Loading...
HomeMy WebLinkAbout20011381 Ver 1_Site Plan_2001080210" THICK CLASS A RIP RAP PHAS_ ONE RECONSTRUCTION SECTION SCALE: 1/4"= 1'-0" BANK RESTORATION PER MITCHELL & ASSOCIATES SPECIFICATIONS (T'P BOTH SIDES) / 1 r L t � r } WEST PIPE I 1 1 1 1 (TYP) 10" THICK CLASS A RIP RAP 2" COVER 3" COVER s ° J � r % L I i 1 1 EAST PIPE i 1 I 1 ! t � d PHASE TWO RECONSTRUCTION SECT ON SCALE: 1/4" = 1 ' -0" 8 T &B SECTION (AAA SECTION SCALE: 1/4" 1'-0" .i \ E DOWNSTREAM DIVERSION INTERMEDIATE DIVERSION SECTION SCALE: 1/4" = 1' -0" 50# SAND BAGS UPSTREAM DIVERSION SECTION SCALE: 1 /4" = 1 ' -0" IS (TYP BOTH SIDES) FACE SPILLWAY WITH 12" DEEP NO. 57 WASHED STONE PROP. CREEK SECTION A SCALE: 1 /4 "= 1 -Olt .S (TYP BOTH SIDES) PROP. CREEK SECTIONS B, C, AND D SCALE: 1/4"= l'-O" SEDIMENT TRAP DIMENSIONS \• -FILL SECTION BEYOND PUMP(GPM) BANK RESTORATION PER MITCHELL & ASSOCIATES SPECIFICATIONS W(FT) L (FT) S FT 100 4 25 25 4 80 4 23 23 4 60 4 21 °♦ 4 40 s 19 19 4 20 4 16 16 / \ LIGHTLY COMPACT, LIME, FERTILIZE, SEED AND MULCH. PROVIDE SUPPORT TO THE PIPE BY EXPOSING A 'MAXIMUM OF 10' LENGTH AT A AUGUST 15 - SEPTEMBER 15 KY 31 TALL FESCUE 6. FERTILIZE WITH 500 .POUNDS 10 -10 -10 PER ACRE. LIME WITH 2000 TIME. THE RIP RAP WITHIN THE BERM WILL BE REUSED FOR THE REMAINDER OF KY 31� TALL FESCUE 100 LBS./ KRE 50# SAND BAGS THE CREEK BED STABILIZATION. 40 LBS./ ACPE It STRAW AT 3000 POUNDS PER ACRE. t ! t I '� 5•fl WEST PIPE I EAST PIPE I 1 i t / � CLASS A RIP RAP ENTRANCE SECTION. 1 (TYP) 1 (TYP) / ;,- N 10. GRADE AND STABILIZE THE WEST BANK, CREEK BED, AND CULVERT ENTRANCE, 10" THICK CLASS A RIP RAP PHAS_ ONE RECONSTRUCTION SECTION SCALE: 1/4"= 1'-0" BANK RESTORATION PER MITCHELL & ASSOCIATES SPECIFICATIONS (T'P BOTH SIDES) / 1 r L t � r } WEST PIPE I 1 1 1 1 (TYP) 10" THICK CLASS A RIP RAP 2" COVER 3" COVER s ° J � r % L I i 1 1 EAST PIPE i 1 I 1 ! t � d PHASE TWO RECONSTRUCTION SECT ON SCALE: 1/4" = 1 ' -0" 8 T &B SECTION (AAA SECTION SCALE: 1/4" 1'-0" .i \ E DOWNSTREAM DIVERSION INTERMEDIATE DIVERSION SECTION SCALE: 1/4" = 1' -0" 50# SAND BAGS UPSTREAM DIVERSION SECTION SCALE: 1 /4" = 1 ' -0" IS (TYP BOTH SIDES) FACE SPILLWAY WITH 12" DEEP NO. 57 WASHED STONE PROP. CREEK SECTION A SCALE: 1 /4 "= 1 -Olt .S (TYP BOTH SIDES) PROP. CREEK SECTIONS B, C, AND D SCALE: 1/4"= l'-O" SEDIMENT TRAP DIMENSIONS \• -FILL SECTION BEYOND PUMP(GPM) D FT W(FT) L (FT) S FT 100 4 25 25 4 80 4 23 23 4 60 4 21 21 4 40 4 19 19 4 20 4 16 16 4 NOTE: TOE OF SLOPE AND L X W NO SCALE AGGREGATE SPECIFICATIONS: RECOMMENDED CONSTRUCTION SEQUENCE FOR LARGE CULVERT ' 1, RIP RAP PER NCDOT STANDARD SPECIFICATIONS FOR ROADS AND DEMOLITION: STRUCTURES. 1. REMOVE CHANNEL OBSTRUCTIONS AT THE UPSTREAM END OF THE EXISTING N 2. ENGINEERING FABRICS PER NCDOT STANDARD SPECIFICATIONS FOR ROADS CULVERT. AND STRUCTURES. 2. BUILD THE SEDIMENT TRAP FOR CONSTRUCTION DRAINAGE, SIZE DEPENDENT ON PUMP CHOSEN. ALL PUMPING TO SEDIMENT TRAP TO OCCUR DURING DRY WEATHER. PHASE ONE 3. DIVERT ENTIRE CREEK FLOW INTO THE 'EAST CULVERT BY CREATING- A TEMPORARY UPSTREAM DIVERSION. SOIL PREPARATION AND SEEDING SPECIFICATIONS: 4. BUILD A TEMPORARY DOWNSTREAM DIVERSION IN THE WEST CULVERT AT THE 1. STRIP TOP 4" OF SOIL (TOPSOIL) PRIOR TO GRADING AND STOCKPILE Al A DISCHARGE END. DESIGNATED LOCATION FOR RE -USE. 5. PUMP OUT THE WATER WITHIN THE UPSTREAM AND DOWNSTREAM DIVERSIONS. 2. SLOPES TO BE SCARIFIED 4 DEEP, SPREAD 4" TOPSOIL, LIME, FERTILIZ(:. PLACE THE PUMP AT THE DOWNSTREAM END OF THE CULVERT AND DISCHARGE COMPACT SURFACE BY RUNNING A DOZER UP AND DOWN THE SLOPE, SEEK DIRECTLY INTO THE CREEK ON STABLE RIP RAP, PROTECT THE PUMP, INTAKE AND MULCH. FROM FISH AND OTHER' AQUATIC SPECIES. NET AND REMOVE FISH WITHIN THE TAI EWATE R PAD SEED TYPE PLANTING Rr "E 3. ALL FILLS TO BE COMPACTED TO 95% OF ASTM D 698 (STANDARD CULVERT AND TRANSFER TO THE CREEK DOWNSTREAM. 120 LBS./ ACRE MAY 1 - AUGUST 15 PROCTOR), EXCEPT TOP 12" UNDER BUILDINGS AND PAVEMENTS TO BE 100- 6. EXTEND THE PUMP DISCHARGE TO THE SEDIMENT TRAP. AUGUST 16 - DECEMBER 31 PLAN: NO SCALE COMPACTED. 7, EXCAVATE THE WEST BANK AT THE UPSTREAM END FOR THE PIPE DEMOLITION, COMMON BERMUDA 20 LBS,/ ACRE 4. SEDIMENT TRAP TOP AND SIDES TO BE COMPACTED, LIGHTLY SCARIFIED, REMOVE THE PIPE. 40 LBS. / ACRE MAY 1 - JULY 31 SEEDED AND MULCHED. LEAVE BOTTOM BARE SOIL, 8. REMOVE THE SOIL ON TOP OF THE EAST PIPE AND ADJACENT TO THE WEST COMMON BERMUDA 5. ALL OTHER DISTURBED AREAS TO BE SCARIFIED 4" SPREAD 4" TOPS&-, SECTION. CONSTRUCT THE PERMANENT CREEK BED RIP . RAP STABILIZATION, AND GERMAN MILLETT 15 LBS./ ACRE AUGUST 1 - AUGUST 15 TEMPORARY RIP RAP AND SAND BAG' BERM AGAINST THE PIPE AS SHOWN. 100 LBS./ A'RE LIGHTLY COMPACT, LIME, FERTILIZE, SEED AND MULCH. PROVIDE SUPPORT TO THE PIPE BY EXPOSING A 'MAXIMUM OF 10' LENGTH AT A AUGUST 15 - SEPTEMBER 15 KY 31 TALL FESCUE 6. FERTILIZE WITH 500 .POUNDS 10 -10 -10 PER ACRE. LIME WITH 2000 TIME. THE RIP RAP WITHIN THE BERM WILL BE REUSED FOR THE REMAINDER OF KY 31� TALL FESCUE 100 LBS./ KRE POUNDS PER ACRE GROUND AGRICULTURAL LIMESTONE. MULCH WITH WHEAT THE CREEK BED STABILIZATION. 40 LBS./ ACPE STRAW AT 3000 POUNDS PER ACRE. '� 5•fl 7. ALL AREAS NOT PERMANENTLY SEEDED WITHIN 30 WORKING DAYS AFTER 9. CONSTRUCT THE ENTRANCE FOOTING FOR THE WEST PIPE. INSTALL THE LAST DISTURBANCE SHALL HAVE TEMPORARY SEEDING. FOLLOW UP WITH ENTRANCE SECTION. 2 (TYP) PERMANENT SEEDING WITHIN ONE YEAR. 10. GRADE AND STABILIZE THE WEST BANK, CREEK BED, AND CULVERT ENTRANCE, i 8. APPLY PERMANENT SEEDING WITHIN 30 WORKING DAYS OR 120 CALANDER 11. INSTALL A SAND BAG BERM ALONG THE EAST EDGE OF THE STABILIZED CREEK DAYS AFTER FINAL GRADE IS REACHED, UNLESS TEMPORARY SEEDING iS BED. 1 in APPLIED. 12. REMOVE THE DEWATERING - PUMP. , EX. GRADE 9. , REGRADING SEEDED AREAS BY REGRADG ERODED AREAS, REAPPLYING - S-�.,D, FERTILIZER, LIME, 0 R MULC H AS REQUIRED T 0 ESTABLISH A FULL Y ESTABLISHED, 13. REMOVE THE TEMPORARY DOWNSTREAM DIVERSION IN THE WEST PIPE. -' . TURF. , . PHASE TWO / TEMPORARY SEED SCHEDULE 14. REMOVE THE TEMPORARY UPSTREAM DIVERSION, AND DIVERT THE ENTIRE CREEK INTO THE WEST ;PIPE. DIVERSION BERM SECTION: NO SCALE PLANTING DATES SEED TYPE PLANTING Rr "E JANUARY 1- APRIL 31 ANNUAL. RYE 120 LBS./ ACRE MAY 1 - AUGUST 15 GERMAN MILLETT 40 LBS./ ACK, AUGUST 16 - DECEMBER 31 ANNUAL RYE 120 LBS./ ACRE 15. INSTALL A TEMPORARY INTERMEDIATE DIVERSION WITHIN THE EAST PIPE BETWEEN THE 60" WYE SECTION-AND THE LIMIT OF DEMOLITION. 16. PUMP OUT THE WATER WITHIN THE UPSTREAM- AND ,INTERMEDIATE DIVERSIONS. PLAGUE THE PUMP IN THE PIPE JUST UPSTREAM OF THE DIVERSION AND " DISCHARGE DIRECTLY INTO THE PIPE BELOW THE INTERMEDIATE 'DIVERSION. PROTECT THE PUMP INTAKE FROM FISH AND OTHER AQUATIC SPECIES: NET AND -REMOVE FISH WITHIN THE PIPE AND TRANSFER TO BELOW THE INTERMEDIATE DIVERSION: PERMANENT SEED SCHEDULE 17. EXTEND THE PUMP DISCHARGE TO THE SEDIMENT TRAP. CUT ENTRANCE SECTION OF 1 1 ' DIA C P M 1 (rfP) 3/4x 18" GALV. ANCHOR BOLT, 9" HOOK, 5" EXPOSURE, WASHER AND NUT CREEK BOTTOM s 101, o 2" COVER 10" CLASS A RIP RAP I-. ood } 1 KJP FOR RE'11IEW ONLY -NOT FOR CONSTRUCTION 0 KJP PRELIM 1) iIARY- NOT FOR CONSTRUCTION REV NO. DRAWN BY DESCRIPTION 3" COVER -/ SECTION C NO SCALE SEAL. C1 +a isoo f 5/31/01 <11 GIB 5/22/01 �E¢f_I.c��® APPROVED DATE PLANTING DATES SEED TYPE PLANTING RAr JANUARY 1- APRIL 15 KY 31 TALL FESCUE 100 LBS./ kRE ANNUAL RYE 40 LBS./ A R, APRIL 15 - APRIL 31 KY 31 TALL FESCUE 60 LBS./ ACRE COMMON BERMUDA 20 LBS,/ ACRE ANNUAL RYE 40 LBS. / ACRE MAY 1 - JULY 31 KY 31 TALL FESCUE 60 LBS./ ACRE COMMON BERMUDA 20 LBS.% ACRE GERMAN MILLETT 15 LBS./ ACRE AUGUST 1 - AUGUST 15 KY 31 TALL FESCUE 100 LBS./ A'RE GERMAN MILLETT 15 LBSJ ACPE AUGUST 15 - SEPTEMBER 15 KY 31 TALL FESCUE 100 LBS.J ARE SEPTEMBER 15 - DECEMBER 31 KY 31� TALL FESCUE 100 LBS./ KRE ANNUAL RYE 40 LBS./ ACPE 18. EXCAVATE THE EAST BANK AT THE UPSTREAM END FOR THE PIPE DEMOLITION. REMOVE THE PIPE, 19. CONSTRUCT THE ENTRANCE FOOTING FOR THE EAST PIPE, INSTALL THE ENTRANCE SECTION. 20. GRADE AND STABILIZE THE EAST BANK, CREEK BED, AND CULVERT ENTRANCE. 21. REMOVE THE DEWATERING PUMP. 22; REMOVE THE TEMPORARY INTERMEDIATE DIVERSION IN THE EAST PIPE, 23. REMOVE THE TEMPORARY UPSTREAM DIVERSION, AND EQUALIZE THE CREEK FLOW INTO BOTH PIPES, RECOMMENDED CONSTRUCTION SEQUENCE FOR SMALL CREEK CONSTRUCTION. 1. CONSTRUCT THE BERM ON THE NORTH SIDE OF THE 'PROPERTY AND STABILIZE,' 2. CONSTRUCT THE PROPOSED CREEK FROM THE DOWNSTREAM END TOWARDS; THE UPSTREAM END. CONSTRUCT A TEMPORARY SANDBAG BERM ON THE UPSTREAM END TO DIVERT WATER INTO EXISTING 18" CPP UNTIL THE CREEK BANKS ARE STABILIZED. 3. REMOVE THE SANDBAG BERM AND USE THE BAGS TO BLOCK, FLOW INTO, THE CPP, DIVERTING THE FLOW TO THE NEW CREEK. A nr7AAnt 14,-14 TWr CIRCT '7A' I,_C'i"TIf1A1 Ar twi;- f`Do RV' C'Vr A\ /ATI #!f' ,bChAt'Mhkff? T_uc*