Loading...
HomeMy WebLinkAboutWQ0039245_Regional Office Historical File Pre 2018Water Resources Environmental Quality June 5, 2017 Mr. Robert H. West, Development Director TBR 1305 Owner, LLC 1575 Northside Drive, Bldg. 100, Suite 200 Atlanta, GA 30318 Y OOPER Governor MICHAEL S. REGAN Secretary S. JAY ZINIMERMAN Director Subject: Permit No. WQ0039245 TBR 1305 Owner, LLC Central Retail Redevelopment, Wastewater Collection System Extension Permit Mecklenburg County Dear Mr. West: In accordance with your application received May 26, 2017, we are forwarding herewith Permit No. WQ0039245 dated June 5, 2017, to TBR 1305 Owner, LLC (Permittee) for the construction and operation upon certification of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded and shall be subject to the conditions and limitations as specified therein. This cover lettershall be considered a part of this permit and is therefore incorporated therein by reference. Please -pay particular attention to the following conditions contained within this permit: Condition 11.1: Condition 11.4: This permit shall not be automatically transferable; a request must be made and approved. Requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2T .0403 or any individual system -wide collection system permit issued to the Permittee. It shall be the responsibility of the Permittee to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service. Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding. `Nothing Compares �.— State of North Carolina 1 Environmental Quality I Water Resources I Water Quality Regional Operations Mooresville Regional Office 1610 East Center Avenue, Suite 301 I Mooresville, North Carolina 28115 704-663-1699 If you need additional information concerning this matter, please contact Barry Love at or via e-mail at barry.love@ncdenr.gov. Sincerely, by W. Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Mooresville Regional Office Division of Water Resources, NCDEQ cc: Nate Doolittle, P.E. (e-copy) Barbara Gross (e-copy) Tommy Rowland (e-copy) Regional Office Files Water Resources Central Files PERCS (e-copy) 7 235 2143 2 Environmental Quality WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, •permission is hereby granted to TBR 1305 Owner, LLC Mecklenburg County for the construction and operation of approximately 44 linear feet of 6-inch gravity sewer, to serve the Central Retail Redevelopment project, and the discharge of 13,000 gallons per day of collecteddomestic wastewater into the Charlotte Water existing sewerage system, pursuant to the application received May 26, 2017, and in conformity with 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track • Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting data subsequently filed and approved by the Department of Environmental Quality and considered apart of this permit. This permit shall be effective from the date of issuance until rescinded and shall be subject to the specified conditions and limitations contained therein. by W. Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Mooresville Regional Office Division of Water Resources, NCDEQ Permit Number: WQ0039245 Permit Issued: June 5, 2017 3 SUPPLEMENT TO PERMIT COVER SHEET TBR 1305 Owner, LLC is hereby authorized to: Construct, and then operate upon certification the aforementioned wastewater collection extension. The sewage and wastewater collected by this system shall be treated in the Charlotte Water Sugar Creek Wastewater Treatment Plant in accordance with Permit Number NC0024937. Permitting of this project does not constitute an acceptance of any part of the project that does not meet 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; and the Division's. Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable, unless specifically mentioned herein. Division approval is based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in the application. It shall be the Permittee's responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules. Construction and operation is contingent upon compliance with the Standard Conditions and any Special Conditions identified below. I. SPECIAL CONDITIONS No flow in excess of the quantity permitted herein, 13,000 GPD shall be made tributary to the subject sewer system until an application for permit modification for an increase in flow has been submitted to and approved by the Division. [15A NCAC 02T.0304(b)] 2. This permit shall become voidable unless the agreement between TBR 1305 Owner, LLC and Charlotte Water for the collection and final treatment of wastewater is in full force and effect. [15A NCAC 02T.0304(h)] 11. STANDARD CONDITIONS This permit is not transferable. In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Permittee, a forrnal permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved. [15A NCAC 02T.0104; G.S 143-215.1(d3)] 2. This permit shall become voidable unless the wastewater collection facilities are constructed in. accordance with the conditions of this permit; 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials unless specifically mentioned herein. [15A NCAC 02T.0110] This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. [15A NCAC 02T .0110] 4 4. The wastewater collection facilities shall be properly maintained and operated at all times. The Permittee shall maintain compliance with an individual system -wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2T .0403. If an individual permit is not required, the following performance criteria shall be met: [15A NCAC 02T .0108(b)]: a, The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and to prevent any contravention of groundwater standards or surface water standards. b. A map of the sewer system shall be developed and shall be actively maintained. c. An operation and maintenance plan including pump station inspection frequency, preventative maintenance schedule, spare parts inventory and overflow response has been developed and implemented. d. Pump stations that are not connected to a telemetry system shall be inspected every day (Le. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six -months and inspections are documented. f. A general observation of the entire sewer system shall be conducted at least once per year. g. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina General Statute §143-215.1C. h. A Grease Control Program is in place as follows: 1. For public owned collection systems, the Grease Control Program shall include at least biannual distribution of educational materials for both commercial and residential users and the legal means to require grease interceptors at existing establishments. The plan shall also include legal means for inspections of the grease interceptors, enforcement for violators and the legal means to control grease entering the system from other public and private satellite sewer systems. 2. For privately owned collection systems, the Grease Control Program shall include at least bi- annual distribution of grease education materials to users of the collection system by the permittee or its representative. 3. Grease education materials shall be distributed more often than required in Parts (1) and (2) of this Subparagraph if necessary to prevent grease -related sanitary sewer overflows. i. Right-of-ways and easements shall be maintained in the full easement width for personnel and equipment accessibility. j. Documentation shall be kept for Subparagraphs (a) through (I) of this Rule for a minimum of three years with exception of the map, which shall be maintained for the life of the system. . The Pennittee shall report by telephone to a water resources staff member at the Mooresville Regional Office, telephone number (704) 663-1699, as soon as possible, but in no case more than 24 hours, following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures ofpumps, line blockage orbreakage, etc.;or b. Any S5Oand/or spill over l,8U8gallons; n, c. Any S3Oand/or spill, regardless ofvolume, that reaches surface water Voice mail messages or faxed information is permissible, but this shall not be considered as the initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) 858'0368 or /919\ 733'3,300. Persons reporting any of the above occurrences shall file a spill report by completing and submitting Part | of Form CS'550 (or the most current Division approved form) within five days following first knowledge ofthe occurrence. This report must outline the actions taken orproposed tobptaken to ensure that the problem does not recur. Part QufForm CS-S3[)(orthemost current Division approved form) can also be completed to show/that the SSO was beyond control, [G.6. 143'215.1C/a1W 6. Construction of the gravity sewers, pump stations, and force mains shall be scheduled no as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. [15A W[ACUJT.O1Q8/bD 7. Upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form attached to this permit shall be submitted with the required supporting documents to the address provided on the form. Acomplete certification is one where the form is fully executed and the supporting documents are provided asapplicable. Any wastewater flow made tributary to the wastewater collection system extension, prior to completion of this Engineer's [edification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. If the permit is issued to a private entity with an Operational Agreement, then acopy nfthe Articles of Incorporation, Denlaratiwns/Cmwemants/Restric%ions, and Bylaws that have been mppnmpr|stmh/ filed with the applicable County's Register of Deeds office shall be submitted with the certification. A complete certification is one where the form is fully executed and the supporting documents are provided aaapplicable. Supporting documentation shall include the fnNovving- a. One copy of the project construction record drawings (plan & profile views of sewer lines & force mains) of the wastewater collection system extension. Final record drawings should be clear on the plans or on digital media ([D or DVD disk) and are defined as the design drawings that are marked up or annotated with after construction information and show required buffers, separation distances, material changes, etc. b. One copy of the supporting applicable design calculations including pipe and pump sizing, velocity, pump cycle times, and level control settings, pump station buoyancy, wet well storage, surge protection, detention time in the wet well, and force main, ability to flush low points in force mains with a pump cycle, and downstream sewer capacity analysis. If a portable power source or pump is dedicated to multiple stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, include travel timeframes, shall be provided. c. Changes to the project that do not result in non-compliance with this permit, regulations, or the Minimum Design Criteria should be clearly identified on the record drawings, on the certification in the space provided, or in written summary form. Prior to Certification (Final or Partial): Permit modifications are required for any changes resulting in non-compliance with this permit (including pipe length increases of 10% or greater, increased flow, pump station design capacity design increases of 5% or greater, and increases in the number/type of connections), regulations, or the Minimum Design Criteria. Requested modifications or variances to the Minimum Design Criteria will be reviewed on a case -by -case basis and each on its own merit. Please note that variances to the Minimum Design Criteria should be requested and approved during the permitting process prior to construction. After -construction requests are discouraged by the Division and may not be approved, thus requiring replacement or repair prior to certification & activation. 115A NCAC 02T .0116] 8. Gravity sewers installed greater than ten percent below the minimum required slope per the Division's Gravity Sewer Minimum Design Criteria shall not be acceptable and shall not be certified until corrected. If there is an unforeseen obstacle in the field where all viable solutions have been examined, a slope variance can be requested from the Division with firm supporting documentation. This shall be done through a permit modification with fee. Such variance requests will be evaluated on a case -by -case basis. Resolution of such request shall be evident prior to completing and submitting the construction certification. [ 15A NCAC 02T.0105(n)] 9. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities. [15A NCAC 02T .0116] 10. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T; the Division's Gravity Sewer Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000, as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. [15A NCAC 02T .0104; 15A NCAC 02T .0108(b-c)] 11. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. [15A NCAC 02T .0110; 15A NCAC 02T .0108(b)] 12. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by the Division any other Federal, State, or Local government agencies which have jurisdiction or obtaining other permits which may be prir PERMITTEE: PERMIT #: PROJECT: ISSUE DATE: FAST TRACK SEWER ENGINEERING CERTIFICATION TBR 1305 Owner, LLC WQ0039245 Central Retail Redevelopment June 5, 2017 This project shall not be considered complete nor allowed to operate in accordance with Condition 7 of this permit until the Division has received this Certification and all required supporting documentation. It should be submitted in a manner that documents the Division's receipt. Send the required documentation the Regional Supervisor, Water Quality Regional Operations Section at the address at the bottom. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up until a final certification is received. A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted. PERMITTEE'S CERTIFICATION I, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein or portions thereof. Printed Name, Title Signature Date ENGINEER'S CERTIFICATION I, , as a dul registered Professional En ineer in the State of North Carolina, having been authorized to observe (periodically, ❑ weekly, full time) the construction of the project name and location as referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 02T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials. North Carolina Professional Engineer's Seal w/signature & date: ❑ Final ❑ Partial (include description) Certification Comments/Qualifiers (attach if necessary): State of North Carolina I Environmental Quality I Water Resources I Water Quality Regional Operations Mooresville Regional Office' 610 East Center Avenue, Suite 301 I Mooresville, North Carolina 28115 State of North Carolina Department of Environmental Quality Division of Water Resources 15A. NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION ETA 04-16 & SUPPORTING DOCUMENTATION Apphctttrc n Number: All items must. be completed or the application will he returned APPLICANT INFORMATION: 1, Applicant's r arrre: TF3'R. 1305 Owner, LLC (cirmpany. municipa1rty, IIOA, utility°. eta .j ?, Applicant 'type: ❑ lndividual ❑ Corporation 0 (.icrte-ral Partnership ❑ l Federal ❑ State/County ❑ Municipal 3. Signature authority's name: Robert IF. west per I5A NC Title: Development Direct() 4. Applicant's mailing address: 1575 Ncarthside,1)r. Bldg 100 Suite 200 City: Atlanta State. GA 5. Applicant's contact inlorrna Phone number: (404) 367-6523 Email Address: Willi. tmrr@ tribrl Zip: 303w18- PROJECT INI ORM.AT,ION: 1, Project Warne: Cc.ntr°al Retail Redee elol meet' ?. Application/Project ;status. la modification. provide the ex P tely-Owned Public I' ❑ Other 0 Existing Permit/Project and issued date: Il"new construction but part of a master plan, provide the exist] WQ00e 3. County where project is located. \lecklenb)tt 4. ,Approximate Coordinates (Decimal .Degrees). Latitude. 3 221()40` Longitude:--80.81 .516` 5. Parcel. ID (if" applicable): 08 1.1.81.15, (or Parcel ID to closest downstream sewer) Proposed (New Peruti t permit rrunrber: WOO° CONSULTANT INFORMATION: 1, Professional Engineer Nate Doolittle License Number 315?1. Firm. I,andDesien Mailing address: 223 N,Graharn St, City Charlotte State: NC Zip: 212()2- Phone number: (704) 333-0325 Entail Address: ndooltttleC 1anddesi WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1, Facility Name: Sugar Creek WWTP Permit Number: NC0024937 Owner Name: V. RECEIA"ING DOWNSTREAM SEWER INFORMATION (if (la l'er nt than WGWTF):. . 1, Permit Number(s): WQ System Wide Collection System Permit Number(s) (if applicable): 'QCS Owner Name(s): _„ FORM: F"T`3A 04 16 Page 1 of 5 VI. GENERAL REQUIREMENTS 1. if the Applicant is a Privately -Owned blic Utility, has a Certificate of Public Co • Yes ❑No NIA -enience and Necessity been attached`' 2, If the Applicant. is a. Developer of lots to be sold, has a Developer's OperationalAgreement (FOR iw1: DEV) been attac-lxed? ❑ Yes ]No LNIA 3. Ifthe Applicant is a Home/Property Owners' Ass ciation, has an Og crational Agreement (EQR.M; F{OA been attached? 4. Origin of wastewater: (check all that apply): ❑ Residential Owned ❑ Residential Leased ❑ School / preschool / day care Food and drink facilities ❑ Businesses / offices / factories ❑ Yes ❑No N/A Retail (stores, centers, malls) Retail with food preparation/service ❑ Medical / dental / veterinary facilities © Church ❑ Nursing Horne 5, Nature of wastewater ; % Domestic n cial 100 % Commercial Industrial (See 15A NCAC 02T .0103(;20)) 1-->Is there a Pretreatment Program in effect? 6. Has a flow reduction been. approved under 15A NCAC 02T ,01 14(f)? ❑ Yes Y If yes, provide a copy of flow reduction. approval letter 7, Summarize wastewater generated by project: Establishment Type (see 02"I".0114 Restaurant Daily Design Flow 40 gal/1 seat ❑ Car Wash. ❑ Hotel and/or Motels © Swimming Pool /Clubhouse ❑ Swimming Pool/Filter Backwash © Other (Explain in Attachment) ❑Yes El No Q No No. of Units 325 Flow 1.3,000 GPD gal/ gal/ gal/ gal/ gal/ Total GPD GPD GPD GPD GPD 13,000 GPD a See 15A NCAC 02'T .01 14(b), (d). ie)ill and (c)(2) for caveats to wastewater design flow rates , minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G,S. 42A-4), b Per 15A NCAC 02T ,0114(c), design flow rates for establishments not identified [in table 15A NCAC 02'T:01 14] shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data, 'Wastewater generated by project: 13,000 GPD (per 15A NCAC 02T .01 14) Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: 0 Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with tto new flow expected LI Other (Explain): FORM: FTA 04-16 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (if Applicable) - 027I .0305 & MDC (Ci'avky Seers I. Summarize gravity sewer to be permitted: Size (inches) 6 Length (feet) 44 Material PVC • Section II & Ill of the MDC for Permitting of Gravity Sewers contains information related to design criteria )0 Section III contains information related to minimum slopes for gravity sewer(s) • Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VHI. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2, Approximate Coordinates (Decimal Degrees): Latitude: . Longitude: - 3. Design flow of the pump station: millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): gallons per minute at 5. Summarize the force main to be permitted (for this Purnp Station): Size (inches) Length (feet) feet total dynamic head (TDH) Material 6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1): LJ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)( 1 )(B): • Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day • A/lust be permanent to facility Or if the pump station has an average daily tlow less than 15,000 gallons per day: El Portable power source with manual activation, quick -connection receptacle and telemetry - I 5A NCAC 02T .0305(11)(1)(C) or E] Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)( 1 )(C): ▪ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. • If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)): 1. Does the project comply with all separations found in 1.5.A -NC.A • 70.2T .0305 •.t) & (g) 1.5A NCAC 02T.0305(f) contains minimum separations that shall be provided for sewe Storm sewers and othe Yes LI No systems: Setback Parameter* Separation Required isted below (vertical) ains vertical -water over sewer including in benched trenches) er mains (horizontal) Reclaimed water lines vcrtiea1- reclaimed over sewer. **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches An buildin foundation Any basement Top slope of embankment or cuts of 2 feet or more vertical height Drainage systems and interceptor drains Any swimming pools Final earth grade (vertical) 24 inches 18 inches 10 feet hes 2 feet 100 feet 50 feet 10 feet 5 feet 10 feet 10 feet. 5 feet 10 feet. 36 inches )0 -I 5A NCAC 02T.0305(g) contains •alternatives where separations in 02'f.030.51 f) cannot be achieved. )0 **Stream classifications can be identified using. the Division's NC Surface Water Classifications webpage )0 If noncompliance with 02T.0305(1) or (g), see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) '10 See the Division's draft separation requirements for situations where separation cannot be meet • No variance is required if the alternative design criteria specified is utilized in design and construction `I- As built documents should reference the location of areas effected 3. Does the project comply with all setbacks found in the river basin rules per 15A NCAC 0213 .0200? 0- This would include Trout Buffered Streams per I 5A -NCA( 213.0202 Yes Ej No Z Yes El No 4. Does the project comply with an individual 404 Permit or any 401 Certifications? Yes [I] No 0.- Wetland -related permits shall be requested, obtained, and adhered to for projects that impact wetlands or surface waters )0 Information can be obtained from the 401 & Buffer Permitting Branch 5, Does project comply with I5A NCAC 02T.0105(c)(6) (additional .permits/certifications)? Yes L No Per 15A NCAC 02T.0105(c)(6),. directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.), 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 1.5.A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. Z Yes No • If yes, include an attachment with details for each line, including type (aerial line, size, material, and location) High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 X. CERTIFICATIONS: Does the submitted system comply with 15bA NCrt,C" and ForceMattis llwtt t vcrsionl, and the (irfivity ever Design Crites! for the l rn ittitt f P s Criteria (latest �cr°u(ttj as applic Yes ©No If No, complctc and submit the Variance/Alternative Design Request application ('VADC 10-14) and supporting documents for review, Approval of the request is required prior to submittal of the Fast Track Application and supporting documents, Professional Engineer's Certification: 11-1167 (Professional Engineer's name from Application attest that this application for ltas been reviewed by me and is accurampleete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. 1 fiu.rther attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer. Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that 1 have reviewed this material and have judged it to be consistent with the proposed design. NOTE-- In accord atkee with. General Statutes 143-21.5,6A and 14:3-215,613, any person who knowingly trtakes any false statement, representation., or cert.i.ficat.ion in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to S25,000 per violation North Carolina Professional Engineer's seal, signature, and date: Ap i artfs Certificatittn per 1 A NCAC 02T .010 b attest that thi Authority`s ttarrtc. title from Application Item application for has been reviewed by ne and is accurate and complete to the best of -my knowledge, I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete, 1 understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an imrn.ediate enforcement action that may include civil penalties, injunctive relief, an.dior criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed. and that if all required supporting information and attachments are not included, this application package will be returned. to me as incomplete. NOTE - in accordance ';ith General Statutes 143-215,6A and 143-215.t11, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. attire: Date: FORM: 'ETA 04-16 Pane5of5 CHARLOTTE W TER March 15, 2017 Ms, Mullissa Oliver LandDesign, Inc. 223 North Graham St Charlotte, NC 28202 SUBJECT: WATER AND SANITARY SEWER FLOW ACCEPTANCE CENTRAL AVENUE RETAIL REDEVELOPMENT 1331 CENTRAL AVENUE, CHARLOTTE NC CLTWATER TRACKING# 2017292 After an analysis of the sanitary sewer system associated with the proposed design of project Central Avenue Retail Redevelopment, it was determined that there is sufficient capacity to accommodate the proposed sewer flow of 13,000 gallons per day (325 restaurant seats x 40 gpd/seat) at the connection point(s) indicated on the submitted utility plan for transmission to the Sugar Creek Wastewater Treatment Plant; NPDES permit number NC0024937, for treatment. This acceptance of flow is based on the existing capacity of the designated publicly owned treatments works. Please see attached NC DEQ flow tracking form, CLTWater agrees to furnish water to the subject project. The water quality to the subject project is regulated by the State Drinking Water Act Amendments of 1986 and The Water Supply Management Plan, PWS ID # 0160010 on file with the Public Water Supply Section of NC DEQ, However, CLTWater cannot guarantee a constant pressure +ir quality of flow.. CLTWater does not expect any of the above conditions to preclude water or sewer service to the subject site, However, the applicant should understand that due to the involvement of other agencies and continuing growth of the water and sewer system, the ability to provide service for future projects cannot be guaranteed nor reserved, Connection to the CLTWater an sewer system is accepted on a first come, first served basis. The applicant should understand that this letter is not authorization to construct private water or sewer systems, as the appropriate local or State permits are required prior to construction. If the appropriate authorization to construct ermits are not obtained and construction has not started within one (1) year of issu,:ince of this flow acceptances and payment for any service connection(s) have not been received within (1) year of issuance of this flow acceptance, this flow acceptance. a royal shall be rescinded and a news flow acre Lance re vest must be made, If you have any questions, please do not hesitate to contact me at (704) 432-5801. Sincerely, Barbara Gross Engineering Assistant Charlotte Water 5100 Brookshire Blvd, Charlotte, NC 282.16 charlotte varer.org Operated by the City t f Marlette Division of Witter' e State of North Carolina Department of Environmental Quality Division of Water Resources e for Sewer Extension Applications (FTSE 04-16) Entity Requesting Allocation: LandDesign, Inc. Project Name for which flow is being requested: Central Avenue Retail Redevelopment: More than one PTSE may be re yuired for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewaterf:%w. 1. Complete this section only if you are the owner of the wastewater treatment p1 a. WWTP Facility Name: McAlpine Creek, Irwin Creek, Sugar Creek b. WWTP FaCility.Pertnit i#: NC0024970, NC0024945, NC0024937 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow fi Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used Allflows are in MGD 99.0 12.327 65.760 0.013 78.9% I1. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow, List pump stations located between the project connection point and the WW`I'P: (A) (B) (C) (D)--(B+C) (E)=(A-I)) Design Obligated, Pump Average Daily Apprax, Not Yet Total Current Station Firm Flow** Current Avg, Tributary Flow Plus (Name or Capacity, * (Firm / pf), Daily Flow, Daily Flow, Obligated Available Number) MOD MGD MGD MGD Flow Capacity*** * The Firm Capacity of any pump station is deft ed as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < O. Downstream Facility Name (Sewe al Avenue (1912). Downstream Permit Number: Unknown Page 1 of 6 FTSI, 04-16 III. Certification Statement: I Carl Wilson certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of thj(form xindicates acceptance of this wastewater flow. Signing Offic Signature Page 2 of 6 3 /y17 Date FTSE 04-16 CHARLOTTE W : J TER March 15, 2017 Ms. Mellissa Oliver Land©esign, Inc. 223 North Graham St Charlotte, NC 28202 SUBJECT: WATER AND SANITARY SEWER FLOW ACCEPTANCE CWENTRAL AVENUE RETAIL REDEVELOPMENT 1331 CENTRAL AVENUE, CHARLOTTE NC CLTWATER TRACKING# 2017292 After an analysis of the sanitary sewer system associated with the proposed design of project Central Avenue Retail Redevelopment, it was determined that there is sufficient capacity to accommodate the proposed sewer flow of 13,000 gallons per day (325 restaurant seats x 40 gpd/seat) at the connection point(s) indicated on the submitted utility plan for transmission to the Sugar Creek Wastewater Treatment Plant; NPDES permit number NC0024937, for treatment. This acceptance of flow is based on the existing capacity of the designated publicly owned treatments works. Please see attached NC DEQ flow tracking form. CLTWater agrees to furnish water to the subject project. The water quality to the subject project is regulated by the State Drinking Water Act Amendments of 1986 and The Water Supply Management Plan, PWS ID # 0160010 on file with the Public Water Supply Section of NC DEQ. However, CLTWater cannot guarantee a constant pressure or quality of flow. CLTWater does not expect any of the above conditions to preclude water or sewer service to the subject site. However, the applicant should understand that due to the involvement of other agencies and continuing growth of the water and sewer system, the ability to provide service for future projects cannot be guaranteed nor reserved. Connection to the CLTWater and sewer system is accepted on a first come, first served basis. The applicant should understand that this letter is not authorization to construct private water or sewer systems, as the appropriate local or State permits are required prior to construction. If the appropriate authorization to construct permits are not obtained and construction has not started within one (1) year of issuance of this flow acceptance; and payment for any service connection js) have not been received within (1) year of issuance of this flow acceptance, this flow acceptance approval shall be rescinded and a new flow acceptance request must be made. If you have any questions, please do not hesitate to contact me at (704) 432-5801. Sincerely, Barbara Gross Engineering Assistant Charlotte Water 5100 Brookshire B vd, Charlotte, NC 28216 charlotte vater.oi g Operated by the City of Charlotte CENTRAL RETAIL DEVELOPMENT CHARLOTTE, NORTH CAROLINA 2015 TOPO CENTRAL RETAIL DEVELOPMENT CHARLOTTE, NORTH CAROLINA 2015 ARIAL Corporations Division Page 1 of 1 North Carolina Elaine F. Marshall DEPARTMENT OF THE Secretary SECRETARY OF STATE PO Box 29622 Raleigh. NC 27626-0622 {919)807-2000 Click Here To: View Document Filings File an Annual Report Amend a Previous Annual Report Print a Pre -Populated Annual Report form Corporate Names Account Login Create Site Account Legal: TBR 1305 Owner, LLC Limited Liability Company information Sosld: Status: Annual Report Status: Citizenship: Date Formed: Fiscal Month: State of Incorporation: Registered Agent: Corporate Addresses 1416223 Current -Active Current Foreign 12/11/2014 December DE National Registered Agents, Inc. Mailing: Principal Office: Reg Office: Reg Mailing: 1575 Northside Drive NW Building 100 Suite 200 Atlanta, GA 30318 1575 Northside Drive NW Building 100 Suite 200 Atlanta, GA 30318 160 Mine Lake Ct Ste 200 Raleigh, NC 27615 160 Mine Lake Ct Ste 200 Raleigh, NC 27615 Company Officials All LLCs are managed by their managers pursuant to N.C.G.S. 57D-3-20. Member: Robert West 1575 Northside Drive NW, Building 100, Suite 200 Atlanta GA 30318 https://www.sosnc.gov/Search/profcorp/10683702 5/26/2017 urban design planning civil engineering branding landscape architecture May 18th, 2017 Mooresville Regional DENR Office Division of Water Quality 610 E. Center Ave. Mooresville, NC 28301 RE: Central Retail Development LandDesign PN: 1016238 Dear Sir/Madam, TRB 1305 Owner, LLC are proposing to develop and construct a commercial development consisting of restaurant(s) with 325 seats on a 0.76 acre tract. We are estimating 13,000 gallons per day of gravity sewage. Attached is a Letter from CMUD agreeing to accept our flows to the Sugar Creek WWTP. The sewer system contains a 44 LF of private 6" pvc lateral. The private 6" pvc lateral is an extension of an existing 6" lateral that already served the development and connects to an existing 8" sewer main into Central Ave. Included in this submittal are one (1) copy of the Fast -Track Application form, one (1) $480 Application fee check, one (1) WWTF Capacity and Flow Tracking/Acceptance form, one (1) Color Site Map and Certifications. Thank you for your assistance with this project, please feel free to contact me at 704.333.0325 should you have any questions and/or comments. Respectfully Submitted, Mellissi Oliver, Designer moliver@ ianddesign.com 704.333.0325 Ex. 1059 PO Box 36959 Charlotte„ NC 28236-6959 223 North Graham Street Charlotte, NC 28202 V: 704.333.0325 F: 704.376.8235 N:1 2O 1 ti110162381Docs\Permitt Forms\Private Sewer (Fast T act)1Fast Track Narrative.d©c. Central Files: APS _ SWP 6/5/2017 Permit Number WQ0039245 Permit Tracking Slip Program Category Status Project Type Non -discharge Active New Project Permit Type Gravity Sewer Extension, Pump Stations, & Pressure Sewer Extensions Primary Reviewer barry.iove Coastal SWRuie Permitted Flow 13,000 Facility Version 1.00 Permit Classification Individual Permit Contact Affiliation Facility Name Central Retail Redevelopment Location Address Owner Major/Minor Region Minor Mooresville County Mecklenburg Facility Contact Affiliation Owner Name Tbr 1305 Owner LLC Dates/Events Owner Type Non-Govemment Owner Affiliation Robert H. West 1575 Northside Dr Atlanta GA 30318 Orig Issue 6/5/2017 _ Scheduled App Received Draft Initiated issuance Public Notice Issue Effective Expiration 5/26/2017 6/5/2017 6/5/2017 Regulated Activities Food preparation, other Retail Wastewater collection Outfall Requested /Received Events Additional information requested Additional information received Waterbody Name Streamindex Number Current Class Subbasin