Loading...
HomeMy WebLinkAboutNC0043532_Quarterly Report_20211109Strickland, Bev From: Pitner, Andrew Sent: Tuesday, November 9, 2021 9:50 AM To: Scheller, Roberto Subject: FW: [External] Re: July West Stanly Quarterly Report Attachments: October 20 2021.pdf fyi From: Duane Wingo [mailto:dwingo@stanlycountync.gov] Sent: Tuesday, November 9, 2021 9:48 AM To: Pitner, Andrew <andrew.pitner@ncdenr.gov>; Basinger, Corey <corey.basinger@ncdenr.gov> Subject: [External] Re: July West Stanly Quarterly Report CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Corey, Please find attached the Quartley Report and minutes from the October 2o, 2021, Progress Meeting. The Contractor is working diligently to complete the project and the construction of the process equipment is per the schedule. We have, however, encountered a situation where the design engineering firm failed to include an emergency disconnect on the new generator. This is an electrical code requirement and should have been part of the design plans. The WWTP will not have backup power without the disconnect. I have notified WK Dickson of the seriousness of this issue and we consider it an omission by the Engineering firm. Haren Construction is working diligently to find the parts necessary to get the emergency disconnect constructed but there are supply chain issues, that were not unexpected when I was informed of the issue. I have stressed to the WK Dickson and the Haren Construction to get us a solution asap. 1 There was also a decision made to replace 12-inch valves exiting the aeration basin because of the age and uncertainty of their reliability. We will be installing 18-inch sluice gates to replace the valves. It is uncertain whether the schedule for this work will be done by January 1, 2022, but the sluice gates have been ordered and we are optimistic this specific work not delay the project. We are meeting again next week and I have asked the Engineer to give me the most current update on the projected schedule. After this meeting, I will be in contact with you to discuss an amendment to the SOC request in our opinion is necessary. Thanks, Duane On Fri, Jul 23, 2021 at 12:10 PM Duane Wingo <dwingo@stanlycountync.gov> wrote: Andrew / Corey, On Wednesday, July 21, 2021, we completed the Progress Meeting for the West Stanly WWTP. Attached are the Meeting Notes which should cover the Quarterly reporting requirements for the SOC. The current final completion schedule remains unchanged for January 4th, 2022. Haren Construction is doing a very good job of keeping the work moving forward. All process equipment is now on site. Change Orders have been small and manageable to date. Thanks, Duane 2 Duane Wingo, PE Stanly County Utilities Director 1000 N. First Street Suite 12 Albemarle, NC 28001 Phone: (704) 986-3691 Cell: (704) 221-4291 dwingo(a stanlycountync.gov Duane Wingo, PE Stanly County Utilities Director 1000 N. First Street Suite 12 Albemarle, NC 28001 Phone: (704) 986-3691 Cell: (704) 221-4291 dwingo(&stanlycountync.gov Pursuant to North Carolina General Statutes, Chapter 132, email correspondence to and from this address may be considered public record under North Carolina Public record Laws and may be disclosed to third parties. 3 West Stanly WWTP and Sanitary Sewer Improvements SRF SRF Project No. CS370834-04 WKD #20170316.00.CL Stanly County, W Stanly WWTP and Sanitary Sewer Improvements Project 20170316.00.CL October 20, 2021 1 Construction Progress Meeting Agenda and Minutes (in Blue Text) October 20, 2021, 10:00 am West Stanly WWTP 24939B Barbees Grove Rd Oakboro, NC 28129 OWNER: Stanly County 1000 N. First Street; Suite 12 Albemarle, NC 28001 ENGINEER: WK Dickson & Company, Inc. 1213 W Morehead Street Charlotte, NC 28208 704-334-5348 CONTRACTOR: Haren Construction Company, Inc. PO Box 350 Etowah, TN 37331 423-263-5561 West Stanly WWTP and Sanitary Sewer Improvements SRF SRF Project No. CS370834-04 WKD #20170316.00.CL Stanly County, W Stanly WWTP and Sanitary Sewer Improvements Project 20170316.00.CL October 20, 2021 2 1. Contact Information: Owner: Stanly County Contact: Duane Wingo, PE, Stanly County Utilities Director E-mail: dwingo@stanlycountync.gov Contractor: Haren Construction Company, Inc. Contact: Jason Wolford Cell Phone: 423-453-8322 E-mail: jwolford@harenconstruction.com WWTP Operator: Tommy Gibbons Phone: (910) 605-1284 E-mail: tgibbons@stanlycountync.gov Contractor: Haren Construction Company, Inc. Contact: Tommy Woods Cell Phone: 423-506-5477 E-mail: twoods@harenconstruction.com Engineer: WK Dickson & Co., Inc. Contact: Jason Boyd, PE Office: 704-334-5348 Cell: (919) 609-3843 E-mail: jboyd@wkdickson.com Construction Observation: WK Dickson & Co., Inc. Contact: Steve Gerlach, PE Office: 704-334-5348 E-mail: sgerlach@wkdickson.com DEQ: Dee Browder Phone: (704) 235-2203 E-mail: Dee.browder@ncdenr.gov Subcontractors Electrical Subcontractor: Maynard Electric Company Contact: Dave Howard Cell Phone: 336-340-2935 E-mail: Painting Subcontractors: Universal Painting Corporation Contact: Mauricio Castano Cell Phone: 305-778-9608 E-mail: Formwork and Rebar Subcontractors: National Erectors Contact: Mark Smith Cell Phone: 910-618-9200 E-mail: Automated Entrance Gate Subcontractors: Maybury Fencing Contact: Glen Kinney Cell Phone: 704-975-2889 E-mail: Demolition Sub Contractors: Penhall Company, Inc. Contact: Shannon Howard Cell Phone: 919-868-9393 E-mail: ECS Southeast, LLP Contact: Brian K. Ashman P.E. Cell Phone: (704) 301-9203 E-mail: BAshman@ecslimited.com West Stanly WWTP and Sanitary Sewer Improvements SRF SRF Project No. CS370834-04 WKD #20170316.00.CL Stanly County, W Stanly WWTP and Sanitary Sewer Improvements Project 20170316.00.CL October 20, 2021 3 24- Hour Emergency Contacts Primary: Tommy Woods, Jobsite Supervisor Cell Phone: 423-506-5477 Secondary: Jason Wolford, Project Manager Cell Phone: 423-453-8322 Office Phone: 423-263-5561 Home Phone: 423-746-1737 Tertiary: Rick Chidester, Safety Manager Cell Phone: 865-208-9712 Office Phone: 423-263-5561 Quaternary: Evan Haren, President Cell Phone: 423-744-5933 Office Phone: 423-263-5561 Home Phone: 423-263-9271 I. Attending Atten ded Name Organization Title/Position Email Yes Duane Wingo, PE Stanly County Utilities Director dwingo@stanlycountync.gov Yes Tommy Gibbons Stanly County Chief Operator tgibbons@stanlycountync.gov Yes Dee Browder NC DEQ, DWI Inspector Dee.browder@ncdenr.gov Yes Jason Wolford Haren Construction Project Manager jwolford@harenconstruction.com No Tommy Woods Haren Construction Jobsite Supervisor twoods@harenconstruction.com Yes Kenny Poplin Maynard Electric Site Superintendent Yes Jason Boyd, PE WK Dickson Project Manager jboyd@wkdickson.com No Rebecca Turner, PE WK Dickson Project Engineer rturner@wkdickson.com No Steve Gerlach, PE WK Dickson Project Engineer sgerlach@wkdickson.com Yes Hugh Sadek WK Dickson Project Engineer hsadek@wkdickson.com No Brian Tripp, PE WK Dickson Vice President btripp@wkdickson.com No Darrell Gettys, PE Brittain Engineering Consulting Elect. Eng. dgettys@brittainengineering.com No Brian Ashman, PE ECS Southeast, LLP Project Manager BAshman@ecslimited.com Agenda is established in Specification Section 01 30 00 Administrative Requirements, Subsection 1.4.D: 1. Review minutes of previous meetings. Prior minutes accepted. 2. Review of Work progress. a. Contract Dates: Notice to Proceed: 9/28/2020 Contract Days: 462 days (15 months + 7 days) Liquidated Damages: $1,200 / day West Stanly WWTP and Sanitary Sewer Improvements SRF SRF Project No. CS370834-04 WKD #20170316.00.CL Stanly County, W Stanly WWTP and Sanitary Sewer Improvements Project 20170316.00.CL October 20, 2021 4 b. Update: Day 387/462 Expected Completion Date: January 4, 2022 3. Field observations, problems, and decisions. a. Adjacent property owner relations and roadway management. Property owner seems to be satisfied. 4. Identification of problems impeding planned progress. Aeration basin influent and effluent lines finalization. Stanly Co. approved added cost for structural analysis. 5. Review of submittals schedule and status of submittals. Regarding O&M Manuals, Stanly Co. requested 2 physical copies and 1 digital. Submission of O&M Manuals is ongoing. West Stanly WWTP and Sanitary Sewer Improvements SRF SRF Project No. CS370834-04 WKD #20170316.00.CL Stanly County, W Stanly WWTP and Sanitary Sewer Improvements Project 20170316.00.CL October 20, 2021 5 West Stanly WWTP and Sanitary Sewer Improvements SRF SRF Project No. CS370834-04 WKD #20170316.00.CL Stanly County, W Stanly WWTP and Sanitary Sewer Improvements Project 20170316.00.CL October 20, 2021 6 6. Review of off-site fabrication and delivery schedules. No further things to watch at this point. 7. Maintenance of progress schedule. Updated schedule is attached. We reviewed the schedule. 8. Corrective measures to regain projected schedules. None currently. 9. Planned progress during succeeding work period. See work progress list. 10. Coordination of projected progress. Coordination of activities with operations are going well. Stanly Co. said that sludge hauling will take place the week of 10/25 with real estate being taken up near and around sludge storage area near the gate. 11. Maintenance of quality and work standards. Concrete break tests are coming in in good shape. Coordination with ECS is going well. 12. Effect of proposed changes on progress schedule and coordination. Not applicable. 13. Other business relating to Work. a. Next progress meeting is 11/24/2021 10:00 AM onsite. b. Stanly Co. requested quote from Haren for an additional concrete pad for hypo chemical pump c. Haren to provide sketch on lower aeration basin trough / line inlet point so that we can get structural engineer comments / approval d. Haren advised moving aeration basin influent lines trenches over 5’ 14. Pay Requests, Change Orders as of 10/20/2021. ID Description Sent/Receive d Final Status Change Order 01 Sampler deduct 2/12/2021 3/16/2021 Complete Change Order 02 Larger breaker for RAS pump system 2/12/2021 3/18/2021 Complete Change Order 03 Add 2" to generator slab 3/12/2021 3/18/2021 Complete Change Order 04 Gas Cylinder Conduit, Sensors, Seal Offs, Strobe Lights 4/15/2021 4/19/2021 Complete West Stanly WWTP and Sanitary Sewer Improvements SRF SRF Project No. CS370834-04 WKD #20170316.00.CL Stanly County, W Stanly WWTP and Sanitary Sewer Improvements Project 20170316.00.CL October 20, 2021 7 ID Description Sent/Receive d Final Status Change Order 05 Chlorine contact chamber modifications 5/14/2021 5/19/2021 Complete Change Order 06 No Cost Time Extension 5/19/2021 5/19/2021 Complete Change Order 04 Revised Correction of Math Error in Contract Price 6/1/2021 6/1/2021 Complete Change Order 05 Revised Correction of Math Error in Contract Price 6/1/2021 6/1/2021 Complete Change Order 06 Revised Correction of Math Error in Contract Price 6/1/2021 6/1/2021 Complete Change Order 07 Fuel tank abandonment 7/14/2021 8/3/2021 Complete Change Order 08 Platform Reduction Deduct Change Order 8/4/2021 9/9/2021 Complete Change Order 09 Chemical building lighting and existing fan wiring (verbally approved - formal docs remain) 8/25/2021 9/28/2021 Complete Change Order 10 Chlorine contact chamber structure crack repair (email approved 9/30 - awaiting Owner signature paperwork) 9/30/2021 Owner Change Order 11 Effluent Pump Controls (email approved 10/11 – 10/19 forms back to Haren - paperwork in progress) 10/05/2021 Contractor Change Order 12 Valves for non-potable water system (email approved 10/12– paperwork in progress) 9/21/2021 Contractor Change Order X Chlorine contact chamber structure stabilizers (email 8/25 approved - formal docs remain) 8/12/2021 Contractor Change Order X Front Gate (email 10/11 approved) 8/26/2021 Engineer Change Order X Additional yard hydrants, piping changes (awaiting Contractor review of revised pipe layout to possibly reduce cost estimate) 9/16/2021 Contractor Change Order X Stanly Co. Request for hypo pad pour for tote storage and chemical skid location (awaiting Contractor estimate) 8/25/2021 Contractor Pay Request 01 Pay Request 01 1/26/2021 2/3/2021 Complete Pay Request 02 Pay Request 02 3/11/2021 3/31/2021 Complete Pay Request 03 Pay Request 03 4/12/2021 6/17/2021 Complete Pay Request 04 Pay Request 04 5/5/2021 6/17/2021 Complete West Stanly WWTP and Sanitary Sewer Improvements SRF SRF Project No. CS370834-04 WKD #20170316.00.CL Stanly County, W Stanly WWTP and Sanitary Sewer Improvements Project 20170316.00.CL October 20, 2021 8 ID Description Sent/Receive d Final Status Pay Request 05 Pay Request 05 6/2/2021 6/17/2021 Complete Pay Request 06 Pay Request 06 (51% completion) 6/28/2021 7/1/2021 Complete Pay Request 07 Pay Request 07 8/10/2021 8/10/2021 Complete Pay Request 08 Pay Request 08 9/2/2021 9/21/2021 Complete Pay Request 09 Pay Request 09 9/30/2021 10/7/2021 Owner Reimb. Request 01 DWI Reimbursement Request 01 2/23/2021 3/22/2021 Complete Reimb. Request 02 DWI Reimbursement Request 02 4/21/2021 5/10/2021 Complete Reimb. Request 03 DWI Reimbursement Request 03 6/17/2021 6/28/2021 Complete Reimb. Request 04 DWI Reimbursement Request 04 8/3/2021 8/12/2021 Complete Reimb. Request 05 DWI Reimbursement Request 05 9/21/2021 In Progress Engineer North Carolina Department of Environmental Quality, Division of Water Infrastructure Progress Meeting Agenda Requirements: DWI-a. Work completed in the previous month See prior notes and attached pages. DWI-b. Work planned for the next month See prior notes and attached pages. DWI-c. Schedule update See prior notes and attached pages. DWI-d. Issues and Concerns See prior notes. Dee asked if we received authorization to award with the new total derived from value engineering. We said we would check our records after the meeting to confirm. DWI-e. Status of Requests for Information (RFI) and Requests for Proposals (RFP) See next page. West Stanly WWTP and Sanitary Sewer Improvements SRF SRF Project No. CS370834-04 WKD #20170316.00.CL Stanly County, W Stanly WWTP and Sanitary Sewer Improvements Project 20170316.00.CL October 20, 2021 9 DWI-f. Change orders status See notes in item A14. HAREN CONSTRUCTION COMPANY, INC. WEST STANLY WWTP IMPROVEMENTS PROJECT SCHEDULE SUMMARY: CONTRACT PROJECT DEADLINE: 1-4-22 PREVIOUS MONTH’S PROJECT SCHEDULE COMPLETION DATE: 12-17-21 THIS MONTH’S PROJECT SCHEDULE COMPLETION DATE: 1-3-22 WORK PROGRESS SINCE LAST MEETING: • FORMED AND POURED CCC SUPPORTED WALKWAY • SET NEW GRATING AND HANDRAIL AT CCC • FINIHED ERECTING CLARIFIER MECHANISM • INSTALLED CLAR #2 WEIRS AND BAFFLES • STARTED UP AND CHECKED OUT CLAR MECHANISM BY MFGR COMPLETED • CLEAN UP/OUT CLAR #2 • SET NEW NPW PUMP • TIE FM’S TOGETHER AT MCCOYS PUMP STATION • CONTINUED RUNNING 6” & 8” RAS & DRAIN FM LINES • COMPLETED NEW UTILITY POWER CHANGEOVER • GROUTED CLARIFIER #2 • STARTED RUNNING NEW 18” LINES INTO EACH AERATION BASIN NEXT 6WK UPCOMING SCHEDULED WORK: • COMPLETED CCC UPGRADES • FINISH RUNNING 6” & 8” RAS & DRAIN FM LINES • FINISH RUNNING NEW 18” LINE INTO EACH AERATION BASIN • START-UP NEW ATS & GENERATOR • START-UP NEW RAS PUMP STATION • DO MODIFICATIONS TO CLARIFIER SPLITTER BOX • UPSIZE 12” LINES FROM EACH AERATION BASIN TO CLARIFIER SPLITTER BOX • ELECTRICIANS WORKING TO POWER UP NEW EQUIPMENT • PAINT CLAR #2 TROUGHS ID ITe51' Task Name 0 (Mode 1 �` GENERAL: 2 n NOTICE TO PROCEED (9-28-20) 3 p SUBSTANTIAL COMPLETION 4 b FINAL PROJECT PUNCHLIST & CLEAN-UP 5 ` , PROJECT FINAL COMPLETION (NTP + 462 = 1/4/22) 6 o SITEWORK 7 .� MOBILIZE 8 .% ' , OFFICE TRAILER SETUP 9.�./ ', INSTALL EROSION CONTROL 10 .7 b EXCAVATION FOR CLARIFIER #2 11 ,/ > BACKFILL FOR CLARIFIER #2 12 ..7 "4, EXCAVATION FOR CHLORINE CONTACT CHAMBER 13 ,f 3 BACKFILL FOR CHLORINE CONTACT CHAMBER 14 I SIDEWALKS 15 7> BASE FOR NEW ASPHAL-, 16 I ASPHALT PAVING 17 it FINE GRADE SITE AND GRASSING —18 't. GRASS & STRAW SITE 19 , AUTOMATIC SECURITY GATE 20 p CONCRETE WORK 21 wo 4 CLARIFIER #2 70 ./ T,, HEADWORKS 77 ./ ', CHLORINE CONTACT CHAMBER 103 Ip MISCELLANEOUS ITEMS 104 .7 a FORM AND POUR CAUSTIC SLAB 105 IV ter, FORM AND POUR DUMPSTER PAD 11] al FORM AND POUR INFLUENT TRENCH TO AB #1 _1O7 I p FORM AND POUR INFLUENT TRENCH TO AB #2 108- .7 a FORM AND POUR RECIRC PUMP HOUSE PAD 109 .f 7, FORM AND POUR RAS PUMP STATION PAD 110 .r 4 FORM AND POUR REUSE PUMP PAD 111 et GROUT CLARIFIER #2 112 ./ T, DISINFECTION BUILDING 117 l YARD PIPING 118 I UPSIZE 12" TO 18" LINE FROM AB #1 TO CLAR SB 119 GI UPSIZE 12" TO 18" LINE FROM AB #2 TO CLAR SB 120 p CUT AND CAP 6" & 12" LINES FROM AB#1 121 4 CUT AND CAP 6" & 12" LINES FROM AB #2 122 , 18" INFLUENT LINE TO HEADWORKS 123 al 18" LINE FROM CLAR SB TO CLAR #2 124 ./'p 8" CLAR #1 RAS TO RAS PS 125 .. o 8" CLAR #2 RAS TO RAS PS 126 ../4 SET SSMH A 127 ./ 7, SET SSMH B 128 ,l 4 SET SSMH C 129 ,/ 4 8" DRAIN LINE FROM MH A TO B 130 .f a TEMP 8" LINE FROM EXIST'G CLAR TO MH B 131 '.f T, 8" DRAIN LINE FROM MHC TO MH B 132 './ 7, 4" DRAIN LINES FROM CCC'S TO MH B 133 .f 612, NEW 4" BUILDING DRAIN LINE 134 .j 4 TEMP EXISTING CLAR EFF LINE TO CCC 135 11 8" PLANT DRAIN FM TO AB SB 136 p 8" RAS FM TOABSB 137 46"RAS FM 138 it 4" WAS LINE & VAULT TO DIGESTER 139 I REWORK WATER LINES AROUND PLANT 140 ./ T. 24" LINE FROM HEADWORKS TO AB SPLITTER BOX 141 ./ q SET AB SPLITTER BOX 142— 18"LINEFROMABSBTOAB#1 143.. I> 18" LINE FROM AB SB TO AB #2 1.44 Gp DRAIN LINE FROM WAS MM VAULT TO RECIRC PS 145 b TIE 10" & 16" FM'S TO NEW 18" LINE TO HEADWORKS 146 ./ p WET TAP AND CROSS CONNECTION AT MCCOYS PS 147 a FLANGE PIPING 148 .j 7, FLG PIPING AT AB SPLITTER BOX 149 .! T, 18" FLG PIPING AT HEADWORKS INFLUENT 150 ./ : 24" FLG PIPING AT HEADWORKS EFFLUENT 1i51 ....F .. CLAR #2 SCUM AND TROUGH FLG PIPING WEST STANLY WWTP IMPROVEMENTS Duration Early Start 336 days 0 days 0 days 20 days 0 days 281 days 20 days 10 days 5 days 10 days 10 days 5 days 5 days 4 days 2 days 2 days 2 days 2 days 3 days 208 days 125 days 12 days 40 days 208 days 3 days 5 days 5 days 5 days 10 days 10 days 3 days 3 days 25 days 314 days 5 days 5 days 2 days 2 days 5 days 3 days 2 days 3 days 1 day 2 days 2 days 2 days 2 days 2 days 2 days 2 days 5 days 4 days 4 days 4 days 3 days 2 days 3 days 3 days 2 days 2 days 2 days 2 days 8 days 63 days 3 days 2 days 2 days 2 days Mon 9/28/20 Mon 9/28/20 Mon 1/3/22 Mon 1/31/22 Mon 11/16/20 Mon 11/16/20 Wed 12/16/20 Mon 1/25/21 Wed 2/24/21 Thu 7/8/21 Thu 6/17/21 Mon 9/20/21 Thu 12/9/21 Wed 12/15/21 Fri 12/17/21 Tue 12/21/21 Wed 12/29/21 Tue 12/21/21 Tue 219/21 Fri 3/26121 Mon 5/3/21 Tue 8/10121 Tue 219121 Tue 2/9/21 Thu 7/1/21 Fri 10/29/21 Fri 11/5/21 Thu 11/4/21 Fri 7/23/21 Thu 11/18/21 Tue 11/30/21 Tue 115121 Mon 9128/20 Wed 11/10/21 Wed 11/17/21 Wed 11/24/21 Tue 11/30/21 Thu 12/2/21 Thu 7/8/21 Fri 7/16/21 Tue 7/13/21 Wed 3/10/21 Thu 3/11/21 Tue 7/13/21 Mon 3/15/21 Wed 3/17/21 Thu 7/15/21 Mon 7/19/21 Wed 7/21/21 Fri 3/19/21 Tue 9/14/21 10/19/21 n 10/25/21 Fri 10/29/21 n 12/27/21 Thu 9/9/21 Thu 8/26/21 Tue 11/16/21 Fri 11/12/21 Wed 11/3/21 Mon 9/28/20 Thu 10/7/21 Fri 9/3/21 Fri 9/3/21 Fri 9/24/21 Wed 9/29/21 Tue 10/5/21 Late Start 'Early Finish (Late Finish Mon9120120 Mon 1/31/22 Mon 1/31/22 Mon 9/28/20 Tue 1/4/22 Mon 1/3/22 Tue 1/4/22 Mon 1/31/22 Mon 1/31/22 Mon 1/31/22 Mon 11116/20 Mon 113122 Mon 11/16/20 Tue 12/15/20 Wed 12/16/20 Mon 1/4/21 Mon 1/25/21 Fri 1/29/21 Wed 2/24/21 Tue 3/9/21 Thu 7/8/21 Wed 7/21/21 Thu 6/17/21 Wed 6/23/21 Mon 9/20/21 Fri 9/24/21 Thu 12/9/21 Tue 12/14/21 Wed 12/15/21 Thu 12/16/21 Fri 12/17/21 Mon 12/20/21 Tue 12/21/21 Wed 12/22/21 Wed 12/29/21 Mon 1/3/22 Tue 12/28/21 Mon 12/27/21 Tue 2/9/21 Thu 12/2121 Fri 3/26/21 Tue 9/21/21 Mon 5/3/21 Tue 5/18/21 Tue 8/10/21 Tue 10/5/21 Tue 219/21 Thu 12/2/21 Tue 2/9/21 Thu 2/11/21 Thu 7/1/21 Thu 7/8/21 Thu 12/9/21 Thu 11/4/21 Thu 12/16/21 Thu 11/11/21 Thu 11/4/21 Wed 11/17/21 Fri 7/23/21 Thu 8/5/21 Thu 11/18/21 Mon 11/22/21 Thu 1/27/22 Thu 12/2/21 Tue 115/21 Mon 2/8/21 Wed 3/10/21 Tue 12/28/21 Wed 11/10/21 Tue 11/16/21 Wed 11/17/21 Tue 11/23/21 Wed 11/24/21 Mon 11/29/21 Tue 11/30/21 Wed 12/1/21 Thu 12/2/21 Wed 12/8/21 Thu 7/8/21 Mon 7/12/21 Fri 7/16/21 Mon 7/19/21 Tue 7/13/21 Thu 7/15/21 Wed 3/10/21 Wed 3/10/21 Thu 3/11/21 Fri 3/12/21 Tue 7/13/21 Wed 7/14/21 Mon 3/15/21 Tue 3/16/21 Wed 3/17/21 Thu 3/18/21 Thu 7/15/21 Fri 7/16/21 Mon 7/19/21 Tue 7/20/21 Wed 7/21/21 Thu 7/22/21 Fri 3/19/21 Thu 3/25/21 Tue 9/14/21 Fri 9/17/21 Tue 10/19/21 Fri 10/22/21 Mon 10/25/21 Thu 10/28/21 Wed 1/12/22 Tue 11/2/21 Mon 12/27/21 Tue 12/28/21 Thu 9/9/21 Mon 9/13/21 Thu 8/26/21 Mon 8/30/21 Wed 12/29/21 Wed 11/17/21 Mon 12/27/21 Mon 11/15/21 Mon 1/17/22 Thu 11/4/21 Thu 1/27/22 Tue 9/29/20 Thu 10/7/21 Mon 10/18/21 Fri 9/3121 Frl 12/3/21 Fri 9/3/21 Wed 9/8/21 Fri 9/24/21 Mon 9/27/21 Wed 9/29/21 Thu 9/30/21 Tue 10/5/21 Wed 10/6/21 STANLY COUNTY, NC UTILITIES HAREN CONSTRUCTION CO., INC. DATE: Sun 10/17/21 NTP DATE: 9-28-20 COMPLETION DATE: (NTP + 462) 1-4-22 Task Split Milestone Summary Project Summary ♦ External Tasks Moo 1131/22 Mon 1/31/22 223,228,2: Tue 1/4/22 142,18,19,134 Mon 1/31/22 Mon 1/31/22 4 Mon 113/22 Tue 12/15/20 229,239,244,8 Mon 1/4/21 229,239,244,9,180 Fri 1/29/21 8,182 10 Tue 3/9/21 185,9 12,126,13, Wed 7/21/21 47 14,109 Wed 6/23/21 188,10,76 79,156 Fri 9/24/21 95 14 Tue 12/14/21 11,13,122 15 Thu 12/16/21 14 16 Mon 12/20/21 15 17,19 Wed 12/22/21 16 139 Mon 1/3/22 139 3 Mon 1/3/22 16 3 Mon 1/31/22 Tue 9/21/21 Tue 5/18/21 Tue 10/5/21 Mon 1/31/22 Thu 2/11/21 116 166 Thu 7/8/21 197 163 Wed 12/15/21 137 107 Wed 12/22/21 106 143 Wed 11/17/21 156 110 Thu 8/5/21 157,11 169 Mon 11/22/21 108,240 190,161 Mon 1/31/22 213 Mon 2/8/21 Mon 1/31/22 Tue 11/16/21 173 119 Tue 11/23/21 118 120 Mon 11/29/21 119 121 Wed 12/1/21 120 122 Wed 12/8/21 121 14 Mon 1/31/22 47 125,128 Mon 7/19/21 125 157 Thu 7/15/21 123 124 Wed 3/10/21 10 127 Frl 3/12/21 126 129 Wed 7/14/21 123 131 Tue 3/16/21 127 130 Thu 3/18/21 129 134 Fri 7/16/21 128 132 Tue 7/20/21 131 133 Thu 7/22/21 132 3 Thu 3/25/21 130,10 22 Mon 10/18/21 140 136,146 Fri 10/22/21 135,146 137 Thu 10/28/21 136 106,138,11 Fri 1/14/22 137 144 Tue 12/28/21 17 18 Mon 9/13/21 148 135 Mon 8/30/21 172 Mon 1/3/22 143 3 Tue 12/28/21 107 193,142 Tue 1/18/22 138 170 Fri 1/28/22 186 Mon 10/18/21 135,151 3,136 Mon 1/31/22 Wed 9/8/21 172 140 Mon 9/27/21 163 171 Thu 9/30/21 171 196 Wed 10/6/21 165 192,146 Predecessor::Successor'Total Float Crltr::.: i,2022. L O Nov ]Dec 1 n iFag. _ 19 I 28 I 3 I 10 17 1 24 I 31 l 7 I 1. I 21 .l 3$ 1 S I 13 18 I 26 2 9 16 23- I 30 7 0 days Yes 336 days No[ • 113 0 days Yes Ap 0 days Yes ♦ 1131 0 days Yes 0 days No. 0 days No 0 days No o days No. 0 days No- 0 days NO!— 0 days 1 0 days Ye 0 days Y 0 days Yes 0 days Yes days Y 3 days NG 38 days No 0 days Now 0 days No 0 days Nok 38 days No 0 days No 0 days No, 27 days No 27 days No 0 days No 0 days No 0 days No 38 days No 0 days No 22 days No 0 days Y3� 0 days \'&-s 0 days Yes 0 days Ys 0 days 138 days No 0 days No 0 days No 0 days No 0 days No 0 days No 0 days No 0 days No 0 days No 0 days No 0 days No 0 days No 21 days No 0 days Yea 0 days 47 days NO 0 days 0 days No 0 days No 27 days No• 27 days No 47 days No 333 days No 0 days No 37 days No 0 days No 0 days No, 0 days No' 0 days No 1 rlr External Milestone ♦ Inactive Summary V V Manual Summary Rdlup Finish -only 7 Critical Split Inactive Task ' Manual Task ilill: Manual Summary limiP Deadline i Progress Inactive Milestone Duration -only Slarlony C Critical i.,:� Page 1 0 152 153 184 155 156 157 V 159 160 161 162 163 164 J f 165 .f 166 V 167^.f 1E6 189 f170 J f 171 '.% 172 .f 173 174 175 176^ 177 178 179 180 181 f J 182 .% 183 v 184 v 185 ./ 186 187 188 189 190 191 192 193 194_ .f 195 ,l 196 197 V 198 199 200 201 `202 --203 .! 204 +f 205 206: .l 207 .f 208 209 210 211 212 213 214 215 216 217 218 219 "task Task Name Mode o14J,,1a14J S lb1b1,1b14J41.4p.1ul4aea84) •uLaec.A9844b1.51b1a14beiibl0rnr.loni FIJII10*OCUIOV,1 ussA4olnoscol4,e WEST STANLY WWTP IMPROVEMENTS !Duration 'Early Start !Late Start Early Finish [LOW Finish PradecessonSucansqorTotal Float Cr/ical 2022 SUCTION PIPING AT RECIRC PS 2 days MISC PIPING 91 days WATER LINES AT HEADWORKS 3 days SUMP PUMP PIPING AT HEADWORKS 2 days 2" FLOOR DRAIN AT RECIRC PS 2 days 4" FLOOR DRAIN SYSTEM AT RAS PS 3 days CL2 PIPING AT CCC 3 days SO2 PIPING AT CCC 3 days CAUSTIC CHEM FEED PIPING TO EFFL PS 3 days 4" STILLING WELL IN EFFL PS 2 days EQUIPMENT 158 days SET HEADWORKS 15 days SET CLARIFIER #2 4 days SET WEIRS & BAFFLES 5 days SET CL2 GAS SYSTEM 5 days SET SO2 GAS SYSTEM 5 days SET CAUSTIC SYSTEM 3 days SET RAS PUMP STATION 5 days SET 4" WAS MAGMETER 1 day SET 18" INFLUENT MAGMETER 1 day SET AB SB GATES 3 days SET CLAR SB GATES 3 days SET REUSE VT PUMP 3 days SET EFFLUENT VT PUMP #1 3 days SET EFFLUENT VT PUMP #2 SET EFFLUENT VT PUMP #3 SET CHEM FEED EQUIPMENT AT MCCOYS PS DEMOLITION/ALTERATIONS WORK MECHANICAL DEMO AT OLD CLARIFIERS MECHANICAL DEMO AT OLD HOLDING TANK MECHANICAL DEMO AT RETURN PS CONCRETE DEMO OF OLD HOLDING TANK CONCRETE DEMO OF OLD CLARIFIERS CONCRETE DEMO OF OLD RETURN PS CONCRETE DEMO OF OLD AB SB 1 day DEMO H'RAIL AND WALKWAY AT CCC 3 days CONCRETE DEMO OF MH AT CCC 1 day DEMO INTERIOR CONCRETE AT CLAR SB 5 days RELOCATE OLD RAS PS AS NEW RECIRC PS 5 days MISC METALS WORK 131 days HANDRAIL AT CLARIFIER #2 1 day GRATING, LADDER AND HANDRAIL AT AB SB 3 days GRATING AND HANDRAILS AT CCC 3 days STAIRS AT CCC 1 day ELEVATED PLATFORM AT HEADWORKS 25 days BOLLARDS AT HEADWORKS 30 days ELECTRICAL WORK 177 days ELECTRICAL TO CLARIFER #2 6 days ELECTRICAL TO HEADWORKS 10 days ELECTRICAL TO RAS PS 5 days ELECTRICAL TO RECIRC PS 5 days ELECTRICAL TO GEN & ATS 10 days ELECTRICAL TO EFFLUENT PS 15 days ELECTRICAL TO WAS MAGMETER 5 days SET NEW MCC 2 days SET NEW MDP 2 days SET NEW GEN & ATS 5 days FINAL TERMINATIONS 20 days START-UPS 13 days NEW ELECTRICAL SYSTEMS 3 days HEADWORKS 2 days CLARIFIER #2 3 days RAS PUMP STATION 3 days CL2 GAS SYSTEM 2 days SO2 GAS SYSTME 5 days CAUSTIC CHEM FEED SYSTEM 1 day MAGMETERS 3 days VERTICAL TURBINE PUMPS PHASE 1 2 days 3 days 3 days 3 days 295 days 4 days 5 days 5 days 7 days 10 days 5 days STANLY COUNTY, NC UTILITIES HAREN CONSTRUCTION CO., INC DATE: Sun 10/17/21 Thu 12/2121 Fri 1/28/22 Fri 12/3121 Moil 1/31/22 190 37 days Tue 7120/21 Tue 7/20/21 Wed 11/24/21 Mon 1/31/22 42 days Fri 11/5/21 Thu 1/13/22 Tue 11/9/21 Mon 1/17/22 196 155 43 days Wed 11/10/21 Tue 1/18/22 Thu 11/11/21 Wed 1/19/22 154 212 43 days Thu 11/18/21 Fri 1/28/22 Fri 11/19/21 Mon 1/31/22 12,160 108 45 days Tue 7/20/21 Tue 7/20/21 Thu 7/22/21 Thu 7/22/21 124 109 0 days Fri 11/5/21 Thu 12/16/21 Tue 11/9/21 Mon 12/20/21 195,167,196 159 27 days Wed 11/10/21 Tue 12/21/21 Fri 11/12/21 Mon 12/27/21 158 160 27 days Mon 11/15/21 Tue 12/28/21 Wed 11/17/21 Mon 1/3/22 159 3,156 27 days Tue 11/23/21 Fri 1/28/22 Wed 11/24/21 Mon 1/31/22 110 42 days Mon 4/19/21 Mon 4/19/21 Wed 12/1/21 Mon 1/31/22 39 days Thu 9/2/21 Thu 9/2/21 Thu 9/23/21 Thu 9/23/21 231,105 149,174 0 days Wed 9/22/21 Wed 9/22/21 Mon 9/27/21 Mon 9/27/21 226,69 165 0 days Tue 9/28/21 Tue 9/28/21 Mon 10/4/21 Mon 10/4/21 164 151 0 days Mon 4/19/21 Mon 4/19/21 Fri 4/23/21 Fri 4/23/21 246,104,24 167 0 days Mon 4/26/21 Mon 4/26/21 Fri 4/30/21 Fri 4/30/21 166 158 0 days Thu 8/26/21 Thu 8/26/21 Mon 8/30/21 Mon 8/30/21 251 178,215 0 days No Tue 8/24/21 Tue 8/24/21 Mon 8/30/21 Mon 8/30/21 236,109 201,175 0 days No Fri 11/5/21 Wed 1/19/22 Fri 11/5/21 Wed 1/19/22 144 205 47 days No Tue 9/28/21 Tue 9/28/21 Tue 9/28/21 Tue 9/28/21 149 150 0 days No Tue 8/31/21 Tue 8/31/21 Thu 9/2/21 Thu 9/2/21 141 148 0 days No! Fri 11/5/21 Fri 11/5/21 Tue 11/9/21 Tue 11/9/21 Fri 9/24/21 Fri 9/24/21 Tue 9/28/21 Tue 9/28/21 175,163 176 0 days No Fri 9/3/21 Fri 9/3/21 Wed 9/8/21 Wed 9/8/21 241,169 174 0 days NO Mon 11/22/21 Fri 12/17/21 Wed 11/24/21 Tue 12/21/21 219,174 177 17 days No. Mon 11/29/21 Wed 12/22/21 Wed 12/1/21 Tue 12/28/21 176 220 17 days No' Tue 8/31/21 Thu 1/27/22 Thu 9/2/21 Mon 1/31/22 168 100 days No Wed 9/30/20 Tue 1/5/21 Wed 12/1/21 Mon 1/31/22 39 days No Tue 1/5/21 Tue 1/5/21 Fri 1/8/21 Fri 1/8/21 8 181 0 days No' Mon 1/11/21 Mon 1/11/21 Fri 1/15/21 Fri 1/15/21 180 182 0 days No Mon 1/18/21 Mon 1/18/21 Fri 1/22/21 Fri 1/22/21 181 183,9 0 days No Mon 1/25/21 Mon 1/25/21 Tue 2/2/21 Tue 2/2/21 182 184 0 days No Wed 2/3/21 Wed 2/3/21 Tue 2/16/21 Tue 2/16/21 183 185 0 days No Wed 2/17/21 Wed 2/17/21 Tue 2/23/21 Tue 2/23/21 184 10,187 0 days No Wed 9/30/20 Mon 1/31/22 Wed 9/30/20 Mon 1/31/22 145 333 days No Fri 6/11/21 Fri 6/11/21 Tue 6/15/21 Fri 1/28/22 185,37 188 155 days No Wed 6/16/21 Mon 1/31/22 Wed 6/16/21 Mon 1/31/22 187 12 155 days No Fri 10/29/21 Fri 10/29/21 Thu 11/4/21 Thu 11/4/21 102,137 173 0 days Tue 11/23/21 Tue 1/18/22 Wed 12/1/21 Mon 1/24122 110 152.202 34 days No Wed 5/19/21 Wed 5119/21 Mon 11/22/21 Wed 12/15/21 15 days No Thu 10/7/21 Thu 10/7/21 Thu 10/7/21 Thu 10/7/21 151 199 0 days No Thu 11/18/21 Thu 11/18/21 Mon 11/22/21 Mon 11/22/21 143 3 0 days No Wed 10/6/21 Wed 10/6/21 Fri 10/8/21 Fri 10/8/21 102 195 0 days No Mon 10/11/21 Mon 10/11/21 Mon 10/11/21 Mon 10/11/21 194 158 0 days No Fri 1011/21 Fri 10/1/21 Thu 11/4/21 Wed 12/15/21 150 200,154,11 27days No Wed 5/19/21 Wed 5/19/21 Wed 6/30/21 Wed 6/30/21 76 105 0 days No Tue 3/30/21 Tue 3/30/21 Wed 12/8/21 Mon 1131/22 34 days No Fri 10/8121 Fri 10/8/21 Fri 10/15/21 Fri 10/15/21 192 209 0 days No Fri 11/5/21 Thu 1/6/22 Thu 11/18/21 Wed 1/19/22 196 212,218 38 days No Tue 8/31/21 Tue 8/31/21 Tue 9/7/21 Tue 9/7/21 169 214,209 0 days No Thu 12/2/21 Tue 1/25/22 Wed 12/8/21 Mon 1/31/22 190 34 days No Thu 5/20/21 Thu 5/20/21 Thu 6/3/21 Thu 6/3/21 208 204 0 days No Fri 6/4/21 Fri 6/4/21 Thu 6/24/21 Thu 6/24/21 203 219 0 days No Mon 11/8/21 Thu 1/20/22 Fri 11/12/21 Wed 1/26/22 170 218 47 days No Tue 3/30/21 Tue 3/30/21 Wed 3/31/21 Wed 3/31/21 256 207 0 days No Thu 4/1/21 Thu 4/1/21 Fri 4/2/21 Fri 4/2/21 206 208 0 days No Thu 5/13/21 Thu 5/13/21 Wed 5/19/21 Mon 1/31/22 207,261 203 174 days No Mon 10/18/21 Wed 11/10/21 Fri 11/12/21 Thu 12/9/21 199,201 211,215 17 days No Mon 11115/21 Frl 12/10/21 Frl 12/3/21 Mon 1/31/22 17 days No Mon 11/15/21 Fri 12/10/21 Wed 11/17/21 Tue 12/14/21 209 213,212,2' 17 days No Fri 11/19/21 Thu 1/20/22 Mon 11/22/21 Fri 1/21/22 211,200,155 213 38 days No Tue 11/23/21 Mon 1/24/22 Mon 11/29/21 Wed 1/26/22 211,212 111,214 38 days No Tue 11/30/21 Thu 1/27/22 Thu 12/2/21 Mon 1/31/22 211,201,213 38 days No Mon 11/15/21 Mon 1/17/22 Tue 11/16/21 Tue 1/18/22 168,209 216 39 days No Wed 11/17/21 Wed 1/19/22 Tue 11/23/21 Tue 1/25/22 215 217 39 days Na Wed 11/24/21 Wed 1/26/22 Wed 11/24/21 Wed 1/26/22 216 218 39 days No Mon 11/29/21 Thu 1/27/22 Wed 12/1/21 Mon 1/31/22 200,205,217 39 days No Thu 11/18/21 Wed 12/15/21 Fri 11/19/21 Thu 12/16/21 204,211 220,176 17days No NTP DATE: 9-28-20 COMPLETION DATE: (NTP +462) 1-4-22 No No No No No No No No No No 'Oct 19 26 3 I 10 17 14 21 No IVa� No # N0 No No A 5 1 12 I }! Fah 1 z l 9 I 18 1 23 i 30 T 8- Tassk Summary �10 External Milestone G Inactive Summary V V Manual Summary Rollup itsas Finish -only 3 Critical Split Split Pitied Summary Inactive Task r 1 Manual Task • Manual Summary Deadline • Progress Missions ♦ External Tasks Inactive Milestone Duratianonly -- Start -only C Cnkca' trAiP Page 2 WEST STANLY WWTP IMPROVEMENTS ID 0 ask Mode 220 221 Task Name VERTICAL TURBINE PUMPS PRASE 2 MAIN EQUIPMENT PROCUREMENT Duration jEartyStart LateStart Early Finish Late Finish 2 days Thu 12/2/21 Wed 12129f21 235 days Mon 9/28/20 Mon 9/28/20 PredecessonSueceSSO[Total Float ,critical Fri 12/3/21 Mon 1/3/22 219,177 3 Wed 9/1/21 Wed 9/1/21 17 days No 0 days No 19 LFeb I 3 i 10 j 17 I 24 i N21 1 7 ' 1k �� j l� LI 12 _ 1f� 1 19 I 26 �! �l 8 23 1 30 1 28 Task Summery 411118 External Milestone • Inactive Summary V V Manual Summary Rdlup Filth -only ] Critical Split Split . . ... . . . . . . ..... Pooled Summary _ Inactive Talc r I Manual Task Manual Summary Deadine • Progress p(estone ♦ SRernel Tasks wri —1 Inactive M iestare G Duragonanly - Slartcnly C Critical STANLY COUNTY, NC UTILITIES HAREN CONSTRUCTION CO., INC. DATE: Sun 10/17/21 NTP DATE: 9-28-20 COMPLETION DATE: (NTP + 462) 1422 Page 3