Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2019 Nitrogen loading specific activities
Net Nitrogen Export Change Nitrogen Export without SCM Nitrogen Export with SCM Nitrogen Nitrogen Nitrogen Nitrogen Nitrogen Site Site Acreage Loading Loading Loading Loading Purchased (Ibs/ac/yr) West New bern ESI Phase I 391.66 7.74 3032.2 4.06 1590.3 180.14 Carolina Colours Dog and R.V. Park 5.62 4.86 27.28 4.86 27.28 7.07 Trent Road Office Complex 4.65 10.59 49.25 7.09 32.97 16.23 U-Haul MLK Blvd. 12.75 16.22 175.E 9.8 106.085 28.83 Hardee Farms Phase II 72.46 3.51 253.01 3.51 253.01 0 Panda Express 0 0 0 0 0 0 DMV-State Highway Patrol Building 6.4 10.2 65.28 4.05 25.92 2.88 Tate Commons 8,194 5.78 47.4 4.44 36.38 6.9 Harbor Freight 1.1 12.91 14.2 4.9 9.3 2.47 Totals 502.834 71.81 3664.22 42.71 2081.245 244.52 (Ibs/yr Baseline- Ibs/yr Loading with SCM) - lbs/yr purchased Net Change in Nitrogen = 7NetReduction in Nitrogen due to SCM = lbs/yr loading without SCM - Ibs/yr with SCM 1 1582.975 Net Nitrogen Export Change