HomeMy WebLinkAbout20211579 Ver 1_Stormwater_20211102(Version 2.08; Released April 2018)17BP.1.R.98TIP No.:SF-450097County(ies):Hertford Page 1 of 1TIP Number:Date:Phone:Phone:Email:Email:County(ies):CAMA County?Design/Future: Year:2016Existing: Year:Aquatic T&E Species?NoComments:Yes NoNoWetlands within Project Limits?Nutrient Sensitive Waters (NSW)NoneSupplemental Classification: Forest, agriculturalTributary to Meherrin River25-4-(1)0.30.12Project DescriptionProposed ProjectChowanRiver Basin(s): City/Town:0.4Typical Cross Section Description: Surrounding Land Use: General Project Narrative:(Description of Minimization of Water Quality Impacts)Yesgcail@ncdot.govAddress:6/1/2021HertfordComoGalen CailRaleigh, 27610 NCWBS Element:Bridge replacementWBS Element:Reid RobolNCDOT Contact:919-707-6711Suite 500Raleigh, NC 27606Contractor / Designer:919-754-5005940 Main Campus DriveNorth Carolina Department of TransportationHighway Stormwater Program STORMWATER MANAGEMENT PLAN FOR NCDOT PROJECTSProject Type:1000 Birch Ridge DriveAddress:General Project InformationSF-45009717BP.1.R.98Impairments:Other Stream Classification: Primary Classification: Project Built-Upon Area (ac.)TIP project SF-450097 involves the replacement of the existing NCDOT Bridge #450097 on SR 1311 (Boones Bridge Road) over a tributary of the Meherrin River at Hertford County. Bridge #450097 consists of 1 @ 17.1', 1 @ 17.7' spans reinforced concrete deck on timber joists, timber abutments and timber piles. The proposed bridge consists of 1 @ 50'-21" cored slab with 2'-6" caps. Rip-rap pads will be used to disspate energy and to reduce velocity at all proposed outfalls. No deck drains are required for the proposed bridge. N/ABuffer Rules in Effect:None1902 @ 10' lanes with 5' grass shoulders (road) and 2 @ 10' lanes with 3'-11'' paved shoulders (bridge).Waterbody Information2016NCDWR Stream Index No.:NRTR Stream ID:Annual Avg Daily Traffic (veh/hr/day):Existing SiteProject Length (lin. miles or feet): ac.Surface Water Body (1): Class CNCDWR Surface Water Classification for Water Bodyac.2 @ 10' lanes with 3' grass shoulders.190rrobol@vhb.comProject Includes Bridge Spanning Water Body? Deck Drains Discharge Over Buffer? Dissipator Pads Provided in Buffer?N/ADeck Drains Discharge Over Water Body?(If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative)(If yes, provide justification in the General Project Narrative)
0
0
0
PROFILE (HORIZONTAL)
PROJECT LENGTH
RIGHT OF WAY DATE:
LETTING DATE:
STATE STATE PROJECT REFERENCE NO.
F. A. PROJ. NO.DESCRIPTION
NO.
TOTAL
SHEETS
N.C.
SHEET
1
DESIGN DATA Prepared in the Office of:DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
P.E.
SIGNATURE:
P.E.
P.E.
PROJECT DESIGN ENGINEER
GRAPHIC SCALES
PLANS
PROFILE (VERTICAL)
HYDRAULICS ENGINEER
ENGINEER
ROADWAY DESIGN
LOCATION: 09/08/99STATE OF NORTH CAROLINA
DIVISION OF HIGHWAYS
0
00
6:05:03 PMR:\Hydraulics\PERMITS_Environmental\Drawings\17BP.1.R.98_Hyd_prm_wet_tsh.dgnccarpenterSTATE HIGHWAY DESIGN ENGINEERDEPARTMEN
T
O
F
TRANSPORTATIONSTATE O F NORT
H CAR
O
LI
NAADT ==
=
=
0
0
0 PROJECT ENGINEER
NCDOT CONTACTCONTRACT:W.B.S. NO.
SIGNATURE:
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
TYPE OF WORK: WIDENING, GRADING, PAVING, DRAINAGE, AND STRUCTURE17BP.1.R.9817BP.1.R.98
2016
55 MPH
-L- STA 14+40.00
BEGIN BRIDGE
-L- STA 14+85.00
END BRIDGE
-L- STA 16+75.00
END PROJECT 17BP.1.R.98
-L- STA 10+30.00
BEGIN PROJECT 17BP.1.R.98
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II.
0.009 MILES
FUNC CLASS =
LOCAL
RURAL
=3%TTST
=3%DUALS
GUIDELINES
SUB-REGIONAL TIER
0.113 MILES
BOONES BRIDGE RD (SR 1311)
-L-
20 10 20 40
20 10 20 40PROJECT:17BP.1.R.98
PE
4 4 82
0.122 MILES
V =
HERTFORD COUNTY
BRIDGE NO. 97 BOONES BRIDGE RD (SR 1311) OVER TRIB. OF MEHERRIN RIVER
DETOUR
VICINITY MAP
VIRGINIA
LOCATION
PROJECT
COUNTY
NORTHAMPTON SR 1311Boones Bri
dge Rd SR 1314Whitley Rd
S
R 1310
Statesville RdSR 1313Edwin Evans RdVA 707VA 673
ROAD
TO STATESVILLE
ROAD
TO VAUGHN CREEK
190
4 525% PLANS2018 STANDARD SPECIFICATIONS
APRIL 17, 2020
THIS PROJECT IS NOT WITHIN THE MUNICIPAL BOUNDARIES OF ANY MUNICIPALITY.
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
LENGTH ROADWAY PROJECT 17BP.1.R.98
LENGTH STRUCTURES PROJECT 17BP.1.R.98
TOTAL LENGTH PROJECT 17BP.1.R.98
FEBRUARY 27, 2021
WETLAND AND SURFACE WATER IMPACTS PERMIT
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
SHEET 1 OF 7
PERMIT DRAWING
SITE 1
SITE 2
SITE 3 SITE 4
NOTE: NO DECK DRAINS ON BRIDGE
G
R
A
V
E
L
D
R.10' BST DR.23' C
O
NC
DR
N
A 2011
N
A
D 83 /
REVISIONS DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
SHEET NO.PROJECT REFERENCE NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
17BP.1.R.98
R/W SHEET NO.8/17/996:05:07 PMR:\Hydraulics\PERMITS_Environmental\Drawings\17BP.1.R.98_HYD_prm_DET.dgnccarpenter( Not to Scale)
BANK STABILIZATION
FROM STA. 14+67 TO STA. 14+86 -L-
DETAIL 5
GEOTEXTILE
Type of Liner= CLASS II RIPRAP
3.0'min.
2.0'
NWS
Flatter3:1 or
D3:1( Not to Scale)
SPECIAL CUT DITCH
FROM STA. 10+14 TO STA. 12+04 -L- LT
DETAIL 1
Min. D= 1.5 Ft.
Ground
Natural Slope
Ditch
Front
3:13:1
D
( Not to Scale)
STANDARD 'V' DITCH
FROM STA. 15+40 TO STA. 16+00 -L- LT
FROM STA. 13+00 TO STA. 13+36 -L- RT
FROM STA. 12+04 TO STA. 12+21 -L- LT
Min. D= 1.5 Ft.
DETAIL 2
Ground
Natural
Ground
Natural
FROM STA. 15+00 TO STA. 16+54 -L- RT
FROM STA. 13+67 TO STA. 14+30 -L- RT
FROM STA. 12+81 TO STA. 13+29 -L- LT
Fill Slope3:1 or Flatter
b= 2.0 Ft.
d= 2.0 Ft.
Type of Liner= Class B Rip-Rap
b
DETAIL 3
Ground
Natural
( Not to Scale)
TOE PROTECTION
d
Geotextile
3:13:1D
( Not to Scale)
d
STANDARD 'V' DITCH
FROM STA. 15+28 TO STA. 15+40 -L- LT
Type of Liner= Class B Rip-Rap Max. d= 1.0 Ft.
Min. D= 1.5 Ft.
DETAIL 4
Ground
Natural
Ground
Natural
Geotextile
SHEET 1A OF 7
PERMIT DRAWING
2D-1
REVISIONS INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
SHEET NO.PROJECT REFERENCE NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
417BP.1.R.98
R/W SHEET NO.8/17/996:05:12 PMR:\Hydraulics\PERMITS_Environmental\Drawings\17BP.1.R.98_Hyd_prm_wet_NO_CON_PSH04.dgnccarpenter10 11 12 13 NAD 83/ 2011-L- STA 14+00.00MATCHLINE SEE SHEET 514
0
4
8
12
16
20
24
28
0
4
8
12
16
20
24
28
WETLAND
DENOTES FILL INFF
SITE 2
SITE 1
SHEET 2 OF 7
PERMIT DRAWING
HC HC
CLEARING
DENOTES HAND
10-L- PC Sta. 11+15.10
-L- PT Sta. 13+72.92
-L- POT Sta. 10+30.00
BEGIN PROJECT
0302010001EXEX020304GREU TL-3
GREU TL-3
T
BL-3
WOODS
WOODS
SR 1311 (BOONES BRIDGE RD) 21' BST
VAUGHAN CREEK RD 60.00'60.00'EXIST R/W
EXIST R/W
EXIST R/W
EXIST R/W
2
3' CONC DRPOCKET BF
DS = 50 MPH
GRADE
EXISTING
ELEV. = 25.08
-L- Sta. 10+30.00
BEGIN GRADE
GRADE
PROPOSED
PI = 13+05.00
EL = 20.34'
(-)1.7250%(+)0.3316%
VC = 240'
K = 117
EL=21.30'EL=23.10'STA=10+13.72BEGIN DITCH LTPI=10+43.10(-) 6.1%
(-) 2.1%EL=17.90'STA=12+03.89END DITCH LTF F
F
SEE DETAIL 1
SPECIAL CUT 'V' DITCH
SEE DETAIL 3
TOE PROTECTION
GEOTEXTILE
EST 7 SY
EST 3 TONS
CLASS B RIP RAP
SEE DETAIL 3
TOE PROTECTION
GEOTEXTILE
EST 7 SY
EST 3 TONS
CLASS B RIP RAP
SEE DETAIL 2
SLOPE= 2.2%
EST DDE= 2 CY
STANDARD 'V' DITCH
SEE DETAIL 2
SLOPE= 0.6%
EST DDE= 2 CY
STANDARD 'V' DITCH
DAYLIGHT TO NG
DAYLIGHT TO NG
2GI
TB
0401
+82
BEGIN SBG
RCP-IV
15"
RCP-IV
15"
C
C
C
C
C
C
F
C
F
C
F
C
F
F
F
F
REVISIONS INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
SHEET NO.PROJECT REFERENCE NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
417BP.1.R.98
R/W SHEET NO.8/17/996:05:16 PMR:\Hydraulics\PERMITS_Environmental\Drawings\17BP.1.R.98_Hyd_prm_wet_CON_PSH04.dgnccarpenter10 11 12 13 NAD 83/ 2011-L- STA 14+00.00MATCHLINE SEE SHEET 514
0
4
8
12
16
20
24
28
0
4
8
12
16
20
24
28
WETLAND
DENOTES FILL INFF
SITE 2
SITE 1
SHEET 3 OF 7
PERMIT DRAWING
HC HC
CLEARING
DENOTES HAND
10-L- PC Sta. 11+15.10
-L- PT Sta. 13+72.92
-L- POT Sta. 10+30.00
BEGIN PROJECT
0302010001EXEX020304GREU TL-3
GREU TL-3
T
BL-3
WOODS
WOODS
SR 1311 (BOONES BRIDGE RD) 21' BST
VAUGHAN CREEK RD 60.00'60.00'EXIST R/W
EXIST R/W
EXIST R/W
EXIST R/W
2
3' CONC DRPOCKET BF
DS = 50 MPH
GRADE
EXISTING
ELEV. = 25.08
-L- Sta. 10+30.00
BEGIN GRADE
GRADE
PROPOSED
PI = 13+05.00
EL = 20.34'
(-)1.7250%(+)0.3316%
VC = 240'
K = 117
EL=21.30'EL=23.10'STA=10+13.72BEGIN DITCH LTPI=10+43.10(-) 6.1%
(-) 2.1%EL=17.90'STA=12+03.89END DITCH LTF F
F
C
C
C
C
C
C
F
C
F
C
F
C
F
F
F
F1515
20202020 20202020202020
2525252525SEE DETAIL 1
SPECIAL CUT 'V' DITCH
SEE DETAIL 3
TOE PROTECTION
GEOTEXTILE
EST 7 SY
EST 3 TONS
CLASS B RIP RAP
SEE DETAIL 3
TOE PROTECTION
GEOTEXTILE
EST 7 SY
EST 3 TONS
CLASS B RIP RAP
SEE DETAIL 2
SLOPE= 2.2%
EST DDE= 2 CY
STANDARD 'V' DITCH
SEE DETAIL 2
SLOPE= 0.6%
EST DDE= 2 CY
STANDARD 'V' DITCH
DAYLIGHT TO NG
DAYLIGHT TO NG
2GI
TB
0401
+82
BEGIN SBG
RCP-IV
15"
RCP-IV
15"
15T
1
5" CMP24" RCPWD WING WALL
WD WING WALLGRAVEL DR.
WOODS
WOODS
WOODS
WOODS
BRIDGE 97
WALL
WD WING
H
D
P
E15"STATESVI
LLE RD2002
25.61
WALL
WD WING
EIR60.00'EXI
ST R/
WEXIST R/
W10' BST DR.15"15"2GI
TB
RCP-IV
15"
OF
REVISIONS INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
SHEET NO.PROJECT REFERENCE NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
517BP.1.R.98
R/W SHEET NO.8/17/996:05:21 PMR:\Hydraulics\PERMITS_Environmental\Drawings\17BP.1.R.98_Hyd_prm_wet_NO_CON_PSH05.dgnccarpenterNAD 83/ 2011STA 14+00.00MATCHLINE SEE SHEET 40
4
8
12
16
20
24
28
14 15 16 17 18 19
28
24
20
16
12
8
4
0
WETLAND
DENOTES FILL INFF
S S SURFACE WATER
DENOTES IMPACTS IN
SHEET 4 OF 7
PERMIT DRAWINGTSTS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
DESIGN DISCHARGE
DESIGN FREQUENCY
BASE DISCHARGE
CFS
YRS
YRS
BASE FREQUENCY
OVERTOPPING ELEVATION
OVERTOPPING FREQUENCY
OVERTOPPING DISCHARGE CFS
CFS
YRS
FT
FT
FT
DESIGN HW ELEVATION
BASE HW ELEVATION
BRIDGE HYDRAULIC DATA
DATE OF SURVEY
W.S. ELEVATION
AT DATE OF SURVEY FT
= 410
= 25
= 18.8
= 728
= 100
= 19.9
= 994
= 500+
= 21.1
= 7/24/2019
= 12.9
HC HC
CLEARING
DENOTES HAND
SITE 1
SITE 2
SITE 3
SITE 4
ELEV. = 21.56
-L- Sta. 16+75.00
END GRADE
GRADE
EXISTING
GRADE
PROPOSED
DS = 50 MPH
PI = 13+05.00
EL = 20.34'
VC = 240'
K = 117
(+)0.3316%
-L- Sta. 14+40.00
BEGIN BRIDGE
-L- Sta. 14+90.00
END BRIDGE
1.5:11.5:1DESIGN DISCHARGE
DESIGN FREQUENCY
BASE DISCHARGE
CFS
YRS
YRS
BASE FREQUENCY
OVERTOPPING ELEVATION
OVERTOPPING FREQUENCY
OVERTOPPING DISCHARGE CFS
CFS
YRS
FT
FT
FT
DESIGN HW ELEVATION
BASE HW ELEVATION
BRIDGE HYDRAULIC DATA
DATE OF SURVEY
W.S. ELEVATION
AT DATE OF SURVEY FT
= 410
= 25
= 18.8
= 728
= 100
= 19.9
= 994
= 500+
= 21.1
= 7/24/2019
= 12.9
F
F
C
F
F
C
F
C
F
15T
1
5" CMP24" RCPWD WING WALL
WD WING WALLGRAVEL DR.
WOODS
WOODS
WOODS
WOODS
BRIDGE 97
WALL
WD WING
H
D
P
E15"STATESVI
LLE RD2002
25.61
WALL
WD WING
EIR60.00'EXI
ST R/
WEXIST R/
W10' BST DR.1
3
42
F
F
C
F
F
C
F
C
F
101015151515
1515
1
5151515
15151515152
0
2020
2020202020202025
2
5
25
25252525252530
F
REVISIONS INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
SHEET NO.PROJECT REFERENCE NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
517BP.1.R.98
R/W SHEET NO.8/17/996:05:26 PMR:\Hydraulics\PERMITS_Environmental\Drawings\17BP.1.R.98_Hyd_prm_wet_CON_PSH05.dgnccarpenterNAD 83/ 2011STA 14+00.00MATCHLINE SEE SHEET 40
4
8
12
16
20
24
28
14 15 16 17 18 19
28
24
20
16
12
8
4
0
WETLAND
DENOTES FILL INFF
S S SURFACE WATER
DENOTES IMPACTS IN
SITE 2
SITE 3
SITE 4
SITE 1
SHEET 5 OF 7
PERMIT DRAWINGTSTS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
DESIGN DISCHARGE
DESIGN FREQUENCY
BASE DISCHARGE
CFS
YRS
YRS
BASE FREQUENCY
OVERTOPPING ELEVATION
OVERTOPPING FREQUENCY
OVERTOPPING DISCHARGE CFS
CFS
YRS
FT
FT
FT
DESIGN HW ELEVATION
BASE HW ELEVATION
BRIDGE HYDRAULIC DATA
DATE OF SURVEY
W.S. ELEVATION
AT DATE OF SURVEY FT
= 410
= 25
= 18.8
= 728
= 100
= 19.9
= 994
= 500+
= 21.1
= 7/24/2019
= 12.9
HC HC
CLEARING
DENOTES HAND
ELEV. = 21.56
-L- Sta. 16+75.00
END GRADE
GRADE
EXISTING
GRADE
PROPOSED
DS = 50 MPH
PI = 13+05.00
EL = 20.34'
VC = 240'
K = 117
(+)0.3316%
-L- Sta. 14+40.00
BEGIN BRIDGE
-L- Sta. 14+90.00
END BRIDGE
1.5:11.5:1DESIGN DISCHARGE
DESIGN FREQUENCY
BASE DISCHARGE
CFS
YRS
YRS
BASE FREQUENCY
OVERTOPPING ELEVATION
OVERTOPPING FREQUENCY
OVERTOPPING DISCHARGE CFS
CFS
YRS
FT
FT
FT
DESIGN HW ELEVATION
BASE HW ELEVATION
BRIDGE HYDRAULIC DATA
DATE OF SURVEY
W.S. ELEVATION
AT DATE OF SURVEY FT
= 410
= 25
= 18.8
= 728
= 100
= 19.9
= 994
= 500+
= 21.1
= 7/24/2019
= 12.9
15"15"SEE DETAIL 3
TOE PROTECTION
CLASS II RIP RAP
SEE DETAIL 2
SLOPE= 1.0%
EST DDE= 45 CY
STANDARD 'V' DITCH
0501
0502
SEE DETAIL 4
SLOPE= 13.2%
EST DDE= 41 CY
EST 40 SY GEOTEXTILE
EST 15 TONS
W/ CLASS B RIP RAP
STANDARD 'V' DITCH
SEE DETAIL 3
TOE PROTECTION RETAINREMOVE
2GI
TB
GEOTEXTILE
EST 7 SY
EST 3 TONS
RAP
CLASS B RIP
SEE DETAIL 4
EST 50 SY GEOTEXTILE
EST 35 TONS
CLASS II RIP RAP
BANK STABILIZATION RETAI
NRCP-IV
15"
20.07
3:1 4
:1
0.0400.040 20.9916.8219.50BOUNDARY
WETLAND
R/W
R/W
R/W
EXR/W
EX
R/W
PROP
R/W
PROP
3:1
18.19
19.79 3:13:1 0.0400.040 20.6816.4019.77BOUNDARY
WETLAND
R/W
R/W
EXR/W
EX
R/W
PROP
R/W
PROP
15.82
0.0400.040 20.82BOUNDARY
WETLAND
BOUNDARY
WETLAND
R/W
R/W
EX R/W
EX
R/W
PROP
R/W
PROP
20.843:14:1
0.0410.041 21.3222.88BOUNDARY
WETLAND
R/W
R/W
R/W
EX
R/W
EX
R/W
PROP
R/W
PROP
19.32 3:116.1900
00
55
55
1010
1010
1515
1515
2020
2020
2525
2525
3030
3030
3535
3535
4040
4040
4545
4545
5050
5050
5555
5555
6060
6060
6565
6565
7070
7070
7575
7575
6:05:30 PMR:\Hydraulics\PERMITS_Environmental\Drawings\17BP.1.R.98_hyd_prm_wet_xpl.dgnccarpenterPROJ. REFERENCE NO.SHEET NO.0
6/23/1620 20
25 25
30 30
15 15
20 20
25 25
30 30
15 15
20 20
25 25
15 15
13+00.00
20 20
25 25
15 15
15 15
20 20
25
10
14+00.00
15
20
10
14+50.00
X-2
-L-
2.5 5
16+00.00
15
20
25
17BP.1.R98
FILL
PERMANENT
FILL
PERMANENT
SHEET 6 OF 7
PERMIT DRAWING
CLEARING
HAND
CLEARING
HAND
CLEARING
HAND
CLEARING
HAND
CLEARING
HAND
Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts StreamNo. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp.** Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)1 -L- 12+69 TO 13+61 LT1@50' 21" CORED SLAB W/2'-6" CAPS< 0.01 0.01 2 -L- 13+65 TO 14+53 RT1@50' 21" CORED SLAB W/2'-6" CAPS< 0.01 0.02 1 -L- 14+34 TO 14+59 LT1@50' 21" CORED SLAB W/2'-6" CAPS 0.01 3 -L- 14+67 TO 14+79BANK STABILIZATION < 0.01 < 0.01 50 55 4 -L- 15+11 TO 16+49 RT1@50' 21" CORED SLAB W/2'-6" CAPS< 0.01 0.03 TOTALS*: 0.01 0.08 < 0.01 < 0.01 50 55 0*Rounded totals are sum of actual impactsNOTES:Revised 2018 Feb SHEET 7OF 7 WETLAND AND SURACE WATER IMPACTS SUMMARYWETLAND IMPACTS SURFACE WATER IMPACTSHERTFORDSF-45009717BP.1.R.98NC DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS10/12/2021**The length of temporary stream impacts encompasses the length of permanent impacts.