Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WQ0032085_Regional Office Historical File Pre 2018
Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality September 7, 2007 Mr. Thomas Roberts, President Aqua NC 4163 Sinclair Street Denver, NC 28037 Subject: Permit No. WQ0032085 New Birth Church Wastewater Collection System Extension Mecklenburg County, North Carolina Dear Mr. Roberts, In accordance with your application received on August 10, 2007, we are forwarding herewith Permit No. WQ0032085, dated September 7, 2007, to Aqua NC for the construction and operation of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded, and shall be subject to the conditions and limitations as specified therein. This cover letter shall be considered a part of this permit and is therefore incorporated therein by reference. Please pay particular attention to Permit Condition 3 which requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2T .0403 or any individual system -wide collection system permit issued to the Permittee. Permitting of this project does not constitute an acceptance of any part of the project that does not meet 1) 15A NCAC 2T; 2) the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; 3) and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable, unless specifically mentioned herein. Division approval is based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in the application. It shall be the Permittee's responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. Mooresville Regional Office 610 East Center Ave., Suite 301 Mooresville, NC 28115 Phone: (704) 663-1699 Fax: (704) 663-6040 Internet www.ncmwaterquality.otg Customer Service: 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer-50% Recycled/10% Post Consumer Paper None hCarolina atura!!y Mr. Roberts Page 2 September 7, 2007 In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted for the construction and operation of approximately 661 linear feet of 8-inch gravity sewer, 2,209 linear feet of 2-inch force main, a 25 gallon per minute pump station (with duplex pumps, on -site audible and visual high water alarms,, and a permanent generator w/ATS), and the discharge of 12,000 gallons per day of collected domestic wastewater into the Aqua North Carolina existing sewerage system, pursuant to the application received August 10, 2007, and in conformity with 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources and considered a part of this permit. The sewage and wastewater collected by this system shall be treated in the Aqua North Carolina WWTP (NPDES No. NC0073539) prior to being discharged into the receiving stream. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding. If you need additional information concerning this matter, please contact Dee Browder at (704) 663-1699. • Coleen H. Sullins cc: Mecklenburg County Land Use and Environmental Services Agency (LUESA) Philip Edward, Mecklenburg County Mooresville Regional Office, Collection System Permit File James Carpenter, Meade Gunnell Engineering & Surveying, P.C. Surface Water Protection Central Files Tom Asenzo, PERCS NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES RALEIGH WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT This permit shall be effective from the date of issuance until rescinded and shall be subject to the following specified conditions and limitations: 1. This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit; 15A NCAC 2T; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials unless specifically mentioned herein. 2. This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. 3. The wastewater collection facilities shall be properly maintained and operated at all times. The Permittee shall maintain compliance with an individual system -wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2T .0403. If an individual permit is not required, the following performance criteria shall be met as provided in 15A NCAC 2T .0403: a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and any contravention of the groundwater standards in 15A NCAC 2L .0200 or the surface water standards in 15A NCAC 2B .0200. b. A map of the sewer system shall be developed and shall be actively maintained. c. An operation and maintenance plan shall be developed and implemented. d. Pump stations that are not connected to a telemetry system shall be inspected every day (i.e. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six-month period of time. f. A general observation of the entire sewer system shall be conducted at least once per year. g. Inspection and maintenance records shall be maintained for a period.of at least three years. h. • Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina General Statute §143-215.1C. 1 4. This permit shall not be transferable. In the event there is a desire for the wastewater collection facilities to change ownership. or there is a name change of the Permittee, a formal permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved. 5. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. Per 15A NCAC 2T ,0116, upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form attached to this permit shall be submitted with the required supporting documents to the address provided on the form. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. 7. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities, 8. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T; the Division's Gravity Sewer Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000 as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143- 2.15.6A through §143-215.6C. 9. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. 10. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by other government agencies (local, state and federal) which have jurisdiction, including but not limited to applicable river buffer rules in 15A NCAC 2B .0200, erosion and sedimentation control requirements in 15A NCAC Ch. 4 and under the Division's General Permit NCG010000,, and any requirements pertaining to wetlands under 15A NCAC 2B .0200 and 15A NCAC 2H .0500. 11. Noncompliance Notification:. The Permittee shall verbally report to a Division of Water Quality employee at the Mooresville Regional Office, telephone number (704) 663-1699, as soon as possible, but in no case more than 24 hours or on the next working day, following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any failure of a pumping station or sewer line resulting in a by-pass directly to receiving waters without treatment of all or any portion of the influent to such station or facility. Voice mail messages or faxed information is permissible, but shall not be considered as the initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) 858-0368 or (919) 733-3300. Persons reporting any of the above occurrences shall file a spill report by completing Part I of Form CS-SSO (or the most current Division approved form), within five days following first knowledge of the occurrence. This report shall outline the actions taken or proposed to ensure that the problem does not recur. Part II of Form CS-SSO (or the most current Division approved form) can also be completed to show that the SSO was beyond control. Permit issued this the 7th day of September, 2007. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION for Coleen H. Sullins, Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number WQ0032085 3 Fast Track Engineering Certification Permit No. WQ0032085 September 7, 2007 Owner 04'0 'TPIWQCS Thomas Roberts, President Aqua North Carolina 4163 Sinclair Street Denver, NC 28037 PE James Carpenter Meade Gunnell Eng. & Surv. P.C. 1981 0-A West Catawba Ave Cornelius, NC 28031 Complete and submit this form to the permit issuing regional office with the following: One copy of the project record drawings (plan & profile views of sewer lines) of the wastewater collection system extension Supporting design calculations (selected pumps, system curve, operating point, available storage if portable generator(s) or storage greater than longest past three year outage reliability option selected) for any pump stations permitted as part of this project • Changes to the project should be clearly identified on the record drawings or in written summary form, Permit modifications are re uired for an chan es resulting in non-compliance with this permit, regulations or minimum design criteria. This project shall not be considered complete nor allowed to operate untii this Engineer's Certification and all required supporting documentation have been received by the Division. Therefore, it is highly recommended that this certification be sent in a manner that provides proof of receipt by the Division. ENGINEER'S CERTIFICATION L Partial r Final , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (E] periodically, 0 weekly, El full time) the construction of New Birth Church, a Mecklenburg County project for the Permittee, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 2T; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials. North Carolina Professional Engineer's seal, signature, and date: SEND' THIS FORM & SUPPORTING DOCUMENTATION WITH REQUIRED ATTACHMENTS TO THE FOLLOWING ADDRESS MOORESVILLE REGIONAL OFFICE SURFACE WATER PROTECTION 610 EAST CENTER AVENUE, SUITE 301 MOORESVILLE NC 28115 The Permittee is responsible for tracking all partial certifications up until a final certification is received. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. FAST -TRACK APPLICATION for GRAVITY SEWERS, P A ORCE MAINS PAGE 3 Z USE THE TAB KEY TO MOVE FROM FIELD TO FIELGri Application Number-. (to be completed by OW wner la. Aqua Noth Carolina, Inc, Full Legal Name (company, muni 1b, Plea HOA, Oil,„ lc, The i a( entp� whit will own this system Is: 0 Indual Fa t ni b © State/County 0 Private Partnership EriCorp d, 4163 Sinclair S Mailing Aridness Te 2. Project (Facility 2a. New Birth Church Brief Project. Name (permit v iii rfsfas a Contact Person: 3a. Michael Melton - Aqua North Carolina Name and Affiliation of Someone Who Can Answer 3b. 7 P For mod :a att phase, duplicate prat info 2. Owner Is t�tmlic 2a. If private, applicant le. Denver City 1g. 217 2b, Meckienbia Lion 0 County Where Project is Located uestions About this Application 3c. m meiton(t equaarrlert�,cx rn E-mail (of an existing permit) If Modification, Permit No.: h a separate sheet clearly expi nlrrg reason for the modification (1,e, adding an ength, etc.). Only include the modified Information in this permit application - do not in B17) end 8(10-11) that has already been Included in the original permit. a.._._. _ W tCr Item E3(3)) Q'Private (go to !tern 2a)) _. 0 Retaining Ownership (i,e, store, church, single office, etc.) or 0 Leasing units (lets, townhomes, etc. - skip to Item 8(3)) Selling units (lots, townhomes, etc, - go to item B(2b)) No Carolina, inc. 2b. an If egki, facilities owned by a ❑ Pubic Utility (instruction fli) 0 Homeowner Assoc J Developer (Instruction 1V) ter Treatment Facility (WWTF) Treating Wastewater From Thi< 4b. NC tiff G ize Force Ply): 0 Car Wash 0 Apartrnen d o? niurnne 0 Institution 0 Miobiie Home l artc 0 Hospital 0 School &thumb 0 Restaurant L0 Nursing Home O Office 0 Other (specify): __ Volume of wastewater `Do not Include prey ou ly lions is perlicuOar project 1 Perrnit Nurn 8. If the peurrratied tiow is zero, 'indicate why: 0 Interceptor Line - Row will: permitted in subsequent pernrts that taunt 0 Flow has already been allocated in Permit No, O Rehabilitatpon or replacement of existing sewer with no new flow expected 109 % Domestic/Commercial % industrial % Other (specAfy): y in FAST -TRACK ; °' > ATION for GRAVITY SEWERS, PUMP T NS, AND FORCE MALNS PAGE 4 9, Provide the wastewater flow calculations used in a t ni ,0219(I) for lterr B(7) or the design flow for line or that in 15A NCAC 2H ,0219(1)(1-2) must : supported awsth a NCAC 2H ,0219(t)(3), or In 2,200 seats X 3 gpolseat = 6,600 gpd * 5,400 gpd (reserve 6 pacify) 12,0 gpd 10 Surnmery of Sewer Lines to be Permitted (attach addi Size (inches) 6,. l4"t'Ori TOTAL UNE LENG z urnrrnary of Pump Stations to Location 1D chosen - as shown On Design Flow f °per tm� cross-reference) ' (MGD) Pump Statues Enclosure .t?1 13, Have the folio ns been sup Length (feet) 64.2' 596.79` 2,209 88' 0 54 mites I sheets as necessary) Point 5A NCAC 2H Values other than data in accordance with 15A y or Force Main (use ilia Putt down menu) Gravity Gravy Force Main Power Reliability Option 1- dual line feed; 2• peat generator w/ATS; 3- able generator wttetemetry; 4-wet well storage) st Track Permitting of Purnp Stations artd F. .. tr ion) and 15A NCAC 2Fi ,0200 as app4ica riteria or regulation and indicate why a CIRC.ATrOONS OR CALCULATIONS Wetland/Stream Crossings - General Penns( or 401 Certification? 0 Yes E No 0 NA [7Yes DNo dNIIA Yes 0No DN/A Sedimentation and Erosion Control Phan? Storrnwater? 14, Does this These lines will asediekeito 15, Does this project ha' Be aware that the Dhesi n will not aehapt c irr eti pna+ to sut:whaling the final erne nee ons? Check if six months . t minimum silo,r 0% flatter than the minimum slope, LiniVS i ata4Ytnt` outside ties isSerance sho. kt be . FAST TRACK APPLICATION for GRAVITY SEWERS, PUMP STATIONS, AND FORCE MAINS PAGE 5 CLASSIFICATION 1. Use the Division's guidance document entitled, "DETERMINING STREAM CLASSIFICATIONS FOR FORM FTA 02/03 (FAST -TRACK SEWER SYSTEMS)" to collect and record the stream classification data below (attach additional sheets es necessary). This document Is available from our web site or by contacting the appropriate Division of Water Quality regional office (see instructions far addresses) OR indicate the following: _ E' A Stream Classification is not needed because ail parts of the project are at least 100 feet away from any down slope waterbody; AND, A Scream Classification is not needed because the design does not depend on wet well storage as a power reliability option for any pump station near a Class C dawn slope waterbody. Location ID on Map (self chosen - as shown on map for cross-reference) Name of Waterbody Waterbody Stream Waterbody County River Basin Index Classification Submit the 8.5" x 11" COLOR topographic map as required In Instruction VI regardless of whether a classification is provided! D. CERTIFICATIONS 1a. Applicant's Certification: S . r1 MAIN 1, Y , attest that this application for New Birth Church has been reviewed by me and is accurate and complete to the best of my knowledge. ! understand that If all required parts of this application are not completed and that If all required supporting documentation and attachments are not included. this applcation package is subject to being returned as incomplete. Note: In accordance with North Carolina General Statutes 143-215 6A and 143-215 6B, any person who knowingly makes s any false statement, representation, or certcallon in any application • shall be guilty of a Class 2 misdemeanor de a tine no ., exceed $10,000 as well as civil penalties up to 525, per violation. Signing fir dal Signature 2. Professional Engineer's Certificati I attest that this application for New Birth Church has been reviewed by me and Is accurate, complete and consistent with the information in the engineering plans, calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers adopted February 12, 1996, and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Fore Mains adopted June 1, 2000 and the watershed classification in accordance with Division guidance. Although certain portions of this submittal package may have been developed by other professionals, inclusion of these materials under my signature and seal signifies that 1 have reviewed this material and have judged it to be consistent with the proposed design. Note: In accordance with NC General Statutes 143-215.64 and 143-215 6B, any person who knowingly makes any false .statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed S10,000 as well as civil penalties up to S25,000 per violation. 12a. James M. Carpenter Professional Engineer Name 2b. Meade Gunnell engineering & surveying, p.c. Engineering Firm 2c. 19810-A West Catawba Avenue _ _Mailing Address 2d. Cornelius e. NC 2f. 28031 ' City State Zip 704fi5 -7290 fit. 704fi55-7291 21, )carpenter©meadegunnell.tom! Telephone Facsimile E-mail 1111111111+111' �1�ZN CARD(''+, 1/ 4 ' SSr:' s,. "17";If SEA! r 16741 .I 0) dti•, u11 t S jgfo7 Seal, Signature & Date Central Files: APS SWP 09/07/07 Aqua North Carolina Inc Dates/Events Permit Number WQ0032085 Permit Tracking Slip Program Category Status Project Type Non -discharge Active New Project Permit Type Fast Track Version Permit Classification Gravity Sewer Extension, Pump Stations, & Pressure Sewer 1.00 Individual Extensions Primary Reviewer Permit Contact Affiliation dee:browder Permitted Flow 12000 Facility Facility Name New Birth Church Location Address Owner Major/Minor Region Minor Mooresville County Mecklenburg Facility Contact Affiliation Owner Name Owner Type Non -Government Owner Affiliation Gary Moseley, Manager 4163 Sinclair St Denver NC 28037 Scheduled Orig Issue App Received Draft Initiated Issuance 09/07/07 08/13/07 Regulated Activities Church Subdivision Wastewater collection Outfalt NULL Public Notice Issue Effective Expiration 09/07/07 09/07/07 Re. uestedlReceived Events Additional information requested Additional information received Waterbody Name Stream Index Number Current Class Subbasin ippr, ST-TRACK APPLICATION for GRAVITY SEWERS, P ^ ^ m 1 Owner: la. Aqua North Carolina, Inc. Full Legal Name (company, municipality, HOA, utiF , etc. lb. 60,..sry R f5e/'Y Signing Official Name and Title (Please review A NCC 2H 0206(b)for auth.. ed signri lc, The legal entity who will own this system is: LJ Individual E] Federal Ll Municipality El State/County Li Private Partnership Corporation Other (specify): z 0 0 z 1 a. a. P STATIONS, AND FORCE MA USE THE TAB KEY TO MOVE FROM FIELD TO FIELD! Application Number: (to be completed by DWQ) PAGE 3 Id 4163 Sinclair Street Mailing Address 1 f. NC State lh. 704-789-9404 Telephone li. 704-789-9409 Facsimile 2. Project (Facility) Information: 2a. New Birth Church Brief Project Name (permit will refer to this name 3. Contact Person: 3a. IVIichael Melton — A ua North Carolina Name and Affiliation of omeone Who Can Answer Questions About this Application 3b. 704-989-9404 3c. mamelton©aquaamerica.com Phone Number E-mail le, Denver City lg. 28037 Zip Code 11. mamelton@aquaarnerica.corn E-mail 2b. Mecklenburg County Where Project is Located 1 Project is [SeNew Modification (of an existing permit) If Modification, Permit No.: For modifications, attach a separate sheet clearly explaining the reason for the modification (Le. adding another phase, changing line sizellength, etc.). Only include the modified information in this permit application - do not duplicate project information in B(7) and B(10-11) that has already been included in the original permit. 2. Owner is rPublic (skip to Item B(3)) LJ Private (go to item 2(a)) 2a. If private, applicant will be: 2b. If sold, facilities owned by a (must choose one) E) Retaining Ownership (i.e. store, church, single office, etc.) or Z E) Leasing units (lots, townhomes, etc - skip to Item B(3)) 0 E] Selling units (lots, townhomes, etc. - go to Item B(2b)) .111.01 El Public Utility (Instruction III) El Homeowner Assoc./Developer (Instruction IV) I 3. Aqua North Carolina, Inc. • Owner of Wastewater Treatment Facility (WWTF) Treating Wastewater From This Project • 4a. Willowbrook 4b, NC 0073539 O Name of WWTF WWTF Permit No. LL 5a. Aqua North Carolina, NC '5b. eGravity ,5c. < 2 Owner of Downstream Sewer fReceiving Sewer Size 1E1 Force Main 1 Permit Number of Downstream Sewer (if known) 6. The origin of this wastewater is (check all that apply): Residential Subdivision ( f urkpLi). 0 Apartments/Condominiums El Mobile Home Park 0 School th Ej Restaurant El Office o Car Wash El Institution • Hospital ErChurch Ej Nursing Home El Other (specify): 100 % Domestic/Commercial °,/0 Industrial % Other (specify): 7. Volume of wastewater to be allocated for this particular project: 12,000 gallons per day *Do not include previously permitted allocations 8. if the permitted flow is zero, indicate why: [l] Interceptor Line - Flow will be permitted in subsequent permits that connect to this line El Flow has already been allocated in Permit No. El Rehabilitation or replacement of existing sewer with no new flow expected E—r A /11 - - n. A Irer AST -TRACK APPLICATION for GRAVITY SEWERS, PUMP STATIONS, AND FORCE MAINS PAGE 4 9. Provide the wastewater flow calculations used in determining the permitted flow in accordance with 15A NCAC 2H .0219(1) for Item B(7) or the design flow for line or pump station sizing if zero flow in the space below. Values other than that in 15A NCAC 2H .0219(I)(1-2) must be supported with actual water or wastewater use data in accordance with 15A NCAC 2H .0219(1)(3). 2,200 seats X 3 gpd/seat = 6,600 gpd + 5,400 gpd (reserve capacity) = 12,000 gpd 10. Summary of Sewer Lines to be Permitted (attach additional sheets if necessary) Size (inches) Length (feet) 8" -- 64.2' - 8" 596.79' 2" 2,209.88' W H O ENTER TOTAL LINE LENGTH IN MILES 0.54 mites V11. Summary of Pump Stations to be Permitted (attach additional sheets as necessary) z Location ID Power Reliability Option (self chosen - as shown on Design Flow Operational Point (1- dual line feed; 2- permanent generator w1ATS; 3- 4:c 111 plans for cross-reference) (MGD) GPM @TDH portable generator wltelemetry; 4-wet well storage) Pump Station Enclosure 0.012 25 gpm @ 90' TDH _J- Gravity or Force Main (use the pull down menu) Gravity Gravity Force Main 0 z 2 g12. Does the sewer system comply with the Minimum Design Criteria for the Fast Track Permitting of Pump Stations and Force Mains (latest version), the Gravity Sewer Minimum Design Criteria (latest version) and 15A NCAC 2H .0200 as applicable? W ❑ Yes ❑ No If no, please reference the pertinent minimum design criteria or regulation and indicate why a a variance is requested. SUBMIT TWO COPIES OF PLANS, SPECIFICATIONS OR CALCULATIONS PERTINENT TO THE VARIANCE WITH YOUR APPLICATION 3. Have the following permits/certifications been submitted for approval? Wetland/Stream Crossings - General Permit or 401 Certification? ❑ Yes ❑ No ❑ N/A Sedimentation and Erosion Control Plan? ❑ Yes ❑ No ❑ N/A Stormwater? ❑ Yes ❑ No ❑ N/A 14. Does this project involve aerial lines or siphons? Check if yes: ❑ These lines will.be considered.hiah nriorituand must be checked once every six months____ -_ ._ __- _ 15. Does this project have gravity sewer lines designed at minimum slopes? ❑ Be aware that the Division will not accept installed lines more than 1 d% flatter than the minimum slope. Lines installed outside this tolerance should be corrected prior to submitting the final engineering certification.. AST -TRACK. AI?'P'I:ICAT1 fN for GRA 'ITY SEWERS, P P STATIONS, AN1) FORCE MAINS PAGE 5 0 1 Use the Divisiorfs guidance document entitled, "DETERMINING STREAM CLASSIFICATIONS FOR FORM FTA 0210_ (FAST -TRACK SEWER SYSTEMSr to collect and record the stream classification data below (attach additional sheets a necessary). This document is available from our web site or by contacting the appropriate Division of Water Quality partsproject A Steam Classification instructions of needed because'all indicate f the are at least 100 feet awayfrom any down slope regional waterbody, AND, iy A Stream Classification is not needed because the design does not depend on wet well storage as a powerreliability option for any pump station near a Class C down slope waterbody. Location ID on Map self chosen - as shown on ' Name of Waterbody Stream i Waterbody map for cross-reference) Waterbody County River Basin index Classification COLOR topographic nnap as required In instruction VI of whether a classification is provided! Applicant's Geri# ccat�ion: 1, apt- ► ►` �+' IcrrS die , attest that this application for New Birth Church has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. Note: In accordance with North Carolina General Statutes 143-2156A and 143-215.68, any person who knowingly makes any false statement representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed $10,000 as well as civil penalties up to $25,per violation.. Signing rcial Signs 2, Professional Engineer's Ce l attest that this application for New Birth Church has been reviewed by me and is accurate, complete and consistent with the information in the engineering plans, calculations, and all other supporting documentation to the best of my knowledge. I' further attest that to the best of my knowledge the proposed design has been prepares+' in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers adopted February 12, 1996, and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 and the watershed classification in accordance with Division guidance. Although certain portions of this submittal package may have been developed by other professionals, inclusion of these materials under my signature and seal signifies that i have reviewed this material and have judged it to be consistent with the proposed design. Note: In accordance with NC General Statutes 143-215.6A and 143-215.66, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. 2a, James M. Carpenter Professional Engineer Name 2b. Meade Gunnell engineering & surveng, p,c, Engineering Firm 2c. 19810-A West Catawba Avenue Mailing Address, v.w 2d. Cornelius e, NC 2f. 28031 City State Zip 2g, 704-655_7290 2h. 704-65a-7291 2i, jcarp nterreadegunne Telephone Facsimile E-mail Seal, Signs e Date NTO?9< m<L2«v 1G CO�G . « . NATIONAL, GEODETIC »«:QI DATUM « Dm ifiEs FOR SALF EM S Sc GErL>OGCAL RESTON, am3m,wmam rOFOGRAPH1C,MAP «rfaace. ncary y v % OF V RGNA :mw AND yv 1a IS AVAILABLE ON REQUEST S, N :OR ADO 80225 ISMI I ION „2005 08:28 PUBLIC STAFF a 917044899409 NO.878 D04 STATE OF NORTH CAROLINA UTILITIES COMMISSION RALEIGH DOCKET NO. W-981 BEFORE THE NORTH CAROLINA UTILITIES COMMISSION Know All Men By These Presents, That moymog UTILITrF. , INC. is hereby granted this: CERTIFICATE_ OF PUBLIC PNiV NIENCE AQ NECESSITY to provide wate and sayer utility service in WPR DOOK SUB V O Mecklenburg County, North Carolina subject to such orders, rules, regulations, and conditions as are now or may hereafter be lawfully made by the North Carolina Utilities Commission. APPENDIX A ISSUED BY ORDER OF THE COMMISSION. This the 614day of 1991. NORTH CAROLINA UTILITIES COMMISSION 2A (SEAL) . Ge eva S. igpen, C i� erk- Beverly Eaves Perdue, Governor of wArERo Dee Freeman, Secretary -.9 _ G North Carolina Department of Environment and Natural Resources r - i Coleen Sullins, Director -c Division of Water Quality March 12, 2009 Aqua North Carolina 4163 Sinclair Street Denver, North Carolina 28037 Attn: Thomas Roberts, President SUBJECT: New Birth Church Permit No. WQ0032085 Wastewater Collection System Extension Final Engineering Certification Dear Permittee: The Division received a final engineering certification for the subject project on March 11, 2009. A ' full review of the certification materials may or may not be conducted. It is assumed that receipt of this certification indicates compliance with all regulations, design criteria and the permit. Please be reminded that the Permittee is responsible for keeping a copy of the final record drawings for the life of the project. If you have not received a copy, please contact your consultant immediately to obtain a copy. You arareceiving this letter because the Division has you listed as the responsible party. If this permitted system is no longer owned by you, please complete Form PNOCF-S as this permit is not automatically transferable. Form PNOCF-S can be downloaded from http://h2o.enr.state.nc.us/ndpu/ndpuapps.html#Sewer. If you have any questions concerning this document or the completion of Form PNOCF-S (if necessary), please contact Ms. Dee Browder at the letterhead address or via E-mail at dee.browder@ncmail.net. Sincerely, t) Surface Water Protection Regional Supervisor 5 t.A Robert Krebs Enclosure Cc: Surface Water Protection Section Central Files (certification page only) James Carpenter, Meade Gunnell Engineering & Surveying Nne orth Carolina Naturally Pretreatment, Emergency Response and Collection Systems Unit Internet http:f/h2o.enr.nc.state.us/ndpu 1617 Mail Service Center, Raleigh, NC 27699-1617 An Equal Opportunity Action Employer Telephone (919) 733-5083 Fax (919) 733-0059 50% recycled/10% post -consumer paper Fast Track Engineering Ce Permit No, WQ0032085 September 7, 2007 Owner/WWTPNVQCS Thomas Roberts, President Aqua North Carolina 4163 Sinclair Street Denver, NC 28037 fl PE James Carpenter Meade Gunnell Eng. & Surv. P.C. 19810-A West Catawba Ave Cornelius, NC 28031 Complete and submit this form to the permitissuing regional office with the following: One copy of the project record drawings (plan & profile views of sewer lines) of the wastewater collection system extension Supporting design calculations (selected pumps, system curve, operating point, available storage if portable generator(s) or storage greater than longest past three year outage reliability option selected) for any pump stations permitted as part of this project Changes to the project should be clearly identified on the record drawings or in written summary form. Permit modifications are required for any changes resulting in non-compliance with this permit, regulations or minimum design criteria. This project shall not be considered complete nor allowed to operate until this Engineer's Certification and all required supporting documentation have been received by the Division. Therefore, it is highly recommended that this certification be sent in a manner that provides proof of receipt by the Division.. ENGINEER'S CERTIFICATION EJ Partial rq.'"Final Att'a , as a duly registered Professional Erigiricor in the State of North (a,rolina, having been authorized to observe (.1.--rperiodically, weekly, full time) the construction of New Birth Church, a Mecklenburg County project for the Permittee, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; :15A NCAC 2T; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fa.st-Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials. North Carolina Professional Engineer's seal, signature, and date: SEND THIS FORM & SUPPORTING DOCUMENTATION WITH REQUIRED ATTACHMENTS TO THE FOLLOWING ADDRESS MOORESVILLE REGIONAL OFFICE SURFACE WATER PROTECTION 610 EAST CENTER AVENUE, SUITE 301 MOORESVILLE NC 28115 2-117/2-1 The Permittee is responsible for tracking all partial certifications up until a final certification is received. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shah subject the Permittee to appropriate enforcement actions. tial To: Surface Water Protection From: Jamie Carpenter, PE unn=LL engineering & surveying, p.c. 19810-A West Catawba Avenue Cornelius, NC 28031 704.655.7290 704.665.7291 (fax) Company: NCDENR Project Number: 751.20 Address: 610 E. Center Ave., Mooresville, NC 28115 Phone: Pages: Re: New Birth of Charlotte — Pump Station/Force Main Date: March 10, 2009 Messages Attached please find: • 1 set — Record Drawings ➢ Design Calculations >. Fast Track Engineering Certification • Pump Station Lot Survey If you have questions, comments or require any further information please contact me. (704) 655-7290, Ext. 12 Thank you, Cc: Aqua NC Pump Station and Force Main Calculations For New Birth of Charlotte Project Name 11901 Sam Furr Road, Huntersville, NC Project Address 011-231-01 Tax Parcel ID Number Plans Prepared By: Meade -Gunnell Engineering & Surveying, P.C. Name Residential grinder pump for use in the pumping of dornestic sewage using the well proven PIRANHA cutting system Applications Th.e ABS PIRANHA submersible r :able pumps hava be c.C"ffesr:.iivr nd eccono€nicad drwatenripa lass, using of small. diaroEier in pr, utr areas, al from kuti4ol u hat laying of a convent or • ABS PiRF.NYaye ippli Medium Pumped Faecal matter and sewaoce .hlsax medium 1e(ripe, a.tu continuous opera to 6O C [max. 5 mi Trrsigue scha rgr Construction The water pressure - and The porn€3 section t Motor Ingle phasr 1fll,k; {"tl -{ '..prC�i� �ilipi rrti�° ',«', Irr .sslats[ar'•c:.I p rofeolioto type €d Bearings The moles shyei ts supported €,n (fibre: Shaft sealing Between motor and hydraulic lic sec ame by means of bigh u�al sea Li(a t u,,at se ni) a silicon carlode rueeharoisal dsa GPI, inch e of direction of roi.ation end resi5taril Pea her -ripe -rehire .hrar'k, cedb' L.ip seat aril lribricaliedI. Discharge (3 , .-x tnter€rral. thread Shredding System corrals ;t0Cinnaa o r:c,aU r rurrcr tora.tr_r.i before 11he TCS-Thermo Contr By rrrs.uns of €harrw:d to switch off the Iruruler Doc trine,'.. Materials 0lotrr Rotor w it 3ti Votute, irr p+e.11er rn rn pera i r AST ha 3 . 2 } Clas:r. 4.0l l ABS PIRANHA cutting system capable of shredding domestic waste O Suitable for high head hilly terrain applications o Excellent for onsite" applic ations and where high head/low flow is required 0 Rugged cast iron and stainless steel construction • Operates with single or double piggyback float switch CI No control panel required VA" discharge for economical piping installatit O Easy, cost-effective instanation A m p Technical Data Performance Cu H 1 N tfr ensigns Hz IP 30' x 34" System 24" x 48" System 36" 30" Corpora f ABS C" urnps F,r r rr,f Vieffffi Of kk' (( [[ n, CT 06430 'let: f �t.�..}1 23n-k .'00 Fas (ice� Regional Offices: ABS Pumps Inc 113 Maritime Dri x 23"-- Installation Example 2" Vent basin package; Basin. 30 > 3" or. 24. 486 Fterrli sei- 343 or 2832poxy painted °3 Floats Two n aps;cit,:rCeffT €'riia.ro _,wits y C?r-/r;rftl arid Marna Weight; 140 I136 02o'1.: Pomp & 533 Belt Avenue, Sacra CA 95838 Tot 6 1r.i 2408500 Fax:c 16) 925-39114 38229P it i t. TEL 06141 xa a.=3 17 ,., • lT6 i Far I41 1`64 C101, Tel: Fax �rx �Hoo High level t-vo m tact .0326, Unix 147 T t „sT 113.3 NEW BIRTH CHURCH PUMP STATION DESIGN CALCULATIONS I. DESIGN FLOW CALCULATION FUTURE CONDITIONS Number of Seats in Project = 2200 Number of Gallons per seat = 3 Average Daily Flow in Gallons per Minute = Average Daily Flow (Gallons per Day) = Peak Flow in Gallons per Minute RUNK LINE CAPACITY a. Daily Flow Rate (Qd) in Cubic Feet per Second Qd = ,. b, Capacity of Trunk Line at Minimum Slope Diameter of Trunk Line in inches = 8 Minimum Slope of Trunk Line in ft/ft = 0D06 Mannings Coefficient for Trunk Lone = 0.013 Radius of Trunk Line in Feet = Area of Trunk Line in sq,ft. Wetted Perimeter (full flow) Hydraulic Radius Maximum Flow (Qm) in Cubic Feet per Second Qm III. COMPUTE STATIC HEAD OF SYSTEM High Point Elevation of Force Main (ft) = 752,9 Pump Off Elevation (ft) = 716.5 Static Head (ft) .,.n O E ? A c 5 - -0—cp / \ < cp V. TOTAL DYNAMIC HEAD CALCULATIONS a. Frictional Head For Puma & Vault - initial Conditions Q (gprn) V (ft/s} V*2i2a (ft) K KV*2/2q Hf (ft/ft) L Pipe Frict Pin Head Slat Head TDH (ft) 0 0.000 0,000 11,1 0.000 0.000 22 0.000 0.000 12,25 12,250 10 1.021 0.016 11,1 0,180 0.0031 22 0.068 0.248 12,25 12.498 20 2,042 0,065 11.1 0.719 0,0112 22 0.247 0.966 12,25 13,216 30 3.063 0,146 11.1 1.617 0.0238 22 0.523 2.140 12.25 14,390 40 4.084 0,259 11.1 2.875 0.0405 22 0,890 3,765 12,25 16.015 50 5,105 0,405 11.1 4.492 0.0611 22 1.345 5,837 12,25 18.087 60 6,126 0,583 11.1 6.468 0,0857 22 1.885 8.353 12.25 20.603 70 7.147 0,793 11,1 8.804 0.1139 22 2.507 11,310 12,25 23.560 80 8.168 1.036 11.1 11,499 0.1459 22 3,209 14.708 12.25 26.958 90 9.189 1,311 11.1 14,553 0.1814 22 3.990 18,543 12.25 30,793 100 10.210 1.619 1'1.1 17.967 0,2204 22 4.849 22,816 12,25 35.066 Pipe Size (inches) = 2 K= 11,1 Pipe Length L = 22 HW Coefficient C = 130 Static Head = 12.25 b. Frictional Head Fur Force Main - PVC Pipe - initial Conditions Q (gprn) V (ft/s) V`2/29 (ft) K KV*2/2q Hf (ft/ft) L Pipe Frlct Dvn Head Stet Head TDH (ft) 0 0.000 0.000 4.1 0.000 0.000 2104.9 0.000 0.000 24.15 24.150 10 1.021 0.016 4..1 0.066 0,0027 2104,9 5.714 5.780 24.15 2.9.930 20 2.042 0.065 4„1 0.265 0,0098 2104.9 20,599 20.864 24,15 45,014 30 3.063 0.146 4.1 0,597 0.0207 2104.9 43.612 44.209 24..15 68.359 40 4.084 0.259 4.1 1.062 0.0353 2104.9 74.258 75.320 24.15 99.470 50 5.105 0.405 4.1 1.659 0.0533 2104.9 112.209 113,868 24,15 138.018 60 6.126 0.583 4,1 2.389 0.0747 2104.9 157.222 159.611 24,15 183,761 70 7.147 0.793 4.1 3,252 0.0993 2104,9 209,105 212.357 24.15 236,507 80 8.168 1.036 4.1 4,247 0,1272 2104,9 267.701 271.948 24.15 296,098 90 9.189 1.311 4.1 5.375 0.1581 2104.9 332,876 338.251 24,15 362.401 100 10.210 1.619 4.1 6.636 0.1922 2104,9 404.514 411,150 24.15 435.300 Pipe Size (inches) = 2 K = 4.1 Pipe Length L = 2104.9 HW Coefficient C = 140 Static Head = 24.15 Frictional Head F Cast lr n Pia1 - Initial Conditions Q,(stpm} V (Ws) V*2/20 (ft) K KV_ •zI g Hf (ft/ft) L Pipe Frict Ltvn Head Stat Head TDH (it) 0 0.000 0.000 0 0.000 0.000 105 0,000 0.000 0 0,000 10 1.021 0.016 0 0.000 0.0031 105 0.327 0.327 0 0.327 20 2.042 0.065 0 0.000 0.0112 105 1.179 1,179 0 1.179 30 3.063 0.146 0 0.000 0.0238 105 2,495 2.495 0 2.495 40 4.084 0.259 0 0.000 0.0405 105 4.249 4.249 0 4.249 50 5,105 0.405 0 0.000 0.0611 105 6,420 6.420 0 6.420 60 6.126 0.583 0 0.000 0.0857 105 8.995 8,995 0 8.995 70 7.147 0.793 0 0.000 0.1139 105 11.964 11.964 0 11.964 80 8.168 1.036 0 0.000 0,1459 105 15.316 15.316 0 15,316 90 9.189 1.311 0 0.000 0.1814 105 19.045 19.045 0 19.045 100 10.210 1.619 0 0.000 0.2204 105 23.144 23.144 0 23144 Pipe Size (inches) = 2 K= 0 Pipe Length L. = 105 HW Coefficient C = 130 Static Head = 0.00 d. Fri Head For Pump & Vault - Mid Conditions Q (Upm) V (foal Vinci (ft) K. 0 0,000 0.000 11,1 10 1.021 0,016 11,1 20 2,042 0.065 11,1 30 3 063 0,146 11.1 40 4,084 0,259 11.1 50 5,105 0.405 11.1 60 6,126 0.583 11,1 70 7.147 0,793 11.1 80 8.168 1,036 11.1 90 9.189 1.311 11.1 100 10.210 1.619 11.1 Pipe Size (inches)' K, Pipe Length L HW Coefficient C Static Head 2 11.1 22 120 12.25 e. Friction Heed For Fo w,m1 Y.it31J 0 10 20 30 40 50 60 70 80 90 0.000 1.021 2,042 3.063 4.084 5.105 6.126 7.147 8.168 9,189 10.210 Pipe Size (.inches) K Pipe Length L .= HW Coefficient C w Static Head 10 20 30 40 50 60 70 80 90 100 V*212q (ft� 0.000 0.016 0.065 0.146 0.259 0,405 0.583 0.793 1.036 1.311 1,6'19 2 41 2104.9 135 24,15 on bleed For F V (lt/sl V*2✓2a (ft) 0,000 0.000 1,021 0.016 2.042 0,065 3.063 0.146 4.084 0.259 5,105 0.405 6.126 0.583 7.147 0,793 8.168 1.036 9,189 1.311 10.210 1,619 Pipe Size (inches) = Pipe Length L HW Coefficient C Static Head = 2 0 105 120 0.00 KV*2f2o 0.000 0.180 0.719 1.617 2.875 4.492 6.468 8.804 11.499 14,553 17.967 -PVC Pipe Hf (Rift) 0.000 0.0036 0.0130 0,0276 0,0469 0.0709 0,0993 0.1321 0.1691 0.2103 K !W 2f2q Hf_(ftlfti 4,1 0.000 0.000 4.1 0.066 0.0029 4.1 0.265 0.0105 4.1 0.597 0.0222 4,1 1.062 0,0377 4,1 1.659 0,0570 4.1 2.389 0.0799 4.1 3.252 0.1663 4.1 4.247 0.1360 4.1 5.375 0.1691 4,1 6.636 0.2056 K KKV`2J2q O 0 000 0 0.000 0 0.000 O 0.000 O 0.000 0 0,000 0 0.000 0 0.000 0 0.000 0 0,000 0 0.000 L Pik Friel 22 0,000 22 0.079 22 0.286 22 0.606 22 1.032 22 1,560 22 2.186 22 2.907 22 3,721 22 4.627 22 5.623 ondltl pns L 2104.9 2104.9 2104,9 2104.9 2104.9 2104,9 2104.9 2104.9 21049 2104.9 2104.9 PI e -?iid Condi Hf (fta t 0.000 0.0036 0.0130 0.0276 0,0469 0.0709 0.0993 0.1321 0.1691 0,2103 0,2556 rape Fr(ct 0.000 6.112 22.032 46.647 79.426 120.018 168.164 223.656 286,332 356.D42 432,666 Dvn Hea41 0,000 0.259 1.005 2,223 3.907 6.051 8.654 11,710 15.220 19.180 23.590 Qyn Head 0.000 6.178 22,,298 47,245 80,488 121,677 170,553 226,910 290.57'9 361,418 439,303 Stat Head TDH (ft} 12.25 12.250 12,25 12,509 12.25 13.255 12.25 14.473 12.25 16.157 12.25 18,301 12.25 20.904 12.25 23.960 12.25 27.470 12,25 31,430 12.25 35,840 Stet He d TON (ftl 24.15 24.150 24.15 30..328 24,15 46.448 24,15 7'1,395 24.15 104.638 24,15 145,827 24,15 194,703 24.15 251,d0 24.15 314.729 24,15 385.568 24.15 463.453 L Pipe Frict pvn Head Stat Head T(?H.('ft) 105 0,000 0.000 0 0.000 105 0.379 0.379 0 0,379 105 1.367 1.367 0 1,367 105 2.893 2.893 0 2,893 105. 4„927 4.927 0 4,927 105 7,441- 7.445 0 7,445 105 10.431 10,431 0 10.431 105 13.873 13.873 0 13,873 105 17.761 17.761 0 17.761 105 22,085 22,085 0 22.085 105 26.838 26.838 0 26.838 g. Frict onal Head Far Pump & Vault - End Conditions q.(qprn) 1,1(titis 1r2.12p ift) j2g Hf MAI L Pipe Fr ict Dvn Heag Stat Head TDH (ft} 0 0 000 0.000 11 1 0,000 0.000 22 0,000 0.000 12,25 12,250 10 1.021 0.016 11,1 0.180 0,0051 22 0,111 0,291 12 25 12 541 20 2,042 0,065 11 1 0,719 0,0182 22 0.401 1,120 12 25 13,370 30 3,063 0,146 11,1 1,617 0,0386 22 0.849 2,466 12.25 14 716 40 4.084 0 259 11,1 2.875 0,0657 22 1,446 4,321 12,25 16.571 50 5 105 0,405 11,1 4 492 0,0993 22 2 186 6,677 12,25 18,927 60 6,126 0 583 11,1 6,468 0,1392 22 3,062 9,530 12.25 21,780 70 7.147 0,793 11,1 8,804 0,1851 22 4073 12,876 12 25 25,126 80 8,168 1,036 11.1 11,499 0,2370 22 5,214 16,713 12,25 28.963 90 9,189 1 311 11,1 14,553 0 2947 22 6.484 21,037 12 25 33,287 100 10 210 1 619 11,1 17.967 0,3581 22 7,879 25.846 12.25 38,096 Pipe Size (inches). 2 K r 11.1 Pipe Length L = 22 HW Coefficient C = 100 Static Head r 12,25 h. FjctlonaIHed For Force Main - PVC Pipe - End Conditions Q (ddra) Y.M1) V*212q (ft) K Kr2/2g Hf WM) L !ape Friel Dyn Head Stet Head TDH ift) 0 0.000 0000 4.1 0,000 0.000 2104.9 0.000 0,000 24,15 24.150 10 1,021 0,016 4,1 0,066 0,0031 2104.9 6,554 6,620 24,15 30.770 20 2,042 0,065 4 1 0,265 0,0112 2104.9 23.625 23 891 24 '15 48,041 30 3,063 0 146 4,1 0 597 0,0238 2104.9 50,021 50,618 24,15 74.768 40 4,084 0,259 4 1 1,062 0.0405 2104.9 85,170 86,232 24. 15 110,382 50 5,105 0,405 4.1 1,659 0.0611 21049 128.697 130 357 24.1.5 154,507 60 6,126 0 583 41 2,359 0.0857 2104.9 180,325 182 714 24,15 206 864 70 7 147 0,793 4,1 3 252 0,1139 2104,9 239,832 243,084 24,15 267.234 80 8,168 1,036 4,1 4 247 0,1459 21114,9 307,038 311,285 24,15 335,435 90 9„189 1.311 4 1 5,375 0,1814 2104,9 381,789 387.165 24.15 411.315 100 10210 1619 4 1 6,636 0,2204 2104.9 463,954 470.591 24 15 494,741 Pipe Size (inches) r-- 2 K r. 4,1 Pipe Length L = 2104.9 HW Coefficient C = 130 Static Head = 24,15 i. Frictional Head For Fore - CastI P" -End Conditions gigpm.) Ylfitis r2i2ciffit K KV*2/2q lit (ft/ft) L Pipe Frict Dyn Head Stet Head TDH Itti 0 0 000 0 000 0 0 000 0.000 105 0,000 0 000 0 0 000 10 1 021 0 016 0 0 000 0 0051 105 0 531 0 531 0 0 531 20 2,042 0 065 0 0 000 0 0182 105 1 915 1 915 0 1 915 30 3 063 0,146 0 0 000 C) 0386 105 4 054 4 054 0 4 054 40 4,084 0 259 0 0 000 0 0657 105 6 903 6 903 0 6 903 50 5.105 0 405 0 0 000 0 0993 105 10 431 10 431 0 10.431 60 6 126 0 583 0 0 000 0 1392 105 14 615 14.615 0 14 615 70 7 147 0 793 0 0 OK 0 1851 105 19 438 19 438 0 19 438 80 8 168 1036 0 0 000 0.2370 105 24 885 24,885 0 24 885 90 9 189 1.311 0 0,000 0 2947 105 30 944 30 944 0 30 944 100 10 210 1 619 0 0 000 0,3581 105 37 604 37,604 0 37 604 Pipe Size (inches) - 2 K - 0 Pipe Length L r 105 HW Coefficient C = 100 Static Head = 0.00 j. Total Dynamic Head For lniti l Conditions Q (wool Q 14 a.. 2p. 4Q iQ Di ZQ 100 P&V TDH 12.25 12,50 13.22 14,39 16,01 18.09 20:60 23 56 26,96 30.7935.07 FM TDH (PVC) 24.15 29.93 45.01 68,36 99.47 138.02 183.76 236.51 296.10 362.40 435.30 FM TDH (DIP) 0.(10 0.33 1 18 2.50 4.25 6.42 9.ib6 11.9 5 15.32 19,p5 2.14 TOTAL k. 'Total Dynamic Head For M1d Conditions Q (gorni Q P&V TDH 12.25 FM TDH (PVC) 24.15 FM TDH (DIP) 0.00 TOTAL ,..�.,4.. 1Q 29 IQ 44. 12.51 1 3.26 14.47 16,16 30.33 46.45 71.39 104.64 0.38 1.37 2.89 4,93 18.30 145.83 2C1:90 23,96 194,70 251.06 10,43 13.1i7 27,47 314,73 17.76 QQ 31.43 35.84 385.57 463.45 22.08 26.84 l: Total Dynmic Head For End Conditions Q Worn) 0 14 ztt 2.Q 4Q QQ LQ QQ 4Q 100 P&V TDH 12.25 12-54 13.37 14,72 16.57 18.93 2'1,78 25.13 28.96 33.29 38.10 FM TDH (PVC) 24.15 30.77 48.04 74.77 110.3.8 154.51 206.86 267.23 335,44 411..31 494,74 FM TDH ©iP 0 8" 1.99 4.05 6.90 10 43 14 62 19.44 24.89 30.94 37.60 ( ) 0.00 3 TOTAL�: x Pump Curve Q (89rL1) 4 14 ?Q 4.0 S24 I QQ �Q Pump Curve 1 110.00 98,00 87.00 74,00 59.00 43.00 28,00 4,00 0.00 0.00. Head Curve 0 10 20 30 40 50 60 70 80 90 100 (9pm) PUMP 'P Total 0y am c Head For s k, Total Dynamic Head For; Mid Conditions I. Total Dynamic Head For End Conditions Pump Curve 1 Initial Condition VI. FORCE MAIN VELOCITY V = 0,409(Qp)/(D ^ 2) Pipe Size (inches) = 2 Velocity Table Pump Condition Qp (ppm) Initial 26.00 Mid 25,50 End 25,00 WI. CYCLE TIMES V = T(Qd)(1-(QdWQp)) Tn V/(Qp-Qd) Tf = VtQd To buildoui T(min)= 7.5 Qd (gpm) Cycles per hour V (gal) v V = Active Volume (gal) T = Allowable Cycle Time Between Starts (min) Qp .= Pumping Rate - single pump (gpm) Qd = Design Daily Flow To Pumps (gpm) Tn = Pump Time On Tf = Pump Off Time Tc = Total Cycle Time Pump Condition Qp (apm) Tn min Tf, rtt%n T. rnin Initial 26,00 Mid 25,50 End 25.1)0 Church flow T (min) = 15 Qd (gPm) _ Cycles per hour = V (gal) = Pump Condition Qp (at) Tn mtn T Initial 26.00 Mid 25,50 End 25,00 VUUL. EFFECTIVE DEPTH ©8 Vrue Ve = 3.14(D*2)/41•1" 0(11)= 5.00 Ve(cf)= De (ft) = Actual cycle times Total buildaut T(min)--- 15 ad (Wm) = 20. V (gal) Pump GQ(r it4'on Initial Mid End WV. SPECF(C SPEED Ns = N" Qp^.5/1.1^0,75 N (rpm) = 3400,00 Pump C©ndYti©n Qo fa101.1 Lin Initial 26.0,0 85.00 Mid 25.50 88,00 End 25.00 90.00 xXPOWER RATING Sf Prhp/Php Prhp Php = Sp' = V'= Volume For One Cycle Time (cf) Ve = Volume For One Foot of Storage in Manhole De = Effective Depth (ft) D = Diameter of Wetwell N$ = Specific Speed N = Impeller Speed (rprn) Op = Pump Discharge (gpm) H = Total Head (ft) Sf'= Service Factor Prhp = Rated Horse Power Php = Pump Horses Power D (ft) = 5.00 Ve(cf) De (ft) T (min Qd (gpm) = 1 t.4 V (gal) =,.., Church flow = 15 Pump Gegtiltion QR (gprn) Initial 26.00 Mid 25,50 End 25.00 XI. RESPONSE TIME FOR POWER FAILURE A STANDBY ELECTRIC GENERATOR SHALL BE INSTALLED ON -SITE TO BE USED AS AUXILIARY POWER TO OPERATE SEWER PUMPS IN CASE OF MAIN POWER OUTAGE. THE GENERATOR SHALL BE PROPANE OR NATURAL GAS. IT SHALL BE PROPERLY SIZED TO START AND OPERATE THE PUMP MOTORS. PROPERLY SIZED WIRE, FITTINGS, CONNECTORS, AND AUTOMATIC TRANSFER SWITCH SHALL BE PROVIDED. XII. PUMP STATION BOUYANCY CALCULA' !ONS a. Counter Bouvancy Calculation Length of Bottom Slab Extension (ft) = 1.00 Bottom Slab Thickness (ft) = 1.50 Inner Diameter of Base Bottom (ft) = 4.00 Inner Diameter of Wetwell (ft) = 5.00 Thickness of Wetwell Walls (ft) = 0.50 Thickness of Top Slab (ft) = 0.50 Top Elev. of Wetwell Slab (ft) = 732.50 Bottom Elev. of Wetwell Slab (ft) = 714.00 Width of Hatch (ft) = 3.00 Length of Hatch (ft) = 5.00 Width of Concrete Trench Backfill (ft) = 1.00 Height of Concrete Trench Backfill (ft) = 1.50 Weight of Soil (lbs/cf) = 100.00 Weight of Concrete (lbs/cf) = 150.00 Height of Tapered Base (ft) = 0.50 Ground Surface Elev. (ft) = 732.00 Density of Water (lbs/cf) = 62.40 Vol. of Slab Base (cf) Vol. of Top Slab (cf) Vol. of Riser Section (cf) Vol. of Tapered Base Section (cf) = Vol. Of Conc. Trench Backfill (cf) Total Vol. of Conc.(cf) Total Weight of Conc.(lbs) Vol. Of Soil Over Conc. Backfill Ring (cf) _ Weight of Soil Over Conc. Backfill Ring (lbs) Total Counter Bouyamoy Weight (lbs) , * Weight of Pumps, Piping, and Hatches Not Included b. Bouyancy Calculation Assumption Water Level at Ground Surface Inter Diameter of Wetwell (ft) = 5.00 Length of Bottom Slab Extension (ft) = 1.00 Thickness of Wetwell Walls (ft) = 0.50 Ground Surface Elev. (ft) = 732.00 Bottom Elev, of Wetwell Slab (ft) = 714.00 Bottom Slab Thickness (ft) = 1.50 Density of Water (Ibs/cf) = 62.40 Volume Displaced By Pump Station (cf) Volume Displaced By Conc. Backfill Ring (cf) _ Volume Displaced By Soil Over Backfill Ring (cf) Total Volume Displaced (cf) Weight of Water Displaced (lbs) _ c. Safety Factor SF = Total Center Bou ancy,Weght. weight of Water Displaced SF T (min Qd (gpm V (gal) Force main D (in) _ Ve (gal) = Di (ft) XIII. FORCE MAIN FLUSH CALCULATION Total buildout 15 20.83 2.00 Church flow T (min) = 15 Qd (gpm) = 1 "1.46 V (gal) Therefore, Low point of force maim wilt be flushed in one cycle. V = Volume For One Cycle (gal) Ve = Volume For One Foot of Storage in Force Main DI = Effective Length of Force Main Flushed per Cycle (ft) D = Diameter of Force Main XIV EXISTING GRAVITY SEWER CAPACITY°" CALCULATION Number of Lots in Existing Subdivision = 94 (Assuming four bedroom homes) Flow from Existing Homes = 45120 gpd @ 120 gpd/bedroom 31.33 gpm Total buildout Pump Condition Qp (ppm) Qt (ppm), Qt 1 V (fps) D (in) Initial 26,00 57.33 0.13 2.00 1.93 Mid 25.50 56.83 0.13 2.00 1,93 End 25.00 56.33 0.13 2,00 1,93 Qp = Pumping Rate - singe purnp (gpm) Qt Total flow in existing gravity sewer main V = Velocity in gravity sewer main (fps) D = Depth of flow in gravity sewer main (in) Existing gravity sewer main is an 8 PVC u 0.6% slope, VICINITY MAP NO SCALE R=25.D0 L=39.02 CH =S81'56'13"E 35.18 2.08' rr < IR * 0 iA tf) N• 35'X35' SIGHT Z nk. TRIANGLE MP.) NIR N ui N NIR Rw 10'X70' SIGHT TRIANGLE (TYP.) TRANSIBONAL R/M` LOT 9 SAM FURR ROAD NC HIGHWAY 73 (PROPOSED 200' PUBLIC RIGHT-OF-WAY) (EXISTING 100' PUBLIC RIGHT-OF-WAY) LOT 3 NEW BIRTH DRIVE (94' PUBLIC BICBT--OF WAY) N55' 10'40"E 388.36' TOTAL RW FORCE MAIN ESM'T 3629 SQ. FT. i i NPS NPS CH�55'21 1 405.96' L =406. 04' R�679.58' TOTAL \ NOTES: 1. APPARENT SOURCE OF TITLE: D.BK. 18134 PG. 131. 2. THE RATIO OF PRECISION FOR THIS SURVEY IS 1:15,000 OR BETTER. 3. UNLESS SIGNED AND SEALED, THIS PLAT IS PRELIMINARY NOT FOR RECORDATION, SALES OR CONVEYANCE. 4. AREA BY COORDINATE GEOMETRY METHOD. 5. ALL PROPERTY CORNERS SET ARE #5 REBAR UNLESS OTHERWISE NOTED. CURVE TABLE CURVE LENGTH RADIUS CHORD CHORD BEARING CI 104.46' 5679.58' 104.46' 586'53'07'W 55615'24'W C2 20.12' 5579.58' 20.12' 100 N. Oco PUMP 1182- S Ro#4 REBAR 0 GRAPHIC SCALE 0 50 100 ( IN FEET ) 1 inch = 100 ft.. / / CONCRETE CONTROL MON. q, ro NIR + ACCESS EASEMENT 860 SQ. FT. DAY CARE-SNFURR LLC D.BK. 20984 PG. 578 PIN.i 0N 011-2D TR1--11 z STA. ESM'T Q. FT; tri us G1 � �tO 1n 9 - 0.53' EIR #4 REBAR XNPS 21313121remr oc sorzvmr a - 200 LEGEND EIP PROPERTY UNE EIP EXISTING AXLE EXISTING IRON PIPE EIR EIR EXISTING IRON REBAR NPS NO POINT SET (NPS) NLR IRON REBAR SET NCGS MONUMENT R/W RIGHT OF WAY NTS • SUPERVISION GAMBLE.N E. FROM ANA ACTUAL SURVEY MADE NDERWMY (D.BK.SUPERVISION E` PG.); . THAT THE RATIO OF PRECISION AS CALCULATED IS 1:15,000 OR BETTER: THAT THE BOUNDARIES NOT SURVEYED ARE CLEARLY SHOWN AS BROKEN UNES PLOTTED FROM INFORMATION AS REFERENCED ON THIS PLAT; THAT THIS PLAT WAS PREPARED IN ACCORDANCE WITH G.S. 47-30 AS AMENDED. THAT THE SURVEY IS OF ANOTHER CATEGORY, SUCH AS THE RECOMBINATION OF EXISTING PARCELS, A COURT -ORDERED SURVEY, OR OTHER EXCEPTION TO THE DEFINITION OF SUBDIVISION. WITNESS MY ORIGINAL SIGNATURE, NUMBER AND SEAL THIS 16th DAY OF FEB A Y, A.D., 20 � mI1RFy�a�.� GLENN E. GAMBLE 41 et .I! NORTH CAROLINA PLS REGISTRATION NO. L-3276 a/1�IsS ' ` O � P t a 4 S�� ` � . �3276 �s1147(4;Zrte.45.Eti.Nto?A.,!:\:411 NOT TO SCALE - UNE FROM DEED OR PLAT -- ---� EASEMENTS/51TE TRIANGLES •~ -RW NCGS MONUMENT "NEW NC GRID NAD 83 ROAD" N 622,680.97 7,455,346.60 ELEV = 724.74 (NGVD BENCHMARK 29) NOTES: (CONTINUED) 6. ALL DISTANCES SHOWN HEREON ARE GROUND DISTANCES UNLESS OTHERWISE NOTED. 7. TRAVERSE ADJUSTED BY LEAST SQUARES ADJUSTMENT METHOD. 8. THE PURPOSE OF THIS PLAT IS TO DEDICATE THE SEWER EASEMENT TO AQUA AS SHOWN ON LOT 1 OF NEW BIRTH OF CHARLOTTE PHASE 1 MAP 1 (AS OF THIS DATE NOT RECORDED). UNE L1 L2 TOTAL L3 L4 L5 L6 L7 18 L9 L10 L11 L12 L13 L14 L15 L16 L17 UNE TABLE LENGTH 9.49 6236 107.14 58.38 21.75 99.71 53.68 20.00 9.49 20.00 24.71 52.84 22.29 40.08 50.29 35.77 40.08 BEARING N88.51'37"w 50108'23'W S01'56'42'E S400D'00'E S01'0B'23"W 501'56'42'E S40 00'00'E S88'S1'37'E S88'5t'37`E N8B'51'37"W N55 10'40'E N551 O'40'E N01'08'23"E N01'08'23'E N01108'23'E NO1'08'237 NO108'23'E EXHIBIT MAP OF PROPOSED SANITARY SEWER EASEMENT NEW BIRTH OF CHARLOTTE PROPOSED SANITARY SEWER EASEMENT CITY: HUNTERSVILLE SCALE r=100' JOB NUMBER 751.00 DATE 02/18/09 MECKLENBURG CO. Ma®DE STATE; NORTH CAROLINA cunn=LLsurvy�, euMAN-gist Catawba AvenueCornelius, N.C. 7 7290 28031 655-7291 (fax) DRAWN BY GEG _ CHECK BY JMC SHEET 1 OF 1 BASIS OF BEARING: NC GRID, NAD 83 NEW BIRTH OF CHARLOTTE HUNTERSVILLE, NORTH CAROLINA MECKLENBURG COUNTY PUMP STATION SATE DRIVE Base Engine Displacement In(L) Overspeed Limit, rpm Regenerative. Power, kW Cylinder Black Configuration Bettsry Capadlty Battery Charging Alternator' Starting Voktaga Luba Lill Elitist Typee Standard Cooling g Systsm Standard Fuel m 2006 Cummins Power Generation . Fuel system trtlorts combination natur �t�P Fond Modal ESC`f442, naturally aspirated 266.0 (4.2) 2260 t50 12,00 Cast Iran, V 6 gf€Ecr 200 amps minimum et ambient rattaare trt 32`F (O C) 66 amps 12-volt, negativeg°®round Single spin -on ceresterr-c ombilnatian full SOW with bypass $04°F (40°C) ambient radiator cooling system LP vapor is standard. Options! LP liquid, natural gas, LP liquid/natural gas and LP vaportnat'aaa1 gas 3.4 (6 1122:ti 9.3: e.0 (6,7) 161(L 3,74 122.0 9.7 (9.2) Speofficatkiine subject to change without notice 47.0) 0,3:1 t4 216.0 970 S-13261(6/06) EX. SANITARY SEWER PUMP STATION WITH WATER SERVICE PROP. NATURAL GAS GENERATOR SEE SPECIFICATIONS THIS SHEET PROPOSED 1-1 /4" GAS SERVICE PROPOSED GAS METER EX. BACKFLOW PREVENTERS PROPOSED 1" GAS SERVICE EX. WATER METER EX. 4" GAS MAIN e GR !'H � SCAB ( IN ;F' '1' ) inch = 30 ft.