Loading...
HomeMy WebLinkAbout20130644 Ver 1_DCM Permit_20130709Permit Class Permit Number NEW (Express Permit Program) 83 -13 STATE OF NORTH CAROLINA Department of Environment and Natural Resources / 304q_�- and Coastal Resources Commission Ra_-1w,4e Super Wi Vern't for X Major Development in an Area of Environmental Concern pursuant to NCGS I I3A -118 Excavation and/or filling pursuant to NCGS 113 -229 Issued to I. G. Holdings, LLC, c/o Israel Golasa, P. O. Box 120, Kitty Hawk, NC 27949 Authorizing development in Dare County adjacent the Pamlico Sound, at 24530 NC Hi way 12 in the Town of Rodanthe , as requested in the permittee's application dated 6/14/13, including the attached workman drawings (5 total), 2 dated 5/21/13, and 3 dated 6/17/13 (revised) This permit, issued on July 15, 2013, is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Authorized Development 1) Unless specifically altered herein, this permit authorizes the construction of a±10,200 ft= retail building with a detached ±1,792 ft' 5- bedroom house, a 56 -space paved parking lot, a bulkhead, and a pier all as depicted in the attached permit application and workplan drawings. (See Attached Sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires finther Division approval. All work must cease when the permit expires on December 31, 2016 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. Q)C�JQ Tar Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Pennittee I. G. Holdings, LLC c/o Israel Golasa ADDITIONAL CONDITIONS Stormwater Manaeement Permit # 83 -13 Page 2 of 3 2) The Division of Water Quality approval of this project under stormwater management rules of the Environmental Management Commission is covered by way of Stormwater Permit No. SW7130613, which was issued on 6/28/13. Any violation of the permit approved by the DWQ shall be considered a violation of this CAMA permit. Sedimentation and Erosion Control NOTE: The permittee has received a Sedimentation and Erosion Control Plan from the NC Division of Energy, Mineral, and Land Resources (Project No. DARE- 2013 -014). Should the permittee choose to modify /amend the existing Sedimentation and Erosion Control Permit, he or she should contact the Department of Environment and Natural Resources; Land Quality Section, at 943 Washington Square Mall, Washington, NC 27889. 3) In order to protect water quality, runoff from the construction shall not visibly increase the amount of suspended sediments in adjacent waters. 4) Appropriate sedimentation and erosion control devices, measures or structures (e.g. silt fence, diversion swales or berms, etc.) shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses and/or properties. Bulkhead 5) The bulkhead shall be constructed at or landward of the normal water level at the time of construction. 6) The bulkhead shall be constructed prior to any backfilling activities, and the bulkhead shall be structurally tight so as to prevent seepage of backfrll materials through the structure. 7) The bulkhead shall be solid and constructed of treated wood, concrete slabs, vinyl or metal sheet piles or other suitable materials approved by Division personnel. 8) The backfrll material shall be clean and free of any pollutants except in trace quantities. 9) All backfill material shall be obtained from a highground source and confined behind the permitted bulkhead. Pier 10) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. I. G. Holdings, LLC c/o Israel Golasa ADDITIONAL CONDITIONS Permit # 83.13 Page 3 of 3 11) This permit authorizes only the pier and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of the permitted project without permit modification. No non -water dependent uses of structures shall be conducted on, in or over public trust waters without permit modification. 12) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent reflectors shall he attached to the structure in order to make it more visible during hours of darkness or inclement weather. 13) No formalized slips are authorized by this permit. General 14) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he /she abandons the permitted activity without having it transferred to a third party. 15) No vegetated wetlands or open water areas shall be excavated or filled, even temporarily, without permit modification. 16) The permittee and/or his/her contractor shall meet with a representative of the Division prior to project initiation. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required including but not limited to a driveway connection permit from the NC Department of Transportation. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 948 -3852, prior to commencement of any such activity for this determination. In addition, any development or land disturbing activity that is considered non -water dependent is not authorized within 30 feet of the normal water level unless specifically exempted by Coastal Resource Commission (CRC) regulations. NOTE: Engineers and Contractors should be aware of utility locations within the project area. Please contact the local water utility to assist with the location of existing water mains in or near the project area. NOTE: The N.C. Division of Water Quality has determined the project is in compliance with North Carolina's Water Quality Certification Program and has issued General 401 WQ Certification #3900 on 7/9/13 and it was assigned project #13 -0644. NOTE: The U.S. Army Corps of Engineers has assigned the proposed project AID No. SAW -2013- 01154 and authorized the development via Regional General Permit 198000291.