Loading...
HomeMy WebLinkAboutWQ0042928_Application_20211024vti ,04'2 7 2.g RECEIVED/NCDENR/DWR OCT 27 2021 Edward Kiley Riversound POA P.O. Box 572 Edenton NC 27932 Water Quality Regional Operations Section Washington Regional Office Robert, enclosed is the application and check to extend our pump and haul permit for Riversound. We have been actively working towards a solution to this issue. CCU is currently working on the controls, and I understand Joe to be working with Ed Andrews to determine if sub surface is possible. Thanks Ed Kiley I. PRESUBMITTAL INFORMATION: 1. Contacted representative from regional office (Pre -submittal)?: ® Yes ❑ No 2. Contact name (For Regional Office): Robert Tankard II. APPLICANT INFORMATION: 1. Applicant's name (Municipality, Individual, Corporation, etc): Riversound POA 2. Applicant type: ❑ Municipal ❑ State ❑ Privately -Owned Public Utility ❑ County ® Other: Privately Owned 3. Origin of Wastewater: ® Residential Subdivision ❑ Retail (Stores, Shopping Centers) ❑ Apartments/Condominiums ❑ Institution ❑ Mobile Home Park ❑ Hospital ❑ School ❑ Church ❑ Restaurant ❑ Nursing Home f l Office ❑ Other (specify) 4. Signature authority's name: George Hill per 15A NCAC 02T .0106(b) Title: POA President 5. Applicant's mailing address: PO Box 572 City: Edenton State: NC Zip: 27932- 6. Applicant's contact information: Phone number: (252) 484-2086 Email: veopim124@yahoo.com III. CONTACT/CONSULTANT INFORMATION: 1. Contact name: Title/Affiliation: 2. Contact's information: Phone number: ( ) _ Email: Iv. RECEIVING FACILITY INFORMATION: Domestic: Commercial: Industrial: Other: 100% % If more than 1 facility has agreed to accept the wastewater, please list all the owners, facility names, and permit numbers as a separate attachment) 1. Owner: Town of Hertford 2. Facility name: 3. Facility permit number: 4. WWTF permit number: 5. WWTF contact name: Harold F. Sanchez Title/Affiliation: Public Works Director 6. WWTF contact information: Phone number: (252) 426-3039 Email: publicworks@townofhertfordnc.com APPLICATION P&H 01-16 Page 3 of 5 V. PROJECT INFORMATION: 1. Duration of Pump and Haul Request (Six Months Typical): 6 Months 2. Has a prior permit been issued? ❑ New ® Prior Pump & Haul Permit Permit No.: W00042527 3. Permanent Method of Wastewater Disposal: WWTP 4. Date Permanent Disposal will be available: 5. Have permits / approvals for permanent disposal been obtained? ❑ Yes ❑ No Permit Number: 6. Is there a Pretreatment Program in effect? ❑ Yes ® No 7. Describe any pretreatment prior to pumping and hauling: 8. Volume of Wastewater Generated: 300 Gallons per Day 9. Explain how the wastewater flow was determined: ❑ 15A NCAC 02T .0114 or ❑ Representative Data If representative data, describe: Two houses, using water bills 10. Describe Tank / Container wastewater will be pumped from (attach description if necessary): Equalizing Tank 11. Is Tank / Container in place or will it be installed (attach description if necessary): In Place 12. What type of high water alarm does the container have: ® Audible and Visual ® Telemetry (Auto Dialer / SCADA) VI. CERTIFICATION: 1. Applicant's Certification: (Signature of Signing Official and Project Name) la. I, Edward Kiley , attest that this application for November 11, 2021 has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that issuance of a permit will require pump and haul facilities or activities to be inspected at least daily by me or a designated representative. Note: In accordance with North Carolina General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25, 0 per violation. i0/2.-(L Signing Official Signature / Date ENGINEERING DOCUMENTS MUST BE COMPLETED PRIOR TO SUBMITTAL. ACTIVITIES SHALL BE INSPECTED AT LEAST DAILY BY THE PERMITTEE OR IT'S REPRESENTATIVE PER 15A NCAC 02T .0204(d). APPLICATION P&H 01-16 Page 4 of 5