Loading...
HomeMy WebLinkAboutGW1-2021-05570_Well Construction - GW1_20211013 % .. T. 7 -li - - - _ -. -. r _ -... - _.. - i ____ .. Well Contractor Name Fr:OGI 10 - u�SCr-Ti^II M 0 3(� 1 NC Well Contractor Certification NumbertCGg'$O(\ Sc OUTER CASING farmullirased ells ORLINER ifs livable YADKIN WELL COMPANY,INC. �p�p cj�,Ol rROM To DlAnmrreR 55 Company Name "s se l..33(W-k v 7 V1. 3-;1 16. CASING OR TUBING thermal dozed-loon) 2.Well Construction Permit OU-s F Q / /o Y�S' FROM To DLAWiTER �TMCEMSSn MAT x List all applicable well construction perzOls(i e.UDC,County,Slate Valiance,etc) ft 9 y ft• C� �At nn 3.Well Use(check Fell r.se): ft• ft in. Water SupplylKrefl: 17.SCF,Tzi a I �s �- � Rrtord T O DIA_l:'IETC� LOT SrZZ TMC.4dES0 PIAT-M ALL .� V�ricultural OMunicipal/Public ft. ft OGeothemial(Heating/Cooling Supply) Wesidential Water Supply(single) ft ❑Industrial/Commeroial ❑Residential Water Supply(shared) l9.GROUT ❑Irrigation OWeds>100,000 GPD MON TO nfATM&L EM PLACEWNT METHOD t-AJ-1OUNT �� Non-Water Supply Well: U it, 3 ft. A*A,h `jrc�: 3 (�• OMonitoring ❑Recovery 3 ft. Z 3 ft ,fit r ® �L ?� Injection Well: ft. ft ! �� ❑Aquifer Recharge OGroundwaterRemediation 19.SAS[D/G1oA1rEL PACK(if applicable) ❑Aquifer Storage and Recovery ❑Salinity Barrier FRon4 TO rrwTExIAL HELHOD ❑Aquifer Test ❑Stormwater Drainage ft ft (� ❑Experimental Technology ❑Subsidence Control ft 5 ❑Geothermal(Closed Loop) ❑Tracer 20.DRILLDVG LOG(attach additional sheets if necessa ❑Geothermal%eating/Cooling Return) ❑Other(explain under#21 Remarks) 1 PROM TO DESCRIPTION color,bardnen,toiltrock type,grain dve ete 77 4.Date Well(s)Completed: Well ID# AAO COI 6.,ftft ft /� a Sa.Well Location: Phone # 2J1.� 23®"T 7� yfv • •/ ft Q� tom/' ` ft. ft. S(Ah&A�e 9-e d�,�a Facility/Owner Name Facility ID#((f applicable) ft• ft 2 8 qv ft. ft Physical Address,C iM aid Zip ft ft t Ci k 1 r 21.RFnRxs County Pareel Identification No.CM 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: (ifwellfield,me Wong is sufficient) 22.Certification: 3Go o 0 70 N k90' 4 /0a w _ 6.Is(are)the well(s): idermanent or []TemporarySigoahae of Certified We➢Contracror Date A, Byslgni g thivform,l hereby certify that the well(s)was(were)constructed in accordance with 7.Is this a repair to an cxLOng well: OYes or &No 15A NCAC 02C.0100 or ISA NCAC OlC.0100 Well Construction Standards and that a copy Ijthis is a repair,jrll out brown well construction information and explain the nature of the of this record has been provided to the well owner. repair under#21 remarks section or on the back ofthisform. 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well construction info construction,only 1 GW-1 is needed. Indicate TOTAL NUMBER of wells (add'See Over'in Remarks Box).You may also attach additional pages if necessary. drilled: 24.SUBMITTAL INSTRUCTIONS ; 9.Total well depth below land surface: (ft) For multiple wells list all depths zf differelnt(emmple-3@200'and 2(a)1001 Submit this GW-1 within 30 days of well completion per the following: .� 10.Static water level below top of casing: t/ o (ft) 24a• For All Wells: Original Bonn to Division of Water Resources (DWR), N Information Processing Unit;1617 MSC,Raleigh NC 27699-1617 Ijwurter level is above casurg,use"//+" � N 11.Borehole diameter: b Gn•) Bit Off: S�9l� 24b.For Injection Wells:Copy to IJWR,Underground Injection Control (IUC) Program,1636 MSC,Raleigh,NC 27699-1636 AIR ROTARY 12,Well construction method: 24c.For Water Supply and Operi Loop Geothermal Return s Wells:Copy to the (it.anger, cable,direct push,etc.) county environmental health department of the county where installed FOR WATER SUPPLY WELLS ONLY: 24d.For Water Wells producing lover 100,000 GPD: Copy to DWR,CCPCUA 13s.Yield(gpm) 0 0 Method of test: r • 2/r Permit Program,1611 MSC,Raleigh,NC 27699-1611 70%HTH OZ DATE SITE VISITED: —1 2. -Z/ ��� ,1 13b.Disinfection type: Amount: .Z� .�� �O /'A t l f VISITED BY: ::r W i l7 2P I—GW-1 North Carolina Department of Environmental Quality-Division of Water Resources Revised 6-6-2018