HomeMy WebLinkAboutNCC192251_NOT Closeout Documents_20211110Charlolte-Mecklenburg
STORM
WATER
2145 Suttle Avenue
Services
EC Inspection Report C h a r I o t t e, NC 2 8 2 0 8
Project Name: Windsor Run Phase 1C
Location: 2010 McKee Road, Matthews North Carolina - Matthews
Owner: Windsor Run, LLC
EC - Final Inspection #: 63,250 - Date/Time: 8/6/21 14:30 - 8/6/21 15:00 - Inspector: Chanell Hatch
Weather conditions: Sunny
Soil conditions: Workable
Contact made: N/A
Erosion and sediment control measures removed: YES
Site permanently stabilized: YES
BMP's installed per approved plans: N/A
Summary: Final inspection for Windsor Run Phase 1C #393057, all measures have been removed and the site has been
permanently stabilized.
dx
CHARLOTTE.
To report pollution or drainage problems call: 311
http://stormwater.charmeck.org
0
11/3/2021 2:35:13PM Page 1 of 1