Loading...
HomeMy WebLinkAboutNC0081825_Performance Annual Report_20110830THE TOWN OF Avlsovuv%I,I,e August 30, 2011 System Performance Annual Report NCDWQ 1617 Mail Service Center Raleigh, NC 27699 Re: Performance Annual Report of theAnsonville WWTP Dear Sirs: Enclosed please find the Performance Annual Report of the Ansonville Wastewater Treatment Plant for the fiscal year ending June 2011. If I may be of further service to you, please do not hesitate to contact me. Sincerely, JAI4PLAAtil' Dianna McLaughlin Ansonville Water Department Enclosure DENR -FRO FEB 2 8 2012 OWO G 31 2011 ENR-WP. I QUALITY Pik, . , `?1 PI%_ ■ PO BOX 437 ■ ANSONVILLE, NORTH CAROLINA ■ 28007 ■ (704) 826-8404 ■ Performance Annual Report of the Ansonville Wastewater Treatment Plant I. General Information Facility/System Name: Responsible Entity: Person in Charge/Contact: Applicable Permit: Ansonville Wastewater Treatment Plant Town of Ansonville William Waddell III NPDES NC0081825 Description of Treatment Process: The wastewater treatment plant uses what is known as an extended aeration type system. The extended aeration type system means the inflow is aerated for an extended amount of time usually 24 hours before entering the clarification zones. In this chamber aerobic bacteria decompose the organic solids in the sewage. Biological waste treatment is a process which uses microorganisms to consume dissolved organic contaminates in wastewater and convert them into additional microorganisms. Then these are mixed with incoming mixture of microorganisms and water is channeled to clarification or settling zone where the solid organic contaminated and microorganisms settle, allowing the water to be removed through a baffle and weir trough arrangement. The organic contaminate (sludge) that settles by gravity to the bottom of the settling chamber is pumped back to the head of the aeration chamber for mixing with the incoming waste water. The water that is removed then goes through a disinfecting process. This process uses a tablet hypochlorite system and dechlorination system. • II. Performance The WWTP experienced very little problems this year. Any problems were very isolated and were corrected quickly and effectively. July 2010 August 2010 September 2010 October 2010 November 2010 December 2010 January 2011 February 2011 March 2011 April 2011 May 2011 June 2011 All of Ansonville's WWTP parameters were met and WWTP was compliant with state regulations All of Ansonville's WWTP parameters were met and WWTP was compliant with state regulations All of Ansonville's WWTP parameters were met and WWTP was compliant with state regulations Total Suspended Solids in violation of Permit Weekly Average and was corrected All of Ansonville's WWTP parameters were met and WWTP was compliant with state regulations All of Ansonville's WWTP parameters were met and WWTP was compliant with state regulations Total Suspended Solids in violation of Permit Weekly Average and was corrected For the month of January Fecal Coliform geometric mean exceeded. There was a problem with the tablet feeders and was corrected All of Ansonville's WWTP parameters were met and WWTP was compliant with state regulations -All of Ansonville's WWTP parameters were met and WWTP was compliant with state regulations All of Ansonville's WWTP parameters were met and WWTP was compliant with state regulations All of Ansonville's WWTP parameters were met and WWTP was compliant with state regulations All of Ansonville's WWTP parameters were met and WWTP was compliant with state regulations III. Collection System No reportable sewer spills this year. Notification — Copies of this report have been made available to all customers. These copies are available at our office during normal operating hours. Each customer was notified by mail of this. IV. Certification I certify under penalty of law that this report is complete and accurate to the best of my knowledge. I further certify that this report has been made available to the users of customers of the named system and that those users have been notified of its availability. William Waddell, III, ORC Date Ansonville Wastewater Treatment Plant