Loading...
HomeMy WebLinkAbout310122_Compliance Evaluation Inspection_20211104Division of Water Resources Facility Number ® 0 Division of Soil and Water Conservation 0 Other Agency Type of Visit: Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access i d_\ n Date of Visit: Arrival Time: Departure Time: j County: ttl Farm Name: (} %� �7,t l �—� Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Certified Operator: �LP_6 (A �L J Back-up Operator: Location of Farm: Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feede Farrow to Finish Gilts Boars Other Phone: Title: Latitude: Phone: Region: Um-Ab Integrator: Certification Number: Certification Number: Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. IN Non-- Layer Other Discharges and Stream Impacts Design Current Longitude: Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy_ Beef Stocker Beef Feeder Beef Brood Cow 1. Is any discharge observed from any part of the operation? ❑ Yes P No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes No ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes E;Q No ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 511212020 Continued Facility Number: Date of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes R7] No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): �_ ✓ 1 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes ® No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) T 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes P No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? Yes JkNo ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? Yes No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? 15. Does the receiving crop and/or land application site need improvement? 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acres determination? 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment? Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropriate box. ❑WUP ❑Checklists ❑Design ❑ Maps ❑ Lease Agreements []Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis []Waste Tr nsfers ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections 22. Did the facility fail to install and maintain a rain gauge? 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? Page 2 of 3 ❑ Yes C�No ❑ Yes 1�No ❑ Yes No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes ® No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ NA ❑ NE ❑ Weather Code ❑ Sludge Survey ❑ NA ❑ NE ❑ NA ❑ NE 511212020 Continued Facility Number: Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes [� No the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a PDA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26, Did the facility fail to provide documentation of an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) ❑ NA ❑ NE ❑ NA ❑ NE ❑ Yes P No ❑ NA ❑ NE ❑ Yes \go No fE NA ❑ NE ❑ Yes "No ❑ NA ❑ NE ❑ Yes P No ❑ NA ❑ NE ❑ Yes Dd No ❑ NA ❑ NE 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes 33, Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA NE No ❑ NA ❑ NE I No ❑ NA ❑ NE No ❑ NA ❑ NE Iommments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional pages as necessary). Slt�d�_ W Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 Phone: Date: 511212020