Loading...
HomeMy WebLinkAboutGW1-2021-04008_Well Construction - GW1_20211115 w ®, NORTH CAROLINA ilk WELL CONSTRUCTION RECORD (GW-1 ) EnvfronmertmfQua(Iry Form GW-1 Well Construction Electronic Form North Carolina Department of Environmental Quality Division of Water Resources April 1,2021 Submission ID# G W 1-2021-04008 Are you submitting a printed form?* Yes No CONTACT INFORMATION ....................................................................................................................... Contact Name* Email Address* Alton Boshoff aboshoff@cohesion-inc.com Is this a revision to the form you have previously submitted?* Yes No WELL CONSTRUCTION INFORMATION ........ ......... ..... ......... ......... ......... ......... ..... ......... 1.Who is installing these wells?* Owner Well Contractor 1.Well Contractor Information: Certiticate# Cert Level First Name Last Name Company Name 2595 A ALTON BOSHOFF GEO SUPPORT INC 2.Well Construction Permit#: List all applicable well construction permits(i.e.Monitoring Wells,UIC,County,CCPCUA,etc.) What type of well is this?* Injection Well Non-Water Supply Well Water Supply Well(includes irrigation wells) 3.Non-Water Supply Well* Monitoring Recovery 4.Date well was completed and ID# Date Well Completed* Well ID# Well Yield 11/10/2021 M W-3 NA (gallons per minute)" 5.Well Location Facility/Owner Name* Cattail Family, LLC Facility ID# (Required) (If applicable) County* Parcel Identification No.(PIN) Johnston Physical Address* Street Address 2361 Antioch Church Road Address Line 2 City State/Province/Region Zebulon NC Postal/Zip Code Country 27597 us Latitude* 35.6879538000 Longitude*78.2751882000 Decimal degrees Decimal degrees .................................... 6.Is(are)the well(s):* Permanent Temporary 7.Is this a repair to an existing well:* Yes No If this is a repair,fill out known well construction information and explain the nature of the repair under#21 remarks section or on the back of this form. For multiple Geoprobe/DPT or Closed-Loop Geothermal Wells having the same construction,only 1 GW-1 is needed. 8a.Indicate TOTAL NUMBER of wells drilled: 9.Total well depth below land surface: (ft.) 9a.What is the depth of the casing from ground 35 surface? For multiple wells list all depths if different 20 (example-3@200'and 2@100') in feet 10.Static water level below top of casing: (ft.) 11.Borehole diameter: 28.42 6 If water level is above casing,use"+" in inches 12.Well construction method: Auger Air Rotary Cable Tool Direct Push Mud Rotary Rotosonic Other 14.WATER BEARING/FRACTURE ZONES From To Description 26 35 Moisture noticed in sandy layer and getting wetter with depth. in feet in feet 15.OUTER CASING(for multi-cased wells)OR LINER(if applicable) From To Diameter Thickness Material in feet in feet in inches 17.SCREEN From To Diameter Thickness Material 20.00 35.00 2.00 0.01 inch slot SCH40 PVC in feet in feet in inches 18.GROUT ..................................................................................................... From To Material Emplacment Method&Amount 0.30 1.50 Portland Cement Poured in feet in feet 1.50 18.00 Bentonite pellets Poured&hydrated in feet in feet 19. SAND/GRAVEL PACK(if applicable) From To Material Emplacment Method 18.00 35.00 #2 Filter Sand Poured in feet in feet 20. DRILLING LOG From To Description(color, hardness,soil/rock type,grain size,etc.) 0.00 10.00 Red clay in feet in feet 10.00 25.00 Tan silty clay in feet in feet 25.00 35.00 Light tan to grey sandy clay in feet in feet 21. Remarks 22.Site diagram or additional well details: You may upload additional well construction information here. pdf only CERTIFICATION INFORMATION * By signing this form, I hereby certify that the well(s)was(were)constructed in accordance with 15A NCAC 02C.0100 or 15A NCAC 02C.0200 Well Construction Standards and that a copy of this record has been provided to the well owner. 23.Certification* Signature of Certified Well Contractor Submittal Date 11/15/2021