HomeMy WebLinkAboutNCC216466_Site Plan or Location Map_20211118STABILIZATION GUIDELINES SITE AREA DESCRIPTI❑N STABILIZATION TIMEFRAME EXCEPTI❑NS PERIMETER DIKES, SWALE, DITCHES, SLOPES 7 DAYS NONE HIGH QUALITY WATER (HQW) ZONES 7 DAYS NONE IF SLOPES ARE 10' OR LESS IN SLOPES STEEPER THAN 31 7 DAYS LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED, SLOPES 31 ❑R FLATTER 14 DAYS 7 DAYS FOR SLOPES GREATER THAN 50' IN LENGTH ALL OTHER AREAS WITH SLOPES FLATTER 14 DAYS NONE EXCEPT FOR PERIMETER THAN 4:1 AND HQW ZONES SEEDING MIXTURE PLANTING DATES GRASS TYPE POUNDS / ACRE MARCH 1 - AUG. 31 TALL FESCUE 50 CENTIPEDE 10 BERMUDAGRASS 25 (HULLED) LIME 4,000 FERTILIZER 10-20-20 500 MULCH STRAW 4,000 PLANTING DATES GRASS TYPE POUNDS / ACRE SEPT, 1 - FEB. 28 TALL FESCUE 50 CENTIPEDE 10 BERMUDAGRASS 25 (HULLED) LIME 4,000 FERTILIZER 10-20-20 500 MULCH STRAW 4,000 FIFTY (50) POUNDS OF BAHIAGRASS MAY BE SUBSTITUTED FOR EITHER CENTIPEDE OR BERMUDAGRASS, BUT ONLY WITH ENGINEER'S APPROVAL, ON CUT AND FILL SLOPES 2:1 OR STEEPER, CENTIPEDE SHALL BE APPLIED AT THE RATE OF 5 POUNDS PER ACRE AND 20 POUNDS OF SERICEA LESPEDEZA FROM JANUARY 1 - DECEMBER 31, MULCH THRESHED STRAW OF OATS, WHEAT, OR RYE; FREE FROM SEED OF ❑BN❑XI❑US WEEDS; OR CLEAN SALT HAY, STRAW WHICH IS FRESH AND EXCESSIVELY BRITTLE OR STRAW WHICH IS IN SUCH AN ADVANCED STAGE OF DEC❑MP❑SITI❑N AD TO SMOTHER OR RETARD GROWTH OF GRASS WILL NOT BE ACCEPTABLE WATER WATER SHALL BE FREE FROM SUBSTANCES HARMFUL TO GROWTH OF GRASS, MAINTENANCE SERVICE MAINTAIN SEEDED AREA S UNTIL GRASS IS WELL ESTABLISHED AND EXHIBITS A VIG❑R❑US GR❑WING C❑NDITI❑N FOR A MINIMUM OF TWO CUTTINGS, MOW GRASS AT REGULAR INTERVALS TO A MAXIMUM HEIGHT OF 3 INCHES, HAND CLIP WHERE NECESSARY, CONTROL GROWTH OF WEEDS, APPLY HERBICIDES IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTI❑NS, WATER AREAS SEEDED BETWEEN MAY 1 AND JULY 15 AT SUCH INTERVALS AS TO MAINTAIN THE SEEDED AREA IN A M❑IST C❑NDITI❑N UNTIL THE GRASS IS ESTABLISHED AND ACCEPTED BY THE ENGINEER, PR❑VIDE EQUIPMENT TO TRANSPORT AND DISTRIBUTE THE WATER TO THE SEEDED AREAS, AREAS SEEDED BETWEEN SEPTEMBER 1 AND N❑VEMBER 1 NEED NOT BE IRRIGATED BEYOND THE INITIAL WATERING SPECIFIED ABOVE EXCEPT THAT THE CONTRACTOR MAY APPLY WATER AT HIS OWN DISCRETI❑N, SEEDING SCHEDULE NOT TO SCALE 1 J i NOW OR ORMERLY / STATE 0 NORTH CARO INA D.B. 2511, 847 M.B. 37, P. 56 \ N61°38'17"W DIST DIST 1 0.58' EIR E M \ W jz W W ^ O' or �Q� o Q w Q v> r E�� �O CD I C)wm a Q I m w UJ o+ af a -I m W *6 J N n 0- I o N7\8� 48'14'E ECM 1 42.95' I L \ \ REVISIONS c— �- -&4 WETLAND —, DELINEATION "A' I WEkANDS UPLANDS EDGE OF WATER INSTALLATION 1. THE BASE OF BOTH END POSTS SHOULD BE AT LEAST ONE FOOT HIGHER THAN THE MIDDLE OF THE FENCE, CHECK WITH A LEVEL IF NECESSARY, 2. INSTALL POSTS 4 FEET APART IN CRITICAL AREAS AND 6 FEET APART ON STANDARD APPLICATI❑NS, 3. INSTALL POSTS 2 FEET DEEP ON THE DOWNSTREAM SIDE OF THE SILT FENCE AND AS CLOSE AS P❑SSIBLE TO THE FABRIC, ENABLING POSTS TO SUPPORT THE FABRIC FROM UPSTREAM WATER PRESSURE, 4. INSTALL POSTS WITH THE NIPPLES FACING AWAY FROM THE SILT FABRIC, 5. ATTACH THE FABRIC TO EACH POST WITH THREE TIES, ALL SPACED WITHIN THE TOP 8 INCHES OF THE FABRIC, ATTACH EACH TIE DIAG❑NALLY 45 DEGREES THROUGH THE FABRIC, WITH EACH PUNCTURE AT LEST 1 INCH VERTICALLY APART, ALSO, EACH TIE SHOULD BE P❑SITI❑NED TO HANG ON A POST NIPPLE WITH TIGHTENED TO PREVENT SAGGING, 6. WRAP APPR❑XIMATELY 6 INCHES OF FABRIC AROUND THE END POSTS AND SECURE WITH 3 TIES, 7. NO MORE THAN 24 INCHES OF A 36 INCH FABRIC IS ALLOWED ABOVE GROUND LEVEL, 8. THE INSTALLATI❑N SHOULD BE CHECKED AND CORRECTED FOR ANY DEVIATI❑NS BEFORE C❑MPACTI❑N, 9. C❑MPACTI❑N IS VITALLY IMP❑RTANT FOR EFFECTIVE RESULTS, COMPACT THE S❑IL IMMEDIATELY NEXT TO THE SILT FENCE FABRIC WITH THE FRONT WHEEL OF THE TRACTOR, SKID STEER, OR ROLLER EXERTING AT LEAST 60 POUNDS PER SQUARE INCH, COMPACT THE UPSTREAM SIDE FIRST AND THEN EACH SIDE TWICE FOR A TOTAL OF 4 TRIPS, 0 G �'i F� < -5�5>� j ISOMETRIC INSTALLATION USING THE SLICING METHOD 1. INSTEAD OF EXCAVATING A TRENCH, PLACING FABRIC AND THEN BACKFILLING TRENCH, SEDIMENT FENCE MAY BE INSTALLED USING SPECIALLY DESIGNED EQUIPMENT THAT INSERTS THE FABRIC INT❑ A CUT SLICED IN THE GROUND WITH A DISC, CONSTRUCTION SPECIFICATIONS SILT FENCE SHOULD BE USED WHERE SHEET FLOW MAY CREATE EROSION PROBLEMS. SILT FENCES WILL NOT BE ALLOWED TO CONTROL EROSION IN A CONCENTRATED FLOW OR DITCH SITUATION. SILT FENCE STAKES SHOULD BE SIX (6) FEET APART IF NO WIRE BACKING IS USED. 1. CONSTRUCT THE SEDIMENT BARRIER OF STANDARD STRENGTH OR EXTRA STRENGTH SYNTHETIC FILTER FABRICS. 2. ENSURE THAT THE HEIGHT OF THE SEDIMENT FENCE DOES NOT EXCEED 24 INCHES ABOVE THE GROUND SURFACE. (HIGHER FENCES MAY IMPOUND VOLUMES OF WATER SUFFICIENT TO CAUSE FAILURE OF THE STRUCTURE.) 3. CONSTRUCT THE FILTER FABRIC FROM A CONTINUOUS ROLL CUT TO THE LENGTH OF THE BARRIER TO AVOID JOINTS. WHEN JOINTS ARE NECESSARY, SECURELY FASTEN THE FILTER CLOTH ONLY AT A SUPPORT POST WITH 4 FEET MINIMUM OVERLAP TO THE NEXT POST. 4. SUPPORT STANDARD STRENGTH FILTER FABRIC BY WIRE MESH FASTENED SECURELY TO THE UPSLOPE SIDE OF THE POSTS. EXTEND THE WIRE MESH SUPPORT TO THE BOTTOM OF THE TRENCH. FASTEN THE WIRE REINFORCEMENT, THEN FABRIC ON THE UPSLOPE SIDE OF THE FENCE POST. WIRE OR PLASTIC SIP TIES SHOULD HAVE MINIMUM 50 POUND TENSILE STRENGTH. 5. WHEN A WIRE MESH SUPPORT FENCE IS USED, SPACE POSTS A MAXIMUM OF 8 FEET APART. SUPPORT POSTS SHOULD BE DRIVEN SECURELY INTO THE GROUND A MINIMUM OF 24 INCHES. 6. EXTRA STRENGTH FILTER FABRIC WITH 6 FEET POST SPACING DOES NOT REQUIRE WIRE MESH SUPPORT FENCE. SECURELY FASTEN THE FILTER FABRIC DIRECTLY TO POSTS. WIRE OR PLASTIC SIP TIES SHOULD HAVE A MINIMUM 50 POUND TENSILE STRENGTH. 7. EXCAVATE A TRENCH APPROXIMATELY 4 INCHES WIDE AND 8 INCHES DEEP ALONG THE PROPOSED LINE OF POSTS AND UPSLOPE FROM THE BARRIER. 8. PLACE 12 INCHES OF THE FABRIC ALONG THE BOTTOM AND SIDE OF THE TRENCH. 9. BACKFILL THE TRENCH WITH SOIL PLACED OVER THE FILTER FABRIC AND COMPACT. THOROUGH COMPACTION OF THE BACKFILL IS CRITICAL TO SILT FENCE PERFORMANCE. 10. DO NOT ATTACH FILTER FABRIC TO EXISTING TREES. 0 'moo .S`]. MAINTENANCE C' • INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. • SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. • REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY SILT FENCE DETAIL STABILIZED. NOT TO SCALE NOW OR FORMERLY ROE D.B. 4225, P. 17 M.B. 68, P. 239 <� WETLAND DELINEATION "B" WETLAND DELINEATION "C" WETLANDS \ / UPLAND // POND lEBRIS PILE WETLANDS 3.7 ACRE LIMITS OF / CLEARING SILT FENCE DEBRIS 1 PILE 1 1 M 2"-3" ABC, #57 ❑R EQUIVALENT NOW ORIII �FORMEF�LY / WW,RD D.B. 423, P. 16 M.B. 6 P. 239 S16°38'50"E __37791 e 2349.04' , TRACT 1 503446 Sq.Ft. 11.558 ACRES WETLANDS \ `� S16"47'17"E 2734,60' / \ tRLANDS \ TRACT 2 552372 Sq.Ft. 1 12.681 ACRES \Q \ 0710 �Rc CONSTRUCTION SPECIFICATIONS 1. CLEAR THE ENTRANCE AND EXIT AREA OF ALL VEGETATION, ROOTS AND OTHER OBJECTIONABLE MATERIAL AND PROPERLY GRADE IT. 2. PLACE THE GRAVEL TO THE SPECIFIC GRADE AND DIMENSIONS SHOWN ON THE PLANS AND SMOOTH IT. 3. PROVIDE DRAINAGE TO CARRY WATER TO A SEDIMENT TRAP OR OTHER SUITABLE OUTLET. 4. USE GEOTEXTILE FABRICS BECAUSE THEY IMPROVE STABILITY OF THE FOUNDATION IN LOCATIONS SUBJECT TO SEEPAGE OR HIGH WATER TABLE. MAINTENANCE MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT 50'-0" MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOPDRESSING WITH 2-INCH STONE. AFTER EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED OR TRACKED ONTO PUBLIC ROADWAYS. r� CONSTRUCTION ENTRANCE / EXIT NOT TO SCALE NOTES � O 214< 1. FILL WILL BE TAKEN TO TERRACES SUBDIVISION UNDER PROJECT ID: PENDE-2020-026 (E&SC PERMIT ISSUED 7/16/20) 2. EXCAVATION OR GRADING WHERE ALL OF THE FOLLOWING APPLY: MINING ACT - 74-49(7)(F)... a. THE EXCAVATION OR GRADING IS CONDUCTED TO PROVIDE SOIL OR OTHER UNCONSOLIDATED MATERIAL TO BE USED WITHOUT FURTHER PROCESSING FOR A SINGLE OFF -SITE CONSTRUCTION PROJECT FOR WHICH AN EROSION AND SEDIMENTATION CONTROL PLAN HAS BEEN APPROVED IN ACCORDANCE WITH ARTICLE 4 OF CHAPTER 113A OF THE GENERAL STATUTES. b. THE AFFECTED LAND, INCLUDING NONPUBLIC ACCESS ROADS, DOES NOT EXCEED FIVE ACRES. C. THE EXCAVATION OR GRADING IS COMPLETED WITHIN ONE YEAR. d. THE EXCAVATION OR GRADING DOES NOT INVOLVE BLASTING, THE REMOVAL OF MATERIAL FROM RIVERS OR STREAMS, THE DISPOSAL OF OFF -SITE WASTE ON THE AFFECTED LAND, OR THE SURFACE DISPOSAL OF GROUNDWATER BEYOND THE AFFECTED LAND. e. THE EXCAVATION OR GRADING IS NOT IN VIOLATION OF ANY LOCAL ORDINANCE. f. AN EROSION AND SEDIMENTATION CONTROL PLAN FOR THE EXCAVATION OR GRADING HAS BEEN APPROVED IN ACCORDANCE WITH ARTICLE 4 OF CHAPTER 113A OF THE GENERAL STATUTES. SITE N.C. AY 172 VICINITY MAP NOT TO SCALE SURVEY BY: CHARLES F. RIGGS & ASSOCIATES, INC. (C-730) LAND SURVEYING - CONVENTIONAL & GLOBAL POSITIONING SYSTEMS, LAND PLANNING & COMPUTER MAPPING 502 NEW BRIDGE STREET LANDFALL EXECUTIVE SUITES P.O. BOX 1570 1213 CULBRETH DRIVE JACKSONVILLE, NC 28540-1570 WILMINGTON, NC 28405 TELEPHONE: (910) 455-0877 TELEPHONE: (910) 681-7444 E—MAIL: riggsland®riggslandnc.com CONSTRUCTION SEQUENCE 1. OBTAIN ALL NECESSARY PERMIT APPROVALS PRIOR TO ANY LAND DISTURBING ACTIVITY. 2. HOLD A PRE -CONSTRUCTION MEETING WITH THE EROSION CONTROL INSPECTOR. 3. INSTALL CONSTRUCTION ENTRANCE AND SILT FENCE. 4. CLEAR AREA FOR HAUL ROAD AND INSTALL HAUL ROAD. 5. BEGIN POND EXCAVATION. 6. STABILIZE (FERTILIZE, SEED, AND MULCH) ALL DISTURBED AREAS AS SOON AS POND EXCAVATION IS COMPLETE AND FINIAL GRADES AREA ESTABLISHED. 7. ONCE CONSTRUCTION IS COMPLETE AND ALL DISTURBED AREAS ARE STABILIZED, REMOVE TEMPORARY EROSION CONTROL MEASURES. / 4"— \ WETLAND KLINEATION "D" \\ 1 WETLANDS \ \ \ l 20' DRAINAGE & LOT 25 \ \ UTILITY EASEMENT \ FOLKSTONE PLANTATION1-1 \ M.B. 35, P. 81 WETLANDS lo F c4� I 110 00, UPLANDS \ co I-, WETLANDS UPLAND9�_ \ \ UPLANDS — — N73-12'38'E IP �73*12'43"E El \ n .�W 4' \ 20' DRAINAGE & DIRT ROAD , � 7 _ _ �— HAUL ROAD 05 ACRE LIMITS OF DISTRUBANCE PRIVA E 30' ACCESS N16°47' 7"W 2742.52' NMP 1 WETLAND DELINEATION "C" NMP \ \ J \ \ \ \ f' WETLAND DELINEATION "D" TLAND DELINEATION "E\ \ UTILITY EAS ENT (2200sf OF AREA REMAINS TO BE CONSTRUCTION � & UTILITY EASEMENT 1 \ \ \ EXCAVATED TO FINISH POND) � /� J M \ ENTRANCE l �� ^ l i \ / ✓ _j 00 \ J � \ Ld \ �� L \ \ w N L�\1 w \/ 0, a 0- \ 1 / NOW OR FORMERLY NOW OR FORMERLY of cn oL 00 of \a- o of oL NOW OR FORMERLY LAPAGE HAMPTON Q PEARCEa NOW OR FORMERLY m Of � D.B. 3271, P. 82 \ O O o o \ o m 06 RICHTER D.B. 3788, P. 119 _ 1 o o \ moo op o DESIGN & MAINTENANCE OF ALTERNATIVE LAND USES RSC ENGINEERING, PLLC 15226 US HWY 17 HAMPSTEAD, NORTH CAROLINA 28443 PHONE: 910.270.9599 - FAX: 910.270.9592 Engineering, PLLC E-Mail: sonya@rscengineering.com LOT 26 FOI_kSTONE PLANTATIO MOB. 35, P. 81 \ \ � I 1 \\ i \) 100, 0 100, 200' SCALE: 1"=100' (Horiz,) GET RIGHT INVESTMENTS II, LLC TRACTS 1 & 2, FOLKSTONE PLANTATION II, M.B.39, P. 146 STUMB SOUND TOWNSHIP, ONSLOW COUNTY, NORTH CAROLINA GET RIGHT INVESTMENTS II, LLC, OWNER, D.B. 5270, P. 402 250 & 260 PILCHERS BRANCH ROAD DATE: 08/03/2021 250 P I L C H E R S BRANCH ROAD SCALE: 1" = 100, SINGLE SOURCE JOB # 21053477 BORROW PIT PLAN DRAWN BY: JAR SHEET C 1