Loading...
HomeMy WebLinkAboutGW1-2021-05459_Well Construction - GW1_20210615 -- -3f.'_ - -•-�-___LAJcx+lc 1A.5 FROM TO DzSCrL�IOit Well Contractor Name ' d�� 1s^ �r TIM ft. .a3 GocPf" 0 (�-1�l o� 9 ft. ft. NC Well Contactor Certification Number ,1`j 1 T_ �O� r 15.OUTER CASING tar multi-cased wells OR LINER if a plicnble YADKIN WELL COMPANY,INC. n�S;lr`�ljy�li FROM To DIAAMTER; THICIQVESS TERIAL t�f^.L ft, ;in. Company Name �`y;f�`a^',vl;r'il ft. � d 16.INNER CASING OR T[JBING( 'othermal dosed-loop)^� 2.Well Construction Permit#: 0DF{9 FROM TO DIALMETER` THICTM.SS MATEERIAL List all applicable well construction perffi its(.r-11IC,County,State,Variance,etc.) Jj fL U D ft /Y I in 509,)l C,, 3.Well Use(check well ase): ft. ft in. 17.SCr�£ i l Water Supply Weil: FRord TO DUAIETLR: !.SLOT SIZE TMCHNESS i••IATf RIAL Pgricultural Ca G rt e,, ❑Municipal/Public ft. ft. in. ❑Geothermal(Heating/Cooliug Supply) ❑Residential Water Supply(single) It ft. in.! Cs ❑Industrial/Conunercial ❑Residential Water Supply(shared) 111.GROUT Cs GIrrigation ❑Wells>100,000 GPD, FROnf I TO P TERIAL E:4PLACE&LNT PM TROD c A.r.ioUNT Non-Water Supply Well: it. 14, ft' I tole Put oural 4 104 33_ ❑Monitoring ❑Recovery l r F• ' fi (2 u IC K 6rou Nv ftj LS 114 4.3 S r Injection Well: ft. ft. � ❑Aquifer Recharge ❑Groundwater Remediation .19.SAP@/GRA1r ,L PACK(if applicable) [:]Aquifer Storage and Recovery ❑Salinity Barrier FEOM TO IYIATERi L I EBPLACEP.M41KhLl On ❑Aquifer Test ❑Stormwater Drainage ft ft i ❑Experimental Technology ❑Subsidence Control % ft ❑Geothermal(Closed Loop) ❑Tracer 20.DRILLING LOG attacb additional sheets if necessa ❑Geothermal 04eating/Cooling Return) 00ther(explain under#21 Remadm) PROM TO Dl�SCRIPTION color,bardarss,coiUrodc i°saq etc.) ^� tt U ft. ft 4.Date Well(s)Completed: S 13( (31 Well. `T 40 r i�OO S fitt. 183 ft G roe% ! - C OV,, one #33�=3�'��Q�� . �'T 5a./WeeJll Location: Facility/Owner Namtf Famlity ID#(if applicable) Physical Ad ess,City,and Zip ft ft S wY`in y 2L REBIAP c County Parcel Identification No.MN) 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: '4N (ifwell field,one lat/long is sufficient) 22.Certification: N W 5 a6�•�� (_ 6.Ls(are)the well(s):Aermanent or ❑Temporary Sipatarb ofCmifiedWill Contractor Date Bysigning thisform,I hereby certify that the well(s)was(were)conducted in accordance with 7.Is this a repair to an existing well: ❑Yes or ANO 15ANCAC 02C.0100 or 15A NCAC 02C.0200 Well Construction Standards and that a copy If this is a repair,fill out(mown well construction information d explain the nature of the of this record has been provided to the well owner. repair under#21 remarks section or on the back of thisform- G 23.Site diagram or additional well details: r 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to,provide additional well construction info construction,only 1 GW-1 is needed. Indicate TOTAL NUMBER ofwells (add'See Over'in Remarks Box).You may also attach additional pages ifnecessary. drilled: p 24.SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface: o, (ft) Submit this GW-1 within 30 days of well completion per the following: For mudttple wells IW all'depths ifdifferent(example-3©200'and 2@100) t �0 (ft) 24a. For All Wells: Original foim to Division of Water Resources (DWR), 10.Static water Ievel below top of casing: Information Processing Unit,1617 MSC,Raleigh,NC 27699-1617 Ifwater level is above casing,use C r. Bit Off: �1 I 1 24b.For Infection Wells:Copy toDWR,Underground Injection Control(IUC) 11.Borehole diameter: (in.) Program,1636 MSC,Raleigh,NC 27699-1636 f 12.Well construction method: AIR ROTARY 24c.For Water Supply and Open-Loop Geothermal Return Wells:Copy to the (i.e.auger,rotary,cable,duect push,etc.) county environmental health depa r t nent of the county where installed FOR WATER SUPPLY WELLS ONLY: 24d.For Water Wells producinEover 100,000 GPD:Copy to DWR,CCPCUA 13a.Yield(gpm) Ls Method of test: jR,A k Pemnt�Oir�'1611 MSC,Raleigb,WC 27699-1611 13b.Disinfection type: 70%HTH Amount: OZ DATE SITE VISITED: ! i i �G� a VISITED BY: Forty W-1 s._ North Catlglina Department of Environmental Quality-Division of Water Resources Revised 6-6-2018 .. ► nrz