Loading...
HomeMy WebLinkAboutNCS000585_New Bern Audit Notification signed and preliminary agenda_20211103ROY COOPER Governor ELIZABETH S. BISER Smxe,ary BRIAN WRENN Dfrector CERTIFIED MAIL 7019 1120 0002 0066 3279 RETURN RECEIPT REQUESTED Ordilrailf November 3, 2021 City of New Bern Attn: Mr. Matt Montanye, Director of Public Works PB Box 1129 New Bern, NC 28563 Subject: MS4 PERMIT COMPLIANCE AUDIT NOTIFICATION City of New Bern NPDES MS4 Permit No. NCS000585 Craven County Dear Mr. Montanye: The Department of Environmental Quality (DEQ) has reviewed the documents submitted in response to the September 30, 2021 pre -audit documentation request. Based upon this review, staff will be performing the following National Pollutant Discharge Elimination System (NPDES) Municipal Separate Storm Sewer System (MS4) Permit compliance audit for the subject permit. An on -site audit will be performed, which includes on -site interviews with MS4 representatives and site inspection(s) of municipal industrial facilities. The on -site audit is scheduled for December 3, 2 02 1 beginning at 9:00 am and is expected to take at least one (1) full day (see attached agenda). Please arrange for an appropriate meeting space that will accommodate your representatives, 2-3 staff members from DEQ, and access to any tools routinely utilized to implement the MS4 Program (e.g. databases, GIS, forms, etc.). You are expected to ensure that all relevant staff, contractors and management/leadership/officials are present for scheduled audit meetings. The audit is structured but informal, and the agenda will be flexible depending upon progress. However, the Preliminary Findings portion of the audit will be held as scheduled so that management and elected officials can plan to attend. On -site meeting rooms must provide adequate space for all participants to maintain appropriate social distancing protocols for COVID-19. If special arrangements or schedule adjustments are necessary to achieve this, please discuss this with me prior to the audit date. All participants of on -site meetings are expected to wear personal protective equipment in accordance with current state requirements, guidelines and recommendations; and to also maintain appropriate social distancing protocols for COVID-19 at all times. North Carol`ma Department of ?nvironmental Qualta v ' Divlslon of Energy, Mineral and Lard Resourr es �� 52Kurth Salisbury Street f 1W Mail Service Center ; Raleigh, North Carolina 2709.1612 Should you have any questions regarding the upcoming MS4 Permit compliance audit, please feel free to contact me atpaul.clark(� ncdenr.L!ov or (919) 707-3642. Sincerely, � CAL Paul Clark Water Supply Watershed Protection Coordinator Cc: Avery Smith, Goldsboro-Stormwater Superintendent Jeanette.PowellLtncdenneoy MS4 Program Coordinator DEMLR Washington Regional Office DEMLR NPDES MS4 Permit Laserfiche File North Carolina Department of Environmental Quality 1 Division of Energy: Mineral and Land Resources 512 North Salisbury Street 1612 Mail Service Center ( Raleigh, North Carolina 27699 1612 ikylit{`.t t.l ESIri104�CNt14Slla! 1�1 %.i V I.4200 W F�Q Preliminary Agenda for MS4 Program Audit New Bern, NC December 3, 2021 Mtg Location: TBD Time Agenda Item 9:00 am — 9:15 am Introductions and Audit Overview 9:15 am - 9:45 am Program Implementation, Documentation, and Assessment 9:45 am — 10:15 am Illicit Discharge Detection and Elimination (IDDE) 10:15 — 10:45 pm Pollution/Prevention and Good Housekeeping 10:45 — 11:00 am Break 11:00 am - 12:00 pm Post Construction (including NSW) 12:00 pm - 1:00 pm Lunch Break 1:00 pm - 3:00 pm Site Visits (Municipal Facilities, outfalls, post construction sites) 3:00 - 3:15 pm Break 3:15 — 3:45 pm DEQ staff conference 3:45 pm - 4:15 pm Closing Conference/Preliminary Findings Page 1