Loading...
HomeMy WebLinkAboutWQ0033370_Regional Office Historical File Pre 2018 (2)r Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality November 18, 2008 Mr. Steven Husemann, Interim Town Manager Town of Mooresville 413 N. Main Street PO Box 878 Mooresville, NC 28115 Subject: Permit No. WQ0033370 Modification The Residences at Morrison Plantation Phase 1 Wastewater Collection System Extension Iredell County, North Carolina Dear Mr. Husemann, In accordance with your application received on November 5, 2008, we are forwarding herewith Permit No. WQ0033370, dated November 18, 2008, to the Town of Mooresville for the construction and operation of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded and shall be subject to the conditions and limitations as specified therein. This cover letter shall be considered a part of this permit and is therefore incorporated therein by reference. Please pay particular attention to Permit Condition 3 which requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2T .0403 or any individual system -wide collection system permit issued to the Permittee. Permitting of this project does not constitute an acceptance of any part of the project that does not meet 1) 15A NCAC 2T; 2) the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; 3) and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable, unless specifically mentioned herein. Division approval is based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in the application. It shall be the Permittee's responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. Noy` Carolina Nturally Mooresville Regional Office 610 East Center Ave., Suite 301 Mooresville, NC 28115 Phone: (704) 663-1699 Fax: (704) 663-6040 Internet: www.ncmwaterquality.org Customer Service: 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer— 50% Recycled/10% Post Consumer • Paper Mr. Husemann Page 2 November 18, 2008 In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted for the construction and operation of approximately 1,664 linear feet of 8-inch gravity sewer and the discharge of 65,894 gallons per day of domestic wastewater in conformity with 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources and considered a part of this permit. The sewage and wastewater collected by this system shall be treated in the Town of Mooresville Rocky River VVVVTP (NPDES Permit No, NC0046728) prior to being discharged into the receiving stream. Assessing subsequent impacts to the downstream collection system and treatment facility is the complete responsibility of the Town of Mooresville. Mooresville must utilize whatever tracking tools necessary for planning additions of sewer flow in order to maintain compliance with the WWTP permitted limits and the collection system permit WQCS00041 If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding. If you need additional information concerning this matter, please contact Dee Browder at (704) 663-1699. for Co een H. Sullins cc: Mooresville Regional Office, Collection System Permit Files William McAnally, Taylor Wiseman & Taylor Surface Water Protection Central Files PERCS I NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES RALEIGH WASTEWATER COLLECTION SYSTEM EXTENSIONPERMIT This permit shall be effective from the date of issuance until rescinded and shall be subject to the following specified conditions and limitations: 1. This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit; 15A NCAC 2T; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials unless specifically mentioned herein. 2. This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. 3. The wastewater collection facilities shall be properly maintained and operated at all times. The Permittee shall maintain compliance with an individual system -wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2T .0403. If an individual permit is not required, the following performance criteria shall be met as provided in 15A NCAC 2T .0403: a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and any contravention of the groundwater standards in 15A NCAC 2L .0200 or the surface water standards in 15A NCAC 2B .0200. b. A map of the sewer system shall be developed and shall be actively maintained. c. An operation and maintenance plan shall be developed and implemented. d. Pump stations that are not connected to a telemetry system shall be inspected every day (i.e. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six-month period of time. f. A general observation of the entire sewer system shall be conducted at least once per year. g. Inspection and maintenance records shall be maintained for a period of at least three years. h. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina General Statute §143-215.1C. 1 4. This permit shall not be transferable. In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Permittee, a formal permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved. 5. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. 6. Per 15A NCAC 2T .0116, upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form attached to this permit shall be submitted with the required supporting documents to the address provided on the form. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. 7. A copy of the construction record drawings shall be maintained on file by the Permitteeo the life of the wastewater collection facilities. 8. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T, the Division's Gravity Sewer Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000 as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143- 215.6A through §143-215.6C. 9. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. 10. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by other government agencies (local, state and federal) which have jurisdiction, including but not limited to applicable river buffer rules in 15A NCAC 2B ,0200, erosion and sedimentation control requirements in 15A NCAC Ch. 4 and under the Division's General Permit NCG010000, and any requirements pertaining to wetlands under 15A NCAC 2B .0200 and 15A NCAC 2H .0500. 11. Noncompliance Notification: The Permittee shall verbally report to a Division of Water Quality employee at the Mooresville Regional Office, telephone number (704) 663-1699, as soon as possible, but in no case more than 24 hours or on the next working day, following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any failure of a pumping station or sewer line resulting in a by-pass directly to receiving waters without treatment of all or any portion of the influent to such station or facility y Voice mail messages or faxed information is permissible, but shall not be considered as the initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) 858-0368 or (919) 733-3300. Persons reporting any of the above occurrerices shall file a spill report by completing Part I of Form CS-SSO (or the most current Division approved form), within five days following first knowledge of the occurrence. This report shall outline the actions taken or proposed to ensure that the problem does not recur. Part II of Form CS-SSO (or the most current Division approved form) can also be completed to show that the SSO was beyond control. Permit issued this the 18th day of November 2008. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION for Coleen H. Sullins, Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number WQ0033370 Modification 3 Fast Track Engineering Certification Permit No. WQ0033370 November 18, 2008 Own er/WQCSANWTP PE Steven Husemann, Town Manager William B. McAnally Town of Mooresville Taylor Wiseman & Taylor PO Box 878 700 Forest Point Circle, Suite 116 Mooresville, NC 28115 Charlotte, NC 28273 Complete and submit this form to the permit ssuing regional office with the following: • One copy of the project record drawings (plan & profile views of sewer lines) of the wastewater collection system extension • Supporting design calculations (selected pumps, system curve, operating point, available storage if portable generator(s) or storage greater than longest past three year outage reliability option selected) for any pump stations permitted as part of this project • Changes to the project should be clearly identified on the record drawings or in written summary form. Permit modifications are required for any changes resulting in non-compliance with this permit, regulations or minimum design criteria. This project shall not be considered complete nor allowed to operate until this Engineer's Certification and all required supporting documentation have been received by the Division. Therefore, it is highly recommended that this certification be sent in a manner that provides proof of receipt by the Division. ENGINEER'S CERTIFICATION Partial LI Frla , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (LI periodically, E weekly, El full time) the construction of The Residences at Morrison Plantation Phase 1, an Iredell County project for the Permittee, hereby state that, to the best of my abiiities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 2T; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable, and other supporting materials. North Carolina Professional Engineer's seal, signature, and date: SEND THIS FORM & SUPPORTING DOCUMENTATION WITH REQUIRED ATTACHMENTS TO THE FOLLOWING ADDRESS MOORESVILLE REGIONAL OFFICE SURFACE WATER PROTECTION 610 EAST CENTER AVENUE, SUITE 301 MOORESVILLE NC 28115 The Permittee is responsible for tracking all partial certifications up until a final certification is received. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions 0 2 0 2 USE THE TAB KEY TO MOVE FROM HELD TO FIELD! Owner/Permittee: la. Town of Mooresville Full Legal Name (company, municipality, HOA, u 1b..._ C. F.AI ANU lt)r t Signing Official Name and Title (Please review 15A NAC 2T .0106 (b)`°for authorized signing officia Application Number: Ito be completed by DWQ) lc. The legal entity who will own this system is: ❑ Individual ❑ Federal ✓ Municipality ❑ State/County ❑ Private Partnership ❑ Corporation ❑ Other (specify): 1d. 413 N. Main Street Mailing Address f. North Carolina State 1 h, 704-663-3800 Telephone 704-662-6298 Facsimile 2. Protect (Facility) Information: 2a, The Residences at Morrison Plantation Phase 1 Brief Project Name (permit will refer to this name) 3. Contact Person: 3a. William B. McAna9 PE Name and Affiliation of Someone Who Can Answer Questions About this Application e. Mooresville City lg. 28115 Zip Code E-mail 2b, Iredell County Where Project is Lo 3b, 704-527-2535 Phone Number I$ © New 2. Owner is ✓" Public (skip to Item B(3)) 2a. If private, applicant will be: ❑ Retaining Ownership (i.e. store, church, single office, etc.) or El Leasing units (lots, townhomes, etc. - skip to Item B(3)) El Selling units (lots, townhomes, etc. - go to Item B(2b)) Town of Mooresville Owner of Wastewater Treatmen 4a. ing permit) 3c. bmcanally e@taylorwtse E-mail Lion, Permit No.: WQQ003 © Private (go to Item 2(a)) 2b„ If sold, facilities owned by a (must choose one Public Utility (Instruction C) ❑ Homeowner Assoc./Developer (Instruction D) ted n.com Facility (WWTF) Treating Wastewater From This Project L44L( TetAh'wt ago&4b. 4C--OO4 i 71,2 5a. Town of Mooresville 5b. 12-inch /Gravity Owner of Downstream Sewer 'Receiving Sewer Size ❑ Force Main The origin of this wastewater is (check all that apply): ❑ Residential Subdivision ✓ Apartments/Condominiums Mobile Home Park School ❑ Restaurant El Office. Permit # of Downstream Sewer (Instru El Retail (Stores, shopping centers) El Institution Hospital 0 Church EJ Nursing Home Other (specify): on E) 100 % Domestic/Commercial % Industrial (attach description.) (RO: contact your Regional Office Pretreatment st spedify): 7. Volume of wastewater to be allocated or permitted for this particular prp)ect: 65,894 z allons pereday *Do not include future flows or previously permitted allocations \ 8, If the permitted flow is zero, indicate why: El Pump Station, Outfall or Interceptor Line where flow will be permitted in subsequent permits thatConnect to this line ❑ Flow has already been allocated in Permit No. CO Rehabilitation or replacement of existing sewer with no new flow expected (see 15A NAC 02T .0303 to determine if permit is required) FTA 07 cz- 0 010 9. Provide the wastewater flow calculations used in determining the permitted flow in accordance with 15A NCAC 2T .0114 for the value in Item B(7) AND/OR the design flow for line or pump station sizing if a reduced or zero flow is being requested in Item B(7). Values other than that in 15A NCAC 2T .0114 (b) and (c) must be supported with actual water or wastewater use data in accordance with 15A NCAC 2T .0114 (f). See attached Engineers Report 10. Summary of SewerLines to be Pe ed (attach additional sheets if necessary) Size (inches) 8 Lengthrrt) / 1,644 New Gravity or Additional Force Main New Gravity Summary of Pump Stations w/ associated Force Mains to be Permitted (attach additional sheets as necessary) Pump Station Location ID (self chosen - as shown on plans/map for reference) Design Flow Power Reliability Option Operational Point (MGD) 1 - permanent generator w/AT ; Force Main Size Force Main Length GPM @TDH 2 - portable generator wIMTS Pump Station Location ID (self chosen - as shown on plans/map for reference) Design Flow OGPM ©TDhl rational Point Power Reliability Option pe.. . (MGD) 1 permanent generator w/ATS; Force Main Size 2 - portable generator w/MTS Force Main Length 12. Will the wastewater flow in the proposed sewer lines or pump stations be able to be directed to another treatment facility? El Yes El No If Yes, permit number of 2nd treatment facility (RO — if "yes" to 8,12 please contact the Central Office PERCS Unit) 13. Does the sewer system comply with the Minimum Design Criteria for the Fast Track Permitting of Pump Stations and Force Mains (latest version), the Gravity Sewer Minimum Design Criteria (latest version) and 15A NCAC Chapter 2T as applicable? / Yes El No If No, please reference the pertinent minimum design criteria or regulation and indicate why a variance is requested. SUBMIT TWO COPIES OF PLANS, SPECIFICATIONS OR CALCULATIONS PERTINENT TO THE VARIANCE WITH YOUR APPLICATION FTA 12/07 Pir 14. Have the following permits/certifications been submitted for approval for the system or project to be served? Wetland/Stream Crossings - General Permit or 401 Certification? ❑ Yes 0 No / N/A Sedimentation and Erosion Control Plan? ✓ Yes ❑No ❑ N/A ❑ Yes ❑ No /N/A Stormwater? 15. Does this project include any high priority lines, [see 15A NCAC 02T .0402 (2)] involve aerial lines, siphons, or interference manholes)? These lines will be considered high priority and must be checked once every six months Check if Yes: ❑ and provide details 1. Owner/Permittee's Certification: (Signature of Signing Official and Project Name) 1, StE11EN (. 45EMj4NA) , attest that this application for The Residences at Morrison Plantation — Phase 1 has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. Note: In accordance with North Carolina General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as we las civil penalties up to $25,000 per violation. C. CERTIFICATIONS Signing Official Signature ENGINEERING DESIGN DOCUMENTS MUST BE COMPLETED PRIOR TO SUBMITTAL OF THIS Date-_ APPLICATION. THESE DOCUMENTS MUST INCLUDE PLAN AND PROFILE OF SEWERS, THEIR. PROXIMITY TO OTHER UTILITIES, DESIGN CALCULATIONS. ETC. REFER TO 15A NCAC 02T .0305 2. Professional Engineer's Certification: (Signature of Design Engineer and Project Name) 1, William B. McAnally, PE. attest that this application for The Residences at Morrison Plantation — Phase 1 has been reviewed by me and is accurate, complete and consistent with the information in the engineering plans, calculations, and all other supporting documentation to the best of my knowledge. l further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers adopted February 12, 1996, and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 and the watershed classification in accordance with Division guidance. Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that l have reviewed this material and have judged it to be consistent with the proposed design. Note: In accordance with NC General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. 2a. William B. McAnally, PE Professional Engineer Name. '2b. Taylor Wiseman & Taylor Engineering Firm 2c. 700 Forest Point Circle, Suite 116 Mailing Address 2d. Charlotte 2e. NC 2f. 28273 City State Zip 2g. 704-527-2535 2h. 704-527-2537 2i. bmcanally@tayrorwiseman.com Telephone Facsimile E-mail NC PE Seal. Signature & Date FTA 12/07 TAYLOR WISEMAN &TAYLOR ENGINEERS I SURVEYORS I SCIENTISTS 700 Forest r Circle Suite 116 alai-Imre, NC 28273 4 DWQ-Surfcce Wafer Nts, Dee Browder North. Carolina Department of Envirounent and Natural Resources Division of Water Quality Mooresville Regional Office 61.0 E.. Center venue, Suite 301 Mooresville, North. Carolina 28115 Dear Ms. Browder: 27,2537 fax www.taylorwkernan,corn November 3, 2008 11. 03020 Re: 'file Residences at Morrison Plantation — Phase I. Town of Mooresville lredell County, MI'. '\1odifkauon to ‘Vastewa ter Collection System Extension Permit No, ‘VQ0033370 On behalf of our client. Atlantic Realty Partners, Inc.., we are submitting the following information in support of a Fast Track: Application Modification (FTA 12/07) for the above referenced project: 'Phase 1 - ;Modification • One (1) original and one (1) copy of the PAST -TRACK APPLICATION (PTA 12/07)j.0r GRA virry SEWERS., PUMP S14.11ONS, AND FORCE MAINS requesting a modification to Permit No, WQ0033370 for Phase 1 of the. above referenced project. • One ( original and one (1) copy of the How Tracking/ Acceptance for Sewer Extension Permit App feu (ions (FT.S.E- 10/07) in support of a mod ificirti on .to Permit .No. WQ00333'70 for Phase 1 of the above referenced project. • Application review fee in the amount of $480,00 (check .81019) • Two (2) copies of The Residences at Morrison Plantation Construction Plans, prepared by Taylor Wiseman & Taylor, Drawing Number NC-03020, Sheet No.'s 7-1.4, 2.3,26-29 & 12-36 of 38 and revised to October 3, 2008. Two (2) copies of The Residences at Morrison Plantation Phase 1 PraskivratisT Row COculations and Construction Speci:'fications, revised to September 8, 2008. if you have any questn. is or concerns, please contact me at 704-527-2535. 'rhank you for your consideration of this matter, Very truly yours, 31 „° 11.1W B. McAnally, R.egional Manager Enclosure cc: Benjamin D Curran Atlantic Realty Partners, Jason Fish; Atlantic Realty Partners, Inc. 1 /1 °LOS 103.NC1)FNR.,S LAVER.,.thni.o.r/t,a mendecLpha5o ,,/sewor,,,,ex lens nppowo doc State of North Carolina Department of ]nvironment and Natural Resources Division of Water Quality Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE —10/07) Project Applicant Name: adri Project Name for which flow is being requested: Yi€ rasa €14,1417 More than one FTSE-10/07 may be required for a single project If the owner J the WWTP is not responsible fOr all pump stations along- the route of the proposed lvastewater flow„ I. Complete this section only if you are the owner of the wastewater treatment plant. a.. WWTP Facility Name: eV kir b. WWTP Facility Permit (.0 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used All flows are in MGD c a H. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WW"TP Pump Station Name Approx.. Capacity, MGD Approx. Current Avg. (Firm/Design) Daily Flow, MGD 46116 0 ctcr; gg ,99 0 4'1 111. Certification Statement: , certify that, to the best of rn.‘,/ knowledge, the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary, sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and 1I for which I am the7espoiisible party, Signature of this form indicates acceptance q tlns waste Signing (.„Signature icias oc5 Dale ry Instructions for: Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE—10/07) Section 1 a. WWTP Facility Name: Enter the name of the WWTP that will receive the wastewater flow. b. WWTP Facility Permit #: Enter the NPDES or Non -Discharge number for the WWTP receiving the wastewater flow. c. WWTP facility's permitted flow, MGD: From WWTP owner's NPDES or Non -Discharge permit. d. Estimated obligated flow not yet tributary to the WWTP, MGD: This includes flows allocated to other construction projects not yet contributing flow to the collection system. Flows allocated through interlocal agreements or other contracts not yet contributing flow to the collection system are also included. For POTWs that implement a pretreatment program, include flows allocated to industrial users who may not be using all of their flow allocation. Please contact your Pretreatment Coordinator for information on industrial flow tributary to your WWTP. As of January 15, 2008 the POTW should have reviewed flow allocations made over the last two years and reconciled their flow records, to the best of their ability, so it is known how much flow has been obligated and is not yet been made tributary to the WWTP, in accordance with local policies and procedures employed by the reporting entity. The obligated flow not yet tributary plus actual flow will be reconciled annually for systems at Tess than 60% of permitted flow used. Annual updates shall be submitted to the appropriate Regional Office by January 15 of each year and cover the previous calendar year. Semi -Annual updates shall be required when the percent of permitted flow used reaches 60%. Semi- annual time period are defined as January 1 through June 30 and July 1 through December 31. Semi- annual updates shall be submitted to the appropriate Regional Office by July 15 and January 15 of each year. Quarterly updates shall be required when the percent of permitted flow used reaches 80%. Quarters are defined as Qtrl (Jan -Feb -Mar); Qtr2 (Apr -May -Jun); Qtr3 (Jul -Aug -Sep); Qtr4 (Oct -Nov -Dec). Quarterly updates shall be submitted to the appropriate Regional Office by April 15, July 15, October 15 and January 15 of each year. e. WWTP facility's actual avg. flow, MGD: Previous 12 month average. f. Total flow for this specific request, MGD: Enter the requested flow volume. g. Total actual and obligated flows to the facility, MGD Equals [d + e + f] h. Percent of permitted flow used: Equals [(g / c)* 100] For example: On January 15 a POTW with a permitted flow of 6.0 MGD, reported to the Regional Office that there is 0.5 MOD of flow that is obligated but not yet tributary. The annual average flow for 2007 is 2.7 MGD. The first Form FTSE-10/07 submitted after January 15, 2008 may have numbers like this: c. = 6.0 MGD d. = 0.5 MGD e. = 2.7 MGD f. = 0.0I5 MGD g. = 3.215 MGD h.=53.6% The next Form FTSE-10/07 may be updated like this: c. = 6.0 MGD d. = 0.5I5 MGD e. = 2.73 MGD f. = 0.102 MGD g. = 3.349 MGD h. = 55.8% Each subsequent Form FTSE-10/07 will be updated in the same manner. Section II List the name, approximate pump station firm (design) capacity and approximate current average flow (previous 12 months) through the pump station for each pump station that will be impacted by the proposed sewer extension project. Include the proposed flow for this project and other flows that have been approved for the pump station but are not yet tributary. Firm (design) capacity is the design average daily flow of the pump station as calculated by the design engineer or the station capacity with the largest pump out of service as per the Minimum Design Criteria if the design capacity is unknown. Section III Form FTSE-10/07 must be signed by the appropriate official as per 15A NCAC 02T .0106. Central Files: APS SWP 11/17/08 Permit Number WQ0033370 Permit Tracking Slip Program Category Status Project Type Non -discharge In review Major modification Permit Type Fast Track Version Gravity Sewer Extension, Pump Stations, & Pressure Sewer B Extensions Primary Reviewer dee.browder Permitted Flow 64486 Facility Facility Name The Residences at Morrison Plantation Phase 1 Location Address Owner Owner Name Town of Mooresville Dates/Events Permit Classification Individual Permit Contact Affiliation Major/Minor Region Minor Mooresville County Iredell Facility Contact Affiliation Owner Type Government - Municipal Owner Affiliation James Justice Town Of Mooresville Mooresville NC 281150878 Orig Issue App Received 09/02/08 11/17/08 Regulated Activities Apartment complex Condominium Wastewater collection Outfail NULL Scheduled Draft Initiated Issuance Public Notice Issue 11/18/08 es Effective Expiration 11/18/08 Additional information requested Additional information received Waterbody Name Stream Index Number Current Class Subbasin