Loading...
HomeMy WebLinkAboutGW1-2021-06549_Well Construction - GW1_20211027 WELL CONSTRUCTION RECORD(GW-1) For Internal Use Only: 1.Well Contractor Information: 14.WATER ZONES 1. Well Contractor Name j� FROM TO DESCRIPTION 311. �j� ft. 1 ft. NC Well Contractor Certification Number 15.OUTER CASING(for multi-cased wells)OR LINER(if a livable) ;"\ r `�` �l `l I'y� FROM TO DIAMETER THICKNESS MATERIAL \ t- ft. I •a3 ft. I q in. \J�_ Company Name 16.INNER CASING OR TUBING(geothermal closed-loop) 2.Well Construction Permit#: FROM TO DIAMETER THICKNESS MATERIAL List all applicable well construction permits(i.e.UIC,Count-Y,State,Variance,etc.) ft. ft. in. 3.Well Use(check well use): ft. ft. in. 17.SCREEN Water Supply Well: FROM TO DIAMETER SLOT SIZE THICKNESS MATERIAL ❑Agricultural ❑Municipal/Public aft. kA a, ft. in. $ S..h L It O P4L ❑Geothermal(Heating/Cooling Supply) Residential Water Supply(single) ft. ft. in. ❑ Lk /❑_Residential Water Supply(shared) 18.GROUT ❑lrri ation ❑Wells> 100,000 GPD FROM TO MATERIAL EMPLACEMENT METHOD&AMOUNT Non-Water Supply Well: ft. Q ft. 9Jedo-4 t 'O ❑Monitoring ❑Recovery Injection Well: ft. ft. ❑Aquifer Recharge ❑Groundwater Remediation 19.SAND/GRAVEL PACK(it applicable) ❑Aquifer Storage and Recovery ❑Salinity Barrier FROM TO MATERIAL EMPLACEMENT METHOD ❑Aquifer Test ❑Stormwater Drainage ❑Experimental Technology ❑Subsidence Control ❑Geothermal(Closed Loop) ❑Tracer 20.DRILLING LOG(attach additional sheets if necessary) ❑Geothermal(Heating/Cooling Return) ❑Other(explain under#21 Remarks) FROM TO DESCRIPTION(color,hardness,soil rock type, rain siu,etc) O 4.Date Well(s)Completed: lX Z, Well ID# 5a.Well Location: of ft. .21 P h IA �2 1n. 33 ft. A r\ 1/VA (, e j a Facciility/Owner Na !mn 1 ( ` , Faei ID#(if appliclabtle) 3 t. OM aft G�YI Ste, ft. ft. Physical Address,City,and Zip R 839,17 � ft. ft. 1C,t` 1 k_ Ot U 21.REMARKS County Parcel Identification No.(PIN) 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: DWR$3Cibn (if well field,one lat/ionnpg is sufficient) , p-�( 22.Certification: 74 t r 1 �`�u'I j N c ►o_1 t W 0� � w 6.Is(are)the well(s)' rmanent or ❑Temporary Signature ofC6fified Well Contr for Date By signing this form,I hereby certify that the well(s)was(were)constructed in accordance with 7.Is this a repair to an existing well: ❑Yes or No 15A NCAC 02C.0100 or 15A NCAC 02C.0200 Well Construction Standards and that a coP), 1f this is a repair,fill out known well construction information nd explain the nature of the of this record has been provided to the well owner. repair under#21 remarks section or on the back of this form. 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well construction info construction,only 1 GW-1 is needed. Indicate TOTAL NUMBER of wells (add'See Over'in Remarks Box).You may also attach additional pages if necessary. drilled: (� 24.SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface: -i Z-- (ft.) Submit this GW-1 within 30 days of well completion per the following: For multiple wells list all depths if different(example-3@200'and 2@100') 24a. For All Wells: Original form to Division of Water Resources (DWR), 10.Static water level below top of casing: (ft.) Information Processing Unit, 1617 MSC,Raleigh,NC 27699-1617 If water level is above casing,use"+" 11.Borehole diameter: (in.) 24b.For Injection Wells: Copy to DWR, Underground Injection Control(TUC) 1 `{� Program, 1636 MSC,Raleigh,NC 27699-1636 12.Well construction method: rn C� x✓ 24c.For Water Supply and Open-Loop Geothermal Return Wells:Copy to the (i.e.auger,rotary,cable,direct push,etc.) county environmental health department of the county where installed FOR WATER SUPPLY WELLS ONLY: 24d.For Water Wells producing over 100,000 GPD: Copy to DWR,CCPCUA 13a.Yield(gym) Method of test: D Permit Program, 1611 MSC,Raleigh,NC 27699-1611 t ��Y 13b.Disinfection type: A 1 Amount: 1 W d Form GW-1 North Carolina Department of Environmental Quality-Division of Water Resources Revised 6-6-2018