Loading...
HomeMy WebLinkAboutSW1210902_Supplement-EZ Form_20211124SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name Broadpointe Industrial Facility 2 Project Area ac 3 Coastal Wetland Area ac 0 4 Surface Water Area ac 0.006 5 Is this roiect h or Low De—ify) Hi High 6 Does this project use an off -site SCM? No COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided feet 30 8 Will the vegetated setback remain vegetated? Yes 9 If BUA is proposed in the setback, does it meet NCAC 02H.1003 4 c-d ? Yes 10 Is stream bank stabilization proposed on this project? No NUMBER AND TYPE OF SCMS: 11 Infiltration System _ 0 12 Bioretention Cell 0 13 Wet Pond 0 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 1 17 IRainwater Harvesting RWH 0 18 Green Roof 0 19 Level Spreader -Filter Strip LS-FS 0 20 Disconnected Impervious Surface DIS 0 21 Treatment Swale 0 22 Dry Pond 0 23 iStormFilter 0 24 Silva Cell 0 25 Ba filter 0 26 lFilterra 0 LOAD SUPPLEMENT FORMS DESIGNER CERTIFICATION 27 Name and Title: _ Daniel Hyatt 28 Or anization: Wade Trim Inc. 29 Street address: 53 North Market Street 30 City, State, Zip: Asheville, NC 28801 31 JPhone numbers : 8282551197 32 Email: rhyatt@wadetrim.com Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the informations provided here. ,••t%un - n rrrrq,rr ,• =0S��p y: �* � � = N0. 1405 o: � Ui ' i a� may, A'gtu a of Designer Date DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so, number of drainage areas/SCMs 1 3 Does this roiect have low densit areas? Yes 4 If so, number of low density drainage areas 1 5 Is all/part of this project subject to previous rule versions? No FORMS LOADED AREA INFORMATION Entire Site 1 LID 1 4 T pe of SCM N/A Sand Filter Dispersion Flow 5 Total drainage area (sq ft 1092049 273174 818875 6 Onsite drainage area (sq ft 1092049 273174 818875 7 Offsite drainage area (sq ft 0 0 0 8 Total BUA in project (sq ft 223399 sf 216801 sf 6599 sf 9permitting) New BUA on subdivided lots (subject to s ft N/A N/A N/A 10permitting) New BUA not on subdivided lots (subject to s 223399 sf 216801 sf 6599 sf 11 Offsite BUA (sq ft sf sf sf 12 1 Breakdown of new BUA not on subdivided lots: Parking (sq ft 97872 sf 91274 sf 6599 sf Sidewalk (sq ft 4965 sf 4965 sf sf Roof (sq ft 120562 sf 120562 sf sf Roadway s ft N/A N/A N/A Future (sq ft N/A N/A N/A Other, please specify in the comment box below (sq ft N/A N/A N/A 13 New infiltrating permeable pavement on subdivided lots (sq ft N/A N/A N/A 14 New infiltrating permeable pavement not on subdivided lots (sq ft N/A N/A N/A 15permitting) Existing BUA that will remain (not subject to s ft N/A N/A N/A 16 Existina BUA that is already permitted (sq ft N/A N/A N/A 17 Existing BUA that will be removed (sq ft N/A N/A N/A 18 Percent BUA 21 % 79% 1 19 Design storm inches 1.0 in 1.0 in N/A 20 Design volume of SCM cu ft N/A 13059 cf N/A 21 Calculation method for design volume N/A Simple Method N/A ADDITIONAL INFORMATION 22 Please use this space to provide any additional information about the drainage area(s): LD1 designed to have sufficient dispersion at pipe outlet; sized for 10 yr storm event. SAND FILTER 1 11Drainage area number I DA-SF 1 MDC FROM 02H .1050 3 Is the SCM sized to treat the SW from all surfaces at build -out? Yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM (H:V)? 2:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No 7 Are the inlets, outlets, and receiving stream protected from erosion 10- ear storm)? Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes 9 What is the method for dewatering the SCM for maintenance? Drawdown Orifice 10 If applicable, will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC (8)? Yes 12 Does the drainage easement comply with General MDC (9)? Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC 10 ? N/A 14 Is there an O&M Agreement that complies with General MDC (11)? Yes 151 Is there an O&M Plan that complies with General MDC (12)? 1 Yes 161 Does the SCM follow the device specific MDC? Yes 17 Was the SCM desi ned bv an NC licensedprofessional? Yes SAND FILTER MDC FROM 02H .1056 18 SHWT elevation (fmsl) N/A 19 Type of sand filter (open or closed) Open 20 If closed, will the filter will be pre -cast or pour -in -place? 21 If closed, top of grate elevation (fmsl) N/A 22 Is this sand filter designed to attenuate peak flows? No I Sediment Chamber 23 I Volume that can be retained in the sediment chamber (cubic feet) 11038 cf Will there be a permanent pool in the sediment chamber? No Bottom of the sediment chamber (fmsl) 2057.50 24 25 26 Area of the sediment chamber (square feet) 1823 sf 27 Physical depth of the sediment chamber (inches) 12 in 28 Ponding depth in the sediment chamber, above any permanent pool (inches) 36 in 29 Elevation of top of weir between chambers (fmsl) 2059.5 Sand Chamber 30 Volume that can be retained in the sand chamber (cubic feet) 13390 cf 31 Bottom of the sand chamber (fmsl) 2056.50 32 Area of the sand chamber (square feet) 1823 sf 33 Physical depth of the sand chamber (inches) 18 in 34 Ponding depth in the sand chamber, above the sand surface (inches) 36 in 351 Elevation of the bypass device (fmsl) 2062.5 36 Type of bypass device Inlet 37 Mechanism for distributing flow over the sand surface Level Weir 38 Sand specification for sand chamber ASTM C-33 39 Depth above underdrain pipe (inches) 20 in 40 Will the media be maintained to drain at least two inches per hour at the sand surface? Yes 41 Is at least one clean -out pipe provided at the low point of each underdrain line? Yes 42 Will clean -out pipes be capped? Yes ADDITIONAL INFORMATION 43 Please use this space to provide any additional information about the sand filter(s):