HomeMy WebLinkAboutSW6210907_Design Calculations (Riprap)_20211105(Project Name
Timberland Gas Station
Hoke County, NC
Riprap Dissipator #1
Date
Sept. 2021
DO Project No.
DD2114
Double D Engineering, PLLC
150 S. Page Street
Southern Pines, NC 28387
(910) 684-8646
Calculated By
JLH
Checked By
JLH
STORM DESIGN: 10 Year
BACKGROUND: Use the E&S Control Planning & Design Manual, Section 8.06.
REFERENCE: (NCDEHNR, 1993)
Step 1. Minimum Tailwater Condition
Step 2.
D-o =
18 in.
D-o =
1.50 ft.
Q-10 =
5.40 cfs
d-50 =
0.3 ft.
L-a =
9 ft.
Step 3.
3*D-o =
4.50 ft.
W =
10.50 ft.
Step 4.
d-max
0.45 ft.
d-max
5 in.
Step 5.
Thickness =
0.68 ft.
Thickness =
8 in.
DESIGN DIMENSIONS:
Pipe diameter in inches
Pipe diameter in feet
Pipe outlet (from drainage calculations)
from Figure 8.06 a
from Figure 8.06 a
3 times the outlet pipe diameter
Pipe diameter + Apron length
Maximum Stone Diameter (1.5*d-50) in inches
Maximum Stone Diameter (1.5*d-50) in feet
Min. Apron Thickness With Filter Fabric (1.5*d-max) in feet
Min. Apron Thickness With Filter Fabric (1.5*d-max) in inches
Apron Dimensions
Riprap
Length
Width
3-D-o
Thick
Class
9
11
5
181n.
B
NOLOGY: Q10 = 10-Year Design Storm, Peak Discharge, (cfs)
D-o = Pipe Diameter, (in. & ft.)
d-50 = Mean Stone Diameter of Rip -Rap, (ft.)
L-a = Length of Rip -Rap Apron, (ft.)
3*D-o = Width of Rip -Rap Apron @ Pipe Outlet, (ft.)
W = Width of Rip -Rap Apron @ End of Apron, (ft.)
d-max = Maximum Stone Diameter of Rip -Rap, (ft. & in.)
Thickness = Thickness of Rip -Rap Apron With Filter Fabric, (ft. &in.)
Project Name
Timberland Gas Station
Location
Hoke County, NC
STORM DESIGN: 10 Year
Riprap Dissipator #2
Date
Aug. 2021
DD Project No.
DD2012
Double D Engineering, PLLC
150 S. Page Street
Southern Pines, NC 28387
(910) 684-8646
Calculated By
JLH
Checked By
JILH
BACKGROUND: Use the E&S Control Planning & Design Manual, Section 8.06.
ENCE: (NCDEHNR, 1993)
Step 1. Minimum Tailwater Condition
Step 2,
Step 3.
Step 4.
Step 5
D-o =
18 in.
Pipe diameter in inches
D-o =
1.50 ft.
Pipe diameter in feet
Q-10 =
3.01 cfs
Pipe outlet (from drainage calculations)
d-50 =
0.3 ft,
from Figure 8.06 a
L-a =
9 ft.
from Figure 8.06 a
3*0-o = 4.50 ft.
W = 10.50 ft.
d-max 0.45 ft
d-max 5 in.
Thickness = 0.68 ft.
Thickness = 8 in.
DESIGN DIMENSIONS:
3 times the outlet pipe diameter
Pipe diameter + Apron length
Maximum Stone Diameter (1.5*d-50) in inches
Maximum Stone Diameter (1.5*d-50) in feet
Min. Apron Thickness With Filter Fabric (1.5*d-max) in feet
Min. Apron Thickness With Filter Fabric (1.5*d-max) in inches
Apron Dimensions Riprap
Length WWdth 3-D-o Thick Class
9 11 5 181n. a
RMINOLOGY: Q10 = 10-Year Design Storm, Peak Discharge, (cfs)
D-0 = Pipe Diameter, (in. & ft.)
d-50 = Mean Stone Diameter of Rip -Rap, (ft.)
L-a = Length of Rip -Rap Apron, (ft.)
3*D-o = Width of Rip -Rap Apron @ Pipe Outlet, (ft.)
W = Width of Rip -Rap Apron @ End of Apron, (ft.)
d-max = Maximum Stone Diameter of Rip -Rap, (ft. & in.)
Thickness = Thickness of Rip -Rap Apron With Filter Fabric, (ft. &in.)
Project Name Riprap Dissipator #3 Date
Timberland Gas Station Aug, 2021
DD Project No,
Location Double D Engineering, PLLC DD2012
Hoke County, NC 150 S. Page Street Calculated By
Southern Pines, NC 28387 JLH
(910) 684-8646 Checked By
JLH
STORM DESIGN: 10 Year
BACKGROUND: Use the E&S Control Planning & Design Manual, Section 8.06.
(REFERENCE: (NCDEHNR, 1993)
Step 1. Minimum Tailwater Condition
Step 2.
D-o =
18 in.
D-o =
1.50 ft.
Q-10 =
4.89 cfs
d-50 =
0.3 ft.
L-a =
9 ft,
Step 3.
3*D-o =
4.50 ft.
W =
10.50 ft.
Step 4.
d-max
0.45 ft.
d-max
5 in.
Step 5. Thickness = 0.68 ft.
Thickness = 8 in.
DESIGN DIMENSIONS:
Pipe diameter in inches
Pipe diameter in feet
Pipe outlet (from drainage calculations)
from Figure 8.06 a
from Figure 8.06 a
3 times the outlet pipe diameter
Pipe diameter + Apron length
Maximum Stone Diameter (1.5'd-50) in inches
Maximum Stone Diameter (1.5*d-50) in feet
Min. Apron Thickness With Filter Fabric (1.5*d-max) in feet
Min. Apron Thickness With Filter Fabric (1.5*d-max) in inches
Apron Dimensions
Riprap
Length
Width
3*D-o Thick
Class
9
11
5 18in.
B
TERMINOLOGY: Q10 = 10-Year Design Storm, Peak Discharge, (cfs)
D-o = Pipe Diameter, (in. & ft.)
d-50 = Mean Stone Diameter of Rip -Rap, (ft.)
L-a = Length of Rip -Rap Apron, (ft.)
3*D-o = Width of Rip -Rap Apron @ Pipe Outlet, (ft.)
W = Width of Rip -Rap Apron @ End of Apron, (ft.)
d-max = Maximum Stone Diameter of Rip -Rap, (ft. & in.)
Thickness = Thickness of Rip -Rap Apron With Filter Fabric, (ft. &in.)
Project Name Riprap Dissipator 04 Date
Timberland Gas Station Aug. 2021
DD Project No.
Location Double D Engineering, PLLC DD2012
Hoke County, NC 150 S. Page Street Calculated By
Southern Pines, NC 28387 JLH
(910)684-8646 Checked By
JLH
STORM DESIGN: 10 Year
BACKGROUND: Use the E&S Control Planning & Design Manual, Section 8.06.
REFERENCE: (NCDEHNR, 1993)
Step 1. Minimum Taiiwater Condition
Step 2. Q-10 = 7.99 x 0.90 x 0.510 AC = 3,66 cfs
Q-10 =
3.66 cfs
Pipe outlet (from drainage calculations)
d-50 =
0.3 ft.
from Figure 8.06 a
L-a =
9 ft.
from Figure 8.06 a
Step 3. 3*D-o =
0.00 ft.
3 times the outlet pipe diameter
W =
9.00 ft.
Pipe diameter + Apron length
Step 4. d-max 0.45 ft.
d-max 5 in.
Step 5. Thickness = 0.68 ft.
Thickness = 8 in.
DESIGN DIMENSIONS:
Maximum Stone Diameter (1.5*d-50) in inches
Maximum Stone Diameter (1.5*d-50) in feet
Min. Apron Thickness With Filter Fabric (1.5*d-max) in feet
Min. Apron Thickness With Filter Fabric (1.5*d-max) in inches
Apron Dimensions
Riprap
Length
Width
3*D-o
Thick
Class
9
9
0
18in.
B
TERMINOLOGY: Q10 = 10-Year Design Storm, Peak Discharge, (cfs)
D-o = Pipe Diameter, (in. & ft.)
d-50 = Mean Stone Diameter of Rip -Rap, (ft.)
L-a = Length of Rip -Rap Apron, (ft.)
3*D-o = Width of Rip -Rap Apron @ Pipe Outlet, (ft.)
W = Width of Rip -Rap Apron @ End of Apron, (ft.)
d-max = Maximum Stone Diameter of Rip -Rap, (ft. & in.)
Thickness = Thickness of Rip -Rap Apron With Filter Fabric, (ft. &in.)
Project Name Riprap Dissipator 45 Date
Timberland Gas Station Aug, 2021
DD Project No.
Location Double D Engineering, PLLC DD2012
Hoke County, NC 150 S. Page Street Calculated By
Southern Pines, NC 28387 JLH
(910) 684-8646 Checked By
JLH
STORM DESIGN: 10 Year
BACKGROUND: Use the E&S Control Planning & Design Manual, Section 8.06.
REFERENCE: (NCOE-iNR, 1993)
Step 1. Minimum Tailwater Condition
Steep 2. Q-10 = 7.99 x 0.90 x 0.337 AC = 2.42 cfs
0-10 =
2.42 cfs
Pipe outlet (from drainage calculations)
d-50 =
0.3 ft.
from Figure 8.06 a
L-a =
9 ft.
from Figure 8.06 a
Step 3. 3*D-o =
0.00 ft.
3 times the outlet pipe diameter
W =
9.00 ft.
Pipe diameter + Apron length
Step 4. d-max 0.45 ft.
d-max 5 in.
Step 5_ Thickness = 0.68 ft.
Thickness = 8 in.
IDESIGN DIMENSIONS:
Maximum Stone Diameter (1.5*d-50) in inches
Maximum Stone Diameter (1.5*d-50) in feet
Min. Apron Thickness With Filter Fabric (1.5*d-max) in feet
Min. Apron Thickness With Filter Fabric (1.5*d-max) in inches
Apron Dimensions
Riprap
Length
Width
3-D-o
Thick
Class
9
9
0
18in.
B
TERMINOLOGY: Q10 = 10-Year Design Storm, Peak Discharge, (cfs)
D-o = Pipe Diameter, (in. & ft.)
d-50 = Mean Stone Diameter of Rip -Rap, (ft.)
L-a = Length of Rip -Rap Apron, (ft.)
3*D-o = Width of Rip -Rap Apron @ Pipe Outlet, (ft.)
W = Width of Rip -Rap Apron @ End of Apron, (ft.)
d-max = Maximum Stone Diameter of Rip -Rap, (ft. & in.)
Thickness = Thickness of Rip -Rap Apron With Filter Fabric, (ft. &in.)