Loading...
HomeMy WebLinkAboutWQ0040157_Regional Office Historical File Pre 2018Water Resources FILE ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Environmental Quality Interim Director July 17, 2018 Mr. Peter Harakas, V.P. Development and Land Acquisitions Carolina Cottage Homes, LLC 2550 W. Tyvola Rd., Suite 100 Charlotte, NC 28217 Subject: Permit No. WQ0040157 Carolina Cottage Homes, LLC Spencer Towns Wastewater Collection System Extension Permit Mecklenburg County Dear Mr. Harakas: In accordance with your application received July 13, 2018, we are forwarding herewith Permit No. WQ0040157 dated July 17, 2018, to Carolina Cottage Homes, LLC (Permittee) for the construction and operation upon certification of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded, and shall be subject to the conditions and limitations as specified therein. This cover letter shall be considered a part of this permit and is therefore incorporated therein by reference. • Please pay particular attention to the following conditions contained within this permit: Condition 11.1: This permit shall not be automatically transferable; a request must be made and approved. Condition 11.4: Requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2T .0403 or any individual system -wide collection system permit issued to the Permittee. It shall be the responsibility of the Permittee to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150E of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding. %`I�Iothing Compares State of North Carolina 1 Environmental Quality 1 Water Resources 1 Water Quality Regional Operations Mooresville Regional Office 1 610 East Center Avenue, Suite 301 1 Mooresville, North Carolina 28 l 15 704-663-1699 If you need additional information concerning this matter, please contact Barry Love at (704) 235-2143 or via e-mail at barry.love@ncdenragov. Sincerely, DocuSigned by: '•*d.,Ncw fi 1).144.4 F 161 FB69A2D84A3... for by'W.. Corey Basinger,Regional Supervisor Water Quality Regional Operations Section Mooresville Regional Office Division of Water Resources, NCDEQ cc: Katherine Goodman, P.E. (e-copy) Charlotte Water (e-copy) Tommy Rowland (e-copy) Regional Office Files Water Resources Central Files PERCS (e-copy) 2 Environmental Quality WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to Carolina Cottage Homes, LLC Mecklenburg County for the construction and operation of approximately 648 linear feet of 6-inch gravity sewer as part of the Spencer Towns project, and the discharge of 5,320 gallons per day of collected domestic wastewater into the Charlotte Water existing sewerage system, pursuant to the application received July 13, 2018, and in conformity with 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting data subsequently filed and approved by the Department of Environmental Quality and considered a part of this permit. This permit shall be effective from the date of issuance until rescinded and shall be subject to the specified conditions and limitations contained therein. DocuSigned by: L 44410 H P444 F161FR69A2I1A4A3 by W. Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Mooresville Regional Office Division of Water Resources, NCDEQ for Permit Number: WQ0040157 Permit Issued: July 17, 2018 3 , SUPPLEMENT �� �����U�� ����� ������ .�� PERMIT . �������"" �~"."���. Carolina Cottage Homes, LLC is hereby authorized to: Construct, and then operate upon certification the aforementioned wastewater collection extension, The sewage and wastewater collected by this system shall be treated in the Charlotte Water Sugar [reek Wastewater Treatment Plant inaccordance with Permit Number NCO024937. Permitting of this project does not constitute an acceptance of any part of the projectthat does not meet ISA NCA[ JT; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996^ as applicable; and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable, unless specifically mentioned herein. Division approval is based on acceptance of the certification provided by a North CaroUna-licensed Professional Engineer in the application, it shall be the Permittee"s responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules. Construction and operation is contingent upon compliance with the Standard Conditions and any Special Conditions identified below, 1. SPECIAL CONDITIONS l. No Mow in excess of the quantity permitted herein, 5,328 gaUons per day, shoU be made tributary to the snbjectsevversystem umd| an application for permit modification for an increase in Movv has been submitted noand approved bythe Division. [15AN[AC0Il[D304(b)] 2. This permit shall become voidable unless the agreement between Carolina Cottage Homes, kU[ and Charlotte Water for the collection and final treatment ofwastewater is infull force and effect. 1I5A NCA[O2T,O3Q4(h)] 3. The Operational Agreement between the Permittee and the Environmental Management Commission is incorporated herein by reference and shall be a condition o/this permit. Noncompliance with the terms of the Operational Agreement shall subject the Permittee to all sanctions provided by North Carolina General Statutes §l43-315.6Ato§143-215.6Cfor violation mforfailure toact inaccordance with the terms and conditions ofthis permit. [I5AN[ACO2T,OII5] 11. STANDARD CONDITIONS l. This permit �s not transferable, In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Permittee, a hunna| permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request shall be considered on its merits and mayor may not be approved. 115A N[A{O2T.UIO4; G6 I43'2151(d3)) 4 2. This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit; 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials unless specifically mentioned herein. [15A NCAC 02T.0110] 3. This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. [15A NCAC 02T .0110] 4. The wastewater collection facilities shall be properly maintained and operated at all times. The Permittee shall maintain compliance with an individual system -wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2T .0403. If an individual permit is not required, the following performance criteria shall be met: [15A NCAC 02T .0108(b)]: a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and to prevent any contravention of groundwater standards or surface water standards. b. A map of the sewer system shall be developed and shall be actively maintained. c. An operation and maintenance plan including pump station inspection frequency, preventative maintenance schedule, spare parts inventory and overflow response has been developed and implemented. d. Pump stations that are not'connected to a telemetry system shall be inspected every day (Le. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six -months and inspections are documented. f. A general observation of the entire sewer system shall be conducted at least once per year. g. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 28 .0506(a), and public notice shall be provided as required by North Carolina General Statute §143-215.1C. h. A Grease Control Program is in place as follows: 1. For public owned collection systems, the Grease Control Program shall include at least biannual distribution of educational materials for both commercial and residential users and the legal means to require grease interceptors at existing establishments. The plan shall also include legal means for inspections of the grease interceptors, enforcement for violators and the legal means to control grease entering the system from other public and private satellite sewer systems. 5 2. For privately owned collection systems, the Grease Control Program shall include at least bi- annual distribution of grease education materials to users of the collection system by the permittee or its representative. 3. Grease education materials shall be distributed more often than required in Parts (1 and (2) of this Subparagraph if necessary to prevent grease -related sanitary sewer overflows. i. Right-of-ways and easements shall be maintained in the full easement width for personnel and equipment accessibility, j. Documentation shall be kept for Subparagraphs (a) through (i) of this Rule for a minimum of three years with exception of the map, which shall be maintained for the life of the system. 5. The Permittee shall report by telephone to a water resources staff member at the Mooresville Regional Office, telephone number (704) 663-1699, as soon as possible, but in no case more than 24 hours, following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any SSO and/or spill over 1,000 gallons; or c, Any SSO and/or spill, regardless of volume, that reaches surface water Voice mail messages or faxed information is permissible, but this shall not be considered as the initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) 858-0368 or (919) 733-3300, Persons reporting any of the above occurrences shall file a spill report by completing and submitting Part of Form CS-SSO (or the most current Division approved form) within five days following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur, Part II of Form CS-SSO (or the most current Division approved form) can also be completed to show that the SSO was beyond control. [G.S. 143-215.1C(a1)1 6. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. (15A NCAC 02T.0108(b)] 7. Upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form attached to this permit shall be submitted with the required supporting documents to the address provided on the form. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. If the permit is issued to a private entity with an Operational Agreement, then a copy of the Articles of Incorporation, Declarations/Covenants/Restrictions, and Bylaws that have been appropriately filed with the applicable County's Register of Deeds office shall be submitted with the certification. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Supporting documentation shall include the following: a. One copy of the project construction record drawings (plan & profile views of sewer lines & force mains) of the wastewater collection system extension. Final record drawings should be clear on the plans or on digital media (CD or DVD disk) and are defined as the design drawings that are marked up or annotated with after construction information and show required buffers, separation distances, material changes, etc. b. One copy of the supporting applicable design calculations including pipe and pump sizing, velocity, pump cycle times, and level control settings, pump station buoyancy, wet well storage, surge protection, detention time in the wet well, and force main, ability to flush low points in force mains with a pump cycle, and downstream sewer capacity analysis. If a portable power source or pump is dedicated to multiple stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, include travel timeframes, shall be provided. c. Changes to the project that do not result in non-compliance with this permit, regulations, or the Minimum Design Criteria should be clearly identified on the record drawings, on the certification in the space provided, or in written summary form. Prior to Certification (Final or Partial): Permit modifications.are required for any changes resulting in non-compliance with this permit (including pipe length increases of 10% or greater, increased flow, pump station design capacity design increases of 5% or greater, and increases in the number/type of connections), regulations, or the Minimum Design Criteria. Requested modifications or variances to the Minimum Design Criteria will be reviewed on a case -by -case basis and each on its own merit. Please note that variances to the Minimum Design Criteria should be requested and approved during the permitting process prior to construction. After -construction requests are discouraged by the Division and may not be approved, thus requiring replacement or repair prior to certification & activation. [15A NCAC 02T .0116] 8. Gravity sewers installed greater than ten percent below the minimum required slope per the Division's Gravity Sewer Minimum Design Criteria shall not be acceptable and shall not be certified until corrected. If there is an unforeseen obstacle in the field where all viable solutions have been examined, a slope variance can be requested from the Division with firm supporting documentation. This shall be done through a permit modification with fee. Such variance requests will be evaluated on a case -by -case basis. Resolution of such request shall be evident prior to completing and submitting the construction certification. [ 15A NCAC 02T.0105(n)] 9. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities. [15A NCAC 02T .0116] 10. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T; the Division's Gravity Sewer Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000, as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North 7 Carolina -licensed Professional Engineer tmthe licensing board. [lSAMCA[ 02T .Ol04; 15A NCAC0ZT 11. In the event that the wastewater collection facilities fail to perform uatsfactorihy, including the creation o/nuisance conditions, the Pennitteeshall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. i15A N[A[UJT.0II0; I5A N[ACO2T .0100(b) 12. The issuance ofthis permit shall not exempt the Pcrmhteefrom complying with any and all statutes, rules, regulations, wrordinances that may beimposed bythe Division any other Federal, State, or Local government agencies which have jurisdiction or obtaining other permits which may be required by the Division orany other Federal, State, of Local government agencies. [G.S. I43- FAST TRACK SEWER ENGINEERING CERTIFICATION PERMITTEE: Carolina Cottage Homes, LLC PERMIT It: WQ0040157 PROJECT: Spencer Towns ISSUE DATE: July 17, 2018 This project shall not be considered complete nor allowed to operate in accordance with Condition 7 of this permit until the Division has received this Certification and all required supporting documentation. It shouldbe submitted in a manner that documents the Division's receipt. Send the required documentation the Regional Supervisor, Water Quality Regional Operations Section at the address at the bottom. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up until a final certification is received. A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted. PERMITTEE'S CERTIFICATION I, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein or portions thereof. Printed Name, Title Signature Date ENGINEER'S CERTIFICATION 1, , as a duly registered Professional En sneer in the State of North Carolina, having been authorized to observe (El periodically, ❑ weekly, [_] full time) the construction of the project name and location as referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 02T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials. North Carolina Professional Engineer's Seal w/signature & date: ❑ Final n Partial (include description) Certification Comments/Qualifiers (attach if necessary): State ofNorth Carolina I Environmental Quality I Water Resources I Water Quality Regional Operations Mooresville Regional Oticel 610 East Center Avenue, Suite 301 I Mooresville, North Carolina 28115 704 663 1699 ATE OF NORTH CAROLINA COUNTY OF Mecklenburg Permit No. 14 Q 6 0 LN 07 DEVELOPER'S OPERATIONAL AGREEMENT This AGREEMENT made pursuant to G.S. 143-215.1 (di) and entered into this -7 - lg day of , by and between the North Carolina Environmental Management Commission, an agency of the State of North Carolina, hereinafter known as the COMMISSION; and Carolina Cottage Homes, LLC , a corporation/general partnership registered/licensed to do business in the State of North Carolina, hereinafter known as the DEVELOPER. WITNESSETH: 1. The DEVELOPER is the owner of the certain lands lying in Mecklenburg County, upon which it is erecting and will erect dwelling units and other improvements, said development to be known as Spencer Towns (hereinafter the Development). 2. The DEVELOPER desires, to construct a wastewater collection system with pumps, wastewater treatment works, and/or disposal facilities (hereinafter Disposal System) to provide sanitary sewage disposal to serve the Development on said lands. 3. The DEVELOPER has applied to the COMMISSION for the issuance of a permit pursuant to G.S. 143- 215.1 to construct, maintain, and operate the Disposal System. 4. The DEVELOPER has created or shall create unit ownership in said dwellings units, other improvements and lands through filing of a Declaration of Unit Ownership (hereinafter Declaration), pursuant to Chapter 47C or 47F of the North Carolina General Statutes. 5. The DEVELOPER has caused to be formed or will cause to be formed at the time of filing of the Declaration, the (Unit Owners' Association) Spencer Towns Owners Association, Inc. (hereinafter Association), a non-profit corporation organized and existing under and by the virtue of the laws of the State of North Carolina, for the purpose, among others, of handling the property, affairs and business of the Development; of operating, maintaining, re -constructing and repairing the common elements of the lands and improvements subject to unit ownership, including the Disposal System; and of collecting dues and assessments to provide funds for such operation, maintenance, re -construction and repair. 6. The COMMISSION desires to assure that the Disposal System of the Development is properly constructed, maintained and operated in accordance with law and permit provisions in order to protect the quality of the waters of the State and the public interest therein. NOW, THEREFORE, in consideration of the promises and the benefits to be derived by each of the parties hereto, the COMMISSION and DEVELOPER do hereby mutually agree as follows: 1. The DEVELOPER shall construct the Disposal System in accordance with the permit and plans and specifications hereafter issued and approved by the COMMISSION, and shall thereafter properly operate and maintain such systems and facilities in accordance with applicable permit provisions and law. 2. The DEVELOPER shall not transfer ownership and/or control of the Disposal System to the Association until construction has been completed in accordance with the permit and approved plans, and the staff of the Division of Water Resources has inspected and approved of the facilities. In order to change the name of the permit holder, the DEVELOPER must request that the permit be reissued to the Association. The request must include a copy of the Association Bylaws andDeclaration. 3. The DEVELOPER shall not transfer, convey, assign or otherwise relinquish or release its responsibility for the operation and maintenance of its Disposal System until a permit has been reissued to the DEVELOPER's successor. rflT1 _ 1-‘r7x r 1 1 1 .1 1 The DEVELOPER shall provide in the Declaration and Association Bylaws that the Disposal System and appurtenances thereto are part of the common elements and shall thereafter be properly maintained and operated in conformity with law and the provisions of the permit for construction, operation, repair, and maintenance of the system and facilities. The Declaration and Bylaws shall identify the entire wastewater treatment, collection and disposal system as a common element which will receive the highest priority for expenditures by the Association except for Federal, State, and local taxes andinsurance. 5. The DEVELOPER shall provide in the Declaration and Association Bylaws that the Disposal System will be maintained out of the common expenses. In order to assure that there shall be funds readily available to repair, maintain or construct the Disposal System, beyond the routine operation and maintenance expenses, the Declaration and Association Bylaws shall provide that a fund be created out of the common expenses. Such fund shall be separate from the routine maintenance funds allocated for the facility and shall be part of the yearly budget. 6. In the event the common expense allocation and separate fund are not adequate for the construction, repair, and maintenance of the Disposal System, the Declaration and Association Bylaws shall provide for special assessments to cover such necessary costs. There shall be no limit on the amount of such assessments, and the Declaration and Bylaws shall provide that such special assessments can be made as necessary at any time. 7. If a wastewater collection system and wastewater treatment and/or disposal facility provided by any city, town, village, county, water and sewer authorities, or other unit of government shall hereinafter become available to serve the Development, the DEVELOPER shall take such action as is necessary to cause the existing and future wastewater of the Development to be accepted and discharged into said governmental system, and shall convey or transfer as much of the Disposal System and such necessary easements as the governmental unit mayrequire as condition of accepting the Development's wastewater. 8. Recognizing that it would be contrary to the public interest and to the public health, safety and welfare for the Association to enter into voluntary dissolution without having made adequate provision for the continued proper maintenance, repair and operation of its Disposal System, the DEVELOPER shall provide in the Association Bylaws that the Association shall not enter into voluntary dissolution without first having transferred its said system and facilities to some person, corporation or other entity acceptable to and approved by the COMMISSION by the issuance of apermit. 9. The agreements set forth in numbered paragraphs 1, 2, 3, 4, 5, 6, 7, and 8 above shall be conditions of any permit issued by the COMMISSION to the DEVELOPER for the construction, maintenance, repair and operation of the Disposal System. 10. A copy of this agreement shall be filed at the Register of Deeds in the County(ies) where the Declaration is filed and in the offices of the Secretary of State of North Carolina with the Articles of Incorporation of the Association. IN WITNESS WHEREOF, this agreement was executed in duplicate originals by the duly authorized representative of the parties hereto on the day and year written as indicated by each of the parties named below: FOR THE ENVIRONMENTAL COMMISSION Linda Culpepper Interim Director, Division of Water Resources (Date) Carolina C ttage Homes, LLC NamOPER (Signature) Peter Harakas, VP Development and Land Acquisitions Print Name and Title /7/ (PA? (Date) FORM: DEV 11-17 Page 2 of 2 Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources 15A NCAC 02T.0300 FAST TRACK SEWER SYSTEM EXTENSION APPLICATION ETA 04-16 & SUPPORTING DOCUMENTATION Applicatican Nun:nber: All items must be completed or the APPLICANT INFORMATION: [Meted tst I:)t 'RI, ttion rill be returned I. Applicant's name: Carolina Cottage 1Ieatnes, L.L(. (ccat tpany, marniciptality`, BOA, utility, etc.) Applicant type: LJ Individual. Federal Li State/co nature authority's tnanne; teeter arakas per 1 Title: VP Development and Land .Acqpisit,icrtas 4. Applicant's mailing address: 2550 W Tvvula Rd. Suite 100 City: Charlotte State: NC Applicant's contact information: Phone number: (704) J 42-49€i1 11. PROJECT INFORMATION: 1. Project name: S/._psticerllowns, ". Application/Project status: If a modification, provide the Corporation Zip: 28217- 0 General Paruership Municipal s: peter.lasaka)5fu sy'burbank..ctaln Proposed (New Perim Viz, permit number: WQ00 Existingit/Project and issued date: If new construction but part of a master plan, provide the existing permit number: WQ00 3. County where project is located: Mecklenburg 4. Approximate Coordinates (Decimal Degrees): Latitude 35.45'I...ongitude:-80..801' Parcel ID (if applicable): 091-091-0) , ti91 m09 (or Parcel ID to closest downstream sewer) CONSULTANT INFORMATION: 1. Professional Engineer Katherine Goodman Firm: Land[) si .tea one Mailinu address: 223 N. Grahann SC City: Charlotte State: NC Phone number, (704) , 3-0325 se Nt rnber: 1)49t dress. kguodrnarar``rsl anddesiun.coni IV. WASTEWATER TREATMENT FACILITY (%%WTF) INFORMATION: 1_ Facility Name McAlpine Creek, Irwin (reek, Sugar Creek. Per°rnit Owner Name: RECEIVING DOWNSTREAM SEWER l 1, Permit Nurnber(.$): WQ SNStern 'Tide.( olV�: Owner Name(s): ATION differen. han VW med Public Utili t'= I IONAi,.'� NC0024970, NC00249 45. NC0024937 I)on4nstrearn (Receir,`in ) Sewer Si e: inch FORM: FTA 04-16 Page I of 5 VI. GENERAL REQUIREMENTS if the Applicant is a Privately -Owned Public Utility`, has a Ccmfii tftl'te Applicant 3. If the Apphcan 4. Origin ofastt a Residential Owned ❑ Residential Leased ❑ School I preschool / day care ❑ Food and drink facilities ❑ Businesses/offices ` l'ietork Nature of wastewater : 100 % 6. Has a flow reduction been approved. i' If yes, provide a copy of flow' toper of lots to be sold, has a () swat Ye: s No has an e of Public Convenience and 'Necessity been attached'? N/A 1RM: ►shed? tin t1„ 1t(reem ntjE ()R\1 been attached? A pls'f ❑ Retail (stores, centers, nttalls) —1 Retail with food preparation/service ❑ Medical ,' dental veterinary facilities ❑ Church Nursine, Home ic./Contmer a Pretreatment educfion approval letter 7, Summarize wastewater generated by pro Establishment Type Te•awrtl° a See I.51.._(_.L....I_..P..... dwelling: proposed unknown non -resit and residential property located south or east of the in l.i,S, 42.,y_,.d). b Per 15A NCAC 02T ,0I 14(4 desist Clow rates tar° determined using available flow data, water using, fixtures, occupancy or operation patterns, and other measured data. t. effect? 0 Yes Daily Design trite 00 eal'unit No 0 Car Wash ❑ Hotel and,lor Motels ❑ Swimming Pool IClub aottse ❑ Swimming Pool/Filter Backwash Ej Other (Explain in Attachment) No No. of Units Total Flow ).320 GPE:) GP1) (; FBI) (i Pi) G Pf) GPf) 5,320 GPl7 :o wastewater design flow rates i.e., niniattuna flow per nt uses, public access facilities Iocateed near high public is Intracoastal \Vaterway to be used as vacation rentals as defi Wastewater generated by project. 520 GPI) (per,l Do not include future flows or previously permitted allocatio iff permitted flow is zero, indicate why: Pump Station or (gravity Sewer where flow will be permitted in su ❑ Flow has already been allocated in Pettus Number: ❑ Rehabilitation or replacement of El Other (Explain). M_ ents not identified [in table I51N( 1( 02`1 ,01 Ishall be sewer went permits that connect to this line no new flow expec d FORM: ETA 04-16 Page 2 of 5 GRAVITY SEVER DESIGN CRITERIA (If Applicable) - 02T.0305 & 111)( 1. Summarize gravity sewer to be permitted; Size (inche Length (feet) Material 6 647,45. PVC Section 11 & 111 of the MDC of Gravity Sewers contains 'information related to design criteria Section 111 contains infonnatiran related to minimum slopes tbr,gravity sewer(s) Oversizing lines to meet minimum slope requirement is not allowed and a viol'atlora of the MDC VW. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pomp St,atiun° COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT Pump station number or name: Approximate Coordinates (Decimal Degre ). Latitude: Longitude: 3, Design 'flow of the pump station: J. Operational point(s) of the pump(s): 5. Summarize the force main to be pern 6. Power relic E or Size c-cordance vn ith 1 gallons per day (f apacity) Ions per ininute at feet total dynamic tted (for this Pump Station la Length (feet) Standby° power .source or pump wit Material d t'1' atic activation and telen13A NCAC 02"F .03050 '1).(11). Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day Must be permanent to facility •-the pump station has an average daily Clow less than, 15,000 gallons per day: Portable power source with manual activation, quick -connection receptacle and telemetry - .0305(h)(1)(f= ) III Portable pum NCAC 02"f nit with plugged emergency pump connection and telemetry - I5A NCAC 02T .0305 It shall be demonstrated to the 17ivlsIun that the portable source is owned or contracted by the applicant ((raft agreement) and is compatible with the station If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' stew capacities and the rotation schedule of the portable power source or pump, including travel time.franres, shall be prow in the case of a multiple station power outage.. tie FORM: FTA 04-16 3 of 5 IX. SETBACKS & SEPARATIONS — (0.2B .0200 & :I5A NCAC 02T .0305(f)): I. Does the project comply with. all separations found. in 15A NCAC 02T .030.5(t) & (g) 5A NCAC 02T.0305(tcontains minimum separations that shall be provided for sewer s istens: Setback Parameter* sewers and other uli lities not listed below (vertical) [E) Yes LINo Separation Required 24 inches ater over sewer including, in benched 7enches r mains (horizontal) 18 inches The Reclaimed water lines (vertical. - reclaimed v , sewer 8 inches Reclaimed water lines (horizontal - reclaimed over sewer ' et **Any private or public water supply source, including any wells, WS-I waters of Class 1 or Class II impounded reservoirs used as a source of drinking water aters classified .WS (except WS-I or WS-V), B. SA, OR.W, HQW, or SB from normal gh ater (or tide elevation) and wetlands (see item IX2) 00 0 te **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches e Any building foundation Any basernei of embankment or cuts of 2 feet or more sertica1 hetglit Drainage sy steras and interce or drains Any swimming pools 5 feet al earth grade (vertical) 0 fcci 0 feet 36 inches • I 5,A NCAC 0210305Lg) contains alternatives Where separations in 0271,005,(f) cannot be achieved, • **Strea1 . classifications can be identified. using the Division's NC 'iu Water Ctissifications wel2page > If noncompliance with 02T.0305(fLor (g),, see Section X of this application 2. Does the project comply with separation requirements for wetlands?(50 feet of separation) El Yes Ej, No N/A See the Division's draft separation requirements for situations where separationcannot be meet • No variance is required if the alternative design criteria specified is utilized in design and construction *- As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 15A_NCA(2412,1L(1.20if,' • This \You'd include Trout Buffered Streams per I 5A NC AC 213.0202 4. Does the project require coverage/authorization under a 404 Nationwide individual permits or 401 Water Quality Certifications? • Information can be obtained from the 40 I Buiret Permitting_Brancli Yes No Ei] Yes No N/A 5. Does project comply with„I5A 02T.(105(46) (additional permits/certifications)? [Z] Yes El No Per I 5A NCAC 02 C0105je)(_20, directly related environmental .permits or certification applications are being prepared, have been applied for, or have been obtained, Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A, NCAC 02,1/,0402, "high -priority seN,ver" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. El Yes IZ] No El N/A, • If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per I5A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM' FTA 04-16 Page 4 of 5 CERTIFICATIONS: I. Does the submitted system comply with 1SANCAU02"f, the itticttram Destgtt ttt its mar tl r PcttrtTttin.g of Pump Stations, and: Force ls,iauns latest version.),. and the Citavit °Servver Minim ttnt Design Ca°iteria i`Ittes v*prsi rtt) as applicable? Yes No Cr, complete and submitthe Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review. Approval of the request is required prior to submittal of the Fast Track. Application and supporting documents. Professional Engineer's Certification: 1, st that this application for has been reviewed by me and is accurate complete and consistent with the information. supplied in the plans, speci#icathairs, engineering calculations, and all other supporting documeantation to the best of my knowledge. 1 further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria, for the Fast -Track' Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that 1 have reviewed this material and have judged it to he consistent with the proposed design. NOTE - En accordance vvith General Statutes 143-'215.6,A and 143-215,613,, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $1.0,000, as well as civil penalties up to $25,000 per violation. North Carolina Professional Engineer's seal, signature, and date: Applicant's Certification per 15A NCAC. 02T .0lt)6(h): Peter T. Harakas, Vice President (Signature Authority's name & title from Application Item 1.3 s ha application for has been reviewed by me and is accurate and complete to the best of my knowledge, 1 understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. 1 understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penaltie s, injunctive relief, and/or criminal prosecution, [ will make no claim against the Division of Water Resources should a condition of this permit be violated. 1 also understand that if all required parts of this application package are not completed and t hat if all required supporting information and attachments are not included, this application p ackage will be returned to me as incomplete, NOTE - In accordance with GeneStatutes 143215.6A and 143-215 6[3, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to e'eceed $10,000 as well as civil penalties up to $25,000 per violation. Signature:, Date: FORM: FTA 04-16 Page 5 of 5 i LandDesign. CREATING PLACES THAT MATTER. July 9, 2018 Spencer Towns LDI Project No. 1017074 SEWER SYSTEM APPLICANT: Carolina Cottage Homes, LLC 2550 W Tyvola Rd, Suite 100 Charlotte, NC 28217 DEVELOPER: Carolina Cottage Homes, LLC 2550 W Tyvola Rd, Suite 100 Charlotte, NC 28217 DESCRIPTION: We would like to request approval for sewer extension to the project site of Spencer Towns. The property will consist of 28 townhomes and 2 single family residences. The total wastewater flow requested and approved was 5,700 gpd. The single family residences will connect to the existing 8" public sanitary sewer, and the townhomes will allocate a total flow of 5,320 gpd to the private system. We are proposing to install 647.45 If of 6" pvc. Flows from the site will be sent to the McAlpine Creek, Irwin Creek, and Sugar Creek Wastewater Treatment Plants (facility permit numbers NC0024970, NC0024945, and NC0024937). This application package consists of the fast track sewer system extension application, the application fee, the flow tracking and acceptance form from Charlotte Water, a USGS topographic map indicating the location of the project, a street level map showing the project area, and the developer's operational agreement. Respectfully Submitted, Kate Goodman, PE LandDesign, Inc. LANDDES1GN.COM 223 N GRAHAM STREET • CHARLOTTE NC 28202 • 704 333 0325 CHARLOTTE • WASHINGTON DC • DALLAS • ORLANDO • SAN FRANCISCO CHARLOTTE WTER April 12, 2018 Ms, Kate Goodman LandDesign, Inc,. 223 N. Graham St. Charlotte, NC 28202. SUBJECT: WATER AND SANITARY SEWER FLOW ACCEPTANCE SPENCER TOWNS CORNER OF SPENCER ST & 36TH STREET CHARLOTTE NC CLTWATER TRACKING# 2018448 After an analysis of the sanitary sewer system associated with the proposed design of project 2018448, Spencer Towns, it was determined that there is sufficient capacity to accommodate the proposed sewer flow of 5,700 gallons per day (28 units x 190 gal/unit; 2 lots x190 gal/lots) at the connection point(s) indicated on the submitted utility plan for transmission to the Sugar Creek Wastewater Treatment Plant; NPDES permit number NC0024937, for treatment. This acceptance of flow is based on the existing capacity of the designated publicly owned treatments works. Please see attached NC DEQ flow tracking form. CLTWater agrees to furnish water to the subject project. The water quality to the subject project is regulated by the State Drinking Water Act Amendments of 1986 and The Water Supply Management Plan, PWS ID # 0160010 on file with the Public Water Supply Section of NC DENR. However, CLTWater cannot guarantee a constant pressure or quality of flow. CLTWater does not expect any of the above conditions to preclude water or sewer service to the subject site. However, the applicant should understand that due to the involvement of other agencies and continuing growth of the water and sewer system, the ability to provide service for future projects cannot be guaranteed nor reserved. Connection to the CLTVater and sewer system is accepted on a first come, first served basis. The applicant should understand that this letter is not authorization to construct private water or sewer systems, as the appropriate local or State permits are required prior to construction. If the appropriate authorization to construct permits are not obtained and construction has not started within one (2) year of issuance of this flow acceptance, and payment for any service connection(s) have not been received within (2) year of issuance of this flow acceptance, this flow acceptance approval shall be rescinded and a new flow acceptance request must be made. If you have any questions, please do not hesitate to contact me at (704) 391-5138 or Justin Webster (704) 336- 3019. Sincerely, Clive cd4b.e. Eaauset Gwendolyn Banner Engineering Assistant Charlotte Water 5100 Btcyokshir N1C. 28216 cl gar 9otteewatei ,os gk ed by t7e City or Charlotte 1 l� Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Applications (FTSE 04-16) Entity Requesting Allocation: Land Design, Inc . Project Name for which flow is being requested: Spencer Towns More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: McAlpine Creek, Irwin Creek, Sugar Creek b. WWTP Facility Permit#: NC0024970, NC0024945, NC0024937 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used All flaws are in MGD 99.0 11.392 64.791 0.006 76.183 77.0% II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: Pump Station (Name or Number) Firm Capacity, * MGD (A) Design Average Daily Flow** (Firm / pt), MGD (B) (C) (D)=(B+C) (E)=(A-D) Obligated, Approx. Not Yet Current Avg. Tributary Daily Flow, Daily Flow, MGD MGD Total Current Flow Plus Obligated Available Flow Capacity*** * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < D. Downstream Facility Name (Sewer): Unknown Downstream Permit Number: Unknown Page 1 of 2 FTSE 04-16 III. Certification Statement: Keri Cantrell certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form indicates acceptance of this wastewater flow. (.1 ( Signing Official Signature Date Page 2 of 2 FTSE 04-16 Polaris 3G Map Mecklenburg County, North Carolina Date Printed: 7 O O.O251.025)' „0.05 Miles This map or report is prepared for the inventory of real property within Mecklenburg County and is compiled from recorded deeds, plats tax maps, surveys, planimetrtc maps, and other public records and da Users of this map or report are hereby notified that the aforementioned public primary information sources should be consulted for verification. Mecklenburg County and its mapping contractors assume no legal responsibility for the information contained herein, .North Carolina S acre' pry of State Search Results Pagel o • File an Annual Report/Amend an Annual Report • Upload a PDF Filing • Order a Document Online • Add Entity to My Email Notification List • View Filings • Print an Amended a Annual Report form • Print a Pre -Populated Annual Report form Limited Liability Company Legal Name Carolina Cottage Homes, LLC Information Sosld: 1177803 Status: Current -Active Annual Report Status: Current Citizenship: Domestic Date Formed: 12/1/2010 Registered Agent: Teal, Charles E ddresses ailing 550 West Tyvola Rd #100 1arlotte, NC 28217 Mailing West Tyvola Rd #100 ti lotte, NC 28217 ,y Officials Principal. Office 2550 West Tyvola Rd #100 Charlotte, NC 28217 Reg Office 2550 West Tyvola Rd #100 Charlotte, NC 28217 \N aged by their managers pursuant to N.C.G.S. 57D-3-20. �d Ste 100 front ne services/search/Business_Registration_Results 7/16/2018 1017373 1017373 PENCER TOWNS Spencer Towns Sewer Application For your approval F6:w,,,t}°tip Y Kate Goodman 223 North Graham St. Charlotte, NC 28202 Love 610 E Center Ave #301 Room # 3323 Mooresville NC 28115 United States Barry, Tra . sn al 7/10/2018 00006 Mail nd Design KGoodman@landdesign.com NC©ENR- Mooresville Regional Office barry.love@ncdenr.gov Enclosed are the documents for a private sewer application for Spencer Townhomes located in Charlotte, NC. Please let me know if you have any questions. KATE GOODMAN, PE Senior Designer Associate J s flice (o) 704.333,0325 j (,m) 704,267.8405 Charlotte i Washington DC lDailas g; Orlando San Francisco Bo der €. zdD i'gn co f A @Landmesi,gninc -'6,1■Mlq . Transmittal DATE: TRANSMITTAL ID: DESCRIPTION OF CONTENTS 7/10/2018 00006 QTY DATED TITLE NOTES 1 -- Fast Track Application 1 -- Capacity assurance from Charlotte Water 1 -- Check for $480 1 -- Developer agreement 1 -- USGS map 1 -- street map page t°t2 1 (.; V ECANCDE N RIDWR FAST TRACK SEWER ENGINEERING CERTIFICATION PERMITTEE: PERMIT #: PROJECT: ISSUE DATE: Carolina Cottage Homes, LLC WQ0040157 Spencer Towns July 17, 2018 This project shall not be considered complete nor allowed to operate in accordance with Condition 7 of this permit until the Division has received this Certification and all required supporting documentation. It should be submitted in a manner that documents the Division's receipt. Send the required documentation the Regional Supervisor, Water Quality Regional Operations Section at the address at the bottom, Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up until a final certification is received. A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted. PERMITTEE'S CERTIFICATION I, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted jief1r portions thereof, a? 7-- Printed Name, Title Signature ENGINE 'S CERTIFICATION I, gesim \loto,E.t, , as a dLAy registered Professional Eniineer in the State of North Carolina, having been authorized to observe (LA periodically, E weekly, L] full time) the construction of the project name and location as referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 02T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting \ North Carolina Professional Engineer's Seal w/signature & date: CA00 / •(/ 1(4. • F na El Partial (include description) Lars Tb ,See-v6D : Certification Co en ualiflers (attach If necessary): 4 State of North Carolina Elwin:gnu:10M Quality I Water Resnurccr I Water Quality Regional Operation Mooreaville Regional Office! 610 East Center Avenue, Suite, 3O I ktooresvilk, North Carolina 281 1 7rd 61.1 10.010