LF
TOTAL AREA OF STREAM IMPACT 90 SF
TOTAL INTERIOR BUFFER AREA (ZONE 1) 3,695 SF
TOTAL EXTERIOR BUFFER AREA (ZONE 2) 2,484 SF
PREPARED FOR
REX FRAZIER
129 MALTLAND DRIVE
CARY, NC 27518
DATE 07 -24 -13
PROJECT ENGINEER
MIKE L STEWART
PROJECT CARD DESIGNER
JOHN A TEEL
PROJECT SURVEYOR
PROJECT SURVEYOR
GRAPHIC SCALF
too' U 50.
( IN FEET )
1 inch = 100 ft
NC DWQ MAPS
AREA IMPACT MAP
FIGURE #.4