HomeMy WebLinkAboutNCC192399_NOT Closeout Documents_20211102WATER RESOURCES
July 28, 2021
ExperienceOne Homes, LLC
David Schmidt
PO Box 5509
Cary, NC 27512
Re: Certificate of Completion
Project Name: Lightbridge Academy @ Sweetwater
Project Location:
2700 Core Banks Street
Project Number:
18-033
Submitted By:
CE Group, Inc
Submitted Date:
April 1, 2019
Completion Date:
July 28, 2021
THIS IS TO CERTIFY that on the above referenced project the grading has been completed,
temporary S&E measures have been removed, and permanent ground cover sufficient to
restrain erosion has been established as outlined on the approved S&E Plan and in accordance
with the Town of Apex S&E ordinance.
Permanent ground cover sufficient to restrain erosion has been established. No additional self -
monitoring or self -inspections are required. Project is in compliance and released under the
SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction
Activities (NCG01) must be requested by the permittee via a Notice of Termination (NOT). The
NOT is available at: https://edocs.deq.nc.gov/Forms/NCG01-Termination. Please note that this
correspondence must be uploaded as part of completing the NOT process.
The owner of the site will be responsible for regular erosion control maintenance after this
release to the developer.
James Misciagno, CPESC
Environmental Field Services Supervisor
Town of Apex Environmental Engineering
TOWN OF APEX
The Peak of Good Living
PO Box 25o Apex, NC 27502 1 (919) 362-8166 1 www.apexnc.org