Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCC216474_Site Plan or Location Map_20211130
General Notes Erosion and Sedimentation Control Notes: I. Install water mains. Tract Data Legend: 1. Topographic information was created from a combination of Lidar elevation data J. Maintain erosion control measures as needed to assure full funetionability. obtained from the N.C. flood mapping program, and ground topographic survey by 1- Clearing or grading operations shall begin at low points of outfall release K. Fine grade street. Place CA BC over compacted Subgrade. Install asphalt surface Total Area ..................... Acreage in Parks or 6.01 Ac. - Benchmark AQ�Ch Parker & Associates, Inc.. NAVD'88 Datum. Lidar contour lines are not adjusted or other locations where sediment control measures are shown on the course. - Cord to match ground shots. plan and the sediment control devices (sediment traps, silt fences, L. Complete fine grading of roadside shoulders and swales. other land usage ............ 4.31 Ac. Ct- Centerline 2. Boundary information taken from previously record maps. diversions, stormwnter treatment areas, etc. shall be installed before M. Reseed and mulch shoulders and swales. Install liners on all swales. Acreage to be Disturbed 2.86 � CSD -Compost sock Dam 3. Most of the development area is wooded. 4. All easements to be drainage and utility at dimensions shown, or simultaneous) with the disturbance of an area drain to the device. Y Y n9 N. Provide round stabilization (Temporary or Permanent on perimeter areas and 9 P 1'Y } F� or Exposed .................. Number of Lots ................. Ac. 20 (Duplex) D.B. - beed Book efh -Existing Fire Hydrant unless otherwise noted. 2. Sediment control devices and structures shall be installed, maintained and slopes greater than 3:1 within 7 days following the completion of any phase of Minimum Lot width .............. 60' 5. There are no Areas of Environmental Concern (AEC) as defined by Coastal Area amended as needed to provide effective control of accelerated erosion and grading or construction; and 14 days for all other areas internal to the project. Minimum Lot Size ............... 15,000 s . f . ® egv - Existing Gate Valve Management Act (CAMA) on this site, sedimentation until the contributing watersheds are stabilized. 4. Seeding Specifications: Average Lot Size ....... . ....... 3,717 s . f . egw - Existing Guy Wire 6. Wetlands line Survey b Southwind Surveying and Mapping,Inc. dated 1/1B/17, y y y 3. Construction Sequence: Apply lime and fertilizer and work into 4 - 6 inches of soil. Seed mixture shall be Smallest Lot Size .............. 3,427 s . f. (Lot 2A) cop - Edge of Pavement and signed by the U.S.A.C.O.E. 7. Stormwater from this drains to an unnamed - - A. Notify Engineer, owner and Land Quality Section prior to beginning distributed uniformly and covered with a clean straw mulch. All mulch shall be crimped Linear Feet of Drive . - ' 800 L.F. © epb - Existing Phone box O epp - Existing Power Pole project trubutary to Turkey Greek which is classified as SA;HQW. construction. or asphalt tacked to hold in lace. Material and application rates as follows, and are p p PP Proposed Use ................... Existing band Use .............. Single Family Undeveloped Q erpz - Existing Reduced pressure Zone 8. For additional information, see plan and profile and detail sheets. S. Install stabilized construction entrance at point of access, generally considered minimums. *Mulch rate to be doubled is crimped': Water Service .................. ONWASA eupb - Existing Underground Phone Box 9. This site is not affected by any special flood hazard per FEMA C. Limits of clearing will be as shown. Owner m lessen the amount to clear. may Material Application Rate Sewer Service .................. Pluris (Gravity Only) p ewm- Existing Water Meter CPN 370575 4258J (Town of Holly Ridge) effective date Nov. 3, 2005. Confirm prior to start of work Silt fence shall be installed at the down slope Lime 3000 lbs./ac. Fertilizer (10-10-10) 750 lbs./ac. Zone ........................... R-15 ex -Existing edge of clearing immediately after a lot is cleared. Silt fence shall be Mulch 2 tons/ac. Fire District .................. y Ridge Holly FFE-Finished Floor Elevation Note: maintained until the lot is stabilized completely. Silt fences are shown based Asphalt Tack 435 gal . /ac. (Max) ISO Rating ..................... 9 Inv. -Invert Contractor shall insure that he and all his workers (contractors, an topographic information in the locations expected to be needed to trap Permanent Seeding Tax Map 747C, Parcel 74 L- Length subcontractors and other site personnel) do not damage construction sediment prior to entering down slope areas. Actual locations of installation Common Bermuda (Unhulled Sept. 1 - April 1) 100 lbs . /ac . PIN 424804 948814 L.O.D. -Limits of Disturbance M.B. - Map Book stakes or other measures used in laying out the project whether b p J y shall be adjusted to the actual physical on site topography. That is, where silt ( Hulled April 1 - Sept. 1) 75 lbs . /ac . p Deed Ref.: D.B. 4451, Pg. 289 MEG - Match Existing Grade the Engineer or another entity including those under the employ of the fence is not shown on the plan but the actual topographyreflects a downward P Rebel" Fescue 50 lbs . /ac . M.B. 71, P 127 g - O MH -Manhole contractor. Contractor shall cause his workers to observe and verify slope, silt fence shall be installed. Where the actual topography reflects on Rye Grain (Sept. 1 - April 1 only) 50 lbs . /ac . N.C.S.R. -North Carolina Secondary Road to the fullest extent practicable that stakes, other measures and grades upward slope silt fence is not required. German Millet (April 1 - Sept. 1 only) 50 lbs . /ac . Setbacks: (Holly Ridge) Pg, - Page are, or appear to be, accurate and correct, and immediately, but prior D. Clear & grub entire area within the clearing limits as shown. Temporary Seeding Dec. 1 -- Apri 1 15 Front Yazd ..................... 25' C) PK - PK "Nail" to any associated work, notify the staking entity of any potential conflict, E. Strip topsoil ,& stockpile for later use. Kobe Lespede za 50 lbs . /ac . Side Yard 8' RCP - Reinforced Concrete Pipe error or question regarding the work. The Engineer shall not be responsible F. Construct sediment traps and rock check dams where shown. Construct drainage Rye Grain 120 lbs . /ac . ...................... Side Street 25' R - Radius if all of the above measures are not strictly adhered to. The Engineer sholl swales. Install sewer then storm drainage piping. April 15 -- Aug. 15 .......... .......... Rear Yazd ..... 15' R/W - Right-of-way not be responsible where due to damage, his staking can not be verified. G. Immediately seed, mulch and install temporary liners to swales. German Millet 40 lbs . /ac. S.S. - Sanitary Sewer For critical or costly components of the work, where the contractor believes H. Rough grade streets. Aug. 15 - Dec. 30 that staking may not be preserved, the contractor shall request the stakirg Rye Grain 120 lbs . /ac. entity to place staking in an area where its preservation can be insured. 5. Once all areas have been stabilized, contractor is to remove temporary erosion control measures, regrade, & mulch to restabilize these areas. / 6. For additional requirements, see the approved erosion and sedimentation permit. / - 49 i Wetlands Line �:;E I � Qy 50 i Ertle b. Carlyle epp _V y D.B.1513, Pg.136 _V 1 IV / The Landing at Folkston HB Zone ¢ y _VIV\ y Phase I Multi Family M.B. 63, Pg 5 Multi Family Residential lI / Zone R-15 y y _y y / IV Multi Family Residential IV IV \ IVl IV IVy IV IV _V y -66 IV y � � � IV IV 53� I ' IV Iv 1 _ ` IV IV_V IV v IVIV ''• ' The Village at Folkston ' Phase I cl sf - Clearing Limits / Silt Fence cs - Compost Sock Line -� - Flow Arrow to - Lot Label O-Pipe Label ••• •-• - Proposed Ditch sroP _ Stop Sign ohpl - Overhead Power UG - Underground Utility Line - Wetlands Line rl• - Wetlands X 67.00 - Spot Elevation xLC 67, - EX. Spot Elevation - Sediment Trap i - Swale Label 1 CA :E y IVy _VIV\ 51, ' M.B. 63, Pg 114 i a IVy IV IV _V IV a! Single Family Residential ' �- Wetlands Line JI 3 v /� Per�A.B. 64, Pg 130 y v IV y � C7 20, I� V y IV y IV I(: y y IV y „ IV IV v y y y y y y I 63.02 ff a� 7� I y IV i n _V y y I ex. Inv. Pipe �Il y y _V y y y IV y _ 61.22 IV Wild Roots, Inc. I IVIV_V IV IV _V IV b.B. 2910, Pg, 600 II V I y 4 IV I y y _V IV IV _V y y y HB Zone a ( I s � y y _ y y y y I y IV y 3f _V IV y y y �b2 Undeveloped � ,n I: I [,� y _V y y -a IV _V y _V y y IV IV y _V y IV y v y y o I -V y Common Area � I i v y � y �` y � y y 'r y y fi6.56 y V �� � ar y y � y y L y y w i t y IV y (open 4.1 Acres) y y y y IV y \ NY IV y y I y _V I IV � y V y _V y y _V y IV IV y _V y y y _V y IV y IV y y _V y 63.38 1 I l y IV _V I y y _V s+ y y y ar y y y y y y _V y 61 y _V y I y y _V _V -1 I y y ar _v y IV j y v y y y IV I 1.1 y y y y y y y y y y y y 66.57 y f yIV y _V y y I Clenri Site y _V ar y _V �+ y IV �+ y -V ar y , y 7. Limits y JI I y I _V y y _V W Silt Fence at Common Area y y v I a y Begin silt Fence y y IV y y y y y y W �(y ,I Wetlands Line _V (Open Space) y IV y W r' I63.72 at Wetlands y y y y y 66.1s`IV 4.31 Acres j �. Benchmark Begin Ditch I I y y y y y „ y y y y IV BM Eiev = 64.98 R rndi to n y y y = y y ' Bolt Closest I: y y Cleari Limits y y y 65.55 IV IV y " "- pipe A v .v y Clearing y y y 1 to M m Mueller � �' y �' y Silt Fence at y y y I► `�.06 a y � �+ y I' I Datum NavD '88 _V _ y y y Wetlands Line IV 67.03 ` _V y _V y ly IV y IV y v y y Wetlands Line y .y y y �' y y y Y 67 sA s66b38 7A 7s 1L y 65.86 V Per M.B. 64, Pg 130 d I I .v _V y Wetlands Line y y _V y 6.80 se O 8A -6 - _V _V IV 1 20' • VO (Y\ y y Per M.B. 64, Pg 130 y y 66.91 6A "Y . `..; 66.14 y IV IV y ! j IV 63.77 f + ICI 1 1 fb I IV y O j Grade Area for positive IVIV1 v 1I sA drainage from wetlands JI I� j F IVIV'y IV 4A as overflow area to pipe B. / f X66.65 C1- sf f� 9B y I � _V0O 66.65 • �� 67.07X 1 65.4z IV y IV _V I Begin New bitching . r y IVDitch Elev.64.50 c' 66.9 IV IV .1RP, Sylvia Wright Audet 66.6 / ,i,.. F F.: •; * I Folkston # ! !.0 b.B. 5E, Pg. 586 66.48 `t.' : y IV Tract #4 L.O.D. at I to y HB Zone Ex. EOP 4` �. •,. ?:-�.�`.:•,�.. ; `.l�.a. 'i D.B. 71; Pg 1279 Single Family Residential '.. X .. •' R�. y ex.�rtai� Zone R-15 X IV Zone Undeveloped I a Inv. In `e; `;' �•+ 1 ..; } V 1 Stabilized i 641 #' a i Construction I 0 '' x66.64 4 ' `` i0A 3 a 1 Compost Sock ;' S for Disturbance Entrance MEG 66.22 e••' � h' ' �` b7.13 •` ' x: ... �_ `F .�.."� y d x 66.52 CSD ..�...-- ..••-•1 toH y d f for Sewer Connection $ ti _ B f, t. CL sf �.~1 • / Inv. In 64.2e ,n egw O x• -. �� �] CL Y.M. 62.75 I E' b6.40 _ •� Ditch �' �( ` k `1 .' . 64.50 - .. i 4' wide brick sign for MEG R/W The Landing 66.90 � ohpl--� ex- spindW ex. inv. in �284,792.35 64.07 E-2,449,403.75 / ex. inv. out _ Or 63.89 R/W A L -41 X 66.72 1 rs r66.001X 0 gyp/ eugpb epp egw chp It oh101 oh I of - CSD----------- �a Area to Remain Wooded 1 X 66.67 CSD 1 5T#1 HOLLY RIDGE ST#2 epp CITY LIMITS _ 1' ohpl h I ohpl ohpl ohpl ohpl ohpf ohpl oh 1 -----_ ------ - -- - - - - - - ._ -- - - - - -_ ---- - - - - - --------T_....-.-._---�..- -I C54---....._- - - Cleanout Ex. Ditch for Positive Drainage between Driveway Culverts, Maintain NCDOT Road Section. NCSR 1532 - 60' R/ W R/W 4' wide brick } column - ahpL - - ohpl ` ohpl R/W ex. spindd ex. Inv. Out \ N-284,489.31 61.13 E-2,450,097.28 Field Book: Snoods Ferry #4, Pg. 67-69 Disk Nam: Acad #2520 Filename: Folkston Woods - iH-Gen dwg SJS /JRK Job No.: S200910-7478 ex. Inv. Out 61.04 R/W Sheet 3 of 7 Roads & Draina(ye Notes: 1. The streets to be constructed for this project are subject to acceptance by the Town of Holly Ridge, and similar to the N.C. Department of Transportation Certification Program and Quality Management System Maintenance Version Requirements. The Contractor, at his expense, shall provide test results on 1) Subgrade, 2) Base and 3) Pavement. The Contractor shall insure that all construction and testing is performed in accordance with the N.C- Department of Transportation "Standard Specifications for Roads and Structures", latest edition, 2006 Hot Mix Asphalt Specifications and Manual, and "Quality Management System Maintenance Version", and shall report the testing and /or core locations, test method, results and D.O.T. allowable range or tolerance, as applicable. Subgrade shall be tested for density and shall be proofrolled by the testing Engineer or the Engineer or Surveyor who will issue the Final Certification. Base and pavement shall both be tested for density and thickness. If Parker & Associates is administering the construction they must also proofroll the stone. Twenty-four (24) hour advance scheduling before proofroll. Testing for pavement shall be certified by either a professional Engineer or properly certified QMS technician and shall be in accordance with QMS criteria. Required thickness for this project is as shown on the plans. Note that thickness for widening or turn lanes is greater than that for internal streets. 2. Minimum Densities: Subgrade 100% Stone Base 100% 5 9.5C 92% 3. Notify the Engineer or Surveyor, who will issue the overall Final Certification, of all phases of Roadway Construction. 4. All metal used for any type of catch basin or inlet shall be produced in the USA. 5. A minimum sight distance of 10'X70' shall be maintained along the right-of-way of all internal intersections. 6.20 foot radii at right-of-way intersections, 30 foot radii at edge of pavement intersections. 7. All culverts under streets shall be reinforced concrete per North Carolina Department of Transportation Specifications, unless otherwise specified and/or approved by the Engineer and/or Department of Transportation. 8, All roads shall be public and built to NCDOT Standards for acceptance by Town of Holly Ridge. 9. There shall be no encumbrances within the Right-of-way. 10. All materials and practices shall meet North Carolina Department of Transportation Standards. 11. For other detailed construction notes, see plan and profiles. Vole , +' �µ CA1�1 0�%� Uig7r� ,% X, ,....... , . V F�•551p ,�• % � ' Q w ' � SEALr. �rr 37928G� L. r,frrrrr u�,,� Grading, Drainage, Erosion and Sedimentation Control Plan Folkstone Woods Slump Sound Twp., Onslow, Co., North Carolina Cwner/Developer: FolkStone RP, LLC 1000 Hunters Trail Midway Park, North Carolina 28544 (910) 577-1441 DATE: 09-20-2021 GRAPHIC SCALE: 1 "=40' 0 40 80 120 SCALE: 1"=40' FEET TIDEWATER ASSOCIATES, INC. Consulting Engineers - Land Surveyor's - Land Planners Jacksonville, North Carolina P.O. Box 976 - 306 New Bridge Street - 28540 Phone (910) 455-2414 - www.- idewaterENC,com Est 1961 Firm License Number: F-0108