Loading...
HomeMy WebLinkAboutWQ0038760_Regional Office Historical File Pre 2018Water Resources ENVIRONMENTAL QUALITY October 5, 2016 Jon Morris, Manager BIN-Metrolina LLC 610 East Morehead Street, Suite 250 Charlotte, NC 28202 DONALD R. VAN DER VAART Secretary S. JAY ZIMMERMAN Director Subject: Permit No. WQ0038760 BIN-Metrolina LLC Metrolina Park Wastewater Collection System Extension Permit Mecklenburg County Dear Mr. Morris: In accordance with your application received September 26, 2016, we are forwarding. herewith Permit No. WQ0038760 dated October 5, 2016, to BIN-Metrolina LLC (Permittee) for the construction and operation upon certification of the subject wastewater collection system extension. This permit shall be effective from the date of issuance, until rescinded and shall be subject to the conditions and limitations as specified therein. This cover letter shall be considered a part of this permit and is therefore incorporated therein by reference. Please pay particular attention to the following conditions contained within this permit: Condition 11.1: This permit shall not be automatically transferable; a request must be made and approved. ' Condition 11.4: .Requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2T .0403 or any individual system -wide collection system permit issued to the Permittee. It shall be the responsibility of the Permittee to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through .§143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding. State of North Carolina I Environmental Quality I Water Resources I Water Quality Regional Operations, Mooresville Regional Office) 610 East Center Avenue, Suite 301 I Mooresville, North Carolina 28115 704 663 1699 If you need additional information concerning this matter, please contact Bar or via e-mail at barry.love@ncdenr.gov. Sincerely, by W. Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Mooresville Regional Office Division of Water Resources, NCDEQ cc: Jeffery Orsborn, P.E. (e-copy) Barbara Gross (e-copy) Tommy Rowland (e-copy) Regional Office Files Water Resources Central Files PERCS (e-copy) 704) 2 2143 Page 2of8 E_ nvironmental Quality - WASTEWATER COLLECTION, SYSTEM EXTENSION PERMIT • In accordance with the provisions of Article 21.of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to BIN-Metrolina LLC < ' Mecklenburg County 'for the construction and- operation of approximately 4,219 linear feet of 8-inch gravity sewer to serve a warehouse space with 222 loading docks as part of the Metrolina Park project, and the discharge of 24,420 gallons per day of collected domestic wastewater into the Charlotte Water existing -sewerage system, pursuant to the application received September 26, 2016 , and in conformity with 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12,1996, as applicable; the Division's Minimurn Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and 'other supporting data subsequently filed and approved by the :Department of Environmental Quality and considered a part of this permit. _ This permit shall be effective from the date of issuance until rescinded and shall be subjectto the specified Conditions and limitations contained therein. by W. Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Mooresville Regional Office Division of Water Resources, NCDEQ Permit Number: • WQ0038760• - Permit Issued: October 5, 2016 Page 3 of 8 SUPPLEMENT TO PERMIT COVER SHEET BIN-Me*roU^na LLCis hereby authorized to: Construct and then operate uponcertificationthe aforementioned wastewater collection extension. The sewage and wastewater collected by this system shall be treated in the Charlotte Water McAlpine Creek Wastewater Treatment Plant in accordance with Permit Number NCO024970. Permitting of this project does not constitute an acceptance of any part of the projecttha1doesnotmeet 15A N[AC 27; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; and the Division's Minimum Design Criteria for the Fast -Track Permitting ofPump Stations and Force Mains adopted June I, 2000, as applicable, unless, specifically mentioned herein. Division approval is based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in the application, it shall be the Permittee's responsibility to ensure that the as -constructed projectnmects the appropriate design criteria and rules. Construction and operation iscontingent upon compliance with the Standard Conditions and any Special Conditions identified below. 1, SPECIAL CONDITIONS 1 No flow in excess of the quantity permitted herein, I4/4ZOGPDshall bemade tributary tothe subject sewer system until an application for permit modification for an increase in flow has been submitted to and approved by the Division. [15A N[ACO2T.O3Q4(b)l 1 This permit shall become voidable unless the agreement between 0Um'Metndioa LUCend Charlotte Water for the collection and final treatment of wastewater is in full force and effect. [15A NCAC 11. STANDARD CONDITIONS l. This permit is not transferable. in the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Pennbtee a forma{ permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may ormay not be approved. [15A N[ACO2T.02O4; G.S 143'215.1(d3)] 2. This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit; 15A NCAC 2T, the Division's Gravity Sewer Minimum Design Criteria adopted FebnVarylZ, 199tiamapplicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials unless specifically mentioned herein. (15A NCAC 02T.01101 3. This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. (15A NCAC 02T 0110] 4. The wastewater collection facilities shall be property maintained and operated at all times. The Page 4 of 8 operation and maintenance of these facilities as required by 15A NCAC 2T .0403. If an individual . permit is not required, the following performance criteria shall be met: [15A NCAC 02T .0108(b)]: a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and to prevent any contravention of groundwater standards or surface water standards. b. A map of the sewer system shall be developed and shall be actively maintained. • c. An operation and maintenance plan including pump station inspection frequency, preventative maintenance schedule, spare parts inventory and overflow response has been developed and implemented. d. Pump stations that are not connected to a telemetry system shall be inspected every day (Le. 365 days per year). Pump stations that are connected to a telemetry system shall be -inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six -months and inspections are • documented. f. A general observation of the entire sewer system shall be conducted at least once per year. g. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina General Statute §143-215.1C. h. A Grease Control Program is in place as follows: 1. For public owned collection systems, the Grease Control Program shall include at least biannual distribution of educational materials for both commercial and residential users and the legal means to require grease interceptors at existing establishments. Theplan shall also include legal means for inspections of the grease interceptors, enforcement for violators and the legal means to control grease entering the system from other public and private satellite sewer systems. 2. For privately owned collection systems, the Grease Control Program shall include at least bi- annual distribution of grease education materials to users of the collection system by the permittee or its representative. 3. Grease education materials shall be distributed more often than required in Parts (1) and (2) of this Subparagraph if necessary to prevent grease -related sanitary sewer overflows. i. Right-of-ways and easements shall be maintained in the full easement width for personnel and equiprnent accessibility. j.. Documentation shall be kept for Subparagraphs (a) through (i) of this Rule for a minimum of three years with exception of the map, which shall be maintained for the life of the system. 5. The Permittee shall report by telephone to a water resources staff member at the Mooresville Regional Office, telephone number (704) 663-1699, as soon as possible, but in no case more than 24, following the occurrence or first knowledge of the occurrence of either of the following: - Page 5 of 8 a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any SSO and/or spill over 1,000 gallons; or c. Any SSO and/or spill, regardless of volume, that reaches surface water Voice mail messages or faxed information is permissible, but this shall not be considered as the initial verbal report, Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) 858-0368 or (919) 733-3300. Persons reporting any of the above occurrences shall file a spill report by completing and submitting Part I of Form CS-SSO (or the most current Division approved form) within five clays following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur. Part II of Form CS-SSO (or the most current Division approved form) can also be completed to show that the SSO was beyond control. [G.S. 143-215.1C(a1)] 6. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. [15A NCAC 02T.0108(b)] 7. Upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form attached to this permit shall be submitted with the required supporting documents to the address provided on the form, A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. if the permit is issued to a private entity with an Operational Agreement, then a copy of the Articles of incorporation, Declarations/Covenants/Restrictions, and Bylaws that have been appropriately filed with the applicable County's Register of Deeds office shall be submitted with the certification. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Supporting documentation shall include the following: a. One copy of the project construction record drawings (plan & profile views of sewer lines & force mains) of the wastewater collection system extension. Fin& record drawings should be clear on the plans or on digital media (CD or DVD disk) and are defined as the design drawings that are marked up or annotated with after construction information and show required buffers, separation distances, material changes, etc. b. One copy of the supporting applicable design calculations including pipe and pump sizing, velocity, pump cycle times, and level control settings, pump station buoyancy, wet well storage, surge protection, detention time in the wet well, and force main, ability to flush low points in force mains with a pump cycle, and downstream sewer capacity analysis. If a portable power source or pump is dedicated to multiple stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, include travel timeframes, shall be provided. Page 6 of 8 Changes to the project that do not result in non-compliance with this permit, regulations, or the Minimum Design Criteria should be clearly identified on the record drawings, on the certification in the space provided, or in written summary form. Prior to Certification (Final or Partial): Permit modifications are required for any changes resulting in non-compliance with this permit (including pipe length increases of 10% or greater, increased flow, pump station design capacity design increases of 5% or greater, and increases in the number/type of connections), regulations, or the Minimum Design Criteria. Requested modifications or variances to the Minimum Design Criteria will be reviewed on a case -by -case basis and each on its own merit. Please note that variances to the Minimum Design Criteria should,be requested and approved during the permitting process prior to construction. After -construction requests are discouraged by the Division and may not be approved, thus requiring replacement or repair prior to certification & activation. [15A NCAC 02T.01161 8. Gravity sewers installed greater than ten percent below the minimum required slope per the Division's Gravity Sewer Minimum Design Criteria shall not be acceptable and shall not be certified until corrected. If there is an unforeseen obstacle in the field where all viable solutions have been examined, a slope variance can be requested from the Division with firm supporting documentation. This shall be done through a permit modification with fee. Such variance requests will be evaluated on a case -by -case basis. Resolution of such request shall be evident prior to completing and submitting the construction certification. [ 15A NCAC 02T.0105(n)] 9. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities. [15A NCAC 02T .01161 10. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T; the Division's Gravity Sewer Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000, as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. [15A NCAC 02T .0104; 15A NCAC 02T .0108(b-c)1 _ 11. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. [15A NCAC 02T .0110; 15A NCAC 02T .0108(b)1 12. The issuance of this permit shall not exempt the"Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by the Division any other Federal, State, or Local government agencies which have jurisdiction or obtaining other permits which may be required by the Division or any other Federal, State, of Local government agencies. [G.S. 143- . 215.1(b)1 Page 7 of 8 FAST TRACK SEWER ENGINEERING CERTIFICATION PERMITTEE: BIN-Metrolina LLC PERMIT #: WQ0038760 PROJECT: Metrolina Park ISSUE DATE: October 5, 2016 This project shall not be considered complete nor allowed to operate in accordance with Condition 7 of this permit until the Division has received this Certification and all required supporting documentation. It. should be submitted in a manner that documents the Division's receipt. Send the required documentation the Regional Supervisor, Water Quality Regional Operations Section at the address at the bottom. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up until a final certification is received. A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted. PERMITTEE'S CERTIFICATION I, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein or portions thereof. Printed Name, Title Signature Date ENGINEER'S CERTIFICATION I, , as a duly registered Professional En ineer in the State of North Carolina, having been authorized to observe (( ( periodically, 0 weekly, full time) the construction of the project name and location as referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 02T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials. North Carolina Professional Engineer's Seal w/signature & date: Final Partial (include description) Certificatlon Comments/Qualifiers (attach i n ssary): State of North Carolina Env`uoutteetxtal C t 1thty dWater �tuce Mooresville Regional Office{ 610 East Center Avenue, Suite 101 704 663 1699 ooresville, N Carolina 28).15 )nis 115ANCAC 02T.()I06(b) her (7(!4) 597; 7757 l rttsril Address- ma NFORMAT1ON: .Metreylana Park DIvtslo oI 4 (r Resources State of.North C"arolina Department of Environmental Quality Division of Water Resources NCAC 02T .0300 FAST TRACK SEWER SYSTEM EXTENSION APPLICATION 'FTA 04-I6 & SUPPORTING DOCUMENTATION Applic.dtCaora Nruarlacr All items must he eo ted or the atpIrlica APP.LIC°ANT INFORMATION: Applicant's name: 131-N-Metrc)lirtaa 2. Applicant type: 0 Inc ivichtal ©l Federal 4, Api. City: Charlotte Applicant's contract 11 PROJ.E 1 _ 1'roje„c: Applicrrtitarai'ra.)j ct strafe xl.ili%sa,tit n, p1 )v"ic1 :aiistru 4, Appro\ina<ate. C arordinates (Dcci Parcel ID (ifsrpplieable): 037-203-17 (or Parcel 11) to closest downstream sewer) sister pl.ur, provide the e° cck CONSULTANT INFORMATION: I l''rotessioiia9 Engineer: „Fel`Certi (. ()rslx)r l�ir C)resborn 1t1nuineeri)rr (;lrorap, l''`1 aaddress ae Number: 028786 t Morehead Street. .Suite.➢1 Charlotte State: NC 1 cr: (704) 749-141.32 7.ip: 28202 - completed by 1)W`t;i (late WASTEWATER TREATMENT FA+C'IT,ITY (WA "TN'ORMATION: eilrty Name : McAlpine Creek Permit Ntarralxr: '00024970 C)� tacr Name: CI.TWater (CNII 1)) ned RECEDOWNSTREAM SEWER INFORMATION (if different than WAIT): I)errnit Ntrrribcrts): 1a c? Downstream ( Yu. SN tem Wide Collection ti statra 1'crrrtit 1 tarttk NName( s): C'LIWater (C',MI1D) 8 inch 1\ 1 t)4-1(s Al. GENERAL REQUIREMENTS lithe Applicant is ci Privately -Owned Public Utility, has a Certificate of Public Conve LII\es L10 0N/A 2. if the Applicant is a Developer of lots to he sold, has a DeyelopcirLsOperational_Alrcement (E)RM: DEV).. been attached? El Yes No EINIA 3, If the Applicant is a Iroprt Owners ,Association, has an Operational A,orcement (FORM: HOPI) been attached? 0 Yes ElNo EN/A 4 Origin of wastewater, (check a Residential Owned Residential Leased 0 School 1 preschool /day care 0 Food and drink facilities 0 Businesses. / offices factories , at apply): '<oat' (stores, centers,. malls) .Retail with fOod preparittionfservice Medical 1 dental / veterinary facilities Church Nursing Home encc— and Necessity been attached? (;„'ar Wash 0 Hotel and -or Motels 0 Swimming Pool 'Clubhouse PoollEilter Backwash 0 Other (Explain in Attachment) 5. Nature o) viz :.ewa er f)onie,stic/Commercial Commercial t tf'.. Industrial (See 15A NCAC 021 .0103(29)) s there a Pretreatment Program in effect? Lj Yes Nc, Has a flow reduction been approved under ,15A NA: AC 021 .01 1 411)? El Yes ves, nroyide,a cony of flow reduction approval letter 7, Summarize wastewater generated by project: Establishinent Tyne (see 02T.0114()) industrial Daily Design Flow H'i" 2,a1; gall gal/ No .5 No. of Units' Flow --2-272(41÷t7P1) •2'4# (iPI) G P D G Pt) GRD GPI) a See 15A NCAC 021 „01E4-11,01 jskl) and. te)(2) (Or caveats to waStMater design flow rates minimum flow per dwelling,: proposed unknown twit -residential development uses: public access facilities located near high public Use areas; and residential property located smith or east or the Atlantic: Intracoastal Waterway to be iised as vacation rentals as defined in (71,5,214;-)k,4), b Per 1 5A N( AC 02T 4(1c,), design flow rates for establishments not identified [in table I5A NCAC 02T.01 14] shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project:1,7;2NY GPD (per 1 5,A NCA( 021 .0114) Do not include .rtiture flows or previously permitted allocations if permitted, flow is zero, indicate why: El Pump Station or Gravity SeWer where flow will be permitted in subsequer.t pe: tits. that connect to this line 111 How has already been allocated in Permit, Number: El RehahiIituion or replacement of existing sewer with .no new flow expected 0 Other (Explain): FORM: I' IA 04-10 Pau' 2 of 5 4`IL. GRAVITYSEWER DESIGN CRITERIA(IfApplicable) -02T.0 & sIDC(G I. Summarize (gr mite sewer to he perrnitted: ches ) 8„ Lcn tat (rev() 4,219 Material PVC Sc laa)ta ll IIl < 1' tlrs (\41)C 1i)r Seat c n Ili ae>xtttrurs uali)rara<rti rtr t-elated to rartrr.irrrttrra, 1 :is for 2,rav'tr se«cr(s) Ose.rsi.Lin lines to meet minaum slop requircn►cnt is not atrw a and a v tcd to of the AMC PUMP STATMN DESIGN CRITERIA (If Applicable)—02T.0305 & h9_HC (Pump Stations/Fo'ree Mains): COMPLETE FOR EACH PUMP STATION INCLUDE[) IN THIS PROJECT Pun))) statt4au otnnlaer or Hume: Approximate Co )rdivates (Decimal Degrees): Lam E)esittn flow of the primp station, [111 ClI)ns a11or)s per day (1 („)pertitional poirgallons per ntaatutc trt Surnrnar.irc the Ion, e rraain tua lc. penriitted Or this PurnpStation): Sire (inches) Length (legit) l�a�correlial�ilit�'ur re orieart a with 15ANCA1. 12I" [] Standby power source or pump withautomat :term' 11li,u'r rand telemetry - 15A1. NCA,C 02 .0305(1i)( I)(B), Required for all pump stations aitla axr ayeragc daily flow greater than or equal tc, I5„000 gallons per da's r ivlust he permanent to lac,ilit station has an average daily 11e»M less than i;,iu; ( .power soturee V ith n>inrual taco 3t3c�r1 eliticp ccrrrrte�eti )(C) [] Portable pr.unl)iu slra d to tl rlc larar er° urge or pwru)) is dedicated to in up Stado ncl the ra)tatiaat� seh drale..d the t ortaaOle r er Scrrrrec or trtrrrr in the case Ms: utc.tet. I5A NCA(.." 02` 1C:1Cw" 02'1` .0305(.I) v the applicant {dr .± provided Page 3 of 5 IX. SETBACKS & SEPARATIONS- (02B .0200 & 15A N CAC 02T .0305(I)) .Does the project comply with all separationund lfl I5A NCAC 021' .0305(1) 84 15A NCAC 021.0305(1) contains minimum selaraf ms shallided Ji ewer ysterns Setlxick Parameter* S ata1etIl1rc1. Sir . sewers and other ittes not listed below B.rcrtical) 24 inches later nianis (ver cal-waier 0 'C " sewer dudi.ng in benched tTenches' later mains (horizontal) eclained \ la lines rverttea - reclaimed over sewer) OVa sewer) ED Yes El No i inches 10 feet CfleS 2 feet **Any private or public water supply source. including tiny wells. WS-1 kk'ilerS of Class 1 or C1aS8 11 lrnpoul11icd reservoirs used as a source of drinking water 'titers classified '1/4.VS (except WS-I or WS-V)„ 13. SA„. .1.1QW, or SL:i from normal high \\sitter ilor tide elevation uid wetlands (See fletY11X,2) 11 * 1 \ii 0her stream, lak.c. inirkiundment. or ground water lowe - • a u s .-face drain(' ditches feet Any l lldnu.2f0 datu Any tY seri 5 feet lcd ".'opslope (if embankment or cuts of 2 feet or More vertical height rit systenis alld in 1)1 edIlill lliluls 5 fed . y swirralliTqt p001.'S .Final earth gade fverticalt 11) feet I' Indl1cs 15A NCAC 021.0305(g) contains iihMalIVCS l%liere separations in 021,0305(0 cannot be achIeved. **Stream classifications can he identified using die Division's NC Surface Water Classifications webpage 'A.• If noncompliance ‘vith 02T,030.5(1) or (g),, sice Section X of this application 2. flies the project comply \\WI setiaration requirements for wetlands? (50 feel of separation) Sec the 1..)i.visio11*s .draft separation requirements for situations where separation cannot be meet No variance is .required if the (diet nt 1)5) design criteria specified is tail tied in design and construction As built documents :should referencc. the location a areas effected Yes Ell No Does the project comply with till setbacks found in the river basin rules per 15A 'NCAC 0213 020U Yes El No This would include [rout Buffered Streams per ISA NC.AC 213.0202 4. Does the project comply with an individual 404 Permit or any 401. Certifications't Yes [1] No Wetlaild-rolated pci nul ili 11 he requested. obtained, inid tidhered Ail for pi' Oj OCISthat C wetlands or surInce waters information can hie obtained. from the 401 & 1.,,ciffer,PerrnittingBranch 5, .Does project comply with 15A NCAC 02T.0 05fc)(6f ndh 1101 il permitsloortitications)? 15! Yes El No Per 15A. NCAC 021_0105(c)(6), ,directly related environmental permits or certification applications are 'being prepared, have lacen applic'id for, or have been obtained. ISSWMCC of this permit is 5)ontinger0 1SSIE.'1.11C0 Of dependent permits (erosion ilrid sedimentation control plans, stonnwater management pkins„ etc.). 6. Does this project include any .se\ver collection lines that tire deemed *high -priority'.'" Per 15A NCAC 021.0402. "high -priority sewer- means "'taw aerial sewer, sewer contaelim.,r surftiec waters, s on.. or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. II Yes El No f yes, include an attachment with details lair each line, including type taerial Iinc s7e materiid, (.ind 10:1110111. High priority lines shall be inspected by the permittee or its representatixe at least once every six -months and inspections documented per 15A NCAC 02T.0.403(a)(5) or the permitee's .individual System -Wide Collection permit. 171 1IA 04-16 Page 4 of 5 CERTIFICATIONS: Does he submitted system comply with JNCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains (latest version), and the flravi SY:w I Desi = 'riteria (latest vc!iQjj as applicable? Yes El No If No, complete and submit the VariancelAitemative Design Request application (A/ADC 10-14) and supporting documents for review. Approval of the request is required prior to submittal of the Fast Track Application and supporting documents. 2, Professional Engineer's Certification: 1, SX‘e C, Ors6orel (Professio al Engineer's name from Application Item W.I.) attest that this application for has been reviewed by me, 41.nd is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. 1 further attest that to the best of my k„nowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum 'Design Criteria for the Fast -Track Permitting of .Pump Stations and Force Mains (latest version), Although other professionals may have developed certain portions of this submittal package, inclusion of these inaterials under my signature and seal signifies that 1 have reviewed this material and have judged it to be consistent with the proposed design. NOTE -- In accordance with General Statutes 1.43-21.5,6A and 143-215.68, any person who knowingly makes any false statement, representation,or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a •fin e not to exceed $10,000, as well as civilpenalties up to $25,000 per violation. North Carolina Professional Engineer's seal, signature, and date: 3, Applicant's Certification per ISA N .AC 02T .0106(b)7, -&4 s fit„.1 attest that this application for (Signature Authoritys nrnc & title from Application Item 1.3.) has been reviewed by me and is accurate and complete to the best of my knowledge, I understand that if all required parts of this application arc not completed and that if all required supporting documentation and attachments arc not included, this application package is subject to 'being returned as rncornplcte 1 understand that any discharge of wastewater from this non. - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecuuon 1 will make no claim against the Division of Water Resources should a condition of this permit be viOlated, 1 also understandthat if all required parts of this application package are not completed and that if all required supporting .information and attachments are not included, this application package will be returned to me as incomplete, NOTE — In accordance with General Statutes 143:2 .., A and 1437215.613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation, Signature: Date: FORM: FTA 04-16 Page 5 of 5 A LOTTE W TER September 6, 2016 Mr. Jeff Orsborn Orsborn Engineering Group, PA 610 E Morehead St Suite 106 Charlotte, NC 28202 SUBJECT: WATER AND SEWER FLOW ACCEPTANCE METROLINA PARK 7000 APACHE AV, CHARLOTTE NC CLTWATER TRACKING# 2016748 A flow acceptance study of the subject site has been completed and the following has been determined: This project has been approved to discharge into the sanitary sewer system in accordance with the site plans submitted with the application, It should be noted that the review has been set to major/conditional due to capacity concerns at the Paw Creek Pump Station, and Permanent Flow Monitoring Sites 9 and 8. It is expected that those capacity concerns will be alleviated with the completion of force main improvements for the Paw Creek Pump Station, and the completion/relocation of the new Steele Creek Pump Station force main. All other associated sanitary sewer infrastructure was found to have sufficient capacity to accommodate the proposed sewer flow of 24,420 gallons per day (Warehouse space with 222 loading docks x 110 gpd/dock) from this project for transmission to the McAlpine Creek Wastewater Treatment Plant; NPDES permit number NC0024970, for treatment. This acceptance of flow is based upon the existing capacity of the designated publicly owned treatments works. Please see attached NC DEQ FTSE form, Charlotte Water (CLTWater) agrees to furnish water to the subject project. The water quality to the subject project is regulated by the State Drinking Water Act Amendments of 1986 and The Water Supply Management Plan, PWS ID # 0160010 on fide with the Public Water Supply Section of NCDEQ. However, CLTWater cannot guarantee a constant pressure or quality of flow. The applicant should understand that due to the involvement of other agencies and continuing growth of the water system, the ability to provide service for future projects cannot be guaranteed nor reserved. Connection to the CLTWater system is accepted on a first corne, first served basis. Charlotte Water 5100 LBOuok,lu9tk ha.l, 61 �I ;ire NC 282'16 Oka Operated by the City of Charlotte The applicant should understand that this letter` not authorization to construct private water systems;, as the appropriate local or State perniits are required prior to construction, the appropriate authorization to contruct peits am not obtained construction has not started within one (1) year of issuance of this flow acceptance, tance and payment for any service connections have not been received within (1) year of issuance of this flow acceptanc ette this flow acceptance approval shallbe rescinded and a new flow acceptance request must be made. If you have any questions, please do not hesitate to contact me at (704) 432-5801. Sincerely, a Gross Engineering Assistant Cheri atteW t r 'G90 Be) kbrat£ pia , hartr_ita. 2821Cchalk:Ata;3 State of North Carolina Department of Environment and Natural Resources Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Applications (FTSE 08-13) Project Applicant Name: orsborn Encrineerjnq Group PA Project Name for which flow is being requested: Metrolina Park More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: McAlpine Creek, Irwin Creek, Sugar Creek WWTP b. WWTP Facility Permit ##: NC0024970, NC0024945, NC0024937 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used All flows are in MGD 99.0 10.954 70.670 0.0244 81.646 82.5% II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Average Daily Approx. Not Yet Total Current Station Firm Flow** Current Avg. Tributary Flow Plus (Name or Capacity,* (Firm / pi), Daily Flow, Daily Flow, Obligated Available Number) MGD MGD MGD MGD Flow Capacity*** Long Creek 9.9 3.96 4.078 0.153 4.232 -0.272 Paw Creek 10.5 4.2 6.004 0.211 6.215 -2.015 * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily FIow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Page 1 of 6 FTSE 08-13 a 4 III. Certification Statement: I Carl Wilson certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form indicates acceptance of this wastewater flow. .LJ Signing Official Signa re i 1 1 € Page 2 of 6 197/pV/ FTSE 08-I3 FTSE PLANNING ASSESSMENT ADDENDUM (FAA) Submit a planning assessment addendum for each pump station listed in Section II where Available Capacity is < O. Pump Station (Name or Number): Given that: a. The proportion and amount of Obligated, Not Yet Tributary Daily Flow (C) accounts for 3.6 (Long) /3.4 (Paw) % and o .153 /0 .211MGD of the Available Capacity (E) in Pump Station Long Creek and Paw Creek ; and that b. The rate of activation of this obligated, not yet tributary capacity is currently approximately a . 153 / 0 .211 MGD per year; and that c. A funded Capital Project that will provide the required planned capacity, namely Long Creek EQ Basin and Paw Creek Forcemain Replacement is in design or under construction with planned completion in Long creek EQ Basin - complete; and/or d. The following applies: Paw creak Fozce Main - 2Q2o 'CMUD's Capital Improvement Plan has allocated funds for improvements to the Paw Creek forcemain and a 5 million gallon EQ basin at Long Creek Pump Station. Long Creek and Paw Creek pump stations operate as a system using SCADA data to determine the rate of flow delivered from the upstream pump station, Long Creek, to Paw Creek the downstream facility. Long Creek pump station has the ability to transfer flows to flow equalization tanks during peak flow events and then meter out flow to Paw Creek as flow conditions allow. In addition, the basins for both stations are large and result in a daily peaking factor of 2.06 at Paw Creek Pump station, which allows the stations to operate safely at flows greater than 40% of the firm pumping capacity. Therefore: Given reasonably expected conditions and planning information, there is sufficient justification to allow this flow to be permitted, without a significant likelihood of over -allocating capacity in the system infrastructure. I understandthat this does not relieve the collection system owner from complying with G.S. 143-215.67(a) which prohibits the introduction of any waste in excess of the capacity of the waste disposal system. • Signing Ojil Signature Page 3 of 6 (J! fr Date FTSE 08-13 EXISTING PUBLIC SANITARY SEWE OB ## 15029 DATE: 09/08/16 SCALE DRAWN BY: APPROVED BY 00 BY CO PROPOSED PRIVATE SANITARY SEWER SITE BOUNDARY r• \w 1 PROPOSED PUBL.I SANITARY SEWER BUILDING 3 USGS QUAD MAP EXHIBIT FOR METROLINA PARK 9800 STATESVILLE ROAD CHARLOTTE, NORTH CAROLINA ORSBORN ENGINEERING GROUP 61.0 EAST MOREHEAD STREET, SUITE 106 CHARLOTTE, NC 28202 P) 704-749-1432 F) 704-749-1433 ORSBORN ENGINEERING GROUP Metrolina Park Charlotte, North Carolina Project Narrative September 12th, 2016 The overall development includes 4 parcels, subdivided into 7 new lots. Within the development there are 5 new buildings, and 1 existing building. Buildings 4 and 5 will share a lot while buildings 1, 2, and 3 are standalone. All buildings will be under the same ownership. The subdivision of lots is due to bank financing and not for individual sale. Building 1, 3, 4 & 5 will be served by a private sewer system that connects to a public sewer system main along the proposed public road, Gibbon Road. Building 2 private sewer system will connect to a public sewer system in the neighboring development. 610 EAST MOREHEAD STREET, SUITE 106 Page 1 CHARLOTTE, NC 28202 P) 704.749.1432 F)704.749.1433 Corporations Division Page 1 of 1 �.:rz }North Carolina "- }•?; -,` r-1,� Elaine F. l�larsnal! E ,RTM E NT OE THE � 1 f Kf Secretary SECRET RY OF STA f ter` Click Here To: PaBox. 2SS22 RateiJ,,NC27626-Bn22, (91-916117-2 O Account Login Register View Document Filings File an Annual Report Amend a Previous Annual Report Print a Pre -Populated Annual Report Corm Corporate Names Legal: BIN - Metrolina LLC Limited Liability Company Information Sosld: Status: Annual Report Status: Citizenship: Date Formed: Fiscal Month: State of Incorporation: Registered Agent: Corporate Addresses 1513568 Current -Active Current Domestic 4/28/2016 January NC Shaughnessy, Timothy C Mailing: Principal Office: Reg Office: Reg Mailing: 610 East Morehead Street, Suite 250 Charlotte, NC 28202 610 East Morehead Street, Suite 250 Charlotte, NC 28202 610 East Morehead Street, Suite 250 Charlotte, NC 28202 610 East Morehead Street, Suite 250 Charlotte, NC 28202 Company Officials All LLCs are managed by their managers pursuant to N.C.G.S. 57D-3-20. https://www.sosnc.gov/Search/profcorp/12181397 9/26/2016 BORN r? NEED $ C MOREHEA W, TREE SLATE lit PHONE 704.749.1432 FAX 704749.0433 To: Fast Track Permitting NCDENR 610 E. Center Ave. Mooresville, NC 281t 4) R -16 9 Date For Approval _ For Your Use .. As Requested" Copied To: Applictions Fee 5480 Project: 15029 Mfetrol Date: / R/ 016 Sent'ia: FedEx Flow Acceptance/Flo Tracking UStS Quad Map Cover Letter Description Ei For Review and Corn nen Approved as Submitted Approved as Noted Signed: Returned for Corrections, Returned After Review Resubmit for Approval Central Files: APS ____ SWP 10/5/2016 Permit Number WQ0038760 Permit Tracking Slip Program Category Status Project Type Non -discharge Active New Project Permit Type Gravity Sewer Extension, Pump Stations, & Pressure Sewer Extensions Primary Reviewer bany.love Coastal SWRuIe Permitted Flow 22,200 Facility Version Permit Classification 1.00 Individual Permit Contact Affiliation Facility Name Major/Minor Region Metrolina Park Minor Mooresville Location Address County Mecklenburg Facility Contact Affiliation Owner Owner Name Owner Type Bin-Metrolina LLC Non -Government Owner Affiliation Jon Morris Dates/Events 610 E Moorehead St Charlotte NC 28202 Orig Issue 10/5/2016 Scheduled App Received Draft Initiated Issuance Public Notice Issue Effective Expiration 9/26/2016 10/5/2016 10/5/2016 Regulated Activities Requested /Received Events Wastewater collection Additional information requested Additional information received Outfall Waterbody Name Streamlndex Number Current Class Subbasin ENLA PLAN BUILDING 1 WATER QUALITY Pt)Nd.3 tit BUILDING 3B SANITARY SEWER TO BE PARTIALLY CERTIFIED OOIMF,STIC WATER LINE TO BE PARTIALLY CERTIFIED GF¢E PROTECTION WATER U'NE TO ERE ARTEELL.Y CERTIFIED ENLARGED PLAN KEY MAP C4.1 311,11 3"1 I - ENLARGED PLAN CLTWATER TRACKING# 2016748 1 BUILDING 2 : 33 NOM 111111,1 111111111111 MOM IMP. BMW NW* ONION MOM55 IMO NOM. cp 11.313.3333,311.36334;3 33 C 3133 „ 113M3 c 21333 ,c 23 .3833- -333 33232.2-33.33% c", 333. .3 cc: c 311' Cc 744 44414E TO/44, * AWBEA *Om -55:5.5,55 3,14R33388 '3333383334 ,1333,343133 131 1 '14 1.2 SANVTARY SEWER TO BE PARTIALLY CERTIFIED DOMESTIC WATER LINE TO BE PARTIALLY CERTIFIED FIRE P 80TLC1I0N WATER UNE TO BE PARTIALLY CERTIFIED 142 144 2 4, • NOT WA IAR 3414 EAA 3313 313 333 LE MINI) aa.55 5:555 rm ion ow ow so mu SEE ENLARGED P' c, 133 aa a 55 15 51 015 3 3 3 33 13 3' ..F.EICAMC" CE.31,3 5 33" TE /11 474 C4.2 MOW 91114114101 MINIM WOW WWW FAST TRACK SEWER ENGINEERING CERTIFICATION PERMIrrEE: BIN-Metrolina LLC PERMIT #: WQ0038760 PROJECT: Metroline Park ISSUE DATE: October 5,, 2016 This project shall not be considered complete nor allowed to operate in accordance with Condition 7 of this permit until the Division has received this Certification and all required supporting documentation, it should be submitted in a manner that documents the IDivision's receipt. Send the required documentation the Regional Supervisor, Water Quality Regional Operations Section at the address at the bottom. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and snail subject the Permittee to appropriate enforcement actions. The Perrnittee is responsible for tracking all partial certifications up until a final certification is received. A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted. PERMTrEE'55 C RTIFICATION the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein qc2 ons thereof. Printed Name, Title SignatUre 'SjCERT1f)CAT1ON jeAne orsbp , as a duly registered Professional Ehineer in the State of North Carolina, having been authorized to observe (r periodically, ri weekly, full time) the construction of the project name and location as referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 02T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable, the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials. rilx/ North Carolina Professional Engineer's Sea w/signature & date: El Final Partial (include description) See Certification Cornments/Qualifiers ( State of North Carolina1Enroarroerititi Quality Water !Kt...soirees Water (:',arality ReeSenal Operdaisaos Mooresville Regional Office] 610 bast Censer Avenoe, Suitt 21146OresYrIte, North Carolina 211[5 704 063 [699 TRANSMITTAL ORSBORN ENGlNEERINC iR i 610 EAST MOREHE'AD STREET, SUL 106 Project: 15019 CHARLOTTE, NORTH CAROLINA 28202 Metrohna Park PHONE 704.749.1432 FAx 704.749.1433 To: Fast. Track Permitting NCDENR 610 E. Center Ave. Mooresville, NC 28115 (704) 663-1699 Date Ej For Approval For Your Use As Requested Please see exhibits Copied To: Date: 05/17/2017 Sent Via: FedEx Description Fast Track Sewer Engineering Certification C4.0 As -Built Sheet C4.1 As -Built Sheet C4.2 As -Built Sheet ;4:4 As -Built Sheet As -Built '4,5 As -Built Sheet C4.1 Exhibit (11x17) C4.2 Exhibit (11x17) Li For Review and Comment 0 Approved as Submitted Approved as Noted clarification of which sewer is being certified. Returned for Corrections 0 Returned After Review Resubmit for Approval ROY C'OOPER HALL S. REC AN ,'z crertcrr" 1 IN'1)A C1.1L1''f PPER Inr<rvn Director 14, 20l8 Jon Morris, Manager BIN-Metrulina LLC 610 East Morehead Street, Suite 250 Charlotte, NC 28202. •51.j BJLC" I': Final Engineering Certification Acknowledgement Project: Metrolina Park Permit No, WQ0038760 Permittee: BIN-Metrolina unty: Mecklenburg Dear Mr. Mo The Division of Water Resource's l loores °ille Regional Office received the final engineering certification With record drawings"for the subject sewer extension project on May 1 l ; 2018. Enclosed is a certification page for your records. A full review of the certification materials may or may not be conducted. It is assumed that receipt of this certification indicates compliance with. all regulations, design criteria and the permit. However, if a full technical review is conducted, you will be notified of any items of non-compliance. Please be reminded that the Permittee is responsible for keeping a. copy of the trrral retard dravvt. for the life of the project. if you have not received such copy from your consultant, please contact them immediately to obtain a copy. lastly, you are receiving this letter because the I.)iv=ision has you listed as the responsible party. If this permitted system is no longer owned by you or your company, please complete Forth. PNOCF since the permit is not automatically transferable. Form PNOC:Ix' can be downloaded frorn htp.,r�'.`portal.ncdenr.a)g/web/wq>iswp,f'es°tafloc from the C:ollection Systems Applications page. Should you have any questions,, please do not hesitate to contact me at (704) 2:3 5 214 3, Jeffery C. Orsborn, P.E., (Orsborn.En Charlotte, NC 28202) Central Files 1MRO Sincerely, 0 .y Love irtrnmental Specia p, 610 East Morehead Street, Suite 106, ' atc of North Carolina 1 nvi:trna .nu € .altaq 4 `3tes Reaoutees ! Water Qualm RoDortat Upe,ratterts Mooreavi11k Rentonal Call ee 1630 704:3&+3maFcal c 301 '§ Mooretoo lc.. worth Carolina SH. ti VTACKSEWER ENGINEERING CERTIFICATION PERMITTEE: 8IN-Metrolina LLC PERMIT #: W00038760 PROJECT: Metrolina Park ISSUE DATE: October 5, 201€ 31 N:AL. This project shad not be considered complete nor allowed to operate in accordance with Condition 7 of this permit until the Division has received this Certification and all required supporting documentation, It should be submitted in a manner that documents the Division's receipt. Send the required documentation the Regional Supervisor, Water Quality Regional Operations Section at the address at the bottom Any wastewater flow made tributary to the wastewater collection system extension prior to ccarnpletion ofthis Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcementactions, The Permittee is responsible for tracking all partial certifications up until a final certification is received. A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted, PERMITTEE's CERTIFICATION l; the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted in or portions thereof. (OW%U LIA Printed Name, Title Sien Date ENGINEER'S CERTIFICATION I, itSrfer G.0 rsborea , as a duly registered Professional En ineer in the State of North Carolina, having been authorized to observe (0 periodically, I weekly, full time) the construction of the project name and Vocation as referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 1SA NCAC 02T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials. *rtt %I1i North Carolina Professional Engineer's Seal w/signature &i date: final Q Partia n e description Certification Comments/Qualifiers (attach net eh vice. 41, 340 Slate of N'Q tth Carolina } LnviaorthrcrrtlaY Quwiity Water if eoaurces Wa1ex Quality Re,giorial C71cratiorrs Mooresville Regional Ofrirel610 Ease Center Atiznue, Suite 30i 1 Mooresville, North Carolina 28115 204 663 1699