Loading...
HomeMy WebLinkAboutGW1-2021-03911_Well Construction - GW1_20210823 Printform WELT.CONSTRUCTION RECORD(GW7-1) ,� For Internal Use Only: 1.W 1 Contractor Information: i ,3 Qt►� !nWATIERZONES ll Catrtrnetor Name ' (�J eci3;P� �DOR'FROM TO n7 - P�C� <r'� toy`�J, NC Well Contractor CertificationNumbe( n� ��� 15.OUTER CASING for ttsttltftasM evils OR LINER i n61e I,Jck ��.Ut7 FROM To DIAMETER 7'iQCRT'FSS MATERI�� 'r" R. P otnpany Nam r� 16.INNER CASING OR TUBING(geothermal 2.Well Construction Permit#:l024' O a001/Z 2 FROM TO DIAMETER THICKIiESS I MATERk4L List aH applicable wit construction permits(ire UiC.Counht State.Varlafiw.ele.) it. n in 3.Well Use(check well use): fL 1t la Water Supply'*Veil: 17.SCREEN FROM TO uLRMETER SLOTS= THICKNESS MATERIAL Agricultural [MunicipaUPublic n tr. fe thermal(Heating/Cooling Supply) ffWesidcntial Water Supply(single) rr. tl. is :)Industrial/Commercial Residential%later Supply(shared) 1&GROUT 'Ibrixation FROM I TO MATERIAL EJMPLACEMENT METHOD&AMOUNT Non-Water Supply Well: °- ZU ft- 1401e 14 Poo ircd Monitoring Recovery n ft. Injection Well: ft. ft. Aquifer Recharge [Crroundwater Remediation It.SAND/GRAVEL PACK f a le Aquifer Storage and Recovery Salinity Barrier FROM TO MATERIAL EMPLACEMENT hIffHOD Aquifer Test []Stormvtater Drainage R- D• Experimental Technology [Subsidence Control 8. it. Geothermal(Closed Loop) Tracer 20.DRILLING LOG attach additional sheM 1f neeessa Geothermal Heatin Coolin Return) nOther(explain under#21 Remarks) FROM rt. n.To DESCRIPTION caor,harm,sotbroct qpa.g3fa tire.etc 4.Date Wells)Completed: 2-4 WeU IDl# rL R' f3. ft. Sa.Well Location: Mg t i s it l;)l;ka rx n Facility/Owner Name Facility m#(if applicable) n ft, .N 3 41 /'f At m tf v i a h _ ft. ft. Physical Address,City,and Zip ft. tit. Rig(%Aa vtlk 5?417 21.REMARKS Canty iPaml Identification No.(P1N) 5b.Latitude and longitude in degrees/minutes/seeouds or decimal degrees: (if well field,one lat'long is sufficient) 22.Certification: N Vi' 2a2 6.Is(are)the well(s) Permanent or [Temporary S' .ofCeYti6ed well C factor Date BJ,signing this form.I hereby ceniify that the nirll(s)it-as(note)constructed in accordance 7.Is this a repair to an existing well: [Yes or []No u9th IJA NCAC 02C.0100 or ISA NCAC 02C:0200 Well Construction Standards and that a If this is a repair,fill out known xe/l construction information and eaplant the nature o/the ropy aphis record has been prarlded to the well owner. repair under 021 remarks section or on the back of this form. 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well site details or well construction,only i GW-1 is needed. Indicate TOTAL NUMBER of wells construction details. You may also attach additional pages if necessary. drilled: S BMI7TAL tNS7'RUCTIONS 9.Total well depth below land surface: (o (ft) 24a.Lor All We Submit this form;within 30 days of completion of well For multiple µells list all depths ifdifjermt(eumple-1@200'and 2@1001 construction to the following: 10.Sttstic water level below top of casing: Z a (lit.) Division of Water Resources,Information Processing Unit, Ifuuter level is abm:e casing,use"+' 1617 Mail Service Center,4Raleigh,NC 17699-1617 11.Borehole diameter. 6 (in.) 24b.F"IDieetian Wells: In addition to sending the farm to the address in 24a 12.Wed construction method. /Q T i r Kule above,also submit one copy of this form within 30 days of completion of well (ic.auger,rotary,cable,daccr pleb.etc.) construction to the following: I Division of Water Resources,Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mall Service Center,1 Ralefgb,PIC 27699-1636 13a.Yield(gpm) D Method of(est: __d f1 MT 24c.For Water SuDuly&Injection Wells: In addition to sending the fort to the addresses)above, also submit one I copy of'this form within 30 days of 13b.Disinfection type: SA OC,k Amount: 3.5"' completion of well construction to the county stealth department of the county