Loading...
HomeMy WebLinkAbout20121038 Ver 1_Certification of Completion_20130724'Sit NCDENR Certificate of Completi OE- Vvr��9 - Cy JUi 2 4 201 - NR - WATER QUALITY av DWQ Project No Z`0.3 8 County �i� //G U K__ �4a►'ds � `�'.,. Branch DWQ Applicant L�� � / %�/Vn� D Project Name- Vcr70A ��,�4Z , - ,��i>' i��/►'�/�,��� /�T �� Date of Issuance of Wetland Permit Upon completion of all work approved within the 401 Water Quality Certification and /or Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Oversight/Express Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699 -1650 This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer It is not necessary to send certificates from all of these. Applicant's Certification I , hereby state that, to the best of my abilities, due care and diligence was use—d in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and /or Buffer Rules, the approved plans and specifications, and other sup p rtmg materials Signature Date Agent's Certification I, used in the observation of the construction compliance and intent of the 401 Water specifications, and other supporting materials Signature _, hereby state that, to the best of my abilities, due care and diligence was such that the construction was observed to be built within substantial Quality Certification and /or Buffer Rules, the approved plans and Date If this project was designed by a Certified Professional 1, , as a duly registered Professional (i e , Engineer, Landscape Architect, Surveyor, etc ) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and /or Buffer Rules, the approved plans and specifications, and other supporting materials Signature Registration No Date M