Loading...
HomeMy WebLinkAboutNCC216649_Site Plan or Location Map_20211201T H0LLY M Sv�LLE HUNTER o041 go (SR 2 — R A V (SR 2043) 'Ifd 0 ao OC=175A ' C=1,6 1 D Ir —_ 765 00 - - 4LO l -L Ol jap CD cp C=1,8:/'/A' 0 o TROTTER RD 00 C 1 ■ - Cj-1 ■(�1 / ,►-- 1 �+ ONG CREEK r — 1 L_ LOD 1 ,4�7D �_ LOD LOD 00� D cmi '11 C=1,12 C 1 1 1 1 m 1 1 ��I 1 1 1 I 1 \ NANDIN CT C=1 ■ 13 II II 1 \ I� \� ��n ♦ w �O� o 0 -/ --_=uu I Ij � •'C� _` � :a �� �� . kfJ Ali i'A'�7� � •i� � ��� �A wV�\L!�� J IV�lffi�mqm a EROSION CONTROL NOTES: 1. ALL STD. NUMBERS REFER TO THE CITY OF CHARLOTTE LAND DEVELOPMENT STANDARDS MANUAL (CLDSM) AND NCDENR. 2. ALL EROSION CONTROL MEASURES SHALL BE IN ACCORDANCE WITH THE N.C. EROSION AND SEDIMENT CONTROL PLANNING / AND DESIGN MANUAL. / 3. ON -SITE BURIAL PITS REQUIRE AN ON -SITE DEMOLITION LANDFILL PERMIT FROM THE ZONING ADMINISTRATOR. 4. ANY GRADING BEYOND THE DENUDED LIMITS SHOWN ON THE PLAN IS A VIOLATION OF THE MECKLENBURG COUNTY SOIL EROSION AND SEDIMENTATION ORDINANCE AND IS SUBJECT TO A FINE. 5. GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN IS A VIOLATION OF THE CITY/COUNTY / EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. 6. GROUND STABILIZATION MUST OCCUR WITHIN 7 DAYS ON PERIMETER AREAS AND SLOPES GREATER THAN 3:1, AND GROUND STABILIZATION MUST OCCUR WITHIN 14 DAYS ON OTHER AREAS. REFER TO EROSION CONTROL ORDINANCE FOR ADDITIONAL \REQUIREMENTS. \7. ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BY A EROSION CONTROL INSPECTOR. 8. SLOPES SHALL BE GRADED NO STEEPER THAN 2:1. 2:1 FILL SLOPES GREATER THAN 10' REQUIRE ADDITIONAL TERRACING. 9. PERMANENT CUT AND FILL SLOPES PLACED ON A SUITABLE FOUNDATION SHOULD BE CONSTRUCTED AT 2:1 (HORIZONTAL TO VERTICAL) OR FLATTER. PERMANENT SLOPES OF 3:1 SHOULD BE CONSTRUCTED WHERE MOWING IS DESIRABLE AND AS / INDICATED. IF FILL MATERIAL IS BROUGHT ONTO THE PROPERTY OR IF WASTE MATERIAL IS HAULED FROM THE PROPERTY, THEN THE CONTRACTOR SHALL DISCLOSE THE LOCATION OF ANY OFF -SITE BORROW LOCATION AND/OR WASTE BURIAL LOCATION TO THE EROSION CONTROL INSPECTOR. 10. DRIVEWAY PERMIT FOR CONSTRUCTION ENTRANCES IN NCDOT RIGHT OF WAY MUST BE PRESENTED AT PRE -CONSTRUCTION MEET 11. SMOTE GRADING PERMISSION MUST BEOBTAINED OO FROM TGRADE E AADJACENT ECTED PROPEROWNER PROPERTIES. TY N FIELD CONDITIONS WARRANT OFF \ 12. ALL EROSION CONTROL DEVICES SHALL REMAIN UNTIL SITE HAS BEEN PERMANENTLY STABILIZED. 13. CONTRACTOR SHALL ESTABLISH PERMANENT VEGETATION PRIOR TO REMOVING EROSION CONTROL DEVICES. TEMPORARY SEEDING SHALL NOT BE CONSIDERED PERMANENT STABILIZATION. 14. TOPO MAY REQUIRE DIVERSION DITCHES TO BECOME BERMS IN SOME AREAS. 15. EROSION CONTROL INSPECTOR TO BE GIVEN 48 HOURS NOTICE PRIOR TO START CONSTRUCTION. 16. CONTRACTOR SHALL NOT CLEAR, GRUB, OR GRADE BEYOND THE NCDOT CONTROLLED ACCESS FENCING 17. INLET PROTECTION IS REQUIRED FOR ALL INLETS WITHIN THE WORKING AREA. 18. CONTRACTOR SHALL TAKE ALL REASONABLE MEASURES TO KEEP SOIL OFF OF ADJACENT STREETS. ADDITIONAL EROSION CONTROLS MEASURES MAY BE REQUIRED IF CONTRACTOR IS NOT SUCCESSFUL. 19. THIS PROJECT IS WITHIN THE CATAWBA RIVER BASIN. 20. REFER TO SHEET C-1.26 FOR STABILIZATION TIME FRAMES. LandDesign. 223 NORTH GRAHAM STREET CHARLOTTE, NC 28202 704.333.0325 WWW.LANDDESIGN.COM NC ENG. FIRM LICENSE # C-0658 WILD LAND S E N G I N E E R I N G XSTV `1�11111f!!// C A R 4 SEAL 043902 ; �G I t4 ON R I W AG 0911 412021 PROJECT LONG CREEK GREENWAY WATER QUALITY IMPROVEMENT PROJECT (TREYBURN TO 1-485) MECKLENBURG COUNTY LANDDESIGN PROJ.# 1020191 REVISION / ISSUANCE DESIGNED BY: DSR DRAWN BY: DJB CHECKED BY: ARW SCALE NORTH VERT: N/A H O RZ: 1 "=500' fA 0 250' 500' 1000, SHEET TITLE EXISTING CONDITIONS, DEMO & EROSION CONTROL - SHEET INDEX SHEET NUMBER C-1.1 9/17/2021 832 AM DAPHNE BRICE Z:\TEMPLATES\SHEETS\CD SHEETS\CIVIL\SHEET-24X36.DVVi ORIGINAL SHEET SIZE: 24" X