Loading...
HomeMy WebLinkAboutGW1-2021-05461_Well Construction - GW1_20210615 WELL CONSTRU TLO-N RECORD(GH-11- For Internal Use Only: i.well contractor Information: -.14I.WATER ZON.ES --m I - FROM TO DFSC UMON? Well Contractor Name ft Lf_e-,?ft Ll NC Wall contractor Cortification Number WOUTER Trals)O&LIlaw(Ifalipli CASING, kable ft-T TiRCKNESS A V% FROM TO _ -MATERIAL 4 ft, I & I U in. Company ame liNG 3%L 1,1-1,CAIGOR I MAT.12:UAL _')a rlffc[artss 2.Well Construction Permit#: '�e FROM TO & DIAWLM List all applicable well construction permits e.UIC,County,State,Parlance,etc.) ft. 3.Well Use(cbeckwell use): & ft in. M'SCREEM. It"Water Supply Well: FROM TO DIAMiTER I SLOT SUM I TlHCJQMS MATERIAL flAgricultural 13Municipaliftblic 0 & ft in. RGeothermal(Heating/Cooling Supply) residential Water Supply(single) & ft in Industrial/Commercial DResidearbal Water Supply(shared) 1g.GROUT Ittrigation FROM TO MATERIAL. I EMACMW I 90D&AMOUNT Non-Water Supply Well: ft. & e- A9,01.1-d jMonitoring E)Recovery ft ft. v Injection Well: ft & Aquifer Recharge [}Groundwater Remediation �19.SANDIG]WAVEL*PACK(ifiOpUcAblii) Aquifer quifer Storage and Recovery C)Salinity Barrier FROM TO MATERIAL W EMPLACEMEMEMOD Aquifer Test OStormwater Drainage ft & Experimental Technology 13 Subsidence Control & fL Geothermal(Closed Loop) Tracer 20.--D .- G-LOG`(atthib&4diSoid M ibetfoifnetiiy)',"L- ( .hardness, Geothermal(Heating/Cooling Return) nOther(explain under#21 Remarks) 1 FROM TO DESCRVTION color sollfrock zz) ft 4.Date Well(s)Completed: well ED# ft gwe 59.Well Location: & ft & Facility/OwnerName Facility M#(ifopplicable) ft ft. 2yo,? Tr4 16fG2er & ft physical Address,City,and Zip & & LOq k,4, 21L REMARKS 47 County parcel Identification No.(PIN) — ee W Latitude and longitude in degrees/minutes/seconds or decimal degrees: (if-11 flold,one Istilong is sufficient) 22.Certification: N W ��P'4e 6.Is(sre)the well(s),515-r-flnent or Temporary Signature--oCertified Well Con cunt Date By signing this form,I hereby certify that the well(s)was(were)constructed in accordance 7.Is this a repair to an existing well: [3Yes or UN'o with 15A NCAC 02C.0100 or 15A NCAC 02C.0200 Well Construction Standards and that a ff1h1s Is a- e,Pairfill Out known well construction information and plain the nature of the copy of this record has been provided to thew OW I well ner repair under#21 remarks section or on the back of this form. 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well site details or well construction,only I Gw-i is needed. Indicate TOTAL NUMBER of wells construction details. You may also attach additional pages if necessary. drilled: SUBMITTAL INSTRUCTIONS 9-Total well depth below land surface: -S-6 L/ —Vt en example.3@200'and.2@100� For multiple wells list all depths Udfflir t 24a. For All Wells Submit this for ml within 30 days of completion of well construction to the following: 10.Static water level below top of casing: If level is above casing,use (ft) Division of Water Resources;Information Processing Unit, 1617 Nbil Service Center,Raleigh,NC 27699.1617 11.Borehole diameter: 24b.For Injection Wells: In addition to sending the form to the address in 24a 12.Well construction method: PQ fdP I/ above, so submit one copy of this form within 30 days of completion of well (i.e.auger,rotary,cable,direct pusb,cu.) construction to the following: Division of Water Resources,Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center,Raleigh,NC 27699-1636 139.Yield(gpm) 19, Method of test-, 24c.For Water Supply A Iniection Wells; In addition to sending the form to the addresses) above, also submit one copy of this form within 30 days of 13b.Disinfection type- Amount: completion of well construction to the'county health department of the county where constructed. Form ow-I North Carolina DOParnment of Environmental Quality-Division of Water Resources Revised 2-22-2016