Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WQ0037764_Regional Office Historical File Pre 2018
Water Resources Environmental Quality June 5, 2017 Mr. Roy E. Carroll, II, Manager Horizons at Steele Creek, LLC 201 N. Elm Street, Suite 201 Greensboro, NC 27401 ROY COOPER 1-1:Governor MICHAEL S. REGAN Secretary S. JAY ZIMMERMAN Director Subject: Permit No. WQ0037764 MODIFICATION Horizons at Steele Creek, LLC Horizons at Steele.Creek Wastewater Collection System Extension Permit Mecklenburg County Dear Mr. Carroll: In accordance with your application received May 26, 2017, we are forwarding herewith Permit No. WQ0037764 MODIFICATION dated June 5, 2017, to Horizons at Steele Creek, LLC (Permittee) for the construction and operation upon certification of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded, shall void Permit No. WQ0037764 issued May 13, 2015, and shall be subject to the conditions and limitations as specified therein. This cover letter shall be considered a part of this permit and is therefore incorporated therein by reference. This permit was originally issued on May 13, 2015, for 1,949 linear feet(If) of 8-inch gravity sewer and 43,036 gallons per day(gpd) of flow. This modification adds 6,480 gpd of flow for a total of 49,516 gpd. There is no change to the linear feet of line which remains at 1,949 if. Please pay particular attention to the following conditions contained within this permit: Condition 11.1: This permit shall not be automatically transferable; a request must be made and approved. Condition 11.4: Requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2T .0403 or any individual system -wide collection system permit issued to the Permittee. It shall be the responsibility of the Permittee to ensure that the 'as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. Nothing Compares:,—,_ State of North Carolina I Environmental Quality I Water Resources I Water Quality Regional Operations Mooresville Regional Office 1610 East Center Avenue, Suite 301 I Mooresville, North Carolina 28115 704-663-1699 Ifany parts, requirements, orlimitations contained inthis permit are unacceptable, you have the rightto request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must beinthe form ofawritten petition, conforming to Chapter 150BofNorth Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N[ 27699-6714. Unless such: demands are made, this permit shall befinal and binding, If you need additional information concerning this mat -ter, please contact Barry Love at (704)235-2143 or via e-mail at barry.love@ncdenr.gov, bvVV.Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Mooresville Regional Office Division ofWater Resources, NCUG[% cc: 8ruceNooe P.E./e-couv Barbara Gross (e-copy) Tommy Rowland /e-cnov\ Regional Office Files Water Resources Central Files 2 I Environmental Quality WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes .of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to Horizons at Steele Creek, LLC Mecklenburg County for the construction and operation of approximately 1,949 linear feet of 8-inch gravity sewer, to serve the Horizons at Steele Creel( project, and the discharge of 49,516 gallons per day of collected domestic wastewater into the Charlotte Water existing sewerage system, pursuant to the application received May 26, 2017, and in conformity with 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting data subsequently filed and approved by the Department of Environmental Quality and considered a part of this permit. This permit was originally issued on May 13, 2015, for 1,949 linear feet(lf) of 8-inch gravity sewer and 43,036 gallons per day(gpd) of flow. This modification adds 6,480 gpd of flow for a total of 49,516 gpd. There is no change to the linear feet of line which remains at 1,949 if. This permit shall be effective from the date of issuance until rescinded and shall be subject to the specified conditions and limitations contained therein. by W. Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Mooresville Regional Office Division of Water Resources, NCDEQ Permit Number: Permit Issued: WQ0037764 MODIFICATION June 5, 2017 SUPPLEMENT TOPERMIT COVER SHEET Horizons at Steele Creek, LLCis hereby authorized to: Construct, and then operate upon certification the aforementioned wastewater collection extension. The sewage and wastewater collected by this system shall be treated in the Charlotte Water McAlpine Creek Wastewater Treatment Plant in accordance with Permit Number NCO024970, Permitting of this project does not constitute anacceptance of any part ofthe project that does not meet 15A N[A[ JT the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 3000, as applicable, uo|eam specifically mentioned herein. Division approval is based on acceptance of the certification provided by a North Carolina-license,d Professional Engineer in the application. it shall be the Perrnittee's responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules. Construction and operation is contingent upon compliance with the Standard Conditions and any Special Conditions identified below. 1. SPECIAL CONDITIONS 1. Noflow inexcess of the quantity permitted herein, 49,516 GPDshall be made tributary to the subject sewer system until anapplication for permit modification for an increase in flow has been submitted to and approved by the Division. (15A NCAC 02T.0304(b)] 2. This permit shall become voidable unless the agreement between Horizons at Steele Creek, LLC and Charlotte Water for the collection and final treatment ofwastewater is in full force and effect. i15A |LSTANDARD CONDITIONS 1. This permit is, not transferable. |nthe event there isadesire for the wastewater collection facilities to change ownership, or there is a name change of the Pennhtee, a fmMna| permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials asmay beappropriate, The approval 8fthis request shall beconsidered onits merits and may nrmay not beapproved. [IS4NCA[OZT.0IU4;G.5l43'21S.1(0)] 2. This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit; 154 N[AC 2T; the Division's Gravity Sewer KNimirnurn Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for 4 I the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials unless specifically mentioned herein. [15A NCAC 02T.0110] 3. This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. [15A NCAC 02T .0110] 4. The wastewater collection facilities shall be properly maintained and operated at all times. The Permittee shall maintain compliance with an individual system -wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2T .0403. If an individual permit is not required, the following performance criteria shall be met: [15A NCAC 02T .0108(b)1: a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and to prevent any contravention of groundwater standards or surface water standards. b. A map of the sewer system shall be developed and shall be actively maintained. c. An operation and maintenance plan including pump station inspection frequency, preventative maintenance schedule, spare parts inventory and overflow response has been developed and implemented. d. 'Pump stations that are not connected to a telemetry system shall be inspected every day (i.e. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six -months and inspections are documented. f. A general observation of the entire sewer system shall be conducted at least once per year. g• Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina General Statute §143-215.1C. h. A Grease Control Program is in place as follows: 1. For public owned collection systems, the Grease Control Program shall include at least biannual distribution of educational materials for both commercial and residential users and the legal means to require grease interceptors at existing establishments. The plan shall also include legal means for inspections of the grease interceptors, enforcement for violators and the legal means to control grease entering the system from other public and private satellite sewer systems. 2. For privately owned collection systems,_the Grease Control Program shall include at least bi- annual distribution of grease education materials to users of the collection system by the permittee or its representative. 3. Grease education materials shall be distributed more often than required in Parts (1) and (2) of this Subparagraph if necessary to prevent grease -related sanitary sewer overflows. i. Rigand easements shall bemaintained inthe full easement width for personnel and equipment accessibility. j. Documentation shall be kept for Subparagraphs (a) through (i) of this Rule for a minimum of three years with exception of the map, which shall be maintained for the life of the system, . The Permittae shall report by telephone to m water resources staff member at the Mooresville Regional Office, telephone number (7Q4)G6]'1699,aysoon aupossible, but innocase more than 24, following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due toknown orunknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage orbreakage, etc.;ar h. Any 55[)and/or spill over l,OQOgallons; or c. Any SSOand/or spill, regardless nfvolume, that reaches surface water Voice mail messages V,faxed information ispermissible, but this shall not beconsidered authe initial verbal report. Overflows and spills occurring outside normal business hours may also bereported tm the Division of Emergency Management at telephone nwrnber(8OO) 850-0368 or /929\ 733-3300. Persons reporting any of the above occurrences shall file a spill report by completing and submitting Part | of Form C5~SSO (or the most current Division approved hmnn) within five days following first knowledge qftheoccurrence. This report must outline the actions taken nrproposed tobe taken to ensure that the problem does not recur, Part ||ofForm [S-SSD(or the most current Division approved form) can also be completed to show/that the SSC>was beyond control. [G.5. 143'I15.1C(a2)l 6. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service bvthe existing utilities nor result inanoverflow orbypass discharge ofwastewater t0the surface waters ofthe State. [15ANCACOZT.Ol0A(b)l 7� Upon completion ofconstruction and prior to operation of these permitted facilities, the completed Engineering Certification form attached to this permit shall be submitted with the required supporting documents to the address provided on the form. Acornp|mtm certification is one where the form is fully executed and the supporting documents are provided asapplicable. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Perrnittee to appropriate enforcement actions. If the permit i*issued toe private entity with an Operational Agreement, then a copy of the Articles of Incorporation, Declarations/Covenants/Restrictions, and Bylaws that have been appropriately filed with the applicable County's Register of Deeds office shall be submitted with the certification, Acomplete certification isone where the form isfully executed and the supporting documents are provided as applicable, Supporting documentation shall include the following: a. One copy ofthe project constructionnacnnddnawinQ»/p|an&prnfkeviexvsnfsevverUnesQfo,ce mains) ofthe wastewater collection system extension. Final record drawings should beclear Vn the plans or on digital media (CO or DVD disk) and are defined as the design drawings that are 6 marked up or annotated with after construction information and show required buffers, separation distances, material changes, etc. b. One copy of the supporting applicable design calculations including pipe and pump sizing, velocity, pump cycle times, and level control settings, pump station buoyancy, wet well storage, surge protection, detention time in the wet well, and force main, ability to flush low points in force mains with a pump cycle, and downstream sewer capacity analysis. If a portable power source or pump is dedicated to multiple stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, include travel timeframes, shall be provided. c. Changes to the project that do not result in non-compliance with this permit, regulations, or the Minimum Design Criteria should be clearly identified on the record drawings, on the certification in the space provided, or in written summary form. Prior to Certification (Final or Partial): Permit modifications are required for any changes resulting in non-compliance with this permit (including pipe length increases of 10% or greater, increased flow, pump station design capacity design increases of 5% or greater, and increases in the number/type of connections), regulations, or the Minimum Design Criteria. Requested modifications or variances to the Minimum Design Criteria will be reviewed on a case -by -case basis and each on its own merit. Please note that variances to the Minimum Design Criteria should be requested and approved during the permitting process prior to construction. After -construction requests are discouraged by the Division and may not be approved, thus requiring replacement or repair prior to certification & activation. [15A NCAC 02T .0116] 8. Gravity sewers installed greater than ten percent below the minimum required slope per the Division's Gravity Sewer Minimum Design Criteria shall not be acceptable and shall not be certified until corrected. If there is an unforeseen obstacle in the field where all viable solutions have been examined, a slope variance can be requested from the Division with firm supporting documentation. This shall be done through a permit modification with fee. Such variance requests will be evaluated on a case -by -case basis. Resolution of such request shall be evident prior to completing and submitting the construction certification. [ 15A NCAC 02T.0105(n)] 9. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities. [15A NCAC 02T .01161 10. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T; the Division's Gravity Sewer Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000, as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. [15A NCAC 02T .0104; 15A NCAC 02T .0108(b-c)] 11. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. [15A NCAC 02T .0110; 15A NCAC 02T .0108(b)] 12. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by the Division any other Federal, State, or Local government agencies which have jurisdiction or obtaining other permits which may be required by the Division or any other Federal, State, of Local government agencies. [G.S. 143- 215.1(b)] I FAST TRACK SEWER ENGINEERING CERTIFICATION PERMI'TTEE: PERMIT #: PROJECT: ISSUE DATE: Horizons at Steele Creek, LLC WQ0037764 MODIFICATION Horizons at Steele Creek June 5, 2017 This project shall not be considered complete nor allowed to operate in accordance with Condition 7 of this permit until the Division has received this Certification and all required supporting documentation. It should be submitted in a manner that documents the Division's receipt. Send the required documentation the Regional Supervisor, Water Quality Regional Operations Section at the address at the bottom. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up until a final certification is received. A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted. PERMITTEE'S CERTIFICATION I, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein or portions thereof. Printed Name, Title Signature Date ENGINEERS CERTIFICATION I, , as a dul registered Professional En ineer in the State of North Carolina, having been authorized to observe (periodically, n weekly, [ ] full time) the construction of the project name and location as referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 02T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials. North Carolina Professional Engineer's Seal w/signature & date: ❑ Final ❑ Partial (include description) Certification Comments/Qualifiers (attach if necessary): State of North Carolina I Environmental Quality I Water Resources I Water Quality Regional Operations 1/....�..ti'II 1 I CIA r.,..a h A..........0..:...gill1■/ 7 ohna Department of En vironme,m and ity Section Avenue Mooresville, N. C, 2811.5 IF Track Application °'IA 04•-16) Ivlodaficatjora of WQ0037764 For Horizons at Steele Creek (Apartments) Phase 2 Add two Apartrnent'Buildings / 48 Units 48 units at 135 gpd/u.nit. 6.,4.$0_ pd Mecklenburg County, Charlotte, NC atces On 'behalf Horizons at Steele Creek, LLC, we are submitting herewit documents relative to the above referenced project your review and approval the following (I) Original Fast -Tract Application (1) Copy of Fast -Tract. Application (1.) Check for $480 (Horizons at Steele Creek, LL.C) Specifications for this project 'will be per the City of Charlotte standards and specifications. We respectfully request your review and approval of these items, If you have any questions or need any additional information, please give me a call. Thank you for your assistance witl'r this matter Sincerely, CPT Engineering and Surveying, Inc . t ;Lk__ Bruce Nooe, PJ2., P.L.S CIT ENGINEERING AND SURVEYING INC. Land development Consulting TODD D. MURPHY Project Manager Tel 336-812-8SOO ext. 309 Enclosures High Point, NC 22265 Mobile 336-312-0064 E-mail: toddmQCPTengineering.eam Fax 336-812.8784 4400 Tyni Point, 1" C 2726 Phone: (33 r) S' 12 ((1 * I, : (336) 812 www.c'ptengineering.cgrn NARRATIVE FOR Horizons at Steele Creek Apartments Phase 2 Permit Modification Permit No. WQ0037764 Issued Date: May 13, 2015 MECKLENBURG COUNTY CHARLOTTE, NORTH CAROLINA April 5, 2017 OWNER/DEVELOPER: Carroll Investment Properties. Inc. 201 North Elm Street Greensboro, North Carolina 27401 (336) 275-6198 CPT Engineering and Surveying, Inc. 4400 Tyning Street High Point, NC 27265 Phone (336) 812-8800 v Fax (336) 812-8780 PROJECT DESCRIPTION Phase 1: The project is located on an approximately 18.88 acre tract in Mecklenburg County, Charlotte, NC. The purpose of the project is to construct twelve (12) apartment buildings with 288 total units, a clubhouse and pool with associated paved drives and parking including extension of existing water and sewer service. Phase 2: Addition of two 24 unit apartment buildings (48 unit's total) with associated paved drives and parking and including water and sewer service connections. Total site area for Phase I and Phase 2 is 20.1 acres. SITE DESCRIPTION The site consists of 20.1 acres more or less and Phase 1 is currently under construction. ' ADJACENT PROPERTY Land use in the vicinity is a mix residential and vacant land. The site fronts along Steele Creek Road (NC Highway 160). SOILS INFORMATION The soil in the project area is mapped as Iredell fine sandy loam per USDA Natural Resources Conservation Service Web Soil Survey. All soils are in hydrologic group "CID". The site slopes west to east at approximately 5% average slope. ENGINEERING AND SURVEYING INC. c.G>rSLnrars CORPORATE LIG P G-1315 4400 TTfl 51 be 1 HkShl RANT, NoPLTH G.+R L INA 2126,' F'Fti . (MO t 12-6/300 - FAX. ( ) 1512-4511X) 17a 11%5 QUAD '1A d�.©U.EST QUADRANGLE Z4S AT STEELE CREEK OF CHARLOTTE WONT)", NORTH GAR©LINA 15 ANC) UINC, R G75 T LEVEL MAC' AR' 'W IM1M, ZAT STEELE CREEK GfTI' OF : AR'L©'TTE' EN ORB COUNTY, NORTH CAR.ODUNA 4/2&/l5 fli..ititrr Res.ourt.e.w INFO1(i ishoco `S itt: Applicant's c Phone r'u,nnbQr PROJECT INFO)Ilk IAI ION: Project name: kic)nwns a1 Ste Application If sr modification, .°ntrrrt where p 4. Apprr ,irate rdinates. ([leci Parcel ID (if appti (or Parcel ID rn cl bit): I9954 [ 02 t downstream serer) NSU L TANT INFORMATION: Professional Engineer: fInice Nuott Firm, .CPT Ergeerirar:and SurtvLr mailing addres 44OOlynint'.,.SlrerE City, I iah .Paint State: Nib Phone number: (336) 8J248.9,9 Nur; rr>fret'aa r i tIN'ew ['cant() trv°c€t nurrrher: anr5 isr.rc&i plan, provide rric existing permit number' WQOO ude. 3 .Ot35`.I .rng!itude. �8O.5it 120 Address 3 5 4't :paten, trtec:ric: IV. WASTEWATER TR1ATMENT FACILITY (WWTE) INFORMATION: 1, Facility Nance: 1v1cAl,pprre (r k Wasiewx:ei Ownttr Nartte: V, DOWNS'I` .TAM SF Permit SNes ten Wide f`oll'ecti d'�•rrrret N"arne(s)'. Permit Number: N 12IS1ATION (iidifferent than W\V'fF"): ii Nurnher` AFPLICATION �43 Y et If rist tappiteserr tr, NI E It A V, ROL) tlifiriNlENTS 'hs h 0tmOrt: rerc e n N4,;., cr? [ APerllertell retre"'llr'Pert ltt'rt tell he elltklt heart a Develwers Otietationai Arent (FORM: utTr, em` As.sociation jut anOperational Ag!ceinent it ORM OA). boct't atiach-ocr 1„,-1 YCS FIN(' r ty,triLH of w,a,..s.a.,-,,ii:, tcrtf-t f At .tOart ,:iivi:,./). Resideotral (fooled flril. Retail (stores. (refuel:sr retails) rrres i dem re i r cased C, l Retail st ith fond preparat rote 'Serf v r:e Li). 'School. ; El r reSC.: 11001 .' (4,.?, C2:-e IT-1 Med.IIP1 : di,.'1113! ; \ oterrotravt lacriales r —I. Food and (trier, hat:Art les [r,, J Church s., ELI B.usinesses r offr.„.. ices ( tractor res I ,,ri Nifrsing Home Nature of racastorr war t loQtletrrrt Domest kr/Commercial ltro Commercial 1/4, Industrial frSee .15A NCAC .02T ..010312.01 Car Waste tt_ Hotel areator !taloa s.; 11-1 ,ltresr.irrarrata Pool 'Clubhouse Sairrnaavng Pooriteittei Backwash Other toiststonon to Attachment) th k.". a Pretreatment Program in effect? Li \`'es Ej 6. Has a tIoN, rt.,Htrotion bossr approved under 15ANCAC 02T .M Jiqn? n 'Yes No Juk!s11,0ipri wpiit 0-0110. cfy 7. Summarize wastteNvater generated by projecm Establis tiro ent Type (see 027".411.1.(1V Daily ttesigo flow "' No. ot flow Apartrneras, h 1 gar I- t .1 i GED gall , e- i GPI') 4}5.04, u„5 LaKiniz 48 f 6,480 GP0 gat/ F GPle) GPO gal= GPD 6,480 GPI) See 15A NCACO2T .01,14(0. (4), ic.){. 1 ) and (eg2.1 for caveats to wastewater ,design flow refers {ix_ minimum flow per d en pro posea croknown non-residential dcvo'pmcn use facilities located near 1-6t1 public use firer, and residential property located .srooth or east of the Atlantic Intracoastal Waterway to be used itS vacation retttals as defined in b Per 15A NC AC 021 0 14(c), design flow rates for establishments 1101l ennfled in table 15A. NC:AC 07.21,QP41 5hall he deterroted using available flow data, water using fpdores, oceropancry or operation parterrna and other measured data.. Wastewator gertr-rate„d by projerl: GPO (per 15A NcAlic92I tsot include future tow::: or r)re IOUS 1 y permlacri allocations if permitted itOW iS Zero, indleate verry Ell Pump Station or (rravits Setrw C where flow wilt be perry frlow has a treacly been allocated in Perm t"trlr Rthabi 9 ita ran or replactit-1 c,visting with tici: fkiw petritc:d Li other (Licipi!,ity). salnerrrient ptrritit; acitt cottrie,t,tt to tirtts r o R 1\1 fAl A 04- 16 i'Hgt- 2 t2tt. VI 0 t:0 17�Ir:(•1A 1fAppl7r-a,t>I&) sIO W`IlIa Pur iP STATION DESIGN (. l If or narnr' 2„ Appttprit,iaee Coordinates (flecin,al Decoct r Cie wen i1cw of the pump station: Operational point(a) of the pumpts): Summarize the force main to be permitter P ar�lp station 2T U3tlS n. ?t11 C {t; r 10 SewcrO: I (,tio'pry ('vtars ("(rr'iY'tlln'+ uriloicaalR ua itrtr°ai tr.P r'tsi rt 6 rnin rndurll slopes for roviil' SG`tiver(s) not allowed and tt vperlateon of the hi0(3 power Source wilh rdr (_Y1 Portable pvt7)p¢r'a 11 s ri11 I �( �trltl97tr. 1(l A.lrrrlica tar„pfS & MDC(P'ump StalionsIFprce hip PUMP STATION INCLUDED IN THIS PROJECT rplttras flier clay (Tian capacity) s per minute at _.. feet total dyne is Pump Station'f acbv 11Son and telenrtlry pGy rd ('10111 5A N(wnt. 021 ,031051r)(1llff)r to 15,0(}J pallaar 1x-r tfa anti ietemetry .. 1 fA NC; A(_ 02T .O305(h)(1)(( 0pp!'o0 1701th''!.h]A04.H k4S .SFr. a,R IONS (IQ :R.02OO ,.l i 5A NCAt:: A rnv An 1'ufa401 � Cirdic�d�e '°��.sterns ara�i irrt u ._ l 4n sw°it'srasain _ ac1S l earthg tfe (ve,rtiwai) _ . . 1. A C". O' VO.$$00 camtairr4 al term' **Shearn r°1tassi ications .an he identified rasing 'he I.)iri;ir tt's N4 S ith Q% .o3(15(f) or 90, an e Section X of this nt f rion,.'onli 2, Burs the project irttra iurr requirements Z e tiro i vi;nr.,ra's ctrwrt Ne'p ration rrelui °n enl� Cc No A, radii dr'cun ors should reference he lr7.`dt). d iti e9'ili in the rive ?u( ffnfferre,l Streants per 15A NC"".{ "2 a rat ion) atb Doe, the. Project nens ty w`ith an individual404 Permit or tiny d$)i .sriifatat 4 " Wet ;anr -i e fated Pern-rtits Shall be rrquesrcd, obtained, and tsdhered tt� for. f�rujects that irnpoct aw etslands en surfaceYes fnfc:rrrnatatta car be (tht a.incd fre,rn the 401_,& Dieter 1 cnatltfinf Bram 5A iCAC'. (.'. I.(l hHli I,ir irn4)c.t:led by the I erruiIt r;rr eai hcn I,-5=1 NC ,AC (121 „0-I(13(a115) or rhv perttni(c: '�- rrattTraL ann EE' .tier' at least once ever) ar[d force Man -is (latest. x`G r,irip dgc the propes„ed been prepay ritcris Fier C'irriviiv Sev•er's (Latest v°(rsl° p Stations and l orcc Ma;n5 (latest Ye pnc Lase, irictiric,r of these rent d htrs icrtt is try he consistent with the proposed desiRe. NOTE— In accor statement, representation, or cea;ii trat lucle a fine not to evice.e J .it 0,00 North Carolina Professional Appltcanus C'er1,`ficatinn per 15A N(AC 02' i _ S_CarroJI�Ma�nrraer (Signature Authority's h has been reviewed by rnr a tiaas application ETC' not coy 'application package is subjec dischar e system to surface waters e t ,e Ian injuriotisii relief, and/or i riminal prosecution condition of this permit be violated. I also ut_ and that if all required supporting inforn,atlo,a me as incomplete. MO1Pi-in statement, represematir ircltd a fine not to exor;° 143-21 `t.6A and 143.2 application pars peroattles up to "? irlr frrti'ra Application able reg,uiati,)rts.. Gravity Sewer Tract: a� sipri ieti that I have: tewiewrd This V), ranalses any false 2 naisdeme,arior winch alav p�f:I ict tpl to tra the best of my krau+,ndFe. l understand 'het it all reou: required suppuxtirnp, dorumenuttion and attachnrenFs are nut in d as incorplete 1 understand that any discharge of wa:,tcvrater from this ..... diate er fnrcenneant .action that roa«y penalties. m against the Division of Water Resources should a d parts of this application packagr are not completed tided, this application perrkage will he returned tc7 nd attachments a nc with General Statutes I4 - ,.6A and 1,43 ur rertiflctition in any application paaaae 00 as welpen a"otit- d parts of udesC, rbi<; tr)0M: FT 04-16 CHARLOTTE. WLTER May 9, 2017 Mr, Dennis Burton CIP Construction 201 North Eirn St Greensboro, NC 27401 SUBJECT: WATER AND SEWER FLOW ACCEPTANCE HORIZONS AT STEELE CREEK — PHASE II 10510, 10700 STEELE CREEK ROAD, CHARLOTTE NC CLTWATER TRACKING# 2017573 After analysis of the sanitary sewer associated with the proposed design of project, Horizons at Steele Creek Phase II, it was determined that there is sufficient capacity to accommodate the proposed sewer flow of 6,480 gallons pet day (48 apartment units x 135 gpolunit) at the connection point(s) indicated on the submitted utility plan for transmission to the McAlpine Creek Wastewater Treatrnent Plant; NPDES permit number NC0024970, for treatment,. This acceptance of flow is based upon the existing capacity of the designated publicly owned treatments works. Please see attached NC DEQ FTSE form. Charlotte Water (CLTVVater) agrees to furnish water to the subject project. The water quality to the subject project is regulated by the State Drinking Water Act Amendments of 1986 and The Water Supply Management Plan, PWS ID # 0160010 on file with the Public Water Supply Section of NCDEQ. However, CLTWater cannot guarantee a constant pressure or quality of flow. The applicant should understand that due to the involvement of other agencies and continuing growth of the water system, the ability to provide service for future projects cannot be guaranteed nor reserved. Connection to the CLTWater system is accepted on a first come, first served basis. The applicant should understand that this letter is not authorization to construct or extend private water or sewer systems, as the appropriate local or State permits are required prior to construction. If the appropriate authorization to construct permits are not obtained construction has not started within one (1) year of issuance of this flow acceptance, and payment for any service connections haver acceave not ptance eel received wit hin Ml.__ issuance of this flowrequest ter, this flow � � year of acceptance let a P rescinded and a new flow acceptance must be made. If you have any questions, please do not hesitate to contact me at (704) 432-5801. Sincerely, Barbara Gross Engineering Assistant 6 rh,Err,r;e,wrer.R: e i by the CChar State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking/Acceptance for- Sewer Extension Applications (FTSE 04-16) Entity Requesting Allocation: CPT Engineering Project Name for which flow is being requested: Horizons at Steele Creek, PH II More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pwnp stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP FacilityName: McAlpine Creek, Irwin Creek, Sugar Creek b. WWTP Facility Permit #: NC0024970, NC0024945, NCo024937 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used All flows are in MGD 99.0 11.383 62.895 0.006 74.284 75.0% II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D) =(B+C) (E)=(A-D) Design Obligated, Pump Average Daily Approx. Not Yet Total Current Station Firm Flow** Current Avg. Tributary Flow Plus (Name or Capacity, * (Firm / pt), Daily Flow, Daily Flow, Obligated Available Number) MGD MGD MGD MGD Flow Capacity*** Steele Creek 7.9 3.16 3.98 0.91 4.69 -1.73 * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pomp station divided by a peaking factor (pi) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Horizon at Steele Creek Downstream Permit Number: 215 - 041 Page 1 of 6 FTSF 04-16 llI. Certification Statement: ] J. Carl Wilson certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performedin accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of tlrs form indicates acceptance of this wastewater flow. Signing D Signature Page 2 of 6 3f17 Date FTSE 04- 16 PLANNING ASSESSMENT ADDENDUM (PAA) Submit a planning assessment addendum for each pump station listed in Section II where Available Capacity is < 0. Pump Station (Name or Number): Given that: a. The proportion and amount of Obligated, Not Yet Tributary Daily Flow (C) accounts for 18.6 % and 0.91 MGD of the Available Capacity (E) in Pump Station Steele Creek ; and that • b. The rate of activation of this obligated, not yet tributary capacity is currently approximately 0.9I _MGD per year; and that c. A funded Capital Project that will provide the required planned capacity, namely Steele Creek Pump Station Replacement & is in design or under construction with Relief Sewer planned completion in March 2018 ; and/or d. The following applies: The Steele Creek Pump Station replacement project will provide a new regional facility capable of handling build -out flows in the basin, with the construction to be completed by March 2018: Therefore: Given reasonably expected conditions and planning information, there is sufficient justification to allow this flow to be permitted, without a significant likelihood of over -allocating capacity in the system infrastructure. 1 understand that this does not relieve the collection system owner from complying with G.S. 143-215.67(a) which prohibits the introduction of any waste in excess of the capacity of the waste disposal system. Signing O ial Signature Page 3 of 6 117 Date F:FSE 04-16 Central Files: APS SWP 6/5/2017 Permit Number WQ0037764 Permit Tracking Slip Program Category Status Project Type Non -discharge Active Major modification Permit Type Gravity Sewer Extension, Pump Stations, & Pressure Sewer Extensions Primary Reviewer barry.love Coastal SWRuIe Permitted Flow 49,516 Facility Version Permit Classification 1.10 individual Permit Contact Affiliation Facility Name Horizons at Steele Creek Location Address Owner MajorlMinor Region Minor Mooresville County Mecklenburg Facility Contact Affiliation Owner Name Horizons at Steele Creek LLC Dates/Events Owner Type Non-Govemment Owner Affiliation Roy E. Carroll II 201 N Elm St Greensboro NC 27401 Orlg Issue 5/13/2015 Scheduled App Received Draft Initiated Issuance Public Notice Issue Effective Expiration 6/2/2017 6/5/2017 6/5/2017 Regulated Activities Requested /Received Events Apartment complex Condominium Wastewater collection Outfall Additional information requested Additional information received Waterbody Name Streamlndex Number Current Class Subbasln